Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PERSONNEL MANAGEMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling Personnel Turnover in the Parametric Organization

A primary issue in organizing a new parametric cost analysis function is to determine the skill mix and number of personnel required. The skill mix can be obtained by a functional decomposition of the tasks required within the organization and a matrixed correlation with educational or experience backgrounds. The number of personnel is a function of the skills required to cover all tasks, personnel skill background and cross training, the intensity of the workload for each task, migration through various tasks by personnel along a career path, personnel hiring limitations imposed by management and the applicant marketplace, personnel training limitations imposed by management and personnel capability, and the rate at which personnel leave the organization for whatever reason. Faced with the task of relating all of these organizational facets in order to grow a parametric cost analysis (PCA) organization from scratch, it was decided that a dynamic model was required in order to account for the obvious dynamics of the forming organization. The challenge was to create such a simple model which would be credible during all phases of organizational development. The model development process was broken down into the activities of determining the tasks required for PCA, determining the skills required for each PCA task, determining the skills available in the applicant marketplace, determining the structure of the dynamic model, implementing the dynamic model, and testing the dynamic model.

Dean, Edwin B.↗

Money Matters: A Three-Step Process for Using Budget Data in Program Evaluation to Assess the Design and Management of a Novel Public Health Program

We applied a three-step process, abstracting and analyzing program budgets to examine how Colorectal Cancer Control Program (CRCCP) awardees are structuring their programs and to assess the fidelity of program design to the CRCCP public health model. We reviewed 23 state, one tribal organization, and six university awardee budgets. We assessed resource allocations, staffing structures, and contracted partners and their activities. Awardees allocated 83% of all funds to contracts and personnel. Program managers were the most budgeted personnel type across three measures: number of people, full-time equivalency, and personnel costs. Awardees not only contracted with health care systems and clinics (39% of all contracts) but also contracted other partner types. Contractors were mainly funded to implement evidence-based interventions (25%) and conduct evaluation (24%). Program design varied among awardees in the number of staff (0–22), number of full-time equivalencies (0–5.4), and the number of contracts (1–11) budgeted. State awardees budgeted more resources to contracts, compared with university awardees (57% vs. 31%), while universities budgeted more for total personnel costs (41% vs. 30%). We learned that awardees designed their programs with fidelity to the CRCCP model. Although implementation approaches varied, overall results suggest implementation requires a combination of internal capacities and contracted partners. Budgets provide opportunities to use already existing program data to evaluate program design, partnerships, and planned activities.

Uhd, Justin↗

Psychosocial issues in space: results from Shuttle/Mir

Important psychosocial issues involving tension, cohesion, leader support, and displacement of negative emotions were evaluated in a 4 1/2-year study involving five U.S. and four Russian Shuttle/Mir space missions. Weekly mood and group climate questionnaires were completed by five U.S. astronauts, eight Russian cosmonauts, and 42 U.S. and 16 Russian mission control subjects. There were few findings that supported our hypothesized changes in tension, cohesion, and leader support in crew and ground subjects using various time models, although crewmembers reported decreasing leader support in the 2nd half of the missions, and astronauts showed some evidence of a novelty effect in the first few weeks. There was no evidence suggesting a 3rd quarter effect among crewmembers on any of the 21 subscales evaluated. In contrast, there was strong evidence to support the hypothesized displacement of tension and negative emotions from crewmembers to mission control personnel and from mission control personnel to management. There were several significant differences in response between Americans vs. Russians, crewmembers vs. mission control personnel, and subjects in this study vs. people in comparable groups on Earth. Subject responses before, during, and after the missions were similar, and we did not find evidence for asthenia in space. Critical incidents that were reported generally dealt with events on-board the Mir and interpersonal conflicts, although most of the responses were from a relatively small number of subjects. Our findings have implications for future training and lead to a number of countermeasures.

short duration↗

Learning the ABCs (of Project Management)

To lead a project effectively, one has to establish and maintain the flexibility to take appropriate actions when needed. Overconstrained situations should be avoided. To get on top of matters and stay there, a manager needs to anticipate what it will take to successfully complete the job. Physical and financial resources, personnel, and management structure are all important considerations. Carving out the necessary turf up front can make a world of difference to the project's outcome. After the "what," "where," and "when" of a project are nailed down, the next question is "how" to do the job. When I first interviewed for the job of Science Payload Manager on the Advanced Composition (ACE) Explorer mission, Dr. Edward Stone (ACE Principal Investigator) asked, "Al, give me an idea of your management style." It was a question I had not considered before. I thought about it for a few seconds and then answered, "Well, the first descriptive term that comes to mind is the word "tranquility". That seemed to startle him. So I added, "I guess what I mean is, that if the situation is tranquil and the project is running smoothly, then I've anticipated all the problems and taken necessary actions to head them off." He then asked: "Have you ever reached this state?" "No," I admitted, "but I strive for it." That seemed to satisfy him because I got the job.

Frandsen, Allan↗

Management: A bibliography for NASA managers

This bibliography lists 706 reports, articles, and other documents introduced into the NASA scientific and technical information system in 1984. Entries, which include abstracts, are arranged in the following categories: human factors and personnel issues; management theory and techniques; industrial management and manufacturing; robotics and expert systems; computers and information management; research and development; economics, costs, and markets; logistics and operations management; reliability and quality control; and legality, legislation, and policy. Subject, personal author, corporate source, contract number, report number, and accession number indexes are included.

Source record↗

Management Practices and Tools: 2000-2004

This custom bibliography from the NASA Scientific and Technical Information Program lists a sampling of records found in the NASA Aeronautics and Space Database. The scope of this topic is divided into four parts and covers the adoption of proven personnel and management reforms to implement the national space exploration vision, including the use of "system-of-systems" approach; policies of spiral, evolutionary development; reliance upon lead systems integrators; and independent technical and cost assessments. This area of focus is one of the enabling technologies as defined by NASA s Report of the President s Commission on Implementation of United States Space Exploration Policy, published in June 2004.

Source record↗

Report to the administrator by the NASA Aerospace Safety Advisory Panel on the Skylab program. Volume 1: Summary report

Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.

Source record↗

Status Update on TRAC: A DOE-EM Tool for Tracking Groundwater Cleanup and Progress Toward Site Closure - 20245

The U.S. Department of Energy (DOE) Office of Environmental Management (EM) uses a customized, web-based mapping tool called TRAC (Tracking Restoration and Closure) to communicate information on plume sizes, remedial approaches, regulatory drivers, exit strategies, and long-term stewardship requirements at all sites within the DOE-EM complex. The web-based GIS story maps provide robust geospatial visualization of plumes at DOE sites using an intuitive interface that allows users to explore the plume maps, explanatory text, photographs, and video. This collection of story maps not only communicates information for each individual site, but also summarizes pertinent metrics on cleanup and remaining contaminants across all EM sites. This paper describes a new design within TRAC for communicating metrics on plume status, regulatory cleanup progress, and technology implementation. A principal benefit of TRAC is the ability to view individual pieces of data at a time, permitting targeted questions to be addressed, such as the status of regulatory decisions, site cleanup priorities, and site closure needs for each site within the DOE-EM complex. TRAC manages communication and supports decision-making through knowledge access, data and information transparency and traceability, and inclusive participation. It serves as a common resource that provides consistent information for DOE managers, site personnel, regulators and stakeholders. Because long-term stewardship of legacy waste sites requires ongoing coordination and communication among DOE, regulators, and stakeholders, TRAC can also be used to help transition EM sites to the Office of Legacy Management at site closure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Flight Awareness Collaboration Tool

FACT is a software program that provides important information about winter weather operations to airline dispatchers and airport personnel. FACT has a "quad" design and shows various maps, text, and tabular information. It also has a team messaging capability. It is meant to be used by airline dispatchers and airport personnel to manage winter storms. This presentation is for a meeting with Boeing. COMMERCIAL AIRCRAFT; AIRLINE OPERATIONS; STORMS COMPUTER PROGRAMS; AIRLINE OPERATIONS; WEATHER FORECASTING; MESSAGE PROCESSING; AIRCRAFT COMMUNICATION; WINTER; STORMS (METEOROLOGY); COMMERCIAL AIRCRAFT

airline dispatchers↗

Human interactions during Shuttle/Mir space missions

To improve the interpersonal climate of crewmembers involved with long-duration space missions, it is important to understand the factors affecting their interactions with each other and with members of mission control. This paper will present findings from a recently completed NASA-funded study during the Shuttle/Mir program which evaluated in-group/out-group displacement of negative emotions; changes in tension, cohesion, and leader support over time; and cultural differences. In-flight data were collected from 5 astronauts, 8 cosmonauts, and 42 American and 16 Russian mission control personnel who signed informed consent. Subjects completed a weekly questionnaire that assessed their mood and perception of their work group's interpersonal climate using questions from well-known, standardized measures (Profile of Mood States, Group and Work Environment Scales) and a critical incident log. There was strong evidence for the displacement of tension and dysphoric emotions from crewmembers to mission control personnel and from mission control personnel to management. There was a perceived decrease in commander support during the 2nd half of the missions, and for American crewmembers a novelty effect was found on several subscales during the first few months on-orbit. There were a number of differences between American and Russian responses which suggested that the former were less happy with their interpersonal environment than the latter. Mission control personnel reported more tension and dysphoria than crewmembers, although both groups scored better than other work groups on Earth. Nearly all reported critical incidents came from ground subjects, with Americans and Russians showing important differences in response frequencies.

Non-NASA Center↗

Lessons learned from Shuttle/Mir: psychosocial countermeasures

BACKGROUND: During future long-duration space missions, countermeasures need to be developed to deal with psychosocial issues that might impact negatively on crewmember performance and well-being. METHODS: In our recently completed NASA-funded study of 5 U.S. astronauts, 8 Russian cosmonauts, and 42 U.S. and 16 Russian mission control personnel who participated in the Shuttle/Mir program, we evaluated a number of important psychosocial issues such as group tension, cohesion, leadership role, and the displacement of negative emotions from crewmembers to people in mission control and from mission control personnel to management. RESULTS: Based on our findings, which are reviewed, a number of psychosocial countermeasures are suggested to help ameliorate the negative impact of potential psychosocial problems during future manned space missions. CONCLUSIONS: Crewmembers should be selected not only to rule out psychopathology but also to select-in for group compatibility and facility in a common language. Training should include briefings and team building related to a number of psychosocial issues and should involve both crewmembers and mission control personnel. During the mission, both experts on the ground and the crewmembers themselves should be alert to potential interpersonal problems, including the displacement of negative emotions from the crew to the ground. Supportive activities should consist of both individual and interpersonal strategies, including an awareness of changing leisure time needs. Finally, attention should be given to postmission readjustment and to supporting the families on Earth.

Non-NASA Center↗

Federal Workplace Charging Program Guide

This report serves as a program guide to support federal agencies in developing their own policy documents for workplace charging. It provides suggested language that agencies can incorporate into their own policies to define requirements for charging privately owned vehicles (POVs) on government-owned or leased property. The Fixing America's Surface Transportation Act authorizes the U.S. General Services Administration (GSA) and other federal agencies to install, operate, and maintain electric vehicle supply equipment (EVSE) for POVs in parking areas used by federal employees and authorized users, and it requires the collection of fees to recover the costs of installing, operating, and maintaining this equipment. This guide offers details for agency facility managers, transportation personnel, employees, and vendors regarding the charging of electric vehicles (EVs) for use by employees and personnel at government-owned and leased buildings. This guide describes the requirements associated with federal agencies providing EV charging in publicly accessible sites. The policy also describes when and how fees may be imposed to cover costs of electricity, as well as EVSE units and installations in various scenarios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The structure of cockpit management attitudes

A revised version of the Cockpit Management Attitudes Questionnaire (CMAQ) is introduced. Factor analyses of responses from 3 different samples reveal comparable factor structure (previous attempts to factor analyze this measure had produced equivocal results). Implications for the measurement of attitudes and the assessment of attitude change are discussed. It is argued that the CMAQ will benefit both special training programs and efforts to explore attitude-performance linkages in air-transport operations.

NASA Program Space Human Factors↗