Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PV array”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

EVSE Cybersecurity and Resilience

Consequence-driven Cybersecurity Analysis for Extreme Fast Charging Electric Vehicle Infrastructure Electric vehicle (EV) development and associated charging infrastructure are expected to advance rapidly. Thirty percent of all global vehicle sales may be EVs and hybrid EVs by 2025, and they will rely on increasingly sophisticated strategies for grid integration. Next-generation EV charging infrastructure is expected to include interconnected renewable resources, such as photovoltaic (PV) arrays and battery storage systems, along with grid-edge devices. Although distributed energy resources (DERs) are useful in several ways, such as peak shaving at high demand times and backup supply for added resilience, the integration of vehicle charging and DERs could create more avenues for cyberattack. Physical and/or remote access to EV charging station components, including charge ports, power electronics, controllers, and local generation (e.g., PV and energy storage) could be paths to cause power fluctuations, leading to altered operations at the charging station, escalated privileges to administrative systems, exfiltration of financial information (including personally identifiable information), and reduced grid stability. One compromised EV supply equipment component can open the door to a variety of exploitable vulnerabilities. Cloud computing and mobile application control have the potential to expand the threat surface to non-repudiation and firmware integrity challenges. Vendor clouds have access to hundreds of chargers, and if compromised, can scale the attack surface exponentially. The high power and voltage levels of xFC infrastructure (e.g., 400 kW at 1000- V DC) increase the hazards and ability to impact the grid and vehicles more than lower-power charging systems. Legacy communications systems and protocols could also put EV infrastructure at risk of cyberattacks requiring a robust patch management process. Communications networks link EVs and chargers to several stakeholders - including charging station operators, grid operators, vendors/manufacturers, and aggregators - who have both physical and network access to share information for control, monitoring, and analytics. Information in these networks that is vulnerable to compromise includes the state of charge, charging duration, payment information, electricity price, and load control. Analyzing and prioritizing these interconnections risks could help address cybersecurity related to data leakage and manipulation.

charging↗

Thermal Reservoir Networks for Modularly Expandable Thermal Microgrids

The Department of Defense (DoD) faces the substantial challenge of cost-effectively retrofitting one to two installations per month, each comprising approximately 1,000 buildings, to improve resilience, reduce energy consumption, and enhance energy supply security. Achieving these objectives requires optimal system selection and effective risk mitigation during system integration. To address this need, we introduce Platform-Based Design (PBD), a structured, hierarchical methodology adapted from other industrial sectors to the domain of energy system retrofits. We demonstrate the effectiveness of PBD through a techno-economic feasibility study comparing geothermal-coupled thermal energy networks (TENs) with conventional energy systems for heating, cooling, and powering 17 buildings at Joint Base Andrews (JBA) in Maryland. Our analysis illustrates that the PBD approach enables rigorous, data-driven, sequential decision making, resulting in a family of Pareto-optimal systems, among which the TEN emerged as the most promising solution. The selected TEN design integrates geothermal borefields, heat recovery heat pumps, photovoltaic (PV) arrays, and battery storage. Compared to the baseline system – gas heating combined with air-source chillers – the proposed TEN reduces annual imported energy by 74% and peak electricity demand by 45%, achieves a levelized cost of energy of $\$0.210$/kWh, and substantially enhances resilience. Life-cycle costs increase by approximately 6%, and initial investment costs are about 2.5 times higher than the baseline. However, if central plant infrastructure, district loops, and utility-scale PV and battery systems are privately funded and operated, the initial investment would fall below the baseline system cost. Critical to achieving these significant performance improvements were detailed nonlinear dynamic simulations coupling geothermal heat transfer, energy system operation, and realistic feedback control logic. These simulations identified essential design modifications and control strategy refinements that substantially reduced energy use, peak demand, and compressor shortcycling, thereby improving durability and reliability—issues that would have been significantly more expensive to resolve during operation. Additionally, the verification step highlighted sensitivities to key design parameters that could reduce initial investment by approximately $\$2$ million and reduce annual life-cycle costs more than $\$300,000$. We recommend adopting the PBD methodology for future feasibility studies and TEN pilot projects to gain valuable operational experience. Furthermore, we recommend that DoD invest in transferring and scaling the PBD methodology to other installations. This entails developing standardized computational frameworks and component libraries as well as training industry in conducting PBD. Such investments would enable rapid, robust, reliable, and cost-effective retrofits, supporting DoD’s ambitious energy system modernization goals.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Design description of the Schuchuli Village photovoltaic power system

A stand alone photovoltaic (PV) power system for the village of Schuchuli (Gunsight), Arizona, on the Papago Indian Reservation is a limited energy, all 120 V (d.c.) system to which loads cannot be arbitrarily added and consists of a 3.5 kW (peak) PV array, 2380 ampere-hours of battery storage, an electrical equipment building, a 120 V (d.c.) electrical distribution network, and equipment and automatic controls to provide control power for pumping water into an existing water system; operating 15 refrigerators, a clothes washing machine, a sewing machine, and lights for each of the homes and communal buildings. A solar hot water heater supplies hot water for the washing machine and communal laundry. Automatic control systems provide voltage control by limiting the number of PV strings supplying power during system operation and battery charging, and load management for operating high priority at the expense of low priority loads as the main battery becomes depleted.

Ratajczak, A. F.↗

Navy Ratchets Up Resilience Through Agency/Utility Collaboration

Fact sheet describes how the Naval Construction Battalion Center (NCBC) in Gulfport, Mississippi, and Mississippi Power Company (MPC) have integrated a 15-acre solar photovoltaic (PV) array, battery storage, and backup generation with an innovative microgrid to ensure mission readiness at NCBC while increasing renewable energy generation on the grid in MPC's service area. The NCBC/MPC resilience effort will allow the base to more effectively deploy disaster recovery activities in the event of a grid outage.

battery storage↗

Network science can improve the sustainable development of solar energy

Abstract The recent emergence of agrivoltaic and ecovoltaic approaches to ground-mounted photovoltaic (PV) energy provides a much-needed alternative to the environmentally disruptive practices employed in utility-scale solar development. Research on such land-sharing approaches has grown rapidly, with an emphasis on characterizing how PV arrays impact ecosystem processes and agricultural productivity. Although these studies have done well to quantify a variety of dual-use solar practices by employing site-specific sampling designs, this approach has limited our ability to synthesize results across sites, regions, and globally. We call for a network science approach for improved cross-site synthesis of dual-use solar research. We contend that a common approach for data collection and synthesis will facilitate a more rigorous investigation of the agricultural and ecological impacts of PV development across space and over time. The products of this scientifically informed approach can be directly applied to improve sustainable land management.

Bacon, Taylor (ORCID:0009000518578569)↗

Uncertainty Quantification of Bifacial Performance Modeling

Analysis on uncertainty in the annual energy of PV systems that can be attributed to parameters of particular importance to bifacial PV modules is presented. Monte Carlo simulations are used to evaluate the effect of uncertain module bifaciality factors, module transmission fractions, albedo values, and ground clearance. The analyses cover a wide spectrum of potential PV array archetypes through variation of installation parameters. The results of the Monte Carlo analysis reveal that the uncertainty is largely dependent on albedo uncertainty, but more simulations are needed to identify trends across system archetypes. The simulations are aimed at attributing an annual energy uncertainty factor for bifacial considerations that can be applied in post-processing of project probability of exceedance analysis.

bifacial↗

Bifacial Vertical Testbed and Ground Irradiance Data in Golden, Colorado

This data was collected for Tonita et al., “Vertical bifacial photovoltaic system model validation: study with field data, various orientations, and latitudes,” for validation of optical models for vertically-oriented photovoltaics under high albedo. Ground irradiance data for vertical PV arrays modeling in agrivoltaics is also provided. The dataset is provided for further use or study as open source. For any questions on the dataset, email silvana.ovaitt@nlr.gov.

14 SOLAR ENERGY↗

Masking of photovoltaic system performance problems by inverter clipping and other design and operational practices

We describe how performance problems can be “masked,” or not readily evident by several causes: by photovoltaic (PV) system configuration (such as the size of the PV array capacity relative to the size of the inverter and the resultant clipped operating mode); by instrumentation design, installation, and maintenance (such as a misaligned or dirty pyranometer); by contract clauses (when operational availability is transformed to contractual availability, which excludes many factors); and by identified management and operational practices (such as reporting on a portfolio of plants rather than individually). A simple method based on a duration curve is introduced to overcome shortcomings of Performance Ratio based on nameplate capacity and Performance Index based on hourly simulation when quantifying masking effects, and inverter clipping and pyranometer soiling are presented as two examples of the new method. With a better understanding of the non-transparency of masking issues, stakeholders can better interpret performance data and deliver improved AC and DC plant conditions through PV system operation and maintenance (O&M) for improved performance, reduced O&M costs, and a more consistently delivered, and reduced, levelized cost of energy (LCOE).

14 SOLAR ENERGY↗

High-Fidelity Models and Fast EMT Simulation Algorithms for Isolated Multi-port Autonomous Reconfigurable Solar power plant (MARS)

The integration of hybrid photovoltaic (PV) and energy storage system (ESS) based plants has become a promising way of solving the intermittency of PV plants and providing frequency support to the power grid. The multi-port autonomous reconfigurable solar power plant (MARS) can integrate the PV systems and ESSs to an ac grid and dc lines. The proposed isolated MARS incorporates an isolated converter that connects to the PV arrays and is based on the dual active bridge (DAB) converter. The high frequency switching in the DAB and the means to control the DAB converter using delays between switching signals lead to the need for a small timestep in simulations. Moreover, several hundreds of modules that include a DAB converter are present in the MARS. The small timestep and the presence of several hundreds of modules lead to a significant rise in the overall simulation time. To address this issue, simulation algorithms like numerical stiffness-based hybrid discretization and the hysteresis relaxation technique are applied to the switched system model of isolated MARS. Additionally, an event-driven interpolating method is introduced to help increase the minimum timestep to simulate the conventional DAB converter model while maintaining high accuracy in the simulation results. The developed model is validated by comparison with its reference model built in the PSCAD/EMTDC and MATLAB software environments using library components.

Xia, Qian↗

Uncertainty Quantification of Bifacial Performance Modeling

Analysis on uncertainty in the annual energy of PV systems that can be attributed to parameters of particular importance to bifacial PV modules is presented. Monte Carlo simulations are used to evaluate the effect of uncertain module bifaciality factors, module transmission fractions, albedo values, and ground clearance. The analyses cover a wide spectrum of potential PV array archetypes through variation of installation parameters. The results of the Monte Carlo analysis reveal that the uncertainty is largely dependent on albedo uncertainty, but more simulations are needed to identify trends across system archetypes. The simulations are aimed at attributing an annual energy uncertainty factor for bifacial considerations that can be applied in post-processing of project probability of exceedance analysis.

energy modeling↗

Rear-Side Irradiance Simulation of Field PV Modules

Assessing the durability of photovoltaic (PV) module backsheet is critical to increasing module lifetime. Historically, laboratory-based accelerated testing has insufficient in predicting large-scale failures of commercial polymeric materials. Additionally, there is growing concern that standard condition tests do not reflect non-uniformities in field exposure, and that certain modules experience more severe degradation due to their location. Anisotropy in field exposures is installation-dependent and reflects different levels of exposure to irradiance due to mounting geometry, ground surface albedo, and climatic zone. "Bificial_Radiance" [1], simulates the amount of reflected irradiance on the Polyethylene Naphthalate (PEN) backsheet of a PV array located in Maryland. In our work, site specific weather data are gathered for the entire length of exposure for the modules. The total full-spectrum dose for the incident irradiance on the backsheet was then determined. The simulation results are integrated with historical field survey data to better understand real orld outdoor degradation.

backsheet↗

A Hybrid Fuel Cell and Battery Storage Power Management for Grid-Interactive EV Charging Station

With the increasing adoption of renewable energy sources in grid-interactive Electric Vehicle (EV) charging stations, the role of energy storage systems has become critical. While large energy storage systems have mitigated the intermittency of renewable energy, integrating multi-source energy management with prioritized charging can further enhance the reliability of charging stations (CS). This paper presents a decentralized energy management (DEM) approach combining battery energy storage (BES) and fuel cell (FC) systems using a rule-based line resistance correction droop (LRCD) control technique. The proposed droop control dynamically adjusts the gain to balance the state-of-charge (SoC) of the BES, enhancing power support longevity and improving battery life under varying capacity conditions by reducing current stress. Additionally, the paper addresses the challenges of using fuel cells in linear regions to optimize efficiency and manage various charging scenarios. The CS integrates unity power factor grid interaction, and power support for auxiliary loads, maintaining harmonic distortion within 5% during grid islanding. The approach evaluates DC bus voltage regulation under various scenarios of PV array power fluctuations and dynamic load variations, in both grid-connected and standalone operations. In conclusion, the proposed control strategy is validated on a laboratory prototype through various dynamic load variation and grid islanding scenarios.

Khalid, Mohd [Oak Ridge National Laboratory (ORNL)↗

HOMP (Hybrid Operation and Maintenance Platform) [SWR-22-81]

The HOMP software module is contained within NREL's Hybrid Optimization and Performance Platform (HOPP) at this URL: https://github.com/NREL/HOPP/tree/feature/HOMP. HOMP is a python-based software module which can be used concurrently with the Hybrid Optimization and Performance Platform (HOPP) to model, simulate, and optimize degradation, reliability, and operations and maintenance of hybrid power plant components. The program currently models lithium ion battery, PEM electrolyzer, wind turbine, and solar PV array components, which enables users to understand the design and operation tradeoffs of hybrid power plants. For instance, HOMP enables users to answer questions like: how large does a battery bank need to be to achieve optimal charge/discharge rates for performance and reliability? How does plant design change for different objectives (e.g., profit versus resilience)? Under what conditions is it better to produce electricity versus hydrogen? How do we optimally control hybrid power plants to reduce downtime and increase performance?

Clark, Caitlyn↗

The BREKTRIA 500 – A Breakthrough in Technology and Power Density for an Advanced 500kW Utility-Scale String Inverter (Final Technical Report)

The primary goal of this development project, planned to be 36 months in duration, was to create a 500kW utility-scale string inverter, demonstrating an advanced hybrid architecture that would achieve unprecedented high power density, and bring the inverter to the stage of production readiness. Specific key objectives for the 500kW utility-scale string inverter were: Create a 500kW 3-phase 600Vac inverter that was similar in overall size to the existing 250kW string inverters in the market, thereby demonstrating dramatically increased power density; Achieve a cost of goods, including all manufacturing-related costs and overheads, at or below 2.5¢/Wac ($12,500); Demonstrate full-power operation at a 45-50C ambient temperature with no power de-rating; Accommodate a PV array DC input of up to 1MWdc, aka a DC/AC Ratio of 2.0; Demonstrate peak efficiency greater than 99% at any operating dc voltage, and a CEC weighted average efficiency greater than or equal to 98.5%. The motivation for this project was to leapfrog the competition by creating the world’s most powerful string inverter, utilizing an innovative topology and achieving a step change increase in power density. Achieving the goals of the project would have enabled Yaskawa Solectria Solar to demonstrate its technology leadership, manufacture the utility-scale string inverter in the company’s facilities in Illinois, and bring to the market a highly-differentiated and compelling product to help the company grow its share in the large and growing utility market segment. During the course of this project, BREK Electronics’ hybrid architecture inverter was taken from an early-stage 125kW prototype, to a more mature and successfully demonstrated power stage at twice the power. Two 250kW power stages were planned to build the 500kW inverter. Significant progress was made in the inverter controls, achieving a clean AC sinewave and closed-loop operation into the grid, and improved efficiency by control of the high-speed switching. Further, the updated 250kW power stage was on track to achieve full power operation at an ambient temperature of 50C. At the time of the project’s closure in September 2022, global semiconductor supply remained limited, with shortages creating dramatic swings in both availability and price. Given this situation, our ability to predict cost-of-goods two years out with any accuracy or confidence was limited. As a result, the probability of attaining the target cost of 2.5¢/Wac for the 500kW inverter remained uncertain at the closure of the project. This project successfully demonstrated the potential for the advanced hybrid architecture inverter that emerged from a decade of university research on Si IGBTs and SiC mosfets, leading to this unique inverter topology. The team has taken the first steps toward an evolutionary advancement in inverter technology that remains to be fully realized.

14 SOLAR ENERGY↗

AquaPV: Regulatory and Environmental Considerations for Floating Photovoltaic Projects Located on Federally Controlled Reservoirs in the United States

To meet the nation's decarbonization goals, the U.S. Department of Energy's Solar Futures study forecasts that installed solar photovoltaic (PV) capacity must increase nearly tenfold, from 80 gigawatts (GW) in 2020 to approximately 760 GW cumulative installed capacity by 2035. Ground-mounted PV is expected to dominate future solar deployment and will require more than 3.5 million acres of land to meet annual demand projections (of nearly 45 GW) by 2030. However, various competing demands for land (e.g., agricultural production, conservation) and high land acquisition costs in specific locations could be challenges to meeting future PV demand solely with ground-mounted PV deployment. Floating photovoltaics (FPV) may be an alternative in locations where ground-mounted PV is not feasible and aid in reaching the nation's PV deployment and decarbonization goals. FPV is a newer siting approach in which a PV array is affixed to a floating apparatus and sited on a water body like a reservoir behind a dam. FPV systems may be stand-alone or co-located at new or existing hydroelectric facilities or pumped storage hydropower (PSH) facility reservoirs. Co-located FPV systems may or may not be operationally paired and work in tandem with the hydroelectric or PSH facility. This report provides novel analysis to understand the opportunities and challenges associated with developing stand-alone and co-located FPV projects on reservoirs in the United States. Specifically, the report explores potential environmental and energy benefits and environmental impacts associated with the siting, construction, and operation of FPV projects. The report also identifies and analyzes U.S. federal- and state-issued permits and authorizations required by federal laws to understand the licensing pathways and regulatory requirements for FPV projects sited on reservoirs licensed by the Federal Energy Regulatory Commission and on powered and non-powered reservoirs owned by the Bureau of Reclamation or U.S. Army Corps of Engineers.

13 HYDRO ENERGY↗

Community Center and Administration Solar PV Project

The Tribe installed two (2) roof mounted solar PV systems with a total production of approximately 146 kW on the Paskenta Band of Nomlaki Indians’ Community Center in Corning, CA. One of the two solar PV arrays provided 90% of the Community Center’s energy, while the second array provided nearly 100% of the adjacent administration building’s energy.

14 SOLAR ENERGY↗

Building Resiliency into Grand Canyon West Micro-Grid

The objective of the project was to improve the resilience of the non-regional-grid-connected electrical generation system at Grand Canyon West (GCW) to withstand short-term disruptions and rising energy costs by installing an 885-kW solar photovoltaic (PV) array and 750-kilowatts (kW)/2,145-kilowatt hour (kWh) battery energy storage system (BESS). The system is designed to provide 50% of the annual energy needed for the essential facilities at GCW, supplementing the existing diesel generators, saving approximately $\$$463,339 per year and an estimated $\$$11,583,475 over the 25-year life of the system. The project aligns with the Tribe’s conservation ethic and self-determination in the area of energy development.

14 SOLAR ENERGY↗