RAVEN: a GUI and an Artificial Intelligence Engine in a Dynamic PRA Framework

Increases in computational power and pressure for more accurate simulations and estimations of accident scenario consequences are driving the need for Dynamic Probabilistic Risk Assessment (PRA) [1] of very complex models. While more sophisticated algorithms and computational power address the back end of this challenge, the front end is still handled by engineers that need to extract meaningful information from the large amount of data and build these complex models. Compounding this problem is the difficulty in knowledge transfer and retention, and the increasing speed of software development. The above-described issues would have negatively impacted deployment of the new high fidelity plant simulator RELAP-7 (Reactor Excursion and Leak Analysis Program) at Idaho National Laboratory. Therefore, RAVEN that was initially focused to be the plant controller for RELAP-7 will help mitigate future RELAP-7 software engineering risks. In order to accomplish this task, Reactor Analysis and Virtual Control Environment (RAVEN) has been designed to provide an easy to use Graphical User Interface (GUI) for building plant models and to leverage artificial intelligence algorithms in order to reduce computational time, improve results, and help the user to identify the behavioral pattern of the Nuclear Power Plants (NPPs). In this paper we will present the GUI implementation and its current capability status. We will also introduce the support vector machine algorithms and show our evaluation of their potentiality in increasing the accuracy and reducing the computational costs of PRA analysis. In this evaluation we will refer to preliminary studies performed under the Risk Informed Safety Margins Characterization (RISMC) project of the Light Water Reactors Sustainability (LWRS) campaign [3]. RISMC simulation needs and algorithm testing are currently used as a guidance to prioritize RAVEN developments relevant to PRA.

97 MATHEMATICS AND COMPUTING↗

Conditional Tree Reduction in the ADAPT Framework

Probabilistic Risk Assessment (PRA) uses fault tree/event tree analysis to evaluate the environmental impacts of nuclear power plants due to internal or external initiating events. In a fault tree, basic failure events are assembled using primarily And/Or logic to determine the combinations of failures that lead to failure of the system as a whole. An event tree is forward-facing, and begins with a single initiating event. From there the analysis considers what event may occur next, and branches out among the possible configurations of occurrence and non-occurrence of that event. This branching continues until end states are reached. End states may include a safe and stable configuration of the plant, or any number of differing failure states. Both fault and event trees require basic event probabilities as inputs to provide insight on the likelihood of different outcomes. PRA has been applied to nuclear power plants as an analysis tool since the 1975 Reactor Safety Study. In a traditional PRA, the order of events is prescribed by the analyst and each event is typically a binary aleatory uncertainty: occurrence or non-occurrence. Discrete dynamic event tree (DDET) analysis eliminates this subjectivity in ordering of events by using the output of a dynamic system model (simulator) to inform the branching. Branching conditions are triggered by the existence of a relevant plant state in the code, and therefore only occur as physically appropriate. The DDET approach also allows consideration of both epistemic and aleatory uncertainties on a phenomenologically and stochastically consistent platform. A DDET may be orders of magnitude larger than a traditional event tree for the same initiating event, as more of the uncertainty space is likely to be explored and the tree does not require manual assembly. Because of the size, manual inspection of the entire DDET is often infeasible. This problem may be approached from the front by reducing the number of sampled branching values or by online pruning of the tree, thus reducing the total number of branches. Utilizing post-processing techniques to draw actionable insights via clustering has also been proposed. One post-processing tool to reduce the DDET according to user-defined rules has been recently implemented in the Analysis of Dynamic Accident Progression Trees (ADAPT) DDET driver code. The tool creates a 'slice' of the DDET comprised of the set of branches that meet a set of user-input rules, for immediate visualization or for further calculations conditional on the rules being met. This extension is expected to ease analysis of the results of large and complex DDETs, leading to greater applicability of DDETs in PRA. It should be emphasized that this tool is a visualization aide and does not impact the theoretical basis of the DDET approach. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Optimized Uncertainty Quantification Algorithm Within a Dynamic Event Tree Framework

Methods for developing Phenomenological Identification and Ranking Tables (PIRT) for nuclear power plants have been a useful tool in providing insight into modelling aspects that are important to safety. These methods have involved expert knowledge with regards to reactor plant transients and thermal-hydraulic codes to identify are of highest importance. Quantified PIRT provides for rigorous method for quantifying the phenomena that can have the greatest impact. The transients that are evaluated and the timing of those events are typically developed in collaboration with the Probabilistic Risk Analysis. Though quite effective in evaluating risk, traditional PRA methods lack the capability to evaluate complex dynamic systems where end states may vary as a function of transition time from physical state to physical state . Dynamic PRA (DPRA) methods provide a more rigorous analysis of complex dynamic systems. A limitation of DPRA is its potential for state or combinatorial explosion that grows as a function of the number of components; as well as, the sampling of transition times from state-to-state of the entire system. This paper presents a method for performing QPIRT within a dynamic event tree framework such that timing events which result in the highest probabilities of failure are captured and a QPIRT is performed simultaneously while performing a discrete dynamic event tree evaluation. The resulting simulation results in a formal QPIRT for each end state. The use of dynamic event trees results in state explosion as the number of possible component states increases. This paper utilizes a branch and bound algorithm to optimize the solution of the dynamic event trees. The paper summarizes the methods used to implement the branch-and-bound algorithm in solving the discrete dynamic event trees.

42 ENGINEERING↗

Extension of the ADAPT Framework for Multiple Simulators

Probabilistic Risk Assessment (PRA) uses fault tree/event tree analysis to evaluate the environmental impacts of nuclear power plants due to internal or external initiating events. In a fault tree, basic failure events are assembled using primarily And/Or logic to determine the combinations of failures that lead to failure of the system as a whole. An event tree is forward-facing, and begins with a single initiating event. From there the analysis considers what event may occur next, and branches out among the possible configurations of occurrence and non-occurrence of that event. This branching continues until end states are reached. End states may include a safe and stable configuration of the plant, or any number of differing failure states. Both fault and event trees require basic event probabilities as inputs to provide insight on the likelihood of different outcomes. PRA has been applied to nuclear power plants as an analysis tool since the 1975 Reactor Safety Study. In a traditional PRA, the order of events is prescribed by the analyst and each event is typically a binary aleatory uncertainty: occurrence or non-occurrence. Discrete dynamic event tree (DDET) analysis eliminates this subjectivity in ordering of events by using the output of a dynamic system model (simulator) to inform the branching. Branching conditions are triggered by the existence of a relevant plant state in the code, and therefore only occur as physically appropriate. The DDET approach also allows consideration of both epistemic and aleatory uncertainties on a phenomenologically and stochastically consistent platform. One limitation of the DDET driver codes developed to date (namely ADAPT, ADS, and MCDET ) is that the tree is driven by a single simulator. The goal of this work is a general multi-simulator driver. This limits the parameter space that may be explored in a single DDET to that which may be covered by a single simulator. In this work, the Analysis of Dynamic Accident Progression Trees (ADAPT) code is extended to support multiple arbitrary simulators. This capability will increase the depth and breadth of phenomena that may be analyzed in a single DDET. For example, a large-scale system code may pass the analysis to a more detailed code if certain conditions are met, in order to capture relevant phenomena that would be lost if only the system code were to be used. In addition, the time required to cover a given uncertainty space may be reduced by dynamically identifying and running only the situations that are appropriate given the plant conditions in each simulator. The use of multiple simulators is expected to further reduce subjectivity in PRA by enabling high fidelity modeling of reality. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Dynamic Importance Measures in the ADAPT Framework

Probabilistic Risk Assessment (PRA) uses fault tree/event tree analysis to evaluate the environmental impacts of nuclear power plants due to internal or external initiating events. In a fault tree, basic failure events are assembled using primarily And/Or logic to determine the combinations of failures that lead to failure of the system as a whole. An event tree is forward-facing, and begins with a single initiating event. From there the analysis considers what event may occur next, and branches out among the possible configurations of occurrence and non-occurrence of that event. This branching continues until user-defined end states are reached. End states may include a safe and stable configuration of the plant, or any number of differing failure states. Both fault and event trees require basic event probabilities as inputs to provide insight on the likelihood of different outcomes. PRA has been applied to nuclear power plants as an analysis tool since the 1975 Reactor Safety Study. In a traditional PRA, the order of events is prescribed by the analyst and each event is typically a binary aleatory uncertainty: occurrence or non-occurrence. Discrete dynamic event tree (DDET) analysis eliminates this subjectivity in ordering of events by using the output of a dynamic system model (simulator) to inform the branching. Branching conditions are triggered by the existence of a relevant plant state in the code, and therefore only occur as physically appropriate. The DDET approach also allows consideration of both epistemic and aleatory uncertainties on a phenomenologically and stochastically consistent platform. One current limitation of DDETs is the assessment of results, which is not as well developed as in traditional PRA. A concept that is used in PRA to assess the significance of a basic event is the concept of importance measures (IMs). In traditional PRA, IMs only consider the likelihood of occurrence of non-occurrence of a basic event. The application of importance measures to DDETs must take into consideration not only the occurrence and non-occurrence of an event, but also uncertain timing or severity. This work describes three general dynamic importance measures (DIMs) as implemented in the Analysis of Dynamic Accident Progression Trees (ADAPT) DDET driver code. The measures account for the change in progression of the DDET resulting from the different values of each uncertain variable under investigation. The DIMs are applied to a sample DDET to demonstrate the type of insights that may be gained from each one. These measures will facilitate comparison of the impact of dynamic branching events on a consequence of interest, which also allow DDETs to be used in prioritizing plant investments. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A systematic decision-making methodology to formalize the selection of degree of realism in screening analysis of probabilistic risk assessment

In the nuclear power domain, Probabilistic Risk Assessment (PRA) is used to inform decision-making for Nuclear Power Plants (NPPs). Recently, there has been an increase in the utilization of modeling and simulation (M&S) to support the estimation of PRA inputs. Risk analysts should carefully select the PRA items that require M&S and their degree of realism (DoR) with consideration of the required resources. To support this selection, this article formulates a systematic decision-making approach for the DoR selection. The DoR selection is made based on two predictive decision-making attributes: the predicted differences in safety risk estimate (ΔSaRi) and the cost of analysis (ΔCAN). This research also develops and quantifies causal models to estimate ΔSaRi and ΔCAN. The causal model-based prediction of ΔSaRi and ΔCAN helps reduce the trial-and-error nature of the DoR selection in the PRA screening analysis and provides insights for DoR selection and the gradual refinements of PRA realism. This approach is demonstrated for a case study on fire PRA of NPPs, where an adequate DoR is selected from two fire models: an engineering correlation and a zone model.

Alkhatib, Sari [Department of Nuclear, Plasma, and↗

Knowledge Representation Standards and Interchange Formats for Causal Graphs

In many domains, automated reasoning tools must represent graphs of causally linked events. These include fault-tree analysis, probabilistic risk assessment (PRA), planning, procedures, medical reasoning about disease progression, and functional architectures. Each of these fields has its own requirements for the representation of causation, events, actors and conditions. The representations include ontologies of function and cause, data dictionaries for causal dependency, failure and hazard, and interchange formats between some existing tools. In none of the domains has a generally accepted interchange format emerged. The paper makes progress towards interoperability across the wide range of causal analysis methodologies. We survey existing practice and emerging interchange formats in each of these fields. Setting forth a set of terms and concepts that are broadly shared across the domains, we examine the several ways in which current practice represents them. Some phenomena are difficult to represent or to analyze in several domains. These include mode transitions, reachability analysis, positive and negative feedback loops, conditions correlated but not causally linked and bimodal probability distributions. We work through examples and contrast the differing methods for addressing them. We detail recent work in knowledge interchange formats for causal trees in aerospace analysis applications in early design, safety and reliability. Several examples are discussed, with a particular focus on reachability analysis and mode transitions. We generalize the aerospace analysis work across the several other domains. We also recommend features and capabilities for the next generation of causal knowledge representation standards.

Throop, David R.↗

Risk-Informed Safety Margin Characterization Case Study: Selection of Electrical Equipment to Be Subjected to Environmental Qualification

The Risk-Informed Safety Margin Characterization (RISMC) pathway of the DOE’s Light Water Reactor Sustainability (LWRS) program focuses on advancing the state of the art in safety analysis and risk assessment to support decision-making on nuclear power plant operation well beyond the originally designed lifetime of the plants (i.e., beyond 60 years). Among the issues being addressed in RISMC is the significance of SSC aging and how confident we are about our understanding of its impact on the margin between the loads SSCs are expected to see during normal operation and accident conditions, and the SSC capacities (their ability to resist those loads) as the SSCs age. In this paper, a summary is provided of a case study that examines SSC aging from an environmental qualification (EQ) perspective. The case study illustrates how the state of knowledge regarding SSC margin can be characterized given the overall integrated plant design, and was developed to demonstrate a method for deciding on which cables to focus, which cables are not so important from an environmental qualification margin standpoint, and what plant design features or operating characteristics determine the role that environmental qualification plays in establishing a safety case on which decisions regarding margin can be made. The selection of cables for which demonstration of margin with respect to aging and environmental challenges uses a technique known as Prevention Analysis. Prevention Analysis is a Boolean method for optimal selection of SSCs (that is, those combinations of SSCs both necessary and sufficient to meet a predetermined selection criterion) in a manner that allows demonstration that plant-level safety can be demonstrated by the collection of selected SSCs alone. Choosing the set of SSCs that is necessary and sufficient to satisfy the safety objectives, and demonstrating that the safety objectives can be met effectively, determines where resources are best allocated to assure SSC performance margin. The paper describes the resulting component types that were selected by Prevention Analysis and identifies the accident sequence characteristics that cause these component types to be important from an EQ and aging perspective (and, hence, worthwhile evaluating the extent of safety margin). In addition, component types not selected as needing significant margin from an EQ and aging perspective are discussed and an engineering rationale is developed justifying the lack of need to apply resources to demonstrating margin for these component types. This rationale is in terms of design features of the plant and operating characteristics that make these component types less important from an EQ and aging perspective. While the case study focuses on EQ and aging of equipment and cables located inside the containment of this PWR, the prevention analysis method is demonstrated to be an effective technique for identification of minimal collections of components that would be effective in managing safety for a variety of issues associated with aging and long-term operation of the fleet of plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Reliability and Probabilistic Risk Assessment - How They Play Together

PRA methodology is one of the probabilistic analysis methods that NASA brought from the nuclear industry to assess the risk of LOM, LOV and LOC for launch vehicles. PRA is a system scenario based risk assessment that uses a combination of fault trees, event trees, event sequence diagrams, and probability and statistical data to analyze the risk of a system, a process, or an activity. It is a process designed to answer three basic questions: What can go wrong? How likely is it? What is the severity of the degradation? Since 1986, NASA, along with industry partners, has conducted a number of PRA studies to predict the overall launch vehicles risks. Planning Research Corporation conducted the first of these studies in 1988. In 1995, Science Applications International Corporation (SAIC) conducted a comprehensive PRA study. In July 1996, NASA conducted a two-year study (October 1996 - September 1998) to develop a model that provided the overall Space Shuttle risk and estimates of risk changes due to proposed Space Shuttle upgrades. After the Columbia accident, NASA conducted a PRA on the Shuttle External Tank (ET) foam. This study was the most focused and extensive risk assessment that NASA has conducted in recent years. It used a dynamic, physics-based, integrated system analysis approach to understand the integrated system risk due to ET foam loss in flight. Most recently, a PRA for Ares I launch vehicle has been performed in support of the Constellation program. Reliability, on the other hand, addresses the loss of functions. In a broader sense, reliability engineering is a discipline that involves the application of engineering principles to the design and processing of products, both hardware and software, for meeting product reliability requirements or goals. It is a very broad design-support discipline. It has important interfaces with many other engineering disciplines. Reliability as a figure of merit (i.e. the metric) is the probability that an item will perform its intended function(s) for a specified mission profile. In general, the reliability metric can be calculated through the analyses using reliability demonstration and reliability prediction methodologies. Reliability analysis is very critical for understanding component failure mechanisms and in identifying reliability critical design and process drivers. The following sections discuss the PRA process and reliability engineering in detail and provide an application where reliability analysis and PRA were jointly used in a complementary manner to support a Space Shuttle flight risk assessment.

Safie, Fayssal M.↗

Plant-Level Scenario-Based Risk Analysis for Enhanced Resilient PWR – SBO and LBLOCA

This report documents the activities performed during the FY2018 for the DOE Light Water Reactor Sustainability (LWRS) Program, Risk-Informed System Analysis (RISA) Pathway, Enhanced Resilient Plant (ERP) Systems research. The purpose of the RISA Pathway research and development is to support plant owner-operator decisions with the aim to improve the economics, reliability, and maintain the high levels of safety of current nuclear power plants over periods of extended plant operations. The concept of ERP refers to the combinations of Accident Tolerant Fuel (ATF), optimal use of Diverse and Flexible Coping Strategy (FLEX), enhancements to plant components and systems, and the incorporation of augmented or new passive cooling systems, as well as improved fuel cycle efficiency. The objective of the ERP research effort is to use the RISA methods and toolkit in industry applications, including methods development and early demonstration of technologies, in order to enhance existing reactors safety features (both active and passive) and to substantially reduce operating costs through risk-informed approaches to plant design modifications to the plant and their characterization. There are two main focus areas in FY2018 for the ERP R&D efforts. One is to evaluate the risk impact brought by the ATF designs and FLEX in the selected accident scenarios. The other is to investigate various approaches to accomplish the ERP research objective, i.e., use RISA methods and toolkit to enhance existing reactors safety features and reduce plant operating costs.

99 GENERAL AND MISCELLANEOUS↗

Evaluation of Joint Cyber/Safety Risk in Nuclear Power Systems

This report presents an analysis of the Emergency Core Cooling System (ECCS) for a generic Boiling Water Reactor (BWR)-4 NPP. The Electric Power Research Institute (EPRI) developed Hazards and Consequences Analysis for Digital Systems (HAZCADS) process is applied to the ECCS and its subsystems to identify unsafe control actions (UCAs) which act as possible cyber events of concern. The analysis is performed for two design basis events: Small-break Loss of Coolant Accident (SLOCA) and general transients (TRANS), such as unintended reactor trip. In previous work, HAZCADS UCAs were combined with other cyber-attack analysis to develop a risk-informed approach; however, this was for a single system. This report explores advanced systems engineering modeling approaches to model the interactions between digital assets across multiple systems which may be targeted by cyber adversaries. The complex and interdependent design of digital systems has the potential to introduce emergent cyber properties that are generally not covered by hazard analyses nor formal nuclear Probabilistic Risk Assessment (PRA). The R&D and supporting analysis presented here explores approaches to predict and manage how interdependent system properties effect risk. To show the potential impact of a successful cyber-attack to formal PRA event tree probabilities, HAZCADS analysis was also used. HAZCADS was also used to model the automatic depressurization system (ADS) automatic actuation. This analysis extended to an integrated system analysis for common-cause failure (CCF). In this aspect, the HAZCADS analysis continued by analyzing plant design details for system connectivity in support of critical plant functions. A dependency matrix was developed to depict the integrated functionality of the interconnected systems. Areas of potential CCF are indicated. Future work could include adversary attack development to show how CCF could be caused, resulting in PRA events. Across the multiple systems that comprise the ECCS, the analysis shows that the change in such probabilities was very different between systems. This indicates that some systems have a larger potential risk impact from successful cyber-attack or digital failure, which indicates a need for these systems to have a higher priority for design and defensive measures. Furthermore, we were able to establish that a risk analysis using any arbitrary threat model establishes an ordering of components with regard to cyber-risk. This ordering can be used to influence the overall system design with an eye to lowering risk, or as a way to understand real-time risk to operational systems based on a current threat landscape. Expert knowledge of both the analysis process and the system being analyzed is required to perform a HAZCADS analysis. The need for a tiered risk analysis is demonstrated by the results of this report.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SPAR Model Structural Efficiencies

The Nuclear Regulatory Commission (NRC) and the Electric Power Research Institute (EPRI) are supporting initiatives aimed at improving the quality of probabilistic risk assessments (PRAs). Included in these initiatives are the resolution of key technical issues that are have been judged to have the most significant influence on the baseline core damage frequency of the NRC’s Standardized Plant Analysis Risk (SPAR) models and licensee PRA models. Previous work addressed issues associated with support system initiating event analysis and loss of off-site power/station blackout analysis.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Experimental Breeder Reactor II (EBR-II) Level 1 Probabilistic Risk Assessment

The National Academy of Sciences Study of the USDOE Category A Reactors recommended that a Probabilistic Risk Assessment (PRA) should be performed on the EBR-11 Reactor. In January 1989, a Level 1 PRA was initiated. This report documents work performed in completing the Level 1 PRA except for seismic analysis; it describes the methodology used, assumptions made, the analysis performed, and the final results. The seismic risk assessment is in progress. It will be separately documented.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of Dry Cask Risk Tools

The Nuclear Regulatory Commission (NRC) has repeatedly expressed a desire to increase the use of risk in its decision-making. The Probabilistic Risk Assessment (PRA) Policy Statement published in 1995 formalized the Commission’s commitment to risk-informed regulation through the expanded use of PRA. While a great deal of work has been done to incorporate risk insights into the regulatory framework for at-power nuclear reactors. Far less progress has been made to risk inform the dry-casks and nuclear waste transportation areas of the nuclear fuel cycle. INL was tasked with incorporating the information from the two completed dry cask PRAs as well as any additional available information into a tool that helps the NRC use those insights to identify levels of risk at various stages in the nuclear waste cycle. The first task was to address the License Amendment Request (LAR) Process for Dry Cask storage, the second task is for the incorporate transportation into the tool, and the third and final task will be incorporate any additional regulatory applications for dry cask storage. This report covers the first task of the tool and will eventually incorporate the remaining two tasks may be completed in the future and built off the model described here. Task 1 specifically asked to incorporate the risk insights into the process for determining and prioritizing review of license amendment changes related to storage applications by outlining a resource allocation strategy and defining recommendations of for the depth and breadth of the LAR review. It was requested that the tool be similar in design to the SDP notebooks/worksheets and contain quantitative, qualitative, or semi-quantitative approaches to assessing the risk of the change. The final tool that was selected by INL to be developed was a flowchart and associated rationale document that allows the reviewer to quickly assess potential LAR changes and their associated risks as well as the rationale behind the risk categorization. This risk categorization will lead to specific actionable recommendations to expect from a change of that specific category. This allows for a more consistent review process as well as improving the overall efficiency of the review itself.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Improving Dose Modeling With Dynamic Modeling Tools [Slides]

Utilities aiming for higher fuel enrichment for power uprates or extended operation times before refueling must conduct a new dose analysis. Current conservative dose estimation standards may cause utilities to exceed regulatory limits for proposed increased fuel enrichment. A more accurate modeling of doses from reactor accidents can lower these conservative assumptions. Prescott et al. (2022) demonstrated that the Event Modeling Risk Assessment using Linked Diagrams (EMRALD) software tool, developed at Idaho National Laboratory (INL), can be coupled with the Modular Accident Analysis Program (MAAP5) for dynamic accident analysis in reactor plants. EMRALD forms models of potential accident scenarios, while MAAP5 simulates the accident progression and dose consequences. By integrating these software tools with utility-specific data, a more precise estimation of dose consequences from plant accidents can be achieved. Preliminary findings indicate that EMRALD provides accurate mean core damage frequencies for generalized accident scenarios. Future work includes expanding the model to account for plant-specific data and mitigation factors.

97 - MATHEMATICS AND COMPUTING↗

Risk Management for the International Space Station

The International Space Station (ISS) is an extremely complex system, both technically and programmatically. The Space Station must support a wide range of payloads and missions. It must be launched in numerous launch packages and be safely assembled and operated in the harsh environment of space. It is being designed and manufactured by many organizations, including the prime contractor, Boeing, the NASA institutions, and international partners and their contractors. Finally, the ISS has multiple customers, (e.g., the Administration, Congress, users, public, international partners, etc.) with contrasting needs and constraints. It is the ISS Risk Management Office strategy to proactively and systematically manages risks to help ensure ISS Program success. ISS program follows integrated risk management process (both quantitative and qualitative) and is integrated into ISS project management. The process and tools are simple and seamless and permeate to the lowest levels (at a level where effective management can be realized) and follows the continuous risk management methodology. The risk process assesses continually what could go wrong (risks), determine which risks need to be managed, implement strategies to deal with those risks, and measure effectiveness of the implemented strategies. The process integrates all facets of risk including cost, schedule and technical aspects. Support analysis risk tools like PRA are used to support programatic decisions and assist in analyzing risks.

Sebastian, J.↗

Simulation Assisted Risk Assessment: Blast Overpressure Modeling

A probabilistic risk assessment (PRA) approach has been developed and applied to the risk analysis of capsule abort during ascent. The PRA is used to assist in the identification of modeling and simulation applications that can significantly impact the understanding of crew risk during this potentially dangerous maneuver. The PRA approach is also being used to identify the appropriate level of fidelity for the modeling of those critical failure modes. The Apollo launch escape system (LES) was chosen as a test problem for application of this approach. Failure modes that have been modeled and/or simulated to date include explosive overpressure-based failure, explosive fragment-based failure, land landing failures (range limits exceeded either near launch or Mode III trajectories ending on the African continent), capsule-booster re-contact during separation, and failure due to plume-induced instability. These failure modes have been investigated using analysis tools in a variety of technical disciplines at various levels of fidelity. The current paper focuses on the development and application of a blast overpressure model for the prediction of structural failure due to overpressure, including the application of high-fidelity analysis to predict near-field and headwinds effects.

Lawrence, Scott L.↗

Application of the NUREG/CR-6850 EPRI/NRC Fire PRA Methodology to a DOE Facility

The application NUREG/CR-6850 EPRI/NRC fire PRA methodology to DOE facility presented several challenges. This paper documents the process and discusses several insights gained during development of the fire PRA. A brief review of the tasks performed is provided with particular focus on the following: • Tasks 5 and 14: Fire-induced risk model and fire risk quantification. A key lesson learned was to begin model development and quantification as early as possible in the project using screening values and simplified modeling if necessary. • Tasks 3 and 9: Fire PRA cable selection and detailed circuit failure analysis. In retrospect, it would have been beneficial to perform the model development and quantification in 2 phases with detailed circuit analysis applied during phase 2. This would have allowed for development of a robust model and quantification earlier in the project and would have provided insights into where to focus the detailed circuit analysis efforts. • Tasks 8 and 11: Scoping fire modeling and detailed fire modeling. More focus should be placed on detailed fire modeling and less focus on scoping fire modeling. This was the approach taken for the fire PRA. • Task 14: Fire risk quantification. Typically, multiple safe shutdown (SSD) components fail during a given fire scenario. Therefore dependent failure analysis is critical to obtaining a meaningful fire risk quantification. Dependent failure analysis for the fire PRA presented several challenges which will be discussed in the full paper.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗