Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROBABILISTIC ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Seismic Assessment of Buildings: Proposal of a New Modified Uncoupled Modal Response History Analysis

This paper develops a new modified uncoupled modal response history analysis (M-UMRHA) in order to study the seismic behavior of structures. It aims to provide an acceptable accuracy with reduced calculation duration in comparison to complete analysis, i.e. the THA. The proposed method improves the existing UMRHA, developed by Chopra and Goel [1], by considering an energy based approach to build the capacity curve [2] and a pseudo-adaptive feature to account for changes in modal shapes after yielding, motivated by an adaptive method [3]. Validation is made by comparison with NLTHA as well as other simplified methods. Low and medium-rise RC buildings were analyzed under real ground motion records. Results show good estimates of structural parameters and give good correlation between damage and story displacements as well as drifts. Like other simplified methods, accuracy decreases in the inelastic domain. However, this procedure gives acceptable estimates of structural response with a few additional calculations and it has the potential to be used in large scale studies, and probabilistic approaches.

42 ENGINEERING↗

High Performance-Multidisciplinary Simulation for Regional Scale Earthquake Hazard and Risk Assessments

Moderate-to-large magnitude earthquakes represent a significant risk around the world and a major issue across the Department of Energy (DOE) mission interests, ranging from DOE's one-of-a-kind mission critical facilities to national energy systems (nuclear power plants, electric/gas distribution systems, and renewable energy production facilities). As a result, for the DOE there is a strong motivation in promoting and developing a risk-informed and performance-based approach for both the assessment of existing facilities and the design of new structures. DOE National Labs have historically made multidisciplinary contributions to the solution of challenging seismic hazard and risk problems and have been at the forefront for the development of design standards for major facilities. The current approach for estimating the ground motion hazard for critical facilities is based upon a Probabilistic Seismic Hazard Analysis (PSHA), whereby measured ground motion data are collected and homogenized into a probabilistic framework to estimate the hazard for future events. However, recent studies have highlighted the site-specific nature of earthquakes and shown the limitations of a purely empirical approach. Moreover, the design of infrastructure systems has been moving toward a performance-based approach, in which specific performance goals are specified at different levels of excitation and for different limit states. Such an approach requires the availability of robust and reliable computational tools for the nonlinear dynamic analysis of complex structural systems. Ongoing research at Lawrence Berkeley National Laboratory (LBNL) and Lawrence Livermore National Laboratory (LLNL) aims at developing an advanced simulation environment at the exascale for a coupled assessment of earthquake hazard (ground motions) and earthquake risk (structural demands)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Photonic implementation for the topological cluster-state quantum computer

An implementation of the topological cluster-state quantum computer is suggested, in which the basic elements are linear optics, measurements, and a two-dimensional array of quantum dots. This overcomes the need for nonlinear devices to create a lattice of entangled photons. Whereas the thresholds found for computational errors are quite satisfactory (above 10{sup -3}), the estimates of the minimum efficiencies needed for the detectors and quantum dots are beyond current technology's reach. This is because we rely heavily on probabilistic entangling gates, which introduces loss into the scheme irrespective of detector and quantum-dot efficiencies.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Bayesian Neural Networks for Uncertainty Analysis of Hydrologic Modeling: A Comparison of Two Schemes

Bayesian Neural Networks (BNNs) have been shown as useful tools to analyze modeling uncertainty of Neural Networks (NNs). This research focuses on the comparison of two BNNs. The first BNNs (BNN-I) use statistical methods to describe the characteristics of different uncertainty sources (input, parameter, and model structure) and integrate these uncertainties into a Markov Chain Monte Carlo (MCMC) framework to estimate total uncertainty. The second BNNs (BNN-II) lump all uncertainties into a single error term (i.e. the residual between model prediction and measurement). In this study, we propose a simple BNN-II, which use Genetic Algorithms (GA) and Bayesian Model Averaging (BMA) to calibrate Neural Networks with different structures (number of hidden units) and combine the predictions from different NNs to derive predictions and uncertainty analysis. We tested these two BNNs in two watersheds for daily and monthly hydrologic simulation. The BMA based BNNs developed in this study outperforms BNN-I in the two watersheds in terms of both accurate prediction and uncertainty estimation. These results show that, given incomplete understanding of the characteristics associated with each uncertainty source, the simple lumped error approach may yield better prediction and uncertainty estimation.

99 GENERAL AND MISCELLANEOUS↗

Minimally Informative Prior Distributions for PSA

A salient feature of Bayesian inference is its ability to incorporate information from a variety of sources into the inference model, via the prior distribution (hereafter simply “the prior”). However, over-reliance on old information can lead to priors that dominate new data. Some analysts seek to avoid this by trying to work with a minimally informative prior distribution. Another reason for choosing a minimally informative prior is to avoid the often-voiced criticism of subjectivity in the choice of prior. Minimally informative priors fall into two broad classes: 1) so-called noninformative priors, which attempt to be completely objective, in that the posterior distribution is determined as completely as possible by the observed data, the most well known example in this class being the Jeffreys prior, and 2) priors that are diffuse over the region where the likelihood function is nonnegligible, but that incorporate some information about the parameters being estimated, such as a mean value. In this paper, we compare four approaches in the second class, with respect to their practical implications for Bayesian inference in Probabilistic Safety Assessment (PSA). The most commonly used such prior, the so-called constrained noninformative prior, is a special case of the maximum entropy prior. This is formulated as a conjugate distribution for the most commonly encountered aleatory models in PSA, and is correspondingly mathematically convenient; however, it has a relatively light tail and this can cause the posterior mean to be overly influenced by the prior in updates with sparse data. A more informative prior that is capable, in principle, of dealing more effectively with sparse data is a mixture of conjugate priors. A particular diffuse nonconjugate prior, the logistic-normal, is shown to behave similarly for some purposes. Finally, we review the so-called robust prior. Rather than relying on the mathematical abstraction of entropy, as does the constrained noninformative prior, the robust prior places a heavy-tailed Cauchy prior on the canonical parameter of the aleatory model.

99 GENERAL AND MISCELLANEOUS↗

Neural Posterior Estimation for Scalable and Accurate Inverse Parameter Inference in Li-Ion Batteries

Diagnosing the internal state of Li-ion batteries is critical for battery research, operation of real-world systems, and prognostic evaluation of remaining lifetime. By using physics-based models to perform probabilistic parameter estimation via Bayesian calibration, diagnostics can account for the uncertainty due to model fitness, data noise, and the observability of any given parameter. However, Bayesian calibration in Li-ion batteries using electrochemical data is computationally intensive even when using a fast surrogate in place of physics-based models, requiring many thousands of model evaluations. A fully amortized alternative is neural posterior estimation (NPE). NPE shifts the computational burden from the parameter estimation step to data generation and model training, reducing the parameter estimation time from minutes to milliseconds, enabling real-time applications. The present work shows that NPE can infer parameters equally or more accurately than Bayesian calibration, even if it leads to higher voltage reconstruction errors. We also demonstrate that the higher computational costs for data generation are tractable even in high-dimensional cases (ranging from 6 to 27 estimated parameters). The NPE method also offers several interpretability advantages over Bayesian calibration, such as local parameter sensitivity to specific regions of the voltage curve. The NPE method is demonstrated using an experimental fast charge dataset, with parameter estimates validated against measurements of loss of lithium inventory and loss of active material. The implementation is made available in a companion repository (https://github.com/NatLabRockies/BatFIT).

25 ENERGY STORAGE↗

Angular Correlation Function Estimators Accounting for Contamination from Probabilistic Distance Measurements

With the advent of surveys containing millions to billions of galaxies, it is imperative to develop analysis techniques that utilize the available statistical power. In galaxy clustering, even small sample contamination arising from distance uncertainties can lead to large artifacts, which the standard estimator for two-point correlation functions does not account for. We first introduce a formalism, termed decontamination, that corrects for sample contamination by utilizing the observed cross-correlations in the contaminated samples; this corrects any correlation function estimator for contamination. Using this formalism, we present a new estimator that uses the standard estimator to measure correlation functions in the contaminated samples but then corrects for contamination. We also introduce a weighted estimator that assigns each galaxy a weight in each redshift bin based on its probability of being in that bin. We demonstrate that these estimators effectively recover the true correlation functions and their covariance matrices. Our estimators can correct for sample contamination caused by misclassification between object types as well as photometric redshifts; they should be particularly helpful for studies of galaxy evolution and baryonic acoustic oscillations, where forward modeling the clustering signal using the contaminated redshift distribution is undesirable.

79 ASTRONOMY AND ASTROPHYSICS↗

Enhanced Component Performance Study: Emergency Diesel Generators 1998–2014

This report presents an enhanced performance evaluation of emergency diesel generators (EDGs) at U.S. commercial nuclear power plants. This report evaluates component performance over time using (1) Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES) data from 1998 through 2014 and (2) maintenance unavailability (UA) performance data from Mitigating Systems Performance Index (MSPI) Basis Document data from 2002 through 2014. The objective is to show estimates of current failure probabilities and rates related to EDGs, trend these data on an annual basis, determine if the current data are consistent with the probability distributions currently recommended for use in NRC probabilistic risk assessments, show how the reliability data differ for different EDG manufacturers and for EDGs with different ratings; and summarize the subcomponents, causes, detection methods, and recovery associated with each EDG failure mode. Engineering analyses were performed with respect to time period and failure mode without regard to the actual number of EDGs at each plant. The factors analyzed are: sub-component, failure cause, detection method, recovery, manufacturer, and EDG rating. Six trends with varying degrees of statistical significance were identified in the data.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Quantitative Risk Management - Risk Informed Decision Making on High-Risk Waste Remediation Projects - 19022

For every $1 billion invested in projects, $97 million is wasted due to poor project performance. That means 9.7% of money spent on projects is wasted due to poor risk and uncertainty management. High-risk projects, similar to those in waste remediation, have the most to lose. A solid quantitative risk management program is one of the keys to increasing the likelihood that a project will succeed. A quantitative risk program solves two major problems that challenge the effective management of risk and uncertainty: 1. Risks arise at all levels of an organization; however, not all organizational levels have an effective way to identify and resolve them. This can lead to risks that, even if identified, are not reported. 2. Decision-makers are often forced to operate solely on intuition when implementing mitigation strategies, not fully understanding the effects that certain decisions have on the program's cost and schedule. A quantitative risk program uses a risk register and builds it into the project/program integrated schedule to assess the impact of these risks, typically at the 80% confidence contingency level for specific milestones and/or project completion. Implementing a quantitative risk program drives a forward-thinking, proactive mentality to problem solving into all levels of the organization. A healthy risk program for regular reporting and communication ensures that all members of an organization are thinking about risks and using their communication channels to resolve them. It gives a method of communication and incentive for all levels in the organization and helps to ensure that risks will be reported and resolved. Pacific Northwest National Laboratory (PNNL) has developed tools and methods that provide a level of realism for analyzing different scenarios and estimating contingency that does not exist in the standard industry risk tool kit. These tools and methods provide decision-makers with actionable, quantitatively based information to guide their decision making. The first tool is a probabilistic branching risk model for mitigation strategies. Current quantitative risk analysis tools in the industry simulate two cases: fully mitigated and un-mitigated. In the fully mitigated case, the user assumes that every planned mitigation activity is successful. In the un-mitigated case, the user assumes that none are successful. The truth lies between these two extremes. The PNNL team has developed a probabilistic risk model for mitigation scenarios that includes a probability that a mitigation activity will succeed and a probability that a mitigation action will be funded. These probabilities are elicited from subject matter experts and ensure that the contingency calculations at the specified confidence are approaching reality. The second tool developed at PNNL is the Risk Box, which is a tool that integrates with different scenarios in the risk register. For example, say the user is faced with two different and mutually exclusive mitigation actions to reduce a risk. The Risk Box methodology performs the contingency calculations and then displays them on a time-phased graph that shows how each scenario reduces the risk contingency needed on the project/program. This graph then provides quantitative information to show decision-makers which mitigation action provides the greatest reduction (cost and schedule) in risk contingency for the program. Implementing these and other tools within a structured risk program increases the likelihood that a project will come in on schedule and budget, ensures that all personnel are proactively thinking about problems and resolutions, creates communication channels for all members to submit and resolve potential problems, produces a prioritized list of risk rankings to focus leadership on issues that may cause the biggest problems, and implements processes that drive updates to the risk program as the risk profile changes. PNNL has been developing these methods and using them on projects for over 20 years. They have been successfully applied on waste management projects, high-tech research and development projects, and construction projects, and they continue to be used on a number of U.S. Department of Energy projects today. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bayesian Analysis of Peak Ground Acceleration Attenuation Relationship

Estimation of peak ground acceleration is one of the main issues in civil and earthquake engineering practice. The Boore-Joyner-Fumal empirical formula is well known for this purpose. In this paper we propose to use the Bayesian probabilistic model class selection approach to obtain the most suitable prediction model class for the seismic attenuation formula. The optimal model class is robust in the sense that it has balance between the data fitting capability and the sensitivity to noise. A database of strong-motion records is utilized for the analysis. It turns out that the optimal model class is simpler than the full order attenuation model suggested by Boore, Joyner and Fumal (1993).

58 GEOSCIENCES↗

Prediction of Safety Level of Low-Head and Ownerless Hydraulic Structures

Methods of systems reliability theory are applied to the results of an expert inspection of more than 1000 low-head hydraulic power systems in the Moscow region. The rates of failure of homogeneous earth dams are estimated. A state graph of a hydraulic structure, represented as a system that passes through discrete states from a normal to a dangerous level without maintenance or repair, is proposed. The constant failure rates for these states are calculated. The probabilistic characteristics of the safety level of low-head earth dams are predicted.

42 ENGINEERING↗

Longevity of geo-synthetic cover components - 15450

Geo-synthetics form many of the key components in modern landfill cell and final cover designs. Models for the long-term performance assessment of systems incorporating these components have traditionally relied on a small number of standard assumptions originally developed to address the needs of the Resource Conservation and Recovery Act (RCRA) Subtitle D solid waste industry. These past estimates demonstrated that, even under a series of highly conservative factors, the longevity of these components far exceeds the requirements for typical solid waste facilities. Traditionally, the interpretation of the geo-synthetic degradation research has been deterministic as opposed to probabilistic, often due to the relative scarcity of degradation data for particular formulations and environmental conditions. Long-term studies of the mechanical and chemical properties of geo-synthetics subjected to accelerated aging processes have been conducted in an attempt to better quantify their longevity to address applications where performance may be required for 1,000 years or more. Of the many cover system geo-synthetic components, geo-membranes appear to have the most significant impact on the long-term performance of cover systems. Based on available long-term aging studies, a series of property degradation curves and their corresponding model parameters are available for geo-membranes. A strong area of need in the performance assessment of shallow disposal facilities is how to connect these research findings with inputs to probabilistic models. Significantly, factors affecting geo-membrane performance, such as geo-membrane thickness, anti-oxidant package, molecular weight, oxygen exposure, and drainage, can be adjusted and re-engineered using a proposed approach to meet specific performance targets. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Optimization-Based Framework to Define the Probabilistic Design Space of Pharmaceutical Processes with Model Uncertainty

To increase manufacturing flexibility and system understanding in pharmaceutical development, the FDA launched the quality by design (QbD) initiative. Within QbD, the design space is the multidimensional region (of the input variables and process parameters) where product quality is assured. Given the high cost of extensive experimentation, there is a need for computational methods to estimate the probabilistic design space that considers interactions between critical process parameters and critical quality attributes, as well as model uncertainty. In this paper we propose two algorithms that extend the flexibility test and flexibility index formulations to replace simulation-based analysis and identify the probabilistic design space more efficiently. The effectiveness and computational efficiency of these approaches is shown on a small example and an industrial case study.

60 APPLIED LIFE SCIENCES↗

Preventing the Next Mass Extinction: Ethical Obligations

This paper presents a framework to judge whether we are meeting our ethical responsibilities for preventing massive species extinction. The framework is a generalization from another framework, one that addresses ethical responsibilities related to preventing premature, involuntary human deaths from environmental risks and the extinction of the human race. The resulting ethical risk standards are quite stringent and it is argued that we are nowhere close to meeting any standards, except in the cases of human extinction and extinction of all life on earth, which are met by chance, not by design. Much work is needed to build the 'technology' needed to estimate probabilities associated with massive losses of human life and species extinction over the suggested 1000 year planning horizon.

99 GENERAL AND MISCELLANEOUS↗

Uranium Chemical and Radiological Risk Assessment for Freshwater Ecosystems Receiving Ore Mining Releases: Principles, Equations and Parameters

Uranium is an element that has the solely characteristic to behave as significant hazard both from a chemical and radiological point of view. Exclusively of natural occurrence, its distribution into the environment may be influenced by human activities, such as nuclear fuel cycle, military use of depleted uranium, or coal and phosphate fertilizer use, which finally may impact freshwater ecosystems. Until now, the associated environmental impact and risk assessments were conducted separately. We propose here to apply the same methodology to evaluate the ecological risk due to potential chemotoxicity and radiotoxicity of uranium. This methodology is articulated into the classical four steps (EC, 2003: problem formulation, effect and exposure analysis, risk characterisation). The problem formulation dealt both with uranium viewed as a chemical element and as the three isotopes 234, 235 and 238 of uranium and their main daughters. Then, the exposure analysis of non-human species was led on the basis of a common conceptual model of the fluxes occurring in freshwater ecosystems. No-effect values for the ecosystem were derived using the same effect data treatment in parallel. A Species Sensitivity Distribution was fitted: (1) to the ecotoxicity data sets illustrating uranium chemotoxicity and allowing the estimation of a Predicted-No-Effect-Concentration for uranium in water expressed in {mu}g/L; (2) to radiotoxicity effect data as it was done within the ERICA project, allowing the estimation of a Predicted No-Effect-Dose-Rate (in {mu}Gy{center_dot}h{sup -1}). Two methods were then applied to characterize the risk to the ecosystem: a screening method using the risk quotient approach, involving for the radiological aspect back calculation of the water limiting concentration from the PNEDR for each isotope taken into account and a probabilistic risk assessment. A former uranium ore mining case-study will help in demonstrating the application of the whole methodology.

54 ENVIRONMENTAL SCIENCES↗

MASSCLEAN-MASSIVE CLUSTER EVOLUTION AND ANALYSIS PACKAGE: DESCRIPTION AND TESTS

We present MASSCLEAN, a new, sophisticated and robust stellar cluster image and photometry simulation package. This visualization tool is able to create color-magnitude diagrams (CMDs) and standard FITS images in any of the traditional optical and near-infrared bands based on cluster characteristics input by the user, including but not limited to distance, age, mass, radius, and extinction. At the limit of very distant, unresolved clusters, we have checked the integrated colors created in MASSCLEAN against those from other simple stellar population models with consistent results. We have also tested models that provide a reasonable estimate of the field star contamination in images and CMDs. We demonstrate the package by simulating images and CMDs of well-known massive Milky Way clusters and compare their appearance to real data. Because the algorithm populates the cluster with a discrete number of tenable stars, it can be used as part of a Monte Carlo Method to derive the probabilistic range of characteristics (integrated colors, for example) consistent with a given cluster mass and age. Our simulation package is available for download and will run on any standard desktop running UNIX/Linux. Full documentation on installation and its use is also available. Finally, a Web-based version of MASSCLEAN, which can be immediately used and is sufficiently adaptable for most applications, is available through a Web interface.

79 ASTRONOMY AND ASTROPHYSICS↗

Integrating Survival Analysis with Bayesian Statistics to Forecast the Remaining Useful Life of a Centrifugal Pump Conditional to Multiple Fault Types

To improve the viability of nuclear power plants, there is a need to reduce their operational costs. Operational costs account for a significant portion of a plant’s yearly budget, due to their scheduled-based maintenance approach. In order to reduce these costs, proactive methods are required that estimate and forecast the state of a machine in real time to optimize maintenance schedules. In this research, we use Bayesian networks to develop a framework that can forecast the remaining useful life of a centrifugal pump. To do so, we integrate survival analysis with Bayesian statistics to forecast the health of the pump conditional to its current state. We complete our research by successfully using the Bayesian network on a case study. This solution provides an informed probabilistic viewpoint of the pumping system for the purpose of predictive maintenance.

42 ENGINEERING↗

Uncertainty analysis for unprotected accidents in sodium-cooled fast reactors.

Reactor safety analyses often utilize a deterministic approach where in addition to performing best estimate calculations, uncertainty is accommodated by performing calculations with pessimistic values for input parameters that are important to safety. Here, a stochastic approach is considered for explicitly including uncertainty in safety parameters by applying Monte Carlo sampling coupled with established deterministic reactor safety analysis tools. The Monte Carlo approach yields frequency distributions for reactor safety metrics (e.g., peak temperatures) that can be compared to performance limits, allowing for an improved determination of the safety margin and a clear determination of which safety parameters are most important to the transient response. Because the approach enables the estimation of probabilities for violating safety boundaries, it should be useful in a risk-based regulatory environment. It has the advantage of not requiring any substantial rewriting of existing safety analysis computer codes.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗