Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PORT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Venous Access Ports: Indications, Implantation Technique, Follow-Up, and Complications

The subcutaneous venous access device (SVAD or 'port') is a critical component in the care of patients with chronic disease. The modern SVAD provides reliable access for blood withdrawal and medication administration with minimal disruption to a patient's lifestyle. Because of improved materials and catheter technology, today's ports are lighter and stronger and capable of high-pressure injections of contrast for cross-sectional imaging. The majority of SVAD placement occurs in interventional radiology departments due to their ability to provide this service at lower costs, lower, complication rates, and greater volumes. Port-insertion techniques vary depending on the operator, but all consist of catheter placement in the central venous circulation followed by subcutaneous pocket creation and port attachment to the catheter with fixation and closure of the pocket. Venous access challenges occasionally occur in patients with central vein occlusions, necessitating catheterization of collateral veins or port placement in alternate locations. Complications of SVADs include those associated with the procedure as well as short- (<30 days) and long-term problems. Procedural and early complications are quite rare due to the near-universal use of real-time ultrasound guidance for vein puncture, but they can include hematoma, catheter malposition, arrhythmias, and pneumothorax. Late problems include both thrombotic complications (native venous or port-catheter thrombosis) and infections (tunnel or pocket infections or catheter-associated bloodstream infections). Most guidelines suggest that 0.3 infections/1000 catheter days is an appropriate upper threshold for the insertion of SVADs.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Natural thorium isotopes in marine sediment core off Labuan port

Sediment core was collected from Labuan port and analyzed to determine the radioactivity of thorium (Th) isotopes. The objectives of this study are to determine the possible sources of Th isotopes at Labuan port and estimates the sedimentation rate based on {sup 228}Th/{sup 232}Th model. The results suggest the {sup 230}Th and {sup 232}Th might be originated from terrestrial sedimentary rock while {sup 228}Th originated by authigenic origin. High ratio value of {sup 230}Th/{sup 232}Th detected at the top surface sediment indicates the increasing of {sup 230}Th at the recent years which might be contributed from the anthropogenic sources. The sedimentation rate of core sediment from Labuan Port was successfully estimated by using {sup 228}Th/{sup 232}Th model. The result show high sedimentation rate with 4.67 cm/year indicates rapid deposition occurred at this study area due to the high physical activity at the Labuan port. By assume the constant sedimentation rate at this area; we estimated the age of 142 cm core sediment obtained from Labuan port is 32 years started from 1981 to 2012. This chronology will be used in forthcoming research to investigate the historical profile of anthropogenic activities affecting the Labuan port.

07 ISOTOPE AND RADIATION SOURCES↗

Resilient U.S. Land Ports of Entry

The continued operation of Land Ports of Entry (LPOE), managed by the Customs and Border Protection (CBP) and General Services Administration% is vital to the U.S. economy and security. Border faculties are included in the Department of Homeland Security (DHS) Government Facilities Sector2, one of the 16 critical infrastructures "whose assets, systems, and networks, whether physical or virtual, are considered so vital to the United States that their incapacitation or destruction would have a debilitating effect on security, national economic security, national public health or safety, or any combination thereof.'" Specifically, disruptions to the flow of border crossing traffic, in the form of closures or increased border crossing wait times, impact the economy and security of all countries involved. This paper describes a process for analyzing and improving the resilience of U.S. Land Ports of Entry. For LPOE, the team believes that energy resilience is the primary objective due to the complete reliance on the e-manifest system and the increasing use of Multi-Energy Portals (MEPs). Emanifests are part of CPB's Automated Commercial Environment (ACE). They document several key pieces of information about cargo vehicles wishing to cross the border into the United States and are submitted before arriving at the port. Vehicles can be flagged for more invasive inspection based on the content of the e-manifest. MEPs are a non-intrusive inspection (NII) technology used to scan the contents of the cargo. Together MEPs and ACE serve an important role in aiding CBP with their mission to protect "the public from dangerous people and materials", and "enabling legitimate trade and travel.'" To analyze resilience of a port, the team would need to understand the port's current energy usage, which systems depend on energy and what backup systems exist, and any emergency operation plans that dictate how systems are operated in the event of a power outage. The team would also need to determine the design basis threats (DBTs) for the LPOE which could include natural disasters, manmade events, and accidents. The magnitudes of the DBTs are calculated and are then translated to expected impacts on the infrastructure and systems at the port. With this information gathered, existing LPOE models developed here at Sandia National Laboratories could be extended to support decisions about resilience. Current models are implemented in FlexSim, a 3rd party discrete event simulator. FlexSim provides 3-D visuals of physical layout that can reveal valuable insights, allows input to be variable (e.g. time it takes to interact with the CBP officer at primary inspection can vary) so that a whole range of possibilities can be captured in the results, and can be used to collect user-defined output metrics. Current LPOE models focus on cargo vehicle traffic, and process changes caused by the installation of new drive-through MEPs. Extending them to address resilience questions would require the addition of key pieces of information learned during the resilience analysis including critical systems, failure rates, and process changes for when failures occur. The primary output metric for current models is border crossing wait time. Additional metrics would also be added to the model to gain a more complete understanding of impacts related to resilience, for example, MEP scan rate. Once complete, the model could be used to analyze the effectiveness of mitigation strategies representing some future state.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Summary of Preliminary Concepts for a Port of Alaska Resilient Microgrid

The Port of Alaska in Anchorage enables the economic vitality of the Municipality of Anchorage and State of Alaska. It also provides significant support to defense activities across Alaska, especially to the Joint Base Elmendorf-Richardson (JBER) that is immediately adjacent to the Port. For this reason, stakeholders are interested in the resilience of the Ports operations. This report documents a preliminary feasibility analysis for developing an energy system that increases electric supply resilience for the Port and for a specific location inside JBER. The project concept emerged from prior work led by the Municipality of Anchorage and consultation with Port stakeholders. The project consists of a microgrid with PV, storage and diesel generation, capable of supplying electricity to loads at the Port a specific JBER location during utility outages, while also delivering economic value during blue-sky conditions. The study aims to estimate the size, configuration and concept of operations based on existing infrastructure and limited demand data. It also explores potential project benefits and challenges. The report goal is to inform further stakeholder consultation and next steps.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Overview of Preliminary Concepts for a Port of Alaska Resilient Microgrid

The Port of Alaska in Anchorage enables the economic vitality of the Municipality of Anchorage and State of Alaska. It also provides significant support to defense activities across Alaska, especially to the Joint Base Elmendorf-Richardson (JBER) that is immediately adjacent to the Port. For this reason, stakeholders are interested in the resilience of the Ports operations. This report documents a preliminary feasibility analysis for developing an energy system that increases electric supply resilience for the Port and for a specific location inside JBER. The project concept emerged from prior work led by the Municipality of Anchorage and consultation with Port stakeholders. The project consists of a microgrid with PV, storage and diesel generation, capable of supplying electricity to loads at the Port a specific JBER location during utility outages, while also delivering economic value during blue-sky conditions. The study aims to estimate the size, configuration and concept of operations based on existing infrastructure and limited demand data. It also explores potential project benefits and challenges. The report goal is to inform further stakeholder consultation and next steps.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analytic Framework for Optimal Sizing of Hydrogen Fueling Stations for Heavy Duty Vehicles at Ports (CRADA 512)

This CRADA presents the strategy that PNNL and Sandia National Laboratories (SNL) will take to support Seattle City Light (SCL) in properly sizing a hydrogen station for class 8 drayage trucks at the Port of Seattle (Port), as part of a coordinated plan of mixed uses for hydrogen. The proper sizing for the fueling station is unique from past experiences because it will be part of a coordinated plan for a multi-use scheme for the hydrogen, and not a stand-alone fueling station. The multiple use-streams, and their relative values, will impact all facets of station sizing and design, including fueling rates, storage technology and size, equipment selection, and safety considerations. The future deployment of this fueling station, and its proper sizing, is seen as a critical first step in the larger vision of utilizing hydrogen to address a range of issues for SCL and the Port. These include, but are not limited to, large scale fueling of medium duty (MD) and heavy duty (HD) vehicles to reduce emissions, support of adjacent light duty (LD) vehicles, support of critical port operation during extreme events (e.g. resiliency), mitigation of capital intensive electrical distribution system upgrades to support evolving port operations, a market resource that can be used by SCL to generate revenue, and support of planned future maritime operations that currently require heavy use of shipboard hydrogen. While the broader use of hydrogen by SCL and the Port is not the focus of this CRADA, how its use impacts the design of the initial vehicle fueling station, and the modular approach, are the central work. As such, this project will develop the framework and process for developing a modular station design that considers the broader range of coordinate uses of hydrogen as an energy resource.

08 HYDROGEN↗

Effects of Port Angle on Scavenging of an Opposed Piston Two-Stroke Engine

Opposed-piston 2-stroke (OP-2S) engines have the potential to achieve higher thermal efficiency than a typical diesel engine. However, the uniflow scavenging process is difficult to control over a wide range of speeds and loads. Scavenging performance is highly sensitive to pressure dynamics, port timings, and port design. This study proposes an analysis of the effects of port vane angle on the scavenging performance of an opposed-piston 2-stroke engine via simulation. A CFD model of a three-cylinder opposed-piston 2-stroke was developed and validated against experimental data collected by Achates Power Inc. One of the three cylinders was then isolated in a new model and simulated using cycle-averaged and cylinder-averaged initial/ boundary conditions. This isolated cylinder model was used to efficiently sweep port angles from 12 degrees to 29 degrees at different pressure ratios. Results indicate that scavenging performance is correlated with the bulk swirl ratio generated by these port angles. Scavenging performance is also sensitive to the pressure ratio across the engine. It was concluded that, for a given pressure ratio, the smallest port angle produces the best scavenging; however, previous work indicates lower bulk swirl ratio during combustion can have an impact on emissions formation.

33 ADVANCED PROPULSION SYSTEMS↗

Design and evaluation of candidate pressure ports for the HYFLITE experiment

A concept for placing a pressure transducer directly in a shuttle type tile was developed at Langley Research Center. A 5 inch long quartz with a .020 inch inner diameter provides the thermal isolation necessary to allow 2800 F surface pressure measurements to be taken by pressure transducer rated at 250 F. The assembly is potted in place with RTV 560 in a piece of FRCI-12 thermal protection system insulation tile. The integrity of the thermal protection system is maintained even with the intrusion of the pressure port assembly and the pressure port does not disrupt the air flow across the lifting body. Approximately 200 of these pressure ports are to be used in each of the Hypersonic Flight Experiment (HYFLITE) flight tests. Initial vibroacoustic and aerothermal testing of the pressure port designs have been completed at Langley Research vibration laboratory and the 20 MWatt 2 x 9 turbulent duct facility at Ames Research Center. The performance of the pressure ports were found to be well within the required design limits for all cases. In addition, a failure mode in which the entire pressure port assembly was removed proved to be a begin case.

Teter, John E., Jr.↗

Sealing Assembly for Sealing a Port and the Like

The sealing assembly for a port of a valve or the like is disclosed. In detail, the sealing assembly includes the port having a circular shaped end with a circular shaped knife-edge thereon. The sealing assembly further includes a hollow cap having a closed first end with an aperture therethrough and an open second end. The cap further includes internal threads adapted to mate with the external threads of the port. A gasket is mounted within the cap having flat first and second principle sides and made of a deformable metal, the first principle side of the gasket for mounting against the circular shaped knife edge of the port. A plunger having a circular shaped disc portion is adapted to fit within the hollow cap and is engagable with the first principle surface of the gasket and includes a shaft portion extending out of the aperture. The cap and shaft of the plunger include external wrenching flats. Thus when the cap is screwed onto the port and the plunger is prevented from rotating by a wrench mounted on the wrenching flats of the shaft portion of the plunger, the gasket is forced into engagement with the knife edge in pure compression and no rotation of the gasket occurs causing the knife edge to locally deform the gasket sealing of the port.

Jon W Haas↗

Experimental and Computational Investigation of Multiple Injection Ports in a Convergent-Divergent Nozzle for Fluidic Thrust Vectoring

A computational and experimental study was conducted to investigate the effects of multiple injection ports in a two-dimensional, convergent-divergent nozzle, for fluidic thrust vectoring. The concept of multiple injection ports was conceived to enhance the thrust vectoring capability of a convergent-divergent nozzle over that of a single injection port without increasing the secondary mass flow rate requirements. The experimental study was conducted at static conditions in the Jet Exit Test Facility of the 16-Foot Transonic Tunnel Complex at NASA Langley Research Center. Internal nozzle performance was obtained at nozzle pressure ratios up to 10 with secondary nozzle pressure ratios up to 1 for five configurations. The computational study was conducted using the Reynolds Averaged Navier-Stokes computational fluid dynamics code PAB3D with two-equation turbulence closure and linear Reynolds stress modeling. Internal nozzle performance was predicted for nozzle pressure ratios up to 10 with a secondary nozzle pressure ratio of 0.7 for two configurations. Results from the experimental study indicate a benefit to multiple injection ports in a convergent-divergent nozzle. In general, increasing the number of injection ports from one to two increased the pitch thrust vectoring capability without any thrust performance penalties at nozzle pressure ratios less than 4 with high secondary pressure ratios. Results from the computational study are in excellent agreement with experimental results and validates PAB3D as a tool for predicting internal nozzle performance of a two dimensional, convergent-divergent nozzle with multiple injection ports.

Waithe, Kenrick A.↗

Experimental and Computational Investigation of Multiple Injection Ports in a Convergent-Divergent Nozzle for Fluidic Thrust Vectoring

A computational and experimental study was conducted to investigate the effects of multiple injection ports in a two-dimensional, convergent-divergent nozzle, for fluidic thrust vectoring. The concept of multiple injection ports was conceived to enhance the thrust vectoring capability of a convergent-divergent nozzle over that of a single injection port without increasing the secondary mass flow rate requirements. The experimental study was conducted at static conditions in the Jet Exit Test Facility of the 16-Foot Transonic Tunnel Complex at NASA Langley Research Center. Internal nozzle performance was obtained at nozzle pressure ratios up to 10 with secondary nozzle pressure ratios up to 1 for five configurations. The computational study was conducted using the Reynolds Averaged Navier-Stokes computational fluid dynamics code PAB3D with two-equation turbulence closure and linear Reynolds stress modeling. Internal nozzle performance was predicted for nozzle pressure ratios up to 10 with a secondary nozzle pressure ratio of 0.7 for two configurations. Results from the experimental study indicate a benefit to multiple injection ports in a convergent-divergent nozzle. In general, increasing the number of injection ports from one to two increased the pitch thrust vectoring capability without any thrust performance penalties at nozzle pressure ratios less than 4 with high secondary pressure ratios. Results from the computational study are in excellent agreement with experimental results and validates PAB3D as a tool for predicting internal nozzle performance of a two dimensional, convergent-divergent nozzle with multiple injection ports.

Waithe, Kenrick A.↗

Suit Port Aft Bulkhead Mockup Test Results and Lessons Learned

The Small Pressurized Rover (SPR) is currently being carried as an integral part of the current Lunar Surface Architectures under consideration in the Constellation program. One element of the SPR is the suit port, the means by which the crew performs Extravehicular Activities (EVAs). Two suit port deliverables were produced in fiscal year 2008: an aft bulkhead mockup for functional integrated testing with the 1-G SPR mockup and a functional and pressurizable engineering unit. This paper focuses on the test results and lessons learned on the aft bulkhead mockup. The suit port aft bulkhead mockup was integrated with the mockup of the SPR cabin and chassis. It is located on the aft bulkhead of the SPR cabin structure and includes hatches, a locking mechanism, seals, interior and exterior suit don/doff aids, and exterior platforms to accommodate different crewmember heights. A lightweight mockup of the Mark III suit was tested with the suit port aft bulkhead mockup. There are several limitations to the suit port and mockup suits, and results of the suit port evaluation are presented and interpreted within the context of the limitations.

Romig, Barbara A.↗

Suit Port Aft Bulkhead Mockup 2008 Test Results

The Lunar Electric Rover (LER), formerly called the Small Pressurized Rover (SPR), is currently being carried as an integral part of the current Lunar Surface Architectures under consideration in the Constellation program. One element of the LER is the suit port, the means by which the crew performs Extravehicular Activities (EVAs). Two suit port deliverables were produced in fiscal year 2008: an aft bulkhead mockup for functional integrated testing with the 1-G LER mockup and a functional and pressurizable Engineering Unit (EU). This paper focuses on the aft bulkhead mockup test results from Desert Research and Technology Studies (D-RATS) October 2008 testing at Black Point Lava Flow (BPLF), Arizona. Refer to 39th International Conference on Environmental Systems (ICES) for test results of the EU. The suit port aft bulkhead mockup was integrated with the mockup of the LER cabin and chassis. It is located on the aft bulkhead of the LER cabin structure and includes hatches, a locking mechanism, seals, interior and exterior suit don/doff aids, and exterior platforms to accommodate different crewmember heights. A lightweight mockup of the Mark III suit was tested with the suit port aft bulkhead mockup. There are several limitations to the suit port and mockup suits, and results of the suit port evaluation are presented and interpreted within the context of the limitations.

Romig, Barbara A.↗

Acoustic Analysis of Sensor Ports

Acquiring data in rocket engines that is representative of the actual dynamic environment can often be difficult due to a multitude of influences. One source of contamination that is often not considered entirely is the response associated with the acoustic cavity created by a sensor offset. It is common to offset a sensor due to various reasons such as for mounting accessibility, thermal isolation, shock reduction, or prevention of debris impingement. While estimating the natural frequency of the acoustic cavity is straightforward, limited analysis has been described on the determination of the overall frequency response. The sensor port design approach usually attempts to ensure the port is short enough such that the acoustic response is negligible near the frequency-of-interest, but this requires knowledge of the frequency response and simple rules-of-thumb are not always guaranteed. Data correction and/or data interpretation is also often desired for an unsatisfactory response. The limited response analysis in the literature only offers approximations or neglects important contributions. A new approach is devised theoretically and computationally that captures the true acoustic response of a sensor port. This paper summarizes the acoustics background, the port response theoretical development, and provides comparisons of a port acoustic response using an analytical model and computational acoustics. The effects of nonlinear acoustics are also examined. Additionally, the paper summarizes the design of a specialized filter using the predicted sensor port response that can be applied to data for correction.

Casiano, M. J.↗

Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Granby Project Overview - 13208

The Port Granby Project is an integral part of the Port Hope Area Initiative (PHAI), and is located approximately 14 kilometres west of the Municipality of Port Hope in the adjacent Municipality of Clarington, Ontario. The principal objective of the project is the excavation and relocation of low-level radioactive waste (LLRW) and marginally contaminated soils, which were deposited at the Port Granby Waste Management Facility (PGWMF) by Eldorado Nuclear Limited during the period 1955 to 1988, to a new, highly engineered above-ground Long-term Waste Management Facility (LTWMF) to be constructed on a nearby site. The Environmental Assessment for the Project was approved in 2009 August and the required Waste Nuclear Substance License was received in 2011 November. Once the detailed engineering design was completed, in 2011 March, the Port Granby Project was divided into three major contracts for construction implementation purposes. The first of these contracts was completed in late 2012 and the second is planned to start in early 2013. The contracting process for the third major contract is also expected to be completed during 2013. This paper provides an overview of the Port Granby Project as well as discussion on the status of the Project, including the regulatory approvals process, the approach to contracting the construction works and an update of work recently completed and soon to get underway. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Removal of Historic Low-Level Radioactive Sediment from the Port Hope Harbour - 13314

At the Port Hope Harbour, located on the north shore of Lake Ontario, the presence of low-level radioactive sediment, resulting from a former radium and uranium refinery that operated alongside the Harbour, currently limits redevelopment and revitalization opportunities. These waste materials contain radium-226, uranium, arsenic and other contaminants. Several other on-land locations within the community of Port Hope are also affected by the low-level radioactive waste management practices of the past. The Port Hope Project is a community initiated undertaking that will result in the consolidation of an estimated 1.2 million cubic metres of the low-level radioactive waste from the various sites in Port Hope into a new engineered above ground long-term waste management facility. The remediation of the estimated 120,000 m{sup 3} of contaminated sediments from the Port Hope Harbour is one of the more challenging components of the Port Hope Project. Following a thorough review of various options, the proposed method of contaminated sediment removal is by dredging. The sediment from the dredge will then be pumped as a sediment-water slurry mixture into geo-synthetic containment tubes for dewatering. Due to the hard substrate below the contaminated sediment, the challenge has been to set performance standards in terms of low residual surface concentrations that are attainable in an operationally efficient manner. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation Residential Properties Contaminated with LLRW as Part of the Port Hope Area Initiative - The Importance of Effective Community Consultation - 18591

The Port Hope Area Initiative (PHAI) is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. The Eldorado refinery, on the shores of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium ore. Process residues were deposited at the Welcome Waste Management Facility in the Municipality of Port Hope until the mid-1950's switching to the Port Granby Waste Management Facility (PGWMF), which continued to accept waste until the late 1980's. Within the community of Port Hope, surveys are being conducted at approximately 4800 individual properties to identify the presence of LLRW resulting from fugitive emissions from the refinery and/or the use of refinery residue as construction backfill within the community. Identification of the presence of LLRW is based on multiple lines of evidence including reviews of historical information, gamma radiation surveys and physical sampling of soil for the presence of four signature contaminants. Of the 4800 properties being surveyed, it is expected that approximately 10% will contain some degree of LLRW requiring physical remediation. Many of the residences requiring remediation will require extensive soil removal, removal and restoration of outbuildings, fences and other structures, and the removal of mature trees, hedges and decorative gardens. For the property owners involved this phase represents the final and most intrusive aspect of the program. As such, the remedial designs must be sensitive to the needs of the community and individual property owners taking into consideration factors such as the need to minimize the disturbance to the neighborhood; maintaining geotechnical and structural stability of homes during excavations; removal and restoration of outbuildings affected by LLRW; removal and replacement of landscaping features (decks, fences, pools etc) and mature trees; radiation protection during earthworks; control of dust and noise; and maintaining safe access by residents. As Community satisfaction is a key metric for the success of the project, constant and effective communication at all stages of the project is necessary to ensure the residents understand the nature and extent of work to be undertaken; any and all inconveniences they can expect during the work; contingencies to deal with those inconveniences (e.g. parking, garbage collection etc); measures to protect their health and safety; scheduling; and what their property will look like at the completion of works. This paper provides an overview of the residential remediation program in Port Hope and describes the consultation efforts with property owners that are integral to the development of final designs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗