Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PTO”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Low-Flow Marine Hydrokinetic Turbine for Small Autonomous Unmanned Mobile Recharge Stations

A prototype low-flow marine current turbine for deployment from a small unmanned mobile floating platform has been developed for autonomously seeking and harnessing tidal/coastal currents. The support platform is an unmanned surface vehicle (USV), in the form of a catamaran with two electric outboard motors and with capabilities for autonomous navigation. The USV utilized is a WAM-V 16 vehicle that has been developed separately with support from the Office of Naval Research (ONR) [1]. The marine current turbine is based on a freestream waterwheel (FSWW), also known as an undershot waterwheel (FSWW), mounted on the stern of the USV. The concept of operation involves the USV autonomously navigating to a designated marine current resource. Upon arrival, the USV anchors itself, aligns with the current, and deploys the FSWW turbine using a custom cable-lift mechanism. The turbine harnesses the local current, and an onboard power-take-off (PTO) device converts the mechanical energy into electricity, which is stored in an onboard battery bank. When energy harvesting is completed, the turbine and the anchor are retrieved and the USV navigates to a selected location. These unmanned at-sea platforms can provide power to other unmanned maritime systems. Specifically, in this project, the power generated onboard can be used to charge aerial drones via a custom flight deck that has been developed for the USV. The recharging capabilities offered by a fleet of such strategically placed recharging stations can significantly benefit aerial drones operating in the maritime domain by eliminating the need to travel back and forth to land or ship based charging stations. The project has resulted in the development of subcomponents, including the FSWW turbine, a novel PTO, an automated anchoring system for the USV, an automated turbine deployment system, and a flight deck with capabilities onboard the USV for landing, direct-contact charging and takeoff of aerial drones. The design and development of these subsystems have culminated in the overall prototype marine hydrokinetic platform (MHK Platform, Fig. 1). Comprehensive lab and field testing have been conducted to validate the functionality and performance of the platform and its components. The project demonstrates the potential for autonomous, unmanned systems to harness renewable energy from marine currents, and provide sustainable power solutions for maritime applications such as coastal surveillance and environmental monitoring; shoreline mapping; search and rescue; oceanographic research; inspection and maintenance of offshore energy installations like wind turbines and oil rigs; oil spill response; maritime disaster response; and aerial surveys, as well as facilitation of data transfer drones and shore stations.

16 TIDAL AND WAVE POWER↗

Advanced Laboratory and Field Arrays (ALFA)/Lab Collaboration Project (LCP) for Marine Energy (Final Scientific/Technical Report)

The objective of the Advanced Laboratory and Field Arrays (ALFA) project was to reduce the Levelized Cost of Energy (LCOE) of Marine and Hydrokinetic (MHK) energy by leveraging research, development, and testing capabilities at Oregon State University, University of Washington, and the University of Alaska, Fairbanks. ALFA is a project within the Pacific Marine Energy Center (PMEC; formerly NNMREC), a multi-institution entity with a diverse funding base that focuses on research and development for marine renewables. The ALFA project aimed to accelerate the development of next-generation arrays of wave energy conversion (WEC) and tidal energy conversion (TEC) devices through a suite of field-focused R&D activities spanning a broad range of strategic opportunity areas identified in the Funding Opportunity Announcement: • Device and/or array operation and maintenance (O&M) logistics development; • High-fidelity resource characterization and/or modeling technique development and validation; • Array-specific component technology development (e.g. moorings and foundations, transmission, and other offshore grid components); • Array performance testing and evaluation; and • Novel cost-effective environmental monitoring techniques and instrumentation testing and evaluation. The objective of the Lab Collaboration Project (LCP) was to accelerate the development of next-generation marine energy conversion systems. The LCP aimed to achieve these project objectives in collaboration with the national laboratories by: • Developing concept generation and assessment tools; • Improving access to existing testing resources; • Validating collision risk models between fish and turbines; and • Advancing analysis and simulation capabilities for wave-WEC interactions and PTO analysis in nonlinear ocean waves. The ALFA portion of the project was comprised of six overarching technical tasks: • Task 1: Debris Modeling, Detection and Mitigation; • Task 2: Autonomous Monitoring & Intervention; • Task 3: Resource Characterization for Extreme Conditions; • Task 4: Robust Models for Design of Offshore Anchoring and Mooring Systems; • Task 5: Performance Enhancement for Marine Energy Converter (MEC) Arrays; and • Task 6: Evaluating Sampling Techniques for MHK Biological Monitoring. The LCP was divided into four overarching technical tasks: • Task 7: Project Management and Reporting • Task 8: Novel Design and Assessment Methodologies for Wave Energy Converter Design (Wave- SPARC) • Task 9: Testing Access for Commercial Marine Renewable Energy Technology Developers • Task 10: Quantifying Collision Risk for Fish and Turbines • Task 11: Nonlinear Ocean Waves and PTO Control Strategy Each ALFA/LCP task listed above functioned as a separate and discreet project. A final Technical Report was written for each individual task and these reports were uploaded to OSTI, after receiving DOE approval. The following document is a compilation of each of these final, approved reports arranged as individual chapters.

13 HYDRO ENERGY↗

Investigations into Balancing Peak-to-Average Power Ratio and Mean Power Extraction for a Two-Body Point-Absorber Wave Energy Converter

The power harnessed by wave energy converters (WECs) in oceans is highly variable and, therefore, has a high peak-to-average power (PTAP) ratio. To minimize the cost of a WEC power take off (PTO) system, it is desirable to reduce the PTAP ratio while maximizing the mean power extracted by WECs. The important issue of how PTAP ratio reduction measures (such as adding an inertia element) can affect the mean power extracted in a reference model has not been thoroughly addressed in the literature. To investigate this correlation, this study focuses on the integration of the U.S. Department of Energy’s Reference Model 3, a two-body point absorber, with a slider-crank WEC for linear-to-rotational conversion. In the first phase of this study, a full-scale numerical model was developed that predicts how PTO system parameters, along with an advanced control algorithm, can potentially affect the proposed WEC’s PTAP ratio as well as the mean power extracted. In the second phase, an appropriate scaled-down model was developed, and extracted power results were successfully validated against the full-scale model. Finally, numerical and hardware-in-the-loop (HIL) simulations based on the scaled-down model were designed and conducted to optimize or make trade-offs between the operational performance and PTAP ratio. The initial results with numerical and HIL simulations reveal that gear ratio, crank radius, and generator parameters substantially impact the PTAP ratio and mean power extracted.

16 TIDAL AND WAVE POWER↗

Power Generation Enhancement through Latching Control for a Sliding Magnet-Based Wave Energy Converter

A Surface-Riding Wave Energy Converter (SR-WEC) featuring a sliding magnet inside a pitching cylindrical hull is investigated as an easily deployable small power device to support small-scale marine operations. This study extends the earlier development of the system by authors to enhance power performance through the application of end spring and latching control. The inclusion of springs at the tube’s end enhances the magnet release and travel speeds as well as the average power output compared to systems without them. Further improvement of power output can also be achieved by employing optimal latching control. We introduced constant-angle and variable-angle unlatching strategies to determine optimal parameters in combination with passive and reactive power take-off (PTO) controls to assess their effectiveness. The optimized latching control and end spring can increase 60–80% more power output compared with the case without them under certain PTO damping. Additionally, we discussed the effects of limiting peak powers and associated energy leaks with latching.

Lee, Yongseok↗

Review of TEAMER Awards for WEC-Sim Support: Preprint

Testing Expertise and Access for Marine Energy Research (TEAMER) is a U.S. Department of Energy Water Power Technologies Office sponsored program, overseen by the Pacific Ocean Energy Trust, which aims to advance the state of marine energy technologies. The program connects technology developers with experts at U.S. facilities, including numerical modeling and analysis facilities, like WEC-Sim. The WEC-Sim facility is supported by the WEC-Sim development team at Sandia National Laboratories and the National Renewable Energy Laboratory. WEC-Sim (Wave Energy Converter SIMulator) is an open-source software for simulating wave energy converters. WEC-Sim can model the multi-body dynamics of devices comprised of bodies, joints, power take-off systems, and mooring systems. Since TEAMER's first round of support in 2020, there have been eighteen TEAMER awards focused on numerical model development in WEC-Sim. TEAMER awards for WEC-Sim support have modeled a wide range of wave energy converter archetypes, including point absorbers, attenuators, oscillating water columns, and many other novel architectures. A wide variety of studies have been conducted, leading to important insights for TEAMER partners and software improvements for WECSim. This article highlights several successful WEC-Sim TEAMER awards. The awards described herein include TEAMER recipients Ocean Motion Technologies, AquaHarmonics, iProTech, East Carolina University, Virginia Tech, Maiden Wave Energy, and the University of Massachusetts Dartmouth. The awards of these seven partners contain a wide range of investigations and cover the creation of baseline hydrodynamic models, PTO modeling, geometry optimization in both boundary element methods and WECSim, and model tuning and validation.

industry support↗

Multibody for Everybody (M4E) - A Linearization Approach to Enable Frequency Domain Analysis, Time Integration and Control Co-Design

1.1 Background/Objectives: Marine energy represents a promising yet underexploited source of power. To increase the harvested power, significant efforts have been made to improve wave energy converter (WEC) modeling capabilities and optimize power take-off (PTO) performance; however, these efforts have often treated WEC dynamics, PTO design, and controller development sequentially. In contrast, control co-design (CCD) is emerging as a promising strategy to address these issues directly, creating a growing need for fast analysis tools suitable for repeated simulation and parametric studies [1]. To support this need, this work presents the Multibody for Everybody (M4E) [2] linearization module, which employs a symbolic toolbox to provide deeper insight of WEC design parameters. The objective is to demonstrate that a minimal-coordinate linearization of articulated WEC dynamics can provide accurate wave response predictions and substantial computational savings relative to nonlinear time-domain simulation, while preserving compatibility with broader wave-energy analysis workflows, enabling CCD. 1.2 Approach/Activities: The proposed approach linearizes the equations of motion, generated by M4E, in minimal coordinates about a selected operating point and combines the resulting system with frequencydomain hydrodynamic terms to incorporate the reduced mass, damping, stiffness, and forcing operators. The linearized model is used for both impedance-based response amplitude operator (RAO) prediction and rapid regular-wave time integration. The methodology is demonstrated on a single-flap device and a FOSWEC configuration, with linearized M4E responses compared against the corresponding nonlinear M4E simulations and WEC-Sim results. Regular-wave time histories, RAO trends, and runtime differences are assessed. The framework is also compatible with broader wave-energy workflows, including coupling to WecOptTool, although that capability is not the focus of this work [3]. 1.3 Results/Lessons: The linearized M4E model reproduces key regularwave response characteristics such as integration and Response Amplitude over multiple frequencies. This module matches nonlinear M4E and WEC-Sim results while substantially reducing integration cost. Thus, the proposed framework can serve as a rapid analysis layer for articulated WEC design, parameter studies, and controls-oriented workflows. The analysis is most appropriate in the near-equilibrium regime, about the linearization point.

16 TIDAL AND WAVE POWER↗

Numerical Modelling of a Two-Body Point Absorber Featuring Variable Geometry

This work presents a novel wave energy converter (WEC) device concept that incorporates variable geometry modules into a two-body point absorber type WEC. The variable geometry modules consist of air inflatable bags in the surface float and a water inflatable ring in the reaction body. The variable geometry floats are able to provide greater control over the device hydrodynamics; they can be inflated or deflated to emphasize either power absorption or load shedding. The device geometry is controlled in a quasi-static fashion, while the power take-off (PTO) unit is controlled on a wave-to-wave timescale. The surface float is tethered directly to the submerged reaction body through PTO tether lines. A linear time-domain analysis, conducted using open-source Wave Energy Converter (WEC-Sim) software, was used to estimate the absorbed power of the WEC in sea states defined by the Wave Energy Prize. WEC power performance was weighted against the expected capital cost of building the load bearing structure of the device, providing an estimated ACE value. The inclusion of the variable geometry modules was shown to be effective in altering the device geometry to improve power capture with a near proportional increase in expected costs, providing a nearly constant power-to-cost ratio.

cost of energy↗

Transmission mounted electrical charging system and dual driveline load coupling

A system includes a PTO device that selectively couples to a driveline of a vehicle at each of two driveline coupling positions, and a motor/generator electrically coupled to an electrical power storage system. The system further includes a shared load selectively powered by the driveline or the motor/generator. The PTO device further includes a coupling actuator that couples the shared load to the motor/generator in a first position, and couples the shared load to the driveline in a second position.

Fortune, Glenn Clark↗

Nonlinear Model Predictive Control Based on Real-Time Iteration Scheme for Wave Energy Converters Using WEC-Sim: Preprint

One of several challenges that wave energy technologies face is their inability to generate electricity cost-competitively with other grid-scale energy generation sources. Several studies have identified two approaches to lower the levelised cost of electricity: reduce the cost over the device's lifetime or increase its overall electrical energy production. Several advanced control strategies have been developed to address the latter. However, only a few take into account the overall efficiency of the power take-off (PTO) system, and none of them solve the optimisation problem that arises at each sampling time on real-time. In this paper, a detailed Nonlinear model predictive control (NMPC) approach based on the real-time iteration (RTI) scheme is presented, and the controller performance is evaluated using a time-domain hydrodynamics model (WEC-Sim). The proposed control law incorporates the PTO system's efficiency in a control law to maximise the energy extracted. The study also revealed that RTI-NMPC clearly outperforms a simple resistive controller.

model predictive control↗

Influence on Structural Loading of a Wave Energy Converter by Controlling Variable-Geometry Components and the Power Take-Off: Preprint

Oceans are a harsh environment and can impose significant loads on deployed structures. Deployment of wave energy converters (WECs) faces a design challenge with apparently contradictory goals. A WEC should be designed to maximize the energy absorbed while ensuring the operating wave condition does not exceed the failure limits of the device itself. Therefore, the loads endured by the support structure are a design constraint for the system. Adaptability to different sea states is, therefore, highly desirable. This work uses a WEC-Sim model of a Variable Geometry Oscillating Wave Energy Converter (VGOSWEC) mounted on a support structure simulated under different wave scenarios. A VGOSWEC resembles a paddle pitching about a fixed hinge perpendicular to the incoming waves-fronts. Therefore, the hinge experiences loads perpendicular to its axis as it maintains its position. The geometry of the VGOSWEC was varied by opening a series of controllable flaps on the pitching paddle when the structure experiences threshold loads. Since opening the flaps lets the waves transmit through the paddle, it is hypothesized that opening the flaps should result in load shedding at the base of the support structure. This load shedding is achieved by reducing the moments about the hinge axis. This work compares the hydrodynamic coefficients, natural periods, and Response Amplitude Operators (RAOs) from completely closed to completely open configurations of the controllable flaps. These comparisons quantify the effects of letting the waves transmit through the VGOSWEC. This work shows that the completely open configuration can reduce the pitch and surge loads on the base of the support structure by as much as 80%. It was observed that at the paddle's resonance frequency, the loads on the structure increased substantially. This increase in loads can be mitigated by a rotational Power Take-off (PTO) damping about the hinge axis. Changing the rotational PTO damping was identified as an additional design parameter that can be used to control the loads experienced by the WEC's support structure.

fixed and floating structures↗

Programa de Diseno, Fabricacion y Pruebas del Sistema de Desalinizacion por Olas del NREL: Preprint (Spanish Translation)

To de-risk the U.S. Department of Energy's Waves to Water Prize, the National Renewable Energy Laboratory (NREL) developed a modular, wave powered desalination system. The prize was open to wave energy converter (WEC) designs that generate electricity or WECs that desalinate water mechanically. This added installation risks due to the variance in competitor devices, and the aggressive installation timeline. To reduce these risks NREL developed a wave energy converter (WEC) that the installation team could use to practice installation techniques prior to the competitors arriving to ensure all steps had been considered prior to the event. This was achieved by developing a WEC with a modular power-take-off (PTO). The modular PTO can be configured in one configuration to drive an electric generator that sends electricity to a pier. The electricity that is generated is converted, and stored, so that it can be used to power an electric pump that feeds water to a Reverse Osmosis (RO) desalination unit. In the other configuration the generator is replaced with a pump and seawater is pumped to the RO system on the pier without any electrons being generated. This WEC is formally known as the Hydraulic and Electric Reverse Osmosis (HERO) WEC. For the English version of this report, see NREL/CP-5700-86623 (https://www.nrel.gov/docs/fy24osti/86623.pdf).

laboratory testing↗

Sub-Scale Stage 1 Magnetic Gear for a Marine Hydrokinetic Generator

The goal of this project is to design, fabricate, and test a hermetically sealed 50 kilowatt (kW) multistage magnetically geared generator (MGG). In order to reduce risk, a sub-scale 5kW multistage MGG was first built. This project will benefit MHK device developers by providing an MHK PTO that overcomes the reliability concerns of the mechanical gears and the sizing constraints of the direct-drive generators. Measurement data for a 9.5:1 gear ratio magnetic gear with a measured peak torque of 227 N-m as well as the dual stage magnetic gear with a 63:1 gear ratio.

16 TIDAL AND WAVE POWER↗

Stage 2 Full-Scale Rotary Magnetic Gear for a Marine Hydrokinetic Generator

The goal of this project is to design, fabricate, and test a hermetically sealed 50 kilowatt (kW) multistage magnetically geared generator (MGG). This project will benefit MHK device developers by providing an MHK PTO that overcomes the reliability concerns of the mechanical gears and the sizing constraints of the direct-drive generators. Experimental Testing Data for a 6.66:1 gear ratio dual-stack magnetic gear with a measured peak torque of 1391 N-m

16 TIDAL AND WAVE POWER↗

Stage 2 Sub-Scale Magnetic Gear

The goal of this project is to design, fabricate, and test a hermetically sealed 50 kilowatt (kW) multistage magnetically geared generator (MGG). In order to reduce risk, a sub-scale 5kW multistage MGG was first built. This project will benefit MHK device developers by providing an MHK PTO that overcomes the reliability concerns of the mechanical gears and the sizing constraints of the direct-drive generators. 7.67:1 gear ratio magnetic gear with a measured peak torque of 1796 N-m

16 TIDAL AND WAVE POWER↗

HERO WEC V1.0 - WEC-Sim Model

This zip file contains the files that are needed to simulate NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter). This requires the user to have already installed WEC-Sim. In addition to the standard toolboxes that are required to run WEC-Sim the user will also need the Simscape Fluids and Simscape Driveline packages. In the zip file you will find the following: - HEROV1_HPTO.slx: Simulink-based WEC Sim model of the first gen (V1.0) Hydraulic PTO (power take-off) that was designed for the HERO WEC - wecSimInputFile.m: Input file needed to run the model - userDefinedFunctionsMCR.m: MCR (multi condition run) script that is needed if a use wants to simulate multiple wave conditions. - geometry (folder): Includes the geometry file that is needed for visualization - hydroData (folder): Includes the required WAMIT data to run WEC-Sim

16 TIDAL AND WAVE POWER↗

HERO WEC V1.0 - SolidWorks Model

The attached zip file includes a SolidWorks pack-and-go assembly of NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter) V1.0. This model does not include all aspects of the design (i.e. RO (reverse osmosis) system, electrical enclosure, hose, cable) it only includes the WEC and PTO (power take-off) design.

16 TIDAL AND WAVE POWER↗

HERO WEC V1.0 - WEC-Sim Detailed Simulation Runs and Summary Data

Data sets from simulation runs include 144 wave cases that were run based on the WEC-Sim model (https://mhkdr.openei.org/submissions/483). The 144 wave cases represent waves with the following wave height and wave period ranges: - Significant Wave Height: 0.25 - 4.0m in 0.25m increments - Wave Period: 5 - 13 sec in 1 sec increments Each run was simulated using a Pierson-Moskowitz irregular wave spectrum with a 200 second ramp time and a total simulation time of 2,200 seconds. Summary data set includes a spreadsheet and image files with matrices that are associated with data from simulation runs. All matrices cover the same significant wave height and wave periods from the sim runs, in the same increments. The following matrices are included: - Mechanical Power Input: Absorbed power calculated using linear input velocity at PTO (power take-off) multiplied by winch tension. - Mechanical Power Output: The hydraulic power calculated at the pump output prior to the pressure relief valve dump. - Feed Pressure: Average pressure at RO (reverse osmosis) input prior to pre-filters - RO Power Input: The hydraulic power calculated at the RO system inlet, accounts for flow loss due to pressure relief valve - Water Production: Average clean water flow at RO output

16 TIDAL AND WAVE POWER↗

HERO WEC V1 Upgrades - SolidWorks Models (WEC, RO System, and Submersible Pump Housing)

The attached zip files include SolidWorks pack-and-go assemblies of NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter), the reverse osmosis (RO) assembly, and the submersible pump assembly that is used to provide flow to the RO assembly in the electric configuration. These 3 models were upgraded in 2023 from their baseline models. The HERO WEC model does not include all aspects of the design (i.e. RO system, electrical enclosure, hose, cable), it only includes the WEC and PTO (power take-off) design. This model supersedes the old MHKDR model submission, linked below. The RO model file includes a SolidWorks (version 2023) pack-and-go assembly of the RO assembly that was used for HERO WEC as it was upgraded in 2023. This model ONLY includes the RO assembly and not the WEC, hoses, etc. The submersible pump enclosure model includes a SolidWorks (version 2023) pack-and-go assembly of the submersible pump assembly that is used to provide flow to the RO assembly in the electric configuration HERO WECas it was upgraded in 2023. This model ONLY includes the submersible pump assembly and not the WEC, RO system, hoses, etc. This work has been developed by the National Renewable Energy Laboratory, operated by Alliance for Sustainable Energy, LLC, for the U.S. Department of Energy (DOE) under Contract No. DE-AC36-08GO28308. Funding provided U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Water Power Technologies Office.

16 TIDAL AND WAVE POWER↗