Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Passive Building Standards”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

75 records · Page 5

Wastewater Treatment at the Fernald Preserve-Past, Present, and Future - 19555

Industrial wastewater treatment at the Fernald Preserve, Ohio, Site has been ongoing since a uranium metals refinery was constructed there at the beginning of the Cold War in 1951. Initially, the primary purpose of treatment was to recover uranium for reuse. Later, when cleanup of the site was progressing in the 1990's, wastewater treatment efforts greatly expanded. Large treatment facilities were constructed to handle contaminated surface water, groundwater, remediation wastewater, and leachate from the on-site disposal facility. These new facilities were designed to reduce uranium concentration to meet the US Environmental Protection Agency (EPA) drinking water standard and not generate large quantities of contaminated waste. Anion-exchange resin was chosen as the treatment media. The centerpiece of these facilities was the Advanced Wastewater Treatment facility, which had a treatment capacity of 10,978 liters per minute (lpm) (2900 gallons per minute [gpm]). Forecasts estimated that with the exception of groundwater the site's remediation would be completed in 2006. In 2003, the US Department of Energy (DOE) Office of Environmental Management began negotiations with the EPA and Ohio Environmental Protection Agency to reduce wastewater treatment capacity at the Fernald Environmental Management Project. These negotiations resulted in the site's treatment capacity being reduced to 6814 lpm (1800 gpm) via the Converted Advanced Wastewater Treatment facility (CAWWT). By 2010, the uranium concentration in the groundwater being pumped had been reduced to the degree that only intermittent treatment for uranium removal was needed. As a result, the CAWWT was considerably oversized. Increased maintenance on the aging CAWWT equipment led the DOE Office of Legacy Management (LM) to commission an assessment of the facility, which was completed in early 2015. The condition assessment identified numerous components at or near the end of their design life. Based on the assessment's findings and the fact that the current facility's treatment capacity was substantially greater than needed, LM began looking at options for an appropriately sized treatment system to handle the site's needs until the groundwater remediation was completed (currently projected for 2039). Options were evaluated in the spring of 2015, and LM presented the recommended changes to regulators and stakeholders. Approvals for a new, smaller system with a 189 lpm (50 gpm) capacity were obtained through a series of meetings in the summer of 2015. After more detailed planning in the fall of 2015, LM initiated the project in 2016. The project comprises the following four phases: (1) Removal and disposal of used media, piping, and tanks to make room for the new system in the existing building (completed in January 2017); (2) design of the new system (completed in April 2017); (3) construction, installation, and startup of the new system (completed in May 2018); and (4) backwash basin refurbishment (yet to be completed). In the late 2030's, when groundwater remediation is projected to be completed at the site, it is anticipated that the only remaining wastewater treatment need will be for small quantities of leachate from the on-site disposal facility. Results of leachate treatment testing in 2003 indicate it may be feasible to utilize a small passive treatment system for this leachate. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

DAISY Benchmark Performance Data

This repository contains the underlying data from benchmark experiments for Drifting Acoustic Instrumentation SYstems (DAISYs) in waves and currents described in "Performance of a Drifting Acoustic Instrumentation SYstem (DAISY) for Characterizing Radiated Noise from Marine Energy Converters" (https://link.springer.com/article/10.1007/s40722-024-00358-6). DAISYs consist of a surface expression connected to a hydrophone recording package by a tether. Both elements are instrumented to provide metadata (e.g., position, orientation, and depth). Information about how to build DAISYs is available at https://www.pmec.us/research-projects/daisy. The repository's primary content is three compressed archives (.zip format), each containing multiple MATLAB binary data files (.mat format). A table relating individual data files to figures in the paper, as well as the structure of each file, is included in the repository as a Word document (Data Description MHK-DR.docx). Most of the files contain time series information for a single DAISY deployment (file naming convention: [site]_DAISY_[Drift #].mat) consisting of processed hydrophone data and associated metadata. For a limited number of DAISY deployments, the hydrophone package was replaced with an acoustic Doppler velocimeter (file naming convention: [site]_DAISY_[Drift #]_ADV.mat). Data were collected over several years at three locations: (1) Sequim Bay at Pacific Northwest National Laboratory's Marine & Coastal Research Laboratory (MCRL) in Sequim, WA, the energetic tidal channel in Admiralty Inlet, WA (Admiralty Inlet), and the U.S. Navy's Wave Energy Test Site (WETS) in Kaneohe, HI. Brief descriptions of data files at each location follow. - MCRL - (1) Drift #4 and #16 contrast the performance of a DAISY and a reference hydrophone (icListen HF Reson), respectively, in the quiescent interior of Sequim Bay (September 2020). (2) Drift #152 and #153 are velocity measurements for a drifting acoustic Doppler velocimeter in in the tidally-energetic entrance channel inside a flow shield and exposed to the flow, respectively (January 2018). (3) Two non-standard files are also included: DAISY_data.mat corresponds to a subset of a DAISY drift over an Adaptable Monitoring Package (AMP) and AMP_data.mat corresponds to approximately co-temporal data for a stationary hydrophone on the AMP (February 2019). - Admiralty Inlet - (1) Drift #1-12 correspond to tests with flow shielded DAISYs, unshielded DAISYs, a reference hydrophone, and drifting acoustic Doppler velocimeter with 5, 10, and 15 m tether lengths between surface expression and hydrophone recording package (July 2022). (2) Drift #13-20 correspond to tests of flow shielded DAISYs with three different tether materials (rubber cord, nylon line, and faired nylon line) in lengths of 5, 10, and 15 m (July 2022). - WETS - (1) Drift #30-32 correspond to tests with a heave plate incorporated into the tether (standard configuration for wave sites), rubber cord only, and rubber cord, but with a flow shielded hydrophone (November 2022). (2) Drift #49-58 and Drift #65-68 correspond to measurements around mooring infrastructure at the 60 m berth where time-delay-of-arrival localization was demonstrated for different DAISY arrangements and hydrophone depths (November 2022).

16 TIDAL AND WAVE POWER↗