Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “OPS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

New Rover Conops with High-Performance Onboard Computing: Give Up Raw Data to Reduce Ops Cost and Do More Science

A major portion of time during the tactical operation of Mars rovers is spent for selecting, prioritizing, and coordinating sciences and engineering activities such that they fit within resource constraints, including the downlink data volume, energy, and time. In particular, the downlink data volume constraint is getting particularly tighter in recent missions because modern instruments produce increasingly high data volume while the communication bandwidth is essentially bounded by the law of physics. Tactical operation would be substantially simplified, hence the operation cost could be reduced, if the data volume constraint is relaxed or even removed. In this abstract, we propose a new operation paradigm for achieving this goal. The key observation is that, both in science and engineering applications, the bit size of raw data is typically much greater than the volume of processed information that is needed for scientific or engineering analysis. For example, a full-resolution image from Mastcam-Z, the main science camera on Perseverance, is about 700 kB in volume and we downlinked 29,685 images up to Sol 243, totaling ~20 GB of data. But of course, scientists do not use every pixel of these images; what they really look for in the images are geological features, typically represented by specific geometric configurations or textures. An end product after processing hundreds of Mascam-Z images could be a single geological map summarizing the spatial distribution of the features. For another example, a 100-meter drive of Perseverance produces 7-12 MB of drive telemetry, which records every detail of the rover's motion at 8 Hz, including position, attitude, steering angles, encoder readings, motor currents and many other information. But what the ground engineers eventually pay attention to is the signs of anomaly, such as excessive motor currents or high slip; if a drive is nominal, the vast majority of this data is unused. What if, then, we process the raw data onboard and only downlink the processed data that is relevant to scientific or engineering analyses, such as a list of detected science features (with cropped images) or a list of potential signs of anomaly while driving? A major roadblock for such onboard, high-level information processing has been the onboard computational resource. RAD750, the main onboard computer of Perseverance, is obviously not sufficient for performing complex image or signal processing such as object detection, semantic segmentation, or anomaly detection. Interestingly, RAD750 is not the best processor that Perseverance has; Qualcomm's Snapdragon 801, a modern mobile processor, is on her Heli Base Station, a device for communicating with Mars Helicopter Ingenuity; also, Intel's Atom E3845 processors are on engineering cameras. In the reminder of this paper, we will introduce two particular uses cases of these high-performance co-processors (meaning auxiliary CPU, GPU, or other types of processors that are separate from the main processor that runs the main flight software) for lowering operation cost and accommodating more science activities for a given communication constraint.

Didier, A.↗

Biases in CloudSat Falling Snow Estimates Resulting from Daylight-Only Operations

Falling snow is a key component of the Earth’s water cycle, and space-based observations provide the best current capability to evaluate it globally. The Cloud Profiling Radar (CPR) on board CloudSat is sensitive to snowfall, and other satellite missions and climatological models have used snowfall properties measured by it for evaluating and comparing against their snowfall products. Since a battery anomaly in 2011, the CPR has operated in a Daylight-Only Operations (DO-Op) mode, in which it makes measurements primarily during only the daylit portion of its orbit. This work provides estimates of biases inherent in global snowfall amounts derived from CPR measurements due to this shift to DO-Op mode. We use CloudSat’s snowfall measurements during its Full Operations (Full-Op) period prior to the battery anomaly to evaluate the impact of the DO-Op mode sampling. For multi-year global mean values, the snowfall fraction during DO-Op changes by −10.16% and the mean snowfall rate changes by −8.21% compared with Full-Op. These changes are driven by the changes in sampling in DO-Op and are very little influenced by changes in meteorology between the Full-Op and DO-Op periods. The results highlight the need to sample consistently with the CloudSat observations or to adjust snowfall estimates derived from CloudSat when using DO-Op data to evaluate other precipitation products.

Lisa Milani↗

Overarching Properties as Means of Compliance: An Industrial Case Study

The Overarching Properties (OPs) have been created by an inter-national working group and are being evaluated by the National Aeronautics and Space Administration (NASA), the Federal Aviation Administration (FAA), industry, and other certifying agencies in an effort to streamline certification processes. Their intent is to facilitate the use of alternative approaches and to al-low flexibility to combine the system, software, and complex hardware certification. The hope is that the FAA may eventually establish an Advisory Circular that offers the OPs as a Means of Compliance (MoC) for software approval (and eventually systems and hardware) by showing the product possesses the three OPs: Intent (specification of the intended behavior), Correctness (implementation of the intended behavior) and Innocuity (safety of unintended behavior). In the certification community, there is still a concern about the practicability of using such high level properties in certification. This paper aims to address that concern by showing possession of the OPs in an industrial case study using assurance arguments. The two main contributions of this paper are: a certification process based on OPs as Means of Compliance, and a certification argument for an on-board physical model of an UAV, as industrial example. We pro-pose a hybrid approach for the certification process that combines OPs with existing certification standards. Thus, OPs can be used for parts of a system that uses technologies that are not supported by current standards or for which existing standards require additional effort without commensurate additional safety assurance.

certification↗

Retrospectively Documenting Satisfaction of the Overarching Properties: An Exploratory Prototype

Software-intensive aviation systems are typically developed in accordance with recognized development process, safety analysis, and software development standards such as SAE ARP4754A, SAE ARP4761, and RTCA DO-178C. Efforts to streamline assurance processes and make them flexible enough to handle future assurance challenges have produced the Overarching Properties (OPs) for airworthiness approval. Each of the three OPs is a property systems must possess to be certifiable. There is no mandated means of documenting possession of the OPs. To explore possible means, we have prepared retrospective documentation showing that a specimen software system possesses the OPs. The specimen system, Safeguard, enforces geofencing restrictions on unmanned aerial vehicles. Our OP-possession case for its airborne component comprises eight arguments in the Goal Structuring Notation (GSN): a main argument for each OP and five cross-cutting auxiliary arguments. We present this argument as an example for discussion and further research, e.g., into means of assessing OP possession.

safety case↗

Correction of high-frequency noise-temperature inaccuracies

Deep-space mission data rates to Earth are limited by the system operating noise-temperature (T(sub op)) performance of the DSN. This article addresses some of the techniques and definitions used for measuring and reporting the effective noise temperature of receivers (Te) and T(sub op) of the DSN's ground receiving systems. Calibration loads are used to measure T(sub op) of the DSN antennas. At 32 GHz, a calibration load cooled to 2-K physical temperature requires a correction of 0.67 K to determine the noise temperature. Using corrected noise temperature for the calibration loads results in the correct values for T(sub op) such that the total system noise power can be defined by Pn = kT(sub op) B, as required for DSN telecommunications design control tables. T(sub op) and Te should not be converted to equivalent physical temperatures.

Stelzreid, C. T.↗

Self-Guided Multimedia Stress Management and Resilience Training for Flight Controllers

Stress and anxiety-related problems are among the most common and costly behavioral health problems in society, and for those working in operational environments (i.e. astronauts, flight controllers, military) this can seriously impact crew performance, safety, and wellbeing. Technology-based interventions are effective for treating behavioral health problems, and can significantly improve the delivery of evidence-based health care. This study is evaluating the effectiveness, usefulness, and usability of a self-guided multimedia stress management and resilience training program in a randomized controlled trial (RCT) with a sample of flight controllers at Johnson Space Center. The intervention, SMART-OP (Stress Management and Resilience Training for Optimal Performance), is a six-session, cognitive behavioral-based computer program that uses self-guided, interactive activities to teach skills that can help individuals build resilience and manage stress. In a prior RCT with a sample of stressed but otherwise healthy individuals, SMART-OP reduced perceived stress and increased perceived control over stress in comparison to an Attention Control (AC) group. SMART-OP was rated as "highly useful" and "excellent" in usability and acceptability. Based on α-amylase data, individuals in SMART-OP recovered quicker and more completely from a social stress test as compared to the AC group [1]. In the current study, flight controllers are randomized either to receive SMART-OP training, or to a 6-week waitlist control period (WLC) before beginning SMART-OP. Eligible participants include JSC flight controllers and instructors without any medical or psychiatric disorder, but who are stressed based on self-report. Flight controllers provide a valid analog sample to astronauts in that they work in an operational setting, use similar terminology to astronauts, are mission-focused, and work under the same broader work culture. The study began in December 2014, and to date 79 flight controllers and instructors have expressed interest in the study, 49 of those were cleared for participation, we have screened 44 for eligibility, and 23 have met inclusion criteria. Recruitment is ongoing and the study will continue until December 2016. Outcome measures include perceived stress, perceived control over stress, resilience, mood, personality, emotion regulation, sleep, health behaviors, and psychophysiological data such as 24-hour heart rate, alpha amylase, and urinary and salivary cortisol. We are also collecting user feedback such as usability, working alliance, usefulness, and treatment credibility.

Rose, R. D.↗

CloudSat Bias on Falling Snow Estimates Over the Daylight Only Operational Period (2012-2019)

Falling snow is a key component for the global atmospheric, hydrological and energy cycles, and its retrieval from space-based observations represents the best current capability to evaluate it globally. The Global Precipitation Measurement (GPM) Mission Core Observatory, launched in 2014, together with its constellation sensors, can provide quasi-global precipitation estimates every 30 minutes (for level 3 products). Evaluation and validation efforts for such products are crucial, and for global evaluations, one of the most suitable instruments is the Cloud Profiling Radar (CPR) on board CloudSat, which is sensitive to light rain and falling snow. However, due to a battery anomaly in 2011, during its period of overlapping observations with GPM the CPR has operated in a Daylight Only Operations mode (DO-Op) in which it makes measurements primarily during only the daylit portion of its orbit. The goal of this work is to estimate biases inherent in global snowfall amounts derived from CPR measurements due to this shift to DO-Op mode. We use CloudSat's snowfall measurements during its Full Operations (Full-Op) period from 2006 to 2010 to evaluate the impact DO-Op mode would have had during this period. Results indicate that omitting the nocturnal component of the diurnal cycle of snowfall has nonnegligible impact on snowfall amounts in some regions. The lack of nighttime data during DO-Op biases the latitudinally averaged mean snowfall rates as well as some regional values. Hemispheric differences in bias may be due to more pronounced diurnal variability in the northern hemisphere owing to more prevalent land surface versus the southern hemisphere. The results highlight the need to sample consistently with the CloudSat observations or to adjust snowfall estimates derived from CloudSat when using DO-Op data to evaluate other precipitation products.

Milani, Lisa↗

Use of the Airborne Visible/Infrared Imaging Spectrometer to calibrate the optical sensor on board the Japanese Earth Resources Satellite-1

We describe an experiment to calibrate the optical sensor (OPS) on board the Japanese Earth Resources Satellite-1 with data acquired by the Airborne Visible/Infrared Imaging Spectrometer (AVIRIS). On 27 Aug. 1992 both the OPS and AVIRIS acquired data concurrently over a calibration target on the surface of Rogers Dry Lake, California. The high spectral resolution measurements of AVIRIS have been convolved to the spectral response curves of the OPS. These data in conjunction with the corresponding OPS digitized numbers have been used to generate the radiometric calibration coefficients for the eight OPS bands. This experiment establishes the suitability of AVIRIS for the calibration of spaceborne sensors in the 400 to 2500 nm spectral region.

Green, Robert O.↗

Calculation of Operations Efficiency Factors for Mars Surface Missions

For planning of Mars surface missions, to be operated on a sol-by-sol basis by a team on Earth (where a "sol" is a Martian day), activities are described in terms of "sol types" that are strung together to build a surface mission scenario. Some sol types require ground decisions based on a previous sol's results to feed into the activity planning ("ground in the loop"), while others do not. Due to the differences in duration between Earth days and Mars sols, for a given Mars local solar time, the corresponding Earth time "walks" relative to the corresponding times on the prior sol/day. In particular, even if a communication window has a fixed Mars local solar time, the Earth time for that window will be approximately 40 minutes later each succeeding day. Further complexity is added for non-Mars synchronous communication relay assets, and when there are multiple control centers in different Earth time zones. The solution is the development of "ops efficiency factors" that reflect the efficiency of a given operations configuration (how many and location of control centers, types of communication windows, synchronous or non-synchronous nature of relay assets, sol types, more-or-less sustainable operations schedule choices) against a theoretical "optimal" operations configuration for the mission being studied. These factors are then incorporated into scenario models in order to determine the surface duration (and therefore minimum spacecraft surface lifetime) required to fulfill scenario objectives. The resulting model is used to perform "what-if" analyses for variations in scenario objectives. The ops efficiency factor is the ratio of the figure of merit for a given operations factor to the figure of merit for the theoretical optimal configuration. The current implementation is a pair of models in Excel. The first represents a ground operations schedule for 500 sols in each operations configuration for the mission being studied (500 sols was chosen as being a long enough time to capture variations in relay asset interactions, Earth/Mars time phasing, and seasonal variations in holidays). This model is used to estimate the ops efficiency factor for each operations configuration. The second model in a separate Excel spreadsheet is a scenario model, which uses the sol types to rack up the total number of "scenario sols" for that scenario (in other words, the ideal number of sols it would take to perform the scenario objectives). Then, the number of sols requiring ground in the loop is calculated based on the soil types contained in the given scenario. Next, the scenario contains a description of what sequence of operations configurations is used, for how many days each, and this is used with the corresponding ops efficiency factors for each configuration to calculate the "ops duration" corresponding to that scenario. Finally, a margin is applied to determine the minimum surface lifetime required for that scenario. Typically, this level of analysis has not been performed until much later in the mission, and has not been able to influence mission design. Further, the notion of moving to sustainable operations during Prime Mission - and the effect that that move would have on surface mission productivity and mission objective choices - has not been encountered until the most recent rover missions (MSL and Mars 2018).

Layback, Sharon L.↗

Leveling Arguments: Easier Said Than Done

The aerospace industry’s current desire to rapidly adopt new technologies is inconsistent with the traditional approach to creating new aerospace certification standards. To address this, an FAA-sponsored international Overarching Properties Working Group comprising industry representatives and certifying agencies has introduced the concept of Overarching Properties (OPs). OPs provide a foundation for proposing alternative Means of Compliance (MoC) by demonstrating a product's possession of the Intent, Correctness, and Innocuity properties. Handling criticality levels with the OPs is in its infancy but still required to integrate alternative MoC into the existing aerospace certification infrastructure. This paper examines the impact of criticality levels on the creation and evaluation of OP-related arguments (OPRAs), specifically focusing on the Auxiliary Power Unit (APU) system. The study highlights the need for tailored OPRA creation based on assigned criticality levels and proposes self-assessment techniques to strengthen arguments. This research serves as a stepping stone in exploring criticality levels for OPs and bridging the gap in aerospace certification practices.

argument↗

Design and development of a Space Station proximity operations research and development mockup

Proximity operations (Prox-Ops) on-orbit refers to all activities taking place within one km of the Space Station. Designing a Prox-Ops control station calls for a comprehensive systems approach which takes into account structural constraints, orbital dynamics including approach/departure flight paths, myriad human factors and other topics. This paper describes a reconfigurable full-scale mock-up of a Prox-Ops station constructed at Ames incorporating an array of windows (with dynamic star field, target vehicle(s), and head-up symbology), head-down perspective display of manned and unmanned vehicles, voice- actuated 'electronic checklist', computer-generated voice system, expert system (to help diagnose subsystem malfunctions), and other displays and controls. The facility is used for demonstrations of selected Prox-Ops approach scenarios, human factors research (work-load assessment, determining external vision envelope requirements, head-down and head-up symbology design, voice synthesis and recognition research, etc.) and development of engineering design guidelines for future module interiors.

Haines, Richard F.↗

The Fe2(+)-Mg interdiffusion in orthopyroxene: Constraints from cation ordering and structural data and implications for cooling rates of meteorites

Orthopyroxene crystals in a number of meteorites exhibit compositional zoning of Fe and Mg, which provide important constraint on their cooling rates. However, attempts to model cooling rate of these crystals from Fe-Mg zoning profiles suffer from the lack of any measured or theoretically well constrained Fe-Mg interdiffusion data in OP(x) It has been assumed that Fe-Mg interdiffusion in OP(x) only slightly slower than that in olivine. The purpose of this paper is to (1) calculate the Fe-Mg fractionation, and (2) provide analytical formulation relating cooling rate to the length of the diffusion zone across the interface of the overgrowth of a mineral on itself with application to Mg diffusion profile across OP(x) growth on OP(x) in certain mesosiderites.

Ganguly, J.↗

Thomas Leps Internship Abstract

An optical navigation system is being flown as the backup system to the primary Deep Space Network telemetry for navigation and guidance purposes on Orion. This is required to ensure Orion can recover from a loss of communication, which would simultaneously cause a loss of DSN telemetry. Images taken of the Moon and Earth are used to give range and position information to the navigation computer for trajectory calculations and maneuver execution. To get telemetry data from these images, the size and location of the moon need to be calculated with high accuracy and precision. The reentry envelope for the Orion EM-1 mission requires the centroid and radius of the moon images to be determined within 1/3 of a pixel 3 sigma. In order to ensure this accuracy and precision can be attained, I was tasked with building precise dot grid images for camera calibration as well as building a hardware in the loop test stand for flight software and hardware proofing. To calibrate the Op-Nav camera a dot grid is imaged with the camera, the error between the image dot location and the actual dot location can be used to build a distortion map of the camera and lens system so that images can be fixed to display truth locations. To build the dot grid images I used the Electro Optics Lab optical bench Bright Object Simulator System, and gimbal. The gimbal was slewed to a series of elevations and azimuths. An image of the collimated single point light source was then taken at each position. After a series of 99 images were taken at different locations the single light spots were extracted from each image and added to a composite image containing all 99 points. During the development of these grids it was noticed that an intermittent error in the artificial "star" locations occurred. Prior to the summer this error was attributed to the gimbal having glitches in it's pointing direction and was going to be replaced, however after further examining the issue I determined it to be a software issue. I have since narrowed the likely source of the error down to a Software Development Kit released by the camera supplier PixeLink. I have since developed a workaround in order to build star grids for calibration until the software bug can be isolated and fixed. I was also tasked with building a Hardware in the Loop test stand in order to test the full Op-Nav system. A 4k screen displays simulated Lunar and Terrestrial images from a possible Orion trajectory. These images are then projected through a collimator and then captured with an Op-Nav camera controlled by an Intel NUC computer running flight software. The flight software then analyzes the images to determine attitude and position, this data is then reconstructed into a trajectory and matched to the simulated trajectory in order to determine the accuracy of the attitude and position estimates. In order for the system to work it needs to be precisely and accurately aligned. I developed an alignment procedure that allows the screen, collimator and camera to be squared, centered and collinear with each other within a micron spatially and 5 arcseconds in rotation. I also designed a rigid mount for the screen that was machined on site in Building 10 by another intern. While I was working in the EOL we received a $500k Orion startracker for alignment procedure testing. Due to my prior experience in electronics development, as an ancillary duty, I was tasked with building the cables required to operate and power the startracker. If any errors are made building these cables the startracker would be destroyed, I was honored that the director of the lab entrusted such a critical component with me. This internship has cemented my view on public space exploration. I always preferred public sector to privatization because, as a scientist, the most interesting aspects of space for me are not necessarily the most profitable. I was concerned that the public sector was faltering however, and that in order to improve human space exploration I would be forced into private sector. I now know that, at least at JSC, human spaceflight is still progressing, and exciting work is still being done. I am now actively seeking employment at JSC after I complete my Ph.D and have met with my branch chiefs and mentor to discuss transitioning to a grad Co-op position.

Leps, Thomas↗

A Case Study Comparing Citizen Science Aurora Data with Global Auroral Boundaries Derived from Satellite Imagery and Empirical Models

Aurorasaurus is a citizen science project that offers a new, global data source consisting of ground-based reports of the aurora. For this case study, aurora data collected during the 17-18 March 2015 geomagnetic storm are examined to identify their conjunctions with Defense Meteorological Satellite Program (DMSP) satellite passes over the high latitude auroral regions. This unique set of aurora data can provide ground-truth validation of existing auroral precipitation models. Particularly, the solar wind driven, Oval Variation, Assessment, Tracking, Intensity, and Online Nowcasting (OVATION) Prime 2013 (OP-13) model and a Kp-dependent model of Zhang-Paxton (Z-P) are utilized for our boundary validation efforts. These two similar models are compared for the first time. Global equatorward auroral boundaries are derived from the OP 13 model and the DMSP Special Sensor Ultraviolet Spectrographic Imager (SSUSI) far ultraviolet (FUV) data using the Z-P model at a fixed flux level of 0.2 erg cm(exp -2)s(exp -1). These boundaries are then compared with citizen science reports as well as with each other. Even though there are some large differences between the global boundaries for a few cases, the average difference is about 1.5 deg in geomagnetic latitude, with OP-13 being equatorward of Z-P model. When these boundaries are compared with each other as a function of local time, no clear overall trend as a function of local time was observed. It is also found that the ground based reports are more consistent with the predictions of the OP-13 model.

Kosar, Burcu C.↗

NASA's Current Initiative to Improve Operations Planning

As a follow-on to the Technical Capability Assessment Team, in 2015 NASA began seven Agency-wide efforts to seek out opportunities to improve the effectiveness of NASA operations. One of these technical teams is the Mission Operations Planning team, charged with increasing interactions and efficiency for planning of mission activities. That team is chaired by the author with representatives from eight other centers across the Agency. As the strategic architects for the vision of agency-wide ops planning, the team has identified a number of new initiatives and techniques to improve planning, including: breaking down walls within centers which obstruct multi-mission planning; breaking down walls agency-wide which obstruct the sharing of ops planning lessons and capabilities; strengthening the community of practice of ops planning capability developers; establishing best practices for a variety of types of ops planning; defining standards for activity plans and timelines, and plan inputs; and recommending the presence of "multi-mission operations champions" within each center to implement these recommendations into the next decade.

Seal, David↗

Artemis Crewed Surface Operations Training Dust Mitigation Test/Training Facility (DMTF)

Based on several Apollo mission(s) reports and lessons learned1 on lunar dust impacts, it is imperative for successful Artemis missions, to develop dust mitigation methods & train crew in dust cleaning techniques for efficient use of lunar surface time and for crew health. Longer durations and increased number of Extra Vehicular Activities (EVAs) for Artemis need better training. Apollo missions lacked training in a dust facility. Current facilities do not provide adequate fidelity to train crew in dust cleaning operations in suited, pressurized environments. Mimicking dust cleaning actions in existing facilities (eg- Neutral Buoyancy lab) does not provide in depth understanding of actions and time needed to clean suit or positions crew need to take to remove dust from suit. Available dust bins do not support suited/pressurized ops, personnel not trained in suited ops, more overhead/travel. A local facility at Johnson Space Center (JSC) w/ adequate fidelity supporting suited/pressurized ops, personnel in suited ops is a crucial need for rapid development/testing and training. This facility will provide NASA capabilities to: 1. Provide a dust containment bin to perform suited pressurized crewed training/testing activities for dust interaction/mitigation leveraging existing JSC facility infrastructure and 2. Perform end-to-end simulated lunar dust testing of fluid, mechanical, and electrical systems to provide “test like you fly” confidence for industry developed solutions.

EVA training↗