Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Pilot”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Chemical Looping Coal Gasification Sub-Pilot Unit Demonstration and Economic Assessment for IGCC applications (Final Report)

The Ohio State University (OSU) coal to syngas (CTS) technology is an advanced air separation process that can be applied for electricity production via an integrated gasification combined cycle (IGCC). The objective of the proposed project is to enable the OSU CLG technology for a commercially relevant demonstration by 2020. In order to accomplish this objective, small pilot scale demonstration of the CLG reactor system was performed. The small pilot test unit incorporates commercially scalable non-mechanical gas sealing and solids flow control components for extended operations of the integrated reactor system. A cumulative demonstration of greater than 100 hours was performed to confirm the reliability of the reactors (reducer and oxidizer) and non-mechanical devices in maintaining controlled solid circulation, gas sealing, and coal distribution in the reactor (reducer) as well as to confirm sustained syngas product performance. A comprehensive techno-economic analysis (TEA) of the OSU CLG process for IGCC application was conducted with the support of WorleyParsons, Ltd. (WP) and compared to the Department of Energy (DOE) baseline IGCC report. Using the data gained from the small pilot demonstration, a complete comprehensive techno-economic analysis (TEA) of the CLG process was conducted. The evaluation was used as basis to attract utilities and coal industries in Ohio. The project duration lasts 30 months (6 months of no cost extension). Ohio coal was used in the integrated CLG small pilot unit to convert to high hydrogen syngas. A demonstration of the integrated chemical looping reactor system at the 15 kW th scale accelerates technology commercialization in the near term. The 15 kWth demonstration addressed several major technology gaps, such as coal injection and distribution in the reducer, controllable solids circulation with the desired fuel to solids ratio, system pressure distribution for proper gas sealing, effects of contaminants and fuel/oxygen carrier residence time requirements. The fates of impurities, such as SO x and NO x was also investigated in unit demonstrations. WP conducted a comprehensive system TEA to optimize the OSU CLG process design for efficient electricity generation with greater than 90% CO 2 capture in IGCC applications. The conclusion of this project supports the further scale-up of the technology to a commercially applicable large pilot scale test unit for operation by 2020. More importantly, it benefits Ohio as it provides an economically competitive mean for power generation with carbon capture. Given the rise of natural gas usage and strict environmental regulations, the use of Ohio coal is expected to decrease and thus impact the coal economy in Ohio. The conclusion of this project provided way for Ohio coal to compete in the future and secure jobs in the energy sector.

01 COAL, LIGNITE, AND PEAT↗

Safety-Related Instrumentation and Control Pilot Upgrade (Initial Scoping Phase Implementation Report)

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP), NISP-EN-04, Standard Digital Engineering Process (SDEP), and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrade.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Assessment of Sandia's 2021 Pilot Program for Research Traineeships to Broaden and Diversify Fusion Energy Science: Development and Rapid Screening of Refractory Multi-Principal Elemental Composites for Plasma Facing Components

The Fusion Energy Sciences office supported “A Pilot Program for Research Traineeships to Broaden and Diversify Fusion Energy Sciences” at Sandia National Laboratories during the summer of 2021. This pilot project was motivated in part by the Fusion Energy Sciences Advisory Committee report observation that “The multidisciplinary workforce needed for fusion energy and plasma science requires that the community commit to the creation and maintenance of a healthy climate of diversity, equity, and inclusion, which will benefit the community as a whole and the mission of FES”. The pilot project was designed to work with North Carolina A&T (NCAT) University and leverage SNL efforts in FES to engage underrepresented students in developing and accessing advanced material solutions for plasma facing components in fusion systems. The intent was to create an environment conducive to the development of a sense of belonging amongst participants, foster a strong sense of physics identity among the participants, and provide financial support to enable students to advance academically while earning money. The purpose of this assessment is to review what worked well and lessons that can be learned. We reviewed implementation and execution of the pilot, describe successes and areas for improvement and propose a no-cost extension of the pilot project to apply these lessons and continue engagement activities in the summer of 2022.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Development of a Modular, Crushed-Rock Thermal Energy Storage Pilot Design

The goal of this project, primarily funded by the U.S. Department of Energy, is to design a next-step pilot to advance near-term energy storage integrated with a fossil plant to provide a facility capable of being viable and effective in a market with growing penetration of variable renewable energy (VRE). Thermal energy storage (TES) represents an ideal technology for this purpose. The current effort will complete a feasibility study to prepare for the Phase II pre-front end engineering design (pre-FEED) for implementing a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. The crushed rock storage technology, which is being developed by Brenmiller Energy, is a modular TES system termed bGen™, which can accommodate both thermal and electrical inputs and output steam, hot water, or hot air. For this application, the estimated efficiency is 80% thermal to thermal. The TES technology is being designed to operate on a slipstream from NYPA’s Eugene W. Zeltmann Power Project (Zeltmann) natural gas combined cycle (NGCC) plant. The projected size of the system will be up to 4 MWe with at least 4 hours of storage duration, or 16 MWh-e total. Final sizing is being determined during the ongoing feasibility study. The next-step pilot being designed as part of the current project will represent a 5-fold increase in scale for this TES technology, and will be used to validate the technology’s ability to provide effective and economical energy storage. This pilot would represent the next-to-last demonstration scale before the technology could be commercial ready at GWh-e scales in the 2030 timeframe. This project is expected to design the critical next-step pilot, which will be undertaken in real-world operating conditions to better determine the crushed rock TES technology’s ability to be integrated with an NGCC plant and assess degradation over transient cycling at rates befitting various marketplaces. The crushed-rock TES pilot design is a technically feasible next step in the development of the technology and is built upon years of prior testing and demonstration. The proposed TES technology was developed by Brenmiller over the last 8 years and has been tested in 3 generations of demonstration units at various sites, globally. During this field testing, different characteristics and performance of the technology were validated, including the following key features: energy storage capacity, energy storage charge/discharge rate, energy storage loses, energy storage mechanical testing. This presentation will provide an update on the results of the conceptual design study for the modular crushed-rock TES system, integrated with a NGCC power plant.

03 NATURAL GAS↗

Using Apptainer in a Pilot-based Distributed Workload

GlideinWMS is a pilot and pressure-based workload manager for distributed scientific computing. Many experiments like CMS and Fermilab’s Neutrino experiments use it to provision elastic clusters for their analysis and simulations, split into close to a million concurrent jobs. Most user jobs require containers, and the pilots use Apptainer to set up the desired platform. For the pilots that run as regular batch jobs, Apptainer is safer, lighter, and easier to use than other containerization solutions. Many images used by the pilots are expanded SIF images distributed via the CernVM-FS: this combination is very efficient. At Fermilab, for example, we store on GitHub Dockerfiles that mimic the platform in the worker nodes of local clusters. GitHub workflows build and push the images to Docker Hub, and a service periodically pulls and converts them to the expanded SIF images in the CernVM-FS, so the scientists can find a familiar environment everywhere. Apptainer has also been used to run services inside the pilot jobs, like benchmarks that characterize the worker node being used, or a Triton Inference Server that allows sharing a GPU with all the jobs that run in parallel on a node.

Mambelli, Marco [Fermilab] (ORCID:0000000294892681↗

Interim measure conceptual design for remediation at the former CCC/USDA grain storage facility at Centralia, Kansas : pilot test and remedy implementation.

This document presents an Interim Measure Work Plan/Design for the short-term, field-scale pilot testing and subsequent implementation of a non-emergency Interim Measure (IM) at the site of the former grain storage facility operated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in Centralia, Kansas. The IM is recommended to mitigate both (1) localized carbon tetrachloride contamination in the vadose zone soils beneath the former facility and (2) present (and potentially future) carbon tetrachloride contamination identified in the shallow groundwater beneath and in the immediate vicinity of the former CCC/USDA facility. Investigations conducted on behalf of the CCC/USDA by Argonne National Laboratory have demonstrated that groundwater at the Centralia site is contaminated with carbon tetrachloride at levels that exceed the Kansas Tier 2 Risk-Based Screening Level (RBSL) and the U.S. Environmental Protection Agency's maximum contaminant level of 5.0 {micro}g/L for this compound. Groundwater sampling and analyses conducted by Argonne under a monitoring program approved by the Kansas Department of Health and Environment (KDHE) indicated that the carbon tetrachloride levels at several locations in the groundwater plume have increased since twice yearly monitoring of the site began in September 2005. The identified groundwater contamination currently poses no unacceptable health risks, in view of the absence of potential human receptors in the vicinity of the former CCC/USDA facility. Carbon tetrachloride contamination has also been identified at Centralia in subsurface soils at concentrations on the order of the Kansas Tier 2 RBSL of 200 {micro}g/kg in soil for the soil-to-groundwater protection pathway. Soils contaminated at this level might pose some risk as a potential source of carbon tetrachloride contamination to groundwater. To mitigate the existing contaminant levels and decrease the potential future concentrations of carbon tetrachloride in groundwater and soil, the CCC/USDA recommends initial short-term, field-scale pilot testing of a remedial approach that employs in situ chemical reduction (ISCR), in the form of a commercially available material marketed by Adventus Americas, Inc., Freeport, Illinois (http://www.adventusgroup.com). If the pilot test is successful, it will be followed by a request for KDHE authorization of full implementation of the ISCR approach. In the recommended ISCR approach, the Adventus EHC{reg_sign} material--a proprietary mixture of food-grade organic carbon and zero-valent iron--is introduced into the subsurface, where the components are released slowly into the formation. The compounds create highly reducing conditions in the saturated zone and the overlying vadose zone. These conditions foster chemical and biological reductive dechlorination of carbon tetrachloride. The anticipated effective lifetime of the EHC compounds following injection is 1-5 yr. Although ISCR is a relatively innovative remedial approach, the EHC technology has been demonstrated to be effective in the treatment of carbon tetrachloride contamination in groundwater and has been employed at a carbon tetrachloride contamination site elsewhere in Kansas (Cargill Flour Mill and Elevator, Wellington, Kansas; KDHE Project Code C209670158), with the approval of the KDHE. At Centralia, the CCC/USDA recommends use of the ISCR approach initially in a short-term pilot test addressing the elevated carbon tetrachloride levels identified in one of three persistently highly contaminated areas ('hot-spot areas') in the groundwater plume. In this test, a three-dimensional grid pattern of direct-push injection points will be used to distribute the EHC material (in slurry or aqueous form) throughout the volume of the contaminated aquifer and (in selected locations) the vadose zone in the selected hot-spot area. Injection of the EHC material will be conducted by a licensed contractor, under the supervision of Adventus and Argonne technical personnel. The contractor will be identified upon acceptance by the KDHE of the conceptual design presented here. In the pilot test, Argonne will install and periodically sample a network of temporary and permanent monitoring points to document (1) the contaminant distribution in the saturated and vadose zones prior to injection, (2) the distribution of the EHC material in these zones immediately following injection, and (3) subsequent changes in contaminant concentrations that occur over time in response to the imposed treatment. Argonne's investigations have shown that the lithologic properties of the unit hosting the contaminated aquifer at Centralia vary both vertically and laterally, resulting in a heterogeneous distribution of permeabilities and relatively restricted groundwater movement across much of the site.

54 ENVIRONMENTAL SCIENCES↗

Safety-Related Instrumentation & Control Pilot Upgrade Initiation Phase Implementation Report

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP) [Reference 2], NISP-EN-04, Standard Digital Engineering Process (SDEP) [Reference 3], and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrades.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Technical and Economic Evaluation of the First Ever Polymer Flood Field Pilot to Enhance the Recovery of Heavy Oils on Alaska's North Slope via Machine Assisted History Matching

Polymer flooding has become globally established as a potential enhanced oil recovery method for heavy oils. To determine whether this technology may be useful in developing the substantial heavy oil resources on the Alaska North Slope, a polymer flood field pilot commenced at the Milne Point Unit in August 2018. This study seeks to evaluate the results of the field pilot on a technical and economic basis. A reservoir simulation model is constructed and calibrated to predict the oil recovery performance of the pilot through machine-assisted reservoir simulation techniques. To replicate the early water breakthrough observed during waterflooding, transmissibility contrasts are introduced into the simulation model, forcing viscous fingering effects. In the ensuing polymer flood, these transmissibility contrasts are reduced to replicate the restoration of injection conformance during polymer flooding. Transmissibility contrasts are later reinstated to replicate fracture overextension interpreted in one of the producing wells. The calibrated simulation models produced at each stage of the history matching process are used to forecast oil recovery. These forecasts are used as input for economic analysis, incremental to waterflooding expectations. The simulation forecasts indicate that polymer flooding significantly increases the heavy oil production for this field pilot compared to waterflooding alone, yielding attractive project economics. However, meaningful variations between simulation scenarios demonstrate that a simulation model is only valid for prediction if flow behavior in the reservoir remains consistent with that observed during the history matched period. Critically, this means that a simulation model calibrated for waterflooding may not fully capture the technical and economic benefits of an enhanced oil recovery process such as polymer flooding. Subsequently, the simulation model and economic model are used in conjunction to conduct a sensitivity analysis for polymer flood design parameters, from which recommendations are provided for both the continued operation of the current field pilot and future polymer flood designs. The results demonstrate that a higher polymer concentration can be injected due to the development of fractures in the reservoir. The throughput rate should remain high without exceeding operating constraints. A calculated point-forward polymer utilization parameter demonstrates the decreasing efficiency of the polymer flood at later times in the pattern life. Future projects will benefit from starting polymer injection earlier in the pattern life. A pattern with tighter horizontal well spacing will observe a greater incremental benefit from polymer flooding.

Keith, Cody↗

Preliminary Hydrogeologic Characterization Results from the Wallula Basalt Pilot Study

The DOE's Big Sky Regional Carbon Sequestration Partnership has completed drilling the first continental flood basalt sequestration pilot borehole to a total depth (TD) of 4,110 feet on the Boise White Paper Mill property at Wallula, Washington. Site suitability was assessed prior to drilling by the 2007-2008 acquisition, processing and analysis of a four-mile, five-line three component seismic swath, which was processed as a single data-dense line. Analysis of the seismic survey data indicated a composite basalt formation thickness of {approx}8,000 feet and absence of major geologic structures (i.e., faults) along the line imaged by the seismic swath. Drilling of Wallula pilot borehole was initiated on January 13, 2009 and reached TD on April 6, 2009. Based on characterization results obtained during drilling, three basalt breccia zones were identified between the depth interval of 2,716 and 2,910 feet, as being suitable injection reservoir for a subsequent CO2 injection pilot study. The targeted injection reservoir lies stratigraphically below the massive Umtanum Member of the Grande Ronde Basalt, whose flow-interior section possesses regionally recognized low-permeability characteristics. The identified composite injection zone reservoir provides a unique and attractive opportunity to scientifically study the reservoir behavior of three inter-connected reservoir intervals below primary and secondary caprock confining zones. Drill cuttings, wireline geophysical logs, and 31one-inch diameter rotary sidewall cores provided geologic data for characterization of rock properties. XRF analyses of selected rock samples provided geochemical characterizations of the rocks and stratigraphic control for the basalt flows encountered by the Wallula pilot borehole. Based on the geochemical results, the pilot borehole was terminated in the Wapshilla Ridge 1 flow of the Grande Ronde Basalt Formation. Detailed hydrologic test characterizations of 12 basalt interflow reservoir zones and 3 flow-interior/caprock intervals were performed during drilling and immediately following reaching the final borehole drilling depth (i.e., 4,110 ft). In addition, six of the 12 basalt interflow zones were selected for detailed hydrochemical characterization. Results from the detailed hydrologic test characterization program provided the primary information on basalt interflow zone transmissivity/injectivity, and caprock permeability characteristics.

58 GEOSCIENCES↗

COOLING COIL EFFECTS ON BLENDING IN A PILOT SCALE TANK

Blending, or mixing, processes in 1.3 million gallon nuclear waste tanks are complicated by the fact that miles of serpentine, vertical, cooling coils are installed in the tanks. As a step toward investigating blending interference due to coils in this type of tank, a 1/10.85 scale tank and pump model were constructed for pilot scale testing. A series of tests were performed in this scaled tank by adding blue dye to visualize blending, and by adding acid or base tracers to solution to quantify the time required to effectively blend the tank contents. The acid and base tests were monitored with pH probes, which were located in the pilot scale tank to ensure that representative samples were obtained. Using the probes, the hydronium ion concentration [H{sup +}] was measured to ensure that a uniform concentration was obtained throughout the tank. As a result of pilot scale testing, a significantly improved understanding of mixing, or blending, in nuclear waste tanks has been achieved. Evaluation of test data showed that cooling coils in the waste tank model increased pilot scale blending times by 200% in the recommended operating range, compared to previous theoretical estimates of a 10-50% increase. Below the planned operating range, pilot scale blending times were increased by as much as 700% in a tank with coils installed. One pump, rather than two or more, was shown to effectively blend the tank contents, and dual pump nozzles installed parallel to the tank wall were shown to provide optimal blending. In short, experimental results varied significantly from expectations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Piloted jet flames of CH{sub 4}/H{sub 2}/air: Experiments on localized extinction in the near field at high Reynolds numbers

Measurements of temperature and major species concentrations, based on the simultaneous line-imaged Raman/Rayleigh/CO-LIF technique, are reported for piloted jet flames of CH{sub 4}/H{sub 2} fuel with varying amounts of partial premixing with air (jet equivalence ratios of {phi}{sub j} = 3.2, 2.5, 2.1 corresponding to stoichiometric mixture fraction values of {xi}{sub st} = 0.35, 0.43, 0.50, respectively) and varying degrees of localized extinction. Each jet flame is operated at a fixed and relatively high exit Reynolds number (60,000 or 67,000), and the probability of localized extinction is increased in several steps by progressively decreasing the flow rate of the pilot flame. Dimensions of the piloted burner, originally developed at Sydney University, are the same as for previous studies. The present measurements complement previous results from piloted CH{sub 4}/air jet flames as targets for combustion model calculations by extending to higher Reynolds number, including more steps in the progression of each flame from a fully burning state to a flame with high probability of local extinction, and adding the degree of partial premixing as an experimental parameter. Local extinction in these flames occurs close to the nozzle near a downstream location of four times the jet exit diameter. Consequently, these data provide the additional modeling challenge of accurately representing the initial development of the reacting jet and the near-field mixing processes. (author)

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Cost Drivers for a Tokamak-Based Compact Pilot Plant

A comprehensive systems code that includes a range of physics and engineering considerations along with a simplified costing model has been utilized to evaluate the primary cost drivers for a compact tokamak pilot plant. The systems code has been benchmarked against several tokamak reactor designs and is utilized with sophisticated optimization algorithms to develop optimal solutions for a set of user-specified assumptions and design constraints. Here, in contrast to previous models that have focused on the cost of electricity as the key cost metric, this study uses the estimated capital cost of the facility. The analysis suggests that a pilot plant with the following features may offer potential for a cost-attractive pilot plant: A ~ 3, H 98y2 > 1.5, P net = 200 MW, 𝜏 𝑝⁢𝑢⁢𝑙⁢𝑠⁢𝑒 ~ 1 to 2 h utilizing rare-earth barium copper oxide (REBCO) magnet technology and a plug-bucked central solenoid/toroidal field (CS/TF) magnet support structure. While REBCO magnets offer some advantages relative to Nb 3 Sn magnets in all cases, the most gain is obtained when combined with the plug-bucked CS/TF bucking solution. Pulsed operation reduces capital cost requirements relative to steady-state operation, especially at low confinement. Cost sensitivity studies indicate that there are significant cost uncertainties associated with the achievable confinement quality, tritium breeding capability, attainable thermal efficiency, and achievable neutron wall loading, suggesting that these areas are the most critical areas in reducing the cost risk for a compact tokamak pilot plant. Further cost sensitivity studies indicate that the estimated cost is most sensitive to the underlying cost of the magnetic coils, providing further impetus to better establish cost-effective means for producing fusion magnets.

Compact pilot plant↗

Prospects for pilot plants based on the tokamak, spherical tokamak and stellarator.

A potentially attractive next-step towards fusion commercialization is a pilot plant, i.e. a device ultimately capable of small net electricity production in as compact a facility as possible and in a configuration scalable to a full-size power plant. A key capability for a pilot-plant programme is the production of high neutron fluence enabling fusion nuclear science and technology (FNST) research. It is found that for physics and technology assumptions between those assumed for ITER and nth-of-a-kind fusion power plant, it is possible to provide FNST-relevant neutron wall loading in pilot devices. Thus, it may be possible to utilize a single facility to perform FNST research utilizing reactor-relevant plasma, blanket, coil and auxiliary systems and maintenance schemes while also targeting net electricity production. In this paper three configurations for a pilot plant are considered: the advanced tokamak, spherical tokamak and compact stellarator. A range of configuration issues is considered including: radial build and blanket design, magnet systems, maintenance schemes, tritium consumption and self-sufficiency, physics scenarios and a brief assessment of research needs for the configurations.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Application of Sequential Design of Experiments (SDoE) to Large Pilot-Scale Solvent-Based CO2 Capture Process at Technology Centre Mongstad (TCM)

The United States Department of Energy’s Carbon Capture Simulation for Industry Impact (CCSI2) program has developed a framework for sequential design of experiments (SDoE) that aims to maximize knowledge gained from budget- and schedule-limited pilot scale testing. SDoE was applied to the planning and execution of campaigns for testing CO2 capture systems at pilot-scale in order to optimally allocate resources available for the testing. In this methodology, a stochastic process model is developed by quantifying the parametric uncertainty in submodels of interest; for a solvent-based CO2 capture system, these may include physical properties and equipment performance submodels (e.g., mass transfer, interfacial area). This uncertainty is propagated through the full process model, over variable operating conditions, for estimating the resulting uncertainty in key model outputs (e.g., percentage of CO2 capture, solvent regeneration energy requirement). In developing a data collection plan, the predicted output uncertainty is incorporated into an algorithm that seeks simultaneously to select process operating conditions for which the predicted uncertainty is relatively high and to ensure that the entire space of operation is well represented. This test plan is then used to guide operation of the pilot plant at varying steady-state conditions, with resulting process data incorporated into the existing model using Bayesian inference to refine parameter distributions. The updated stochastic model, with reduced parametric uncertainty from data collected, is then used to guide additional data collection, thus the sequential nature of the experimental design. The SDoE process was implemented at the pilot test unit (12 MWe in scale) at Norway’s Technology Centre Mongstad (TCM) in a summer 2018 test campaign with aqueous monoethanolamine (MEA). During the test campaign, the varied operating conditions included the flowrates of circulated solvent, flue gas, and reboiler steam and the CO2 concentration in the flue gas. The process data were used to update probability distributions of mass transfer and interfacial area parameters of a stochastic process model developed by the CCSI2 team. Two iterations of the SDoE process were executed, resulting in the uncertainty in model predicted CO2 capture percentage decreasing by an average of 58.0 ± 4.7% over the full input space of interest. This work demonstrates the potential of the SDoE process for model refinement through reduction in process model parametric uncertainty, and ultimately risk in scale-up, in CO2 capture technology performance.

carbon capture↗

Wireless Roadside Inspection Phase II Tennessee Commercial Mobile Radio Services Pilot Test (Final Report)

The Federal Motor Carrier Safety Administration (FMCSA) Wireless Roadside Inspection (WRI) Program is researching the feasibility and value of electronically assessing truck and bus driver and vehicle safety at least 25 times more often than is possible using only roadside physical inspections. The WRI program is evaluating the potential benefits to both the motor carrier industry and to government. These potential benefits include reduction in accidents, fatalities and injuries on our highways and keeping safe and legal drivers and vehicles moving on the highways. WRI Pilot tests were conducted to prototype, test and demonstrate the feasibility and benefits of electronically collecting safety data message sets from in-service commercial vehicles and performing wireless roadside inspections using three different communication methods. This report summarizes the design, conduct and results of the Tennessee CMRS WRI Pilot Test. The purpose of this Pilot test was to demonstrate the implementation of commercial mobile radio services to electronically request and collect safety data message sets from a limited number of commercial vehicles operating in Tennessee. The results of this test have been used in conjunction with the results of the complimentary pilot tests to support an overall assessment of the feasibility and benefits of WRI in enhancing motor carrier safety (reduction in accidents) due to increased compliance (change in motor carrier and driver behavior) caused by conducting frequent safety inspections electronically, at highway speeds, without delay or need to divert into a weigh station

99 GENERAL AND MISCELLANEOUS↗

Pilot-Scale Silicone Process for Low-Cost Carbon Dioxide Capture. Final Scientific/Technical Report

GE Global Research has developed, over the last 8 years, a platform of cost effective CO 2 capture technologies based on a non-aqueous aminosilicone solvent (GAP-1m). As demonstrated in a previous funded DOE project (DE-FE0007502), the GAP-1m solvent has increased CO 2 working capacity, lower volatility and corrosivity than the benchmark aqueous amine technology. The current report describes the cooperative program between GE Global Research (GE GRC), and the National Carbon Capture Center (NCCC) to design, construct, and operate a pilot-scale process using GAP-1m solvent to demonstrate its performance at 0.5 MWe. (i) Performance of the GAP-1m solvent was demonstrated in a 0.5 MWe pilot with real flue gas for over 900 hrs. of operation using two alternative desorption designs: a Continuous Stirred Tank Reactor (CSTR), and a Steam Stripper Column (SSC). The CSTR is a one-stage separation unit with reduced space requirements, and capital cost. The alternative is a multi-stage separation column, with improved desorption efficiency. Testing the two desorber options allowed us to identify the most cost effective, and space efficient desorber solution. (ii) CSTR Campaign: The CSTR desorber unit was designed, fabricated and integrated with the pilot solvent test unit (PSTU), replacing the PSTU Steam Stripper Column at NCCC. Solvent management and waste water special procedures were implemented to accommodate operation of the non-aqueous solvent in the PSTU. Performance of the GAP-1m solvent with the CSTR was demonstrated for over 500 hrs. while varying temperature of the desorption (230 – 265 oF), solvent circulation rate (GAP-1m : CO 2 (molar) = 1.5 – 4), and flue gas flow rates (0.2 – 0.5 MWe). Solvent carry-over in the CO 2 product was minimized by maintaining water content below 5 wt.%, and desorption pressure at 7 psig. CO 2 capture efficiency achieved was 95% at 0.25 MWe (GAP-1m : CO 2 = 4 (molar), 230 oF desorption), and 65% at 0.5 MWe (GAP-1m : CO 2 (molar) = 1.5, 248 oF). Solvent loss was dominated by thermal degradation of the rich solvent. (iii) Steam Stripper Column Campaign: Higher expected cost of the solvent vs. aqueous amines makes solvent management a top priority to maintain the low cost for the process. During the testing of the GAP-1m solvent with the CSTR, thermal degradation of the rich solvent was found to be the main mechanism in solvent loss. Small amounts of water in the working solution were found to be an effective way to enable steam stripping, thereby lowering desorption temperature, and hence reducing thermal degradation. Steam stripping also increased working capacity by 30% due to a more efficient desorption. The concept was first tested in a glass stripping column (lab scale, GE GRC), optimized in a continuous bench scale system (2 kWe, GE GRC), and demonstrated in a 0.5 MWe PSTU at NCCC. No special system modifications were required to the PSTU to accommodate the testing of the non-aqueous GAP-1 solvent with the regenerator column. SSC was found to be more robust towards solvent entrainment (H 2 O < 35 wt.%). 90 – 95% CO 2 capture efficiency was achieved under stoichiometric conditions at 0.5 MWe (235 oF desorption, 2 psig and 19 wt. % H 2 O). Both CO 2 capture efficiency and specific duty reached optimum conditions at 18 wt.% H 2 O. Low amine degradation (< 0.05 wt.%/day) was recorded over 350 hrs. of operation. Controlled water addition to GAP-1m solvent decreased the desorption temperature, thermal degradation, and improved the CO 2 working capacity due to more efficient absorption and desorption processes. Under these conditions, the GAP-1m solvent exhibited a 25% increased working capacity, and 10% reduction in specific steam duty vs. MEA, at 10 oF lower desorption temperature. (iv) Techno-economic Analysis: The pilot-scale PSTU engineering data were used to update the capture system process models, and the techno-economic analysis was performed for a 550 MW coal fired power plant. The 1st year CO 2 removal cost for the aminosilicone-based carbon-capture process was evaluated at $48/ton CO 2 using the steam stripper column. This is a 20% reduction compared to MEA, primarily due to lower overall capital cost. CO 2 cost using the CSTR desorber is dominated by the economics of the solvent make-up. The steam stripper desorber is the preferred unit operation due to a more efficient desorption, and reduced solvent make-up rate. Further reduction in CO 2 capture cost is expected by lowering the manufacturing cost of the solvent, implementing flowsheet optimization and/or implementing the next generation aminosilicone solvent with improved stability and increased CO 2 working capacity.

0.5 MW Pilot↗

10 MWE CDCL Large Pilot Plant – pre-FEED Study (Final Report)

The Following Document is the Final Technical Scientific Report for the project tittle “10 MWE CDCL Large Pilot Plant – pre-FEED Study” performed by The Babcock & Wilcox Company in collaboration with The Ohio State University, Johnson & Matthey, The Electric Power Research Institute, and the Dover Light & Power Municipal Power Plant. The project Team performed a pre-Front End Engineering Design study of a 10 MWe Coal-Direct Chemical Looping power plant to be hosted at the Dover Light & Power Municipal Plant. As part of the pre-FEED study, the project Team performed multiple pilot test campaigns to obtain design and performance information at the 250 kWth CDCL pilot facility at the Babcock & Wilcox Company’s Research Center. The Techno-Economic analysis was updated based on the FEED study and the pilot tests results. The study shows that the CDCL process is a promising carbon-friendly technology capable of producing electricity with a high efficiency with a cost of electricity of $83.3 / MWh, which corresponded to less than 30% increase in cost of electricity compared to the cost of electricity of a base case study of a supercritical PC boiler.

01 COAL, LIGNITE, AND PEAT↗

Temperature Profile Measurements in a Newly Constructed 30-Stage 5 cm Centrifugal Contactor pilot Plant

An annular centrifugal contactor pilot plant incorporating 30 stages of commercial 5 cm CINC V-02 units has been built and operated at INL during the past year. The pilot plant includes an automated process control and data acquisitioning system. The primary purpose of the pilot plant is to evaluate the performance of a large number of inter-connected centrifugal contactors and obtain temperature profile measurements within a 30-stage cascade. Additional solvent extraction flowsheet testing using stable surrogates is also being considered. Preliminary hydraulic testing was conducted with all 30 contactors interconnected for continuous counter-current flow. Hydraulic performance and system operational tests were conducted successfully but with higher single-stage rotor speeds found necessary to maintain steady interstage flow at flowrates of 1 L/min and higher. Initial temperature profile measurements were also completed in this configuration studying the performance during single aqueous and two-phase counter-current flow at ambient and elevated inlet solution temperatures. Temperature profile testing of two discreet sections of the cascade required additional feed and discharge connections. Lamp oil, a commercially available alkane mixture of C14 to C18 chains, and tap water adjusted to pH 2 were the solution feeds for all the testing described in this report. Numerous temperature profiles were completed using a newly constructed 30-stage centrifugal contactor pilot plant. The automated process control and data acquisition system worked very well throughout testing. Temperature data profiles for an array of total flowrates (FT) and contactor rpm values for both single-phase and two-phase systems have been collected with selected profiles and comparisons reported. Total flowrates (FT) ranged from 0.5-1.4 L/min with rotor speeds from 3500-4000 rpm. Solution inlet temperatures ranging from ambient up to 50° C were tested. Ambient temperature testing shows that a small amount of heat is added to the processed solution by the mechanical energy of the contactors. The temperature profiles match the ambient temperature of the laboratory but are nearly 10° C higher toward the middle of the cascade. Heated input solution testing provides temperature profiles with smaller temperature gradients and are more influenced by the temperature of the inlet solutions than the ambient laboratory temperature. The temperature effects of solution mixing, even at 4000 rpm, were insignificant in any of the studies conducted on lamp oil and water.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗