Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Performance Margins”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Achieving Space Shuttle ATO Using the Five-Segment Booster (FSB)

As part of the continuing effort to identify approaches to improve the safety and reliability of the Space Shuttle system, a Five-Segment Booster (FSB) design was conceptualized as a replacement for the current Space Shuttle boosters. The FSB offers a simple, unique approach to improve astronaut safety and increase performance margin. To determine the feasibility of the FSB, a Phase A study effort was sponsored by NASA and directed by the Marshall Space Flight Center. This study was initiated in March of 1999 and completed in December of 2000. The basic objective of this study was to assess the feasibility of the FSB design concept and also estimate the cost and scope of a full-scale development program for the FSB. In order to ensure an effective and thorough evaluation of the FSB concept, four team members were put on contract to support various areas of importance in assessing the overall feasibility of the design approach.

Sauvageau, Donald R.↗

Lockheed Martin Response to the OSP Challenge

The Lockheed Martin Orbital Space Plane System provides crew transfer and rescue for the International Space Station more safely and affordably than current human space transportation systems. Through planned upgrades and spiral development, it is also capable of satisfying the Nation's evolving space transportation requirements and enabling the national vision for human space flight. The OSP System, formulated through rigorous requirements definition and decomposition, consists of spacecraft and launch vehicle flight elements, ground processing facilities and existing transportation, launch complex, range, mission control, weather, navigation, communication and tracking infrastructure. The concept of operations, including procurement, mission planning, launch preparation, launch and mission operations and vehicle maintenance, repair and turnaround, is structured to maximize flexibility and mission availability and minimize program life cycle cost. The approach to human rating and crew safety utilizes simplicity, performance margin, redundancy, abort modes and escape modes to mitigate credible hazards that cannot be designed out of the system.

Sullivan, Robert T.↗

Orbiting Depot and Reusable Lander for Lunar Transportation

A document describes a conceptual transportation system that would support exploratory visits by humans to locations dispersed across the surface of the Moon and provide transport of humans and cargo to sustain one or more permanent Lunar outpost. The system architecture reflects requirements to (1) minimize the amount of vehicle hardware that must be expended while maintaining high performance margins and (2) take advantage of emerging capabilities to produce propellants on the Moon while also enabling efficient operation using propellants transported from Earth. The system would include reusable single- stage lander spacecraft and a depot in a low orbit around the Moon. Each lander would have descent, landing, and ascent capabilities. A crew-taxi version of the lander would carry a pressurized crew module; a cargo version could carry a variety of cargo containers. The depot would serve as a facility for storage and for refueling with propellants delivered from Earth or propellants produced on the Moon. The depot could receive propellants and cargo sent from Earth on a variety of spacecraft. The depot could provide power and orbit maintenance for crew vehicles from Earth and could serve as a safe haven for lunar crews pending transport back to Earth.

Petro, Andrew↗

Ares V: Overview and Status

NASA has begun preliminary concept work on the vehicle. Over 1,700 alternatives have been investigated since ESAS. Focused on design of EDS, payload shroud, core stage, and RS-68 core stage engines. Recent point of departure update was made following the Lunar Capability Concept Review. Adds additional performance margin using an additional RS-68. Adds half segment on the first stage boosters . Shroud size is dictated by eventual size of Altair lunar lander. Also investigating alternate uses for Ares V not related to human space exploration . Astronomy applications (e.g., large aperture telescopes), . Deep space missions, DoD applications, Other applications.

Creech, Steve↗

Making Human Spaceflight Practical and Affordable: Spacecraft Designs and their Degree of Operability

As we push toward new and diverse space transportation capabilities, reduction in operations cost becomes increasingly important. Achieving affordable and safe human spaceflight capabilities will be the mark of success for new programs and new providers. The ability to perceive the operational implications of design decisions is crucial in developing safe yet cost competitive space transportation systems. Any human spaceflight program - government or commercial - must make countless decisions either to implement spacecraft system capabilities or adopt operational constraints or workarounds to account for the lack of such spacecraft capabilities. These decisions can benefit from the collective experience that NASA has accumulated in building and operating crewed spacecraft over the last five decades. This paper reviews NASA s history in developing and operating human rated spacecraft, reviewing the key aspects of spacecraft design and their resultant impacts on operations phase complexity and cost. Specific examples from current and past programs - including the Space Shuttle and International Space Station - are provided to illustrate design traits that either increase or increase cost and complexity associated with spacecraft operations. These examples address factors such as overall design performance margins, levels of redundancy, degree of automated failure response, type and quantity of command and telemetry interfaces, and the definition of reference scenarios for analysis and test. Each example - from early program requirements, design implementation and resulting real-time operations experience - to tell the end-to-end "story" Based on these experiences, specific techniques are recommended to enable earlier and more effective assessment of operations concerns during the design process. A formal method for the assessment of spacecraft operability is defined and results of such operability assessments for recent spacecraft designs are provided. Recent experience in applying these techniques to Orion spacecraft development is reviewed to highlight the direct benefits of early operational assessment and collaborative development efforts.

Crocker, Alan R.↗

Brief, Why the Launch Equipment Test Facility Needs a Laser Tracker

The NASA Kennedy Space Center Launch Equipment Test Facility (LETF) supports a wide spectrum of testing and development activities. This capability was originally established in the 1970's to allow full-scale qualification of Space Shuttle umbilicals and T-O release mechanisms. The LETF has leveraged these unique test capabilities to evolve into a versatile test and development area that supports the entire spectrum of operational programs at KSC. These capabilities are historically Aerospace related, but can certainly can be adapted for other industries. One of the more unique test fixtures is the Vehicle Motion Simulator or the VMS. The VMS simulates all of the motions that a launch vehicle will experience from the time of its roll-out to the launch pad, through roughly the first X second of launch. The VMS enables the development and qualification testing of umbilical systems in both pre-launch and launch environments. The VMS can be used to verify operations procedures, clearances, disconnect systems performance &margins, and vehicle loads through processing flow motion excursions.

Yue, Shiu H.↗

Summary of Results from Space Shuttle Main Engine Off-Nominal Testing

This paper is a summary of Space Shuttle Main Engine (SSME) off-nominal testing that occurred during 2008 and 2009. During the last two years of planned SSME testing at Stennis Space Center, Pratt & Whitney Rocketdyne worked with their NASA MSFC customer to systematically identify, develop, assess, and implement challenging test objectives in order to expand the knowledge of one of the world s most reliable and highly tested large rocket engine. The objectives successfully investigated three main areas of interest expanding engine performance margins, demonstrating system operational capabilities, and establishing ground work for new rocket engine technology. The testing gave the Space Shuttle Program new options to safely fly out the flight manifest and provided Pratt & Whitney Rocketdyne and NASA new insight into the operational capabilities of the SSME, capabilities which can be used in assessing potential future applications of the RS-25 engine.

Horton, James F.↗

SLS Dual Use Upper Stage (DUUS) Opportunities

Objective: Provide an overview of SLS DUUS type capability requirements to provide context for possible International Partner collaboration. Addition of a DUUS would greatly increase exploration mission capture and performance margin for cis-Lunar and Near Earth System exploration campaigns.

Creech, Steve↗

Coupled Solid Rocket Motor Ballistics and Trajectory Modeling for Higher Fidelity Launch Vehicle Design

Multi-stage launch vehicles with solid rocket motors (SRMs) face design optimization challenges, especially when the mission scope changes frequently. Significant performance benefits can be realized if the solid rocket motors are optimized to the changing requirements. While SRMs represent a fixed performance at launch, rapid design iterations enable flexibility at design time, yielding significant performance gains. The streamlining and integration of SRM design and analysis can be achieved with improved analysis tools. While powerful and versatile, the Solid Performance Program (SPP) is not conducive to rapid design iteration. Performing a design iteration with SPP and a trajectory solver is a labor intensive process. To enable a better workflow, SPP, the Program to Optimize Simulated Trajectories (POST), and the interfaces between them have been improved and automated, and a graphical user interface (GUI) has been developed. The GUI enables real-time visual feedback of grain and nozzle design inputs, enforces parameter dependencies, removes redundancies, and simplifies manipulation of SPP and POST's numerous options. Automating the analysis also simplifies batch analyses and trade studies. Finally, the GUI provides post-processing, visualization, and comparison of results. Wrapping legacy high-fidelity analysis codes with modern software provides the improved interface necessary to enable rapid coupled SRM ballistics and vehicle trajectory analysis. Low cost trade studies demonstrate the sensitivities of flight performance metrics to propulsion characteristics. Incorporating high fidelity analysis from SPP into vehicle design reduces performance margins and improves reliability. By flying an SRM designed with the same assumptions as the rest of the vehicle, accurate comparisons can be made between competing architectures. In summary, this flexible workflow is a critical component to designing a versatile launch vehicle model that can accommodate a volatile mission scope.

Ables, Brett↗

Ultimately Reliable Pyrotechnic Systems

This paper presents the methods by which NASA has designed, built, tested, and certified pyrotechnic devices for high reliability operation in extreme environments and illustrates the potential applications in the oil and gas industry. NASA's extremely successful application of pyrotechnics is built upon documented procedures and test methods that have been maintained and developed since the Apollo Program. Standards are managed and rigorously enforced for performance margins, redundancy, lot sampling, and personnel safety. The pyrotechnics utilized in spacecraft include such devices as small initiators and detonators with the power of a shotgun shell, detonating cord systems for explosive energy transfer across many feet, precision linear shaped charges for breaking structural membranes, and booster charges to actuate valves and pistons. NASA's pyrotechnics program is one of the more successful in the history of Human Spaceflight. No pyrotechnic device developed in accordance with NASA's Human Spaceflight standards has ever failed in flight use. NASA's pyrotechnic initiators work reliably in temperatures as low as -420 F. Each of the 135 Space Shuttle flights fired 102 of these initiators, some setting off multiple pyrotechnic devices, with never a failure. The recent landing on Mars of the Opportunity rover fired 174 of NASA's pyrotechnic initiators to complete the famous '7 minutes of terror.' Even after traveling through extreme radiation and thermal environments on the way to Mars, every one of them worked. These initiators have fired on the surface of Titan. NASA's design controls, procedures, and processes produce the most reliable pyrotechnics in the world. Application of pyrotechnics designed and procured in this manner could enable the energy industry's emergency equipment, such as shutoff valves and deep-sea blowout preventers, to be left in place for years in extreme environments and still be relied upon to function when needed, thus greatly enhancing safety and operational availability.

Scott, John H.↗

The Iodine Satellite (iSat) Project Development Towards Critical Design Review

Despite the prevalence of small satellites in recent years, the systems flown to date have very limited propulsion capability. SmallSats are typically secondary payloads and have significant constraints for volume, mass, and power in addition to limitations on the use of hazardous propellants or stored energy. These constraints limit the options for SmallSat maneuverability. NASA's Space Technology Mission Directorate approved the iodine Satellite flight project for a rapid demonstration of iodine Hall thruster technology in a 12U (cubesat units) configuration under the Small Spacecraft Technology Program. The mission is a partnership between NASA MSFC, NASA GRC, and Busek Co, Inc., with the Air Force supporting the propulsion technology maturation. The team is working towards the critical design review in the final design and fabrication phase of the project. The current design shows positive technical performance margins in all areas. The iSat project is planned for launch readiness in the spring of 2017.

Dankanich, John W.↗

Wide Field Infrared Survey Telescope (WFIRST) Observatory Overview

NASA's Wide Field Infrared Survey Telescope (WFIRST) is being designed to deliver unprecedented capability in dark energy and exoplanet science, and to host a technology demonstration coronagraph for exoplanet imaging and spectroscopy. The observatory design has matured since 2013; we present a comprehensive description of the observatory configuration as refined during the WFIRST Phase-A study. The observatory is based on an existing, repurposed 2.4 meter space telescope coupled with a 288 megapixel near-infrared (0.6 to 2 microns) HgCdTe focal plane array with multiple imaging and spectrographic modes. Together they deliver a 0.28 square degree field of view, which is approximately 100 times larger than the Hubble Space Telescope, and a sensitivity that enables rapid science surveys. In addition, the coronagraph technology demonstration will prove the feasibility of new techniques for exoplanet discovery, imaging, and spectral analysis. A composite truss structure meters both instruments to the telescope assembly, and the instruments and the spacecraft are flight serviceable. We present configuration changes since 2013 that improved interfaces, improved testability, and reduced technical risk. We provide an overview of our Integrated Modeling results, performed at an unprecedented level for a phase-A study, to illustrate performance margins with respect to static wavefront error, jitter, and thermal drift.

Casey, T.↗

Optical Design and Predicted Performance of the WFIRST Phase-B Imaging Optics Assembly and Wide Field Instrument

Now in Phase-B, the architecture of the Wide-Field Infra-Red Survey Telescope (WFIRST) payload has matured since 2013 to accommodate various opto-mechanical constraints. Based on a 2.4-meter aperture Forward Optical Assembly (FOA), the Imaging Optics Assembly (IOA) provides corrected optical fields to each on-board instrument. Using a Three Mirror Anastigmat (TMA) optical design, the Wide-Field Channel (WFC) provides ~1/3-square degree of instantaneous field coverage at 0.11 arcsecond pixel scale. The WFC as-built predictive analysis anticipates near diffraction-limited imaging over a focal plane of 300.8 million pixels, operating in seven panchromatic bands between 0.48 - 2.0μm, or a 1-octive multi-spectral imaging mode from ~0.95-1.93μm. The IOA provides the Coronagraph Instrument (CGI) a collimated beam with very specific wavefront constraints. We present configuration changes since 2013 that improved interfaces, improved testability, and reduced technical risk. We provide an overview of our Integrated Modeling results, performed at an unprecedented level for a phase-A study, to illustrate performance margins with respect to static wavefront error, jitter, and thermal drift.

Dark Energy↗

A Model Based Systems Engineering Approach Towards Developing a Rapid Analysis and Trades Environment

In this work, an integrated and end-to-end modeling environment was developed to assess the system-level impacts of evolving requirements and design parameters. Researchers at the Georgia Institute of Technology's Aerospace Systems Design Laboratory (ASDL) collaborated with JPL engineers to develop, implement, and test a modeling environment to assess design changes to a notional Europa Mission called the Jupiter Europa Buzzer (JEB). This environment was developed using a Model-Based Systems Engineering (MBSE) approach and consists of three major components: the Systems Model, the Mission Simulator, and the Web Based Interactive Dashboard. In summary, utilizing this environment in a representative notional end-to-end scenario, performance margins were calculated in hours while maintaining consistent analytical, hardware, and operational assumptions.

Model Based System Engineering↗

NASA's Space Launch System: Deep Space Access for CubeSats

NASA is embarking on a new generation of missions to the Moon, known as the Artemis program. The Agency’s new super heavy-lift launch vehicle, the Space Launch System (SLS), is a critical enabling capability for these efforts, which will serve as a proving ground for future crewed expeditions to Mars. SLS is designed to return astronauts to the Moon in the Orion spacecraft and to launch more mass and provide more volume for critical payloads than commercially available vehicles, giving NASA a unique asset for deep space exploration. When performance margin and volume is available, as it is on the first flight, Artemis I (previously Exploration Mission-1), SLS can offer CubeSats access to deep space, beyond Earth’s orbit. The Artemis I flight has 13 6U (14 kg) CubeSats manifested, and the Program is currently accepting proposals for 6U and 12U payloads for the Artemis II flight through the agency’s CubeSat Launch Initiative (CSLI) program. Proposals from U.S.-based payload developers to fly on Artemis II will be accepted through CSLI until November 4, 2019. When ridesharing on SLS deep space missions, CubeSats must demonstrate they will not interfere with primary mission objectives. The 13 Artemis I CubeSats that hail from industry, academia, NASA and its international partners represent an array of exciting deep space science investigations and technology demonstrations that may help inform future Artemis missions. The initial SLS Block 1 vehicle for the Artemis I flight is fully manufactured; several elements are complete and have been delivered to the Exploration Ground Systems (EGS) Program at Kennedy Space Center (KSC), which has responsibility for integrating and launching the SLS and Orion stack. Completed elements of the Artemis I vehicle include the Orion Stage Adapter (OSA), which houses the 13 Artemis I CubeSats. With the Artemis I flight hardware and software nearing completion, work is in progress for the second Block 1 launcher, designated for the crewed Artemis II flight. Hardware is being manufactured for every element of the Artemis II vehicle. In this paper, the author will review the status of the Artemis I vehicle and the payloads manifested for the initial flight. Information on the Secondary Payload Deployment System (SPDS) that the SLS Program provides to payload developers will also be included.

Creech, Stephen D.↗

An Impedance-Based Complexity Metric for Unmanned Aircraft System Traffic Scenario Classification

This paper introduces an impedance-based metric to capture the complexity of a given unmanned aircraft system traffic scenario. The metric accounts for both the number of aircraft and the traffic flow pattern. The work presented here extends an earlier approach that introduced another scenario complexity metric based on the number of potential conflicts weighted by the conflict resolution cost associated. Complexity measurements for randomly-generated scenarios were produced through high-fidelity fast-time simulations and treated as baseline. Then the impedance based metric was evaluated, for the same scenarios, without the need for an actual flight simulation and a conflict resolution method. The results show that the impedance-based metric has a strong correlation to the baseline data and performs marginally better than the weighted conflict-based complexity metric introduced in the earlier work. The metric computation generates impedance maps which are useful for identifying high complexity regions in a scenario, where flight plan changes might be necessitated. This metric can therefore be used, in conjunction with other complexity metrics, to inform adequate traffic management strategies and classify a traffic scenario as acceptable, unacceptable or acceptable with changes made to flight plans that pass through the high complexity regions. The metric can also be used as a guidance metric for strategic conflict management methods.

Complexity↗

Recent Results from Dragonfly Testing/Analysis as we head to PDR

Dragonfly is a relocatable lander mission to Saturn's moon Titan4, which as well as being a target of out-standing astrobiological interest as an organic-rich Ocean World, has the combination of low gravity (1/7 that of Earth) and a thick atmosphere (4x the density of Earth), making it an environment uniquely suitable for flight. Thus, the Dragonfly lander (similar in size to the Curiosity Mars rover) can take off using lift from a set of eight rotors and fly to a new landing site several kilometers away. The ability to perform such flights, lasting approximately 30 minutes, every month or so on Titan brings unprecedented mobility to planetary exploration, on a world known to have a diverse land-scape of dunes, craters and other features. Dragonfly is planned to launch in 2027, and following a nearly seven year interplanetary cruise would arrive at Titan by 2034. Due to the large scale height of the Titan atmosphere, Entry, Descent, and Landing (EDL) will be prolonged affair, taking nearly two hours to reach the surface. The ballistic entry environments that Dragonfly will be subjected to are fairly similar to that experienced by recent Mars missions; peak heating on the aeroshell will be about 300 W/sq.cm and peak deceleration is about 10g’s. Following the five minute entry segment, much of the remaining time is spent descending on the drogue and main para-chutes, which carry the dual role of decelerating the spacecraft and stabilizing the system during the long descent. While on one hand, this leisurely EDL sequence affords a relaxed timeline and plenty of time for event staging, it also provides ample opportunity for small disturbances to grow into potential flight safety risks, adding emphasis to the need for careful modeling, simulation and testing of key dynamic events. About two hours after entering the atmosphere, the nearly one metric ton rotocraft will be lowered approximately one meter out of the backshell (the ‘pose’ maneuver) to expose all eight rotors. The rotors will then be used to arrest any residual spin rate and prepare the system for transition to powered flight. Once despin is complete and the lander reaches a target altitude of 1.2 km above the surface (as verified by on-board lidar), the lander will be released and free fall for approximately one second before beginning controlled free flight. This entire “preparation for powered flight” process takes place over several minutes while the system is subject to the dynamic environment produced by so-called “wrist-mode” oscillations as the lander and backshell swing on the main parachute. Once in free flight, the lander will engage on-board terrain relative navigation to locate and navigate to a safe landing zone in the Shangri-La dune field south of Selk crater. Communication during this sequence will be limited to a series of direct-to-Earth X-band tones signalling key events and providing forensic information. Once on the ground, the lander will begin to send additional information, including data collected during this EDL sequence by the on-board Dragonfly Entry Aerosciences Measurements (DrEAM) instrumentation suite. This presentation will walk through the entry to first landing timeline in more detail, with a focus on recent analysis and testing results that inform system performance, margins and residual risk estimation.

Dragonfly↗

AGR-5/6/7 Irradiation Results and Reporting

Final fuel qualification irradiation (AGR-5/6) and performance margin test (AGR-7) 425 µm diameter kernels with 15.5% 235U enrichment Target time-average peak fuel temperatures ~1500°C Target peak burnup 18% FIMA 194 UCO fuel compacts (~570,000 particles) in five capsules Irradiation started Feb 2018 in ATR Northeast Flux Trap

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗