Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Next”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Framework for NASA Space Relay Satellite Services over the Next Decade: Space Relay Partnership and Services Study

The United States National Space Policy provides guidance and directives for U.S. Government agencies to purchase commercial space services and capabilities to the maximum extent practical. In alignment with this guidance, the anticipated initial NASA near-Earth space relay operating capability over the next decade will be comprised of the existing NASA-owned Space Network infrastructure supplemented with commercially-owned and -provided relay satellites and their associated ground stations. NASA awarded contracts to eight study vendors in May 2019 to investigate the feasibility of applying commercial services concepts to the NASA user mission community. The studies, managed by NASA Glenn Research Center, detailed ten study topic areas. NASA completed the analysis and synthesis of these eight industry studies and other relevant information. The responses from the study vendors indicated a strong interest in providing commercial services to NASA missions, and included a wide range of proposed architectures and demonstration ideas. Overall, the responses indicated that a mature and healthy competitive environment exists across a broad spectrum of industry to deliver high-rate space relay services in the next three to five years. This paper will present an overview of the study, analysis and synthesis processes along with common themes and conclusions, and provide next steps and recommendations. The results of this study serve as a foundation for ongoing efforts to acquire interoperable space relay services for NASA missions from multiple commercial service providers.

Eric Knoblock↗

Next Generation Thermal Protection System for Outer Planet Probes and Orbiter

Saturn Probe and Ice Giant Orbiter along with in-situ Probe Missions continue to be very high priority mis-sions. A result of the advocacy by OPAG and other Analysis Groups, the 3D Woven, Dual-Layer HEEET thermal protection system, mature at TRL 6, has closed the TPS gap for extreme environment missions. A mid density follow on to DL HEEET, developed to meet earth entry requirements, is a Single Layer vari-ant of the 3D woven TPS, which provides a mass effi-cient single layer 3D Mid-Density TPS (3MDCP) that has been baselined as the heatshield for MSR EEV. Continued development of 3MDCP will elevate it to TRL 6 by 2025. Conformal-PICA (C-PICA) devel-opment was pursued to establish a more efficient and robust alternate to PICA, and it is at TRL 4+. Our rationale for the next generation of TPS de-velopment is based on the on the missions needs of the next decade Outer Planet missions that are unique and more demanding than any other destinations. Taking advantage of the recent planned development of sev-eral materials, the next generation of TPS offers a much more mass efficient option for small, medium, and large class Outer Planet missions. Saturn Probes: While mission designers are gen-erally interested in shallow entry to maintain the g-load during entry around 50g, the heat-load for shallow entry can range between (100 kJ/cm2 – 300 kJ/cm2), two orders of magnitude higher than Venus or Sample Return missions. TPS must not only offer protection but must be mass efficient to perform reasonable sci-ence. TPS mass can quickly become 50% or more of the mass of the entire entry system. Recent analysis performed shows Saturn Probe missions could signifi-cantly benefit from the single layer HEEET (SL-HEEET/3MDCP). A DL-HEEET based heatshield mass could be ~ (40% -50%), SL-HEEET can provide additional (30% - 50%) mass savings. At the same time, C-PICA can provide (30% - 50%) mass savings on the backshell. The combined mass savings can be significant enough to carry an additional probe, if de-sired. Ice Giant Aerocapture Missions: Aerocapture mission architectures can provide significant ad-vantage over traditional propulsive insertion missions in multiple ways. 1) Reduced trip time ~ (4- 6) years (30% -40%), 2) Enables placing the orbiter, probe, and lander, all together and 3) Allows for greater science mass (probes and landers) due to mass efficiency. The delivery of a probe from orbit makes it easier and eliminates mission design constraints by HEEET for direct entry [4] of probes and allows for more targeted in-situ science once the Orbiter is able to collect data. In the past 20 years, progress made in GN&C for lift-guided entry missions (MSL, Orion EFT1, Mars 2020) and the expertise in blunt body aerodynamics at large scale (~ 5m) has led the EDL community to conclude that aerocapture is a “go do” engineering activity. An aerocapture mission that will deplete the excess energy of a fast arrival mission will require a mass efficient TPS that can handle extreme heat-load, ~ (100 kJ/cm2 – 500 kJ/cm2). Hence TPS, feasibility as well as mass efficiency requires assessment. Utilizing the recent developments, a comprehensive, bounding analysis was done to establish the potential for SOA (HEEET) system as well as emerging new TPS such as SL-HEEET and C-PICA. In this proposed poster, we will outline the process by which we establish bounding aerocapture trajecto-ries for hyperbolic excess velocities ranging from 27 km/s to 35 km/s, for low L/D (~ 0.4) configurations and determine conservative/bounding estimate of aer-othermal environment by using a combination of CFD simulations and stagnation point heating estimates [7]. This engineering approach allows us to assess the TPS need vs. TPS capability and determine the applicability of existing TPS. Once an applicable suite of TPS is determined, the TPS thickness and mass are comput-ed. We show that the TPS mass fraction can be as low as 5% to as high as 20%, depending on the use of ad-vanced TPS, while HEEET is sufficient but will require 50% of the entry mass.

E Venkatapathy↗

Framework for NASA Space Relay Satellite Services over the Next Decade: Space Relay Partnership and Services Study

The United States National Space Policy provides guidance and directives for U.S. Government agencies to purchase commercial space services and capabilities to the maximum extent practical. In alignment with this guidance, the anticipated initial NASA near-Earth space relay operating capability over the next decade will be comprised of the existing NASA-owned Space Network infrastructure supplemented with commercially-owned and -provided relay satellites and their associated ground stations. NASA awarded contracts to eight study vendors in May 2019 to investigate the feasibility of applying commercial services concepts to the NASA user mission community. The studies, managed by NASA Glenn Research Center, detailed ten study topic areas. NASA completed the analysis and synthesis of these eight industry studies and other relevant information. The responses from the study vendors indicated a strong interest in providing commercial services to NASA missions, and included a wide range of proposed architectures and demonstration ideas. Overall, the responses indicated that a mature and healthy competitive environment exists across a broad spectrum of industry to deliver high-rate space relay services in the next three to five years. This paper will present an overview of the study, analysis and synthesis processes along with common themes and conclusions, and provide next steps and recommendations. The results of this study serve as a foundation for ongoing efforts to acquire interoperable space relay services for NASA missions from multiple commercial service providers.

Eric Knoblock↗

The Next Generation Radioisotope Thermoelectric Generator Project - Overview and Progress Status

The Next Generation Radioisotope Thermoelectric Generator (Next Gen RTG) Project is a spaceflight system project within NASA’s Radioisotope Power Systems (RPS) Program. The project, in partnership with the Idaho National Laboratory (INL) / Battelle Energy Alliance (BEA), will build and deliver an unfueled, flight qualified Radioisotope Thermoelectric Generator (RTG) system based on RPS Program needs. The Next Gen RTG Project aims to assure the availability of high-power, vacuum-rated RTGs to enable future deep space missions. The Project team is developing that capability through a multi-phase effort that leverages the heritage General Purpose Heat Source - RTG (GPHS-RTG) design and available legacy hardware. The Project’s primary aim is to re-establish the capability to manufacture a silicon germanium (SiGe) unicouple based thermoelectric converter and associated hardware with minimal changes to the heritage GPHS-RTG design. The project will also refurbish the GPHS-RTG Flight Unit #5 (F-5) located at INL and verify its compliance with heritage GPHS-RTG requirements. This paper will detail the project’s plans for the development of these systems. Management approaches, technical challenges, and risks will also be discussed.

Radioisotope↗

Desirements of Next Generation Spacecraft Interconnects : The JPL NEXUS Perspective

Objectives of NEXUS (NEXt bUS) (1) A research task funded by JPL R&TD program (2) Develop a common highly-capable next generation avionics interconnect with the following features: (a) Transparently compatible with wired, fiber-optic, and RF physical layers (b) A clear and feasible path-to-flight to ensure infusion into future NASA/JPL missions

fiber-optics↗

EPOXI and Stardust NExT: The Management Challenges of Two Comet Flybys in Three Months

The EPOXI and Stardust NExT missions were missions of opportunity utilizing the Deep Impact and Stardust spacecraft, respectively. These new missions took advantage of the cost savings of utilizing spacecraft that were already flying for new science investigations. Both were retargeted to fly by an additional comet. EPOXI visited Hartley 2, significantly smaller than the other Jupiter family comets visited previously. Stardust NExT flew by Tempel 1, providing a second look at the comet previously studied by Deep Impact in 2005. Both projects were part of NASA's Discovery Program. In order to further save costs, the projects were combined into a single project office at JPL. This provided some efficiencies due to the similarity of the missions, but having the flybys space only three months apart posed challenges for the project management team to ensure each project was ready for its critical event and ensuring each received the proper support from the management team. The project office relied on an integrated calendar for tracking and scheduling meetings, reviews, and other key events. The project management team also coordinated their availability for both projects to maintain involvement with each team to ensure effective risk identification and management.

NExT (New Exploration of Tempel 1)↗

Optimizing Landsat Next Shortwave Infrared Bands for Crop Residue Characterization

This study focused on optimizing the placement of shortwave infrared (SWIR) bands for pixel-level estimation of fractional crop residue cover (f R ) for the upcoming Landsat Next mission. We applied an iterative wavelength shift approach to a database of crop residue field spectra collected in Beltsville, Maryland, USA (n = 916) and computed generalized two- and three-band spectral indices for all wavelength combinations between 2000 and 2350 nm, then used these indices to model field-measured f R . A subset of the full dataset with a Normalized Difference Vegetation Index (NDVI) < 0.3 threshold (n = 643) was generated to evaluate green vegetation impacts on f R estimation. For the two-band wavelength shift analyses applied to the NDVI < 0.3 dataset, a generalized normalized difference using 2226 nm and 2263 nm bands produced the top f R estimation performance (R 2 = 0.8222; RMSE = 0.1296). These findings were similar to the established two-band Shortwave Infrared Normalized Difference Residue Index (SINDRI) (R 2 = 0.8145; RMSE = 0.1324). Performance of the two-band generalized normalized difference and SINDRI decreased for the full-NDVI dataset (R 2 = 0.5865 and 0.4144, respectively). For the three-band wavelength shift analyses applied to the NDVI < 0.3 dataset, a generalized ratio-based index with a 2031–2085–2216 nm band combination, closely matching established Cellulose Absorption Index (CAI) bands, was top performing (R 2 = 0.8397; RMSE = 0.1231). Three-band indices with CAI-type wavelengths maintained top f R estimation performance for the full-NDVI dataset with a 2036–2111–2217 nm band combination (R 2 = 0.7581; RMSE = 0.1548). The 2036–2111–2217 nm band combination was also top performing in f R estimation (R 2 = 0.8690; RMSE = 0.0970) for an additional analysis assessing combined green vegetation cover and surface moisture effects. Our results indicate that a three-band configuration with band centers and wavelength tolerances of 2036 nm (±5 nm), 2097 nm (±14 nm), and 2214 (±11 nm) would optimize Landsat Next SWIR bands for f R estimation.

Landsat Next↗

The role of optimization in the next generation of computer-based design tools

There is a close relationship between design optimization and the emerging new generation of computer-based tools for engineering design. With some notable exceptions, the development of these new tools has not taken full advantage of recent advances in numerical design optimization theory and practice. Recent work in the field of design process architecture has included an assessment of the impact of next-generation computer-based design tools on the design process. These results are summarized, and insights into the role of optimization in a design process based on these next-generation tools are presented. An example problem has been worked out to illustrate the application of this technique. The example problem - layout of an aircraft main landing gear - is one that is simple enough to be solved by many other techniques. Although the mathematical relationships describing the objective function and constraints for the landing gear layout problem can be written explicitly and are quite straightforward, an approximation technique has been used in the solution of this problem that can just as easily be applied to integrate supportability or producibility assessments using theory of measurement techniques into the design decision-making process.

Rogan, J. Edward↗

Next generation space robot

The recent research effort on the next generation space robots is presented. The goals of this research are to develop the fundamental technologies and to acquire the design parameters of the next generation space robot. Visual sensing and perception, dexterous manipulation, man machine interface and artificial intelligence techniques such as task planning are identified as the key technologies.

Iwata, Tsutomu↗

Next generation: Unmanned launch vehicles and upper stages: The needs

The focus is on common vehicle elements, higher mission success, and lower transportation cost with respect to the common needs of the Department of Defense, NASA, and U.S. Industry. The following are presented in viewgraph form: (1) perspectives on mission costs and failures; (2) the recurring costs of the Delta 7925, Atlas/Centar, Titan 3, and Titan 4; (3) U.S. launches from 1957-1987 of Vanguard, Jupiter, Thor/Delta, Juno, Atlas, Scout, Redstone, Saturn, Titan, and the Space Transportation System; and (4) subsystem sources of failure. The following topics are also briefly presented: (1) engine costs; (2) a summary of flight experience; (3) recommendations for next generation space transportation; (4) low cost engine demonstration; and (5) the next generation commercial expendable launch vehicle (ELV) needs estimate.

Gunn, Charles R.↗

Next generation: In-space transportation system(s)

The development of the next generation In-Space Transportation System presents a unique challenge to the design of a propulsion system for the Space Exploration Initiative (SEI). Never before have the requirements for long-life, multiple mission use, space basing, high reliability, man-rating, and minimum maintenance come together with performance in one system that must protect the lives of space travelers, support the mission logistics needs, and do so at an acceptable cost. The challenge that is presented is to quantify the bounds of these requirements. The issue is one of degree. The length of acceptable life in space, the time it takes for reuse to pay off, and the degree to which space basing is practical (full, partial, or expended) are the issues that determine the reusable bounds of a design and include dependability, contingency capabilities, resilency, and minimum dependence on a maintenance node in preparation for and during a mission. Missions to planet earth, other non-NASA missions, and planetary missions will provide important but less demanding requirements for the transportation systems of the future. The mission proposed for the SEI require a family of transportation vehicles to meet the requirements for establishing a permanent human presence on the Moon and eventually on Mars. Specialized vehicles are needed to accomplish the different phases of each mission. These large scale missions require assembly in space and will provide the greatest usage of the planned integrated transportation system. The current approach to defining the In-Space Transportation System for the SEI Moon missions with later Mars mission applications is presented. Several system development options, propulsion concepts, current/proposed activities are reviewed, and key propulsion design criteria, issues, and technology challenges for the next generation In-Space Transportation System(s) are outlined.

Huffaker, Fredrick↗

Advanced instrumentation for next-generation aerospace propulsion control systems

New control concepts for the next generation of advanced air-breathing and rocket engines and hypersonic combined-cycle propulsion systems are analyzed. The analysis provides a database on the instrumentation technologies for advanced control systems and cross matches the available technologies for each type of engine to the control needs and applications of the other two types of engines. Measurement technologies that are considered to be ready for implementation include optical surface temperature sensors, an isotope wear detector, a brushless torquemeter, a fiberoptic deflectometer, an optical absorption leak detector, the nonintrusive speed sensor, and an ultrasonic triducer. It is concluded that all 30 advanced instrumentation technologies considered can be recommended for further development to meet need of the next generation of jet-, rocket-, and hypersonic-engine control systems.

Barkhoudarian, S.↗

Computational Tools and Facilities for the Next-Generation Analysis and Design Environment

This document contains presentations from the joint UVA/NASA Workshop on Computational Tools and Facilities for the Next-Generation Analysis and Design Environment held at the Virginia Consortium of Engineering and Science Universities in Hampton, Virginia on September 17-18, 1996. The presentations focused on the computational tools and facilities for analysis and design of engineering systems, including, real-time simulations, immersive systems, collaborative engineering environment, Web-based tools and interactive media for technical training. Workshop attendees represented NASA, commercial software developers, the aerospace industry, government labs, and academia. The workshop objectives were to assess the level of maturity of a number of computational tools and facilities and their potential for application to the next-generation integrated design environment.

Noor, Ahmed K.↗

NASA's next generation tracking and data relay satellite system (TDRSS): Launch and operational ground segment architecture

The next generation's tracking and data relay satellite system (TDRSS) spacecraft currently under development for user support into the next century, is reported. Modifications will be made to the TDRSS ground terminals required for user support, the control of the TDRSS and the support of transfer orbit operations. The modifications will be made while ensuring compatibility with the present generation of TDRSS. The capabilities of the new spacecraft are described and compared with those of the existing generation. The architecture of the modified ground terminals and that of a new terminal, are detailed.

Miller, Ronald A.↗

Next Generation Multimedia Distributed Data Base Systems

The paradigm of client/server computing is changing. The model of a server running a monolithic application and supporting clients at the desktop is giving way to a different model that blurs the line between client and server. We are on the verge of plunging into the next generation of computing technology--distributed object-oriented computing. This is not only a change in requirements but a change in opportunities, and requires a new way of thinking for Information System (IS) developers. The information system demands caused by global competition are requiring even more access to decision making tools. Simply, object-oriented technology has been developed to supersede the current design process of information systems which is not capable of handling next generation multimedia.

Pendleton, Stuart E.↗

The Next Generation Space Telescope

In Space Science in the Twenty-First Century, the Space Science Board of the National Research Council identified high-resolution-interferometry and high-throughput instruments as the imperative new initiatives for NASA in astronomy for the two decades spanning 1995 to 2015. In the optical range, the study recommended an 8 to 16-meter space telescope, destined to be the successor of the Hubble Space Telescope (HST), and to complement the ground-based 8 to 10-meter-class telescopes presently under construction. It might seem too early to start planning for a successor to HST. In fact, we are late. The lead time for such major missions is typically 25 years, and HST has been in the making even longer with its inception dating back to the early 1960s. The maturity of space technology and a more substantial technological base may lead to a shorter time scale for the development of the Next Generation Space Telescope (NGST). Optimistically, one could therefore anticipate that NGST be flown as early as 2010. On the other hand, the planned lifetime of HST is 15 years. So, even under the best circumstances, there will be a five year gap between the end of HST and the start of NGST. The purpose of this first workshop dedicated to NGST was to survey its scientific potential and technical challenges. The three-day meeting brought together 130 astronomers and engineers from government, industry and universities. Participants explored the technologies needed for building and operating the observatory, reviewed the current status and future prospects for astronomical instrumentation, and discussed the launch and space support capabilities likely to be available in the next decade. To focus discussion, the invited speakers were asked to base their presentations on two nominal concepts, a 10-meter telescope in space in high earth orbit, and a 16-meter telescope on the moon. The workshop closed with a panel discussion focused mainly on the scientific case, siting, and the programmatic approach needed to bring NGST into being. The essential points of this panel discussion have been incorporated into a series of recommendations that represent the conclusions of the workshop. Speakers were asked to provide manuscripts of their presentation. Those received were reproduced here with only minor editorial changes. The few missing papers have been replaced by the presentation viewgraphs. The discussion that follows each speaker's paper was derived from the question and answer sheets, or if unavailable, from the tapes of the meeting. In the latter case, the editors have made every effort to faithfully represent the discussion.

Bely, Pierre-Yves↗

Considerations for a Next Generation UV/Optical Space Telescope

During the past 25 years, a remarkable scientific revolution, has occurred in astrophysics as a result of convergence on two advancing fronts. First, instruments and telescopes have been developed to make sensitive measurements throughout the entire electromagnetic spectrum. Secondly, access to space has permitted observations above the obscuring and distorting "dirty window" of our atmosphere. Beginning around the middle of the next decade, a third major path - the availability of the permanently manned Space Station Freedom - will join with the earlier two capabilities, to not only continue this revolution, but to accelerate the quest for answers about the universe that have puzzled mankind for centuries. Beyond Earth-orbit, NASA is actively studying the possibility of a return to the Moon, which would provide a valuable platform for astrophysics observations during the next century. The studies discussed in this paper indicate that the technology requirements associated with the transportation to orbit and the assembly of these telescopes in orbit are major driving forces in the selection of generic design concepts. Ultimately, optical advances which are now becoming available through advanced manufacturing must be matched by technology advances in orbital operations, system modularization, and assembly by man and machine.

Nein, M. E.↗

New Space Industries for the Next Millennium

New Space Industries For the Next Millennium is a final report of the findings from the New Space Industries Workshop held in Washington, DC, in February 1998. The primary purpose of this workshop was to identify what must be done to develop new markets, and to generate plans, milestones and new organizational relationships designed to facilitate the goal of space development. This document provides a summary report on the results of that workshop and is not intended as a statement of NASA or government policy. Previous studies had shown great potential for the development of new markets in space (e.g., travel and entertainment, space solar power, satellite and space transfer services, research and development in space, space manufacturing, and space resources), and a great need for coordination and formation of infrastructures (e.g., space transportation, space business parks, and space utilities), to facilitate the growth of new space businesses. The New Space Industries Workshop brought together government, academia, and industry participants from several previous studies and other professionals interested in the development of space for commercial purposes. Their participation provided input into the role of government and industry in space development as well as the technology needs that will enable space development. The opening of the frontier of space, not just to government missions but to private individuals and commercial business, is a challenge of overarching importance. It is our hope that the workshop and this final report continue in earnest the process of identifying and overcoming the barriers to large-scale public access and development of space in the early years of the next century.

Smitherman, D. V., Jr.↗