Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “National Risk Assessment Partnership”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

83 records · Page 5

GPM Timeline Inhibits For IT Processing

The Safety Inhibit Timeline Tool was created as one approach to capturing and understanding inhibits and controls from IT through launch. Global Precipitation Measurement (GPM) Mission, which launched from Japan in March 2014, was a joint mission under a partnership between the National Aeronautics and Space Administration (NASA) and the Japan Aerospace Exploration Agency (JAXA). GPM was one of the first NASA Goddard in-house programs that extensively used software controls. Using this tool during the GPM buildup allowed a thorough review of inhibit and safety critical software design for hazardous subsystems such as the high gain antenna boom, solar array, and instrument deployments, transmitter turn-on, propulsion system release, and instrument radar turn-on. The GPM safety team developed a methodology to document software safety as part of the standard hazard report. As a result of this process, a new tool safety inhibit timeline was created for management of inhibits and their controls during spacecraft buildup and testing during IT at GSFC and at the launch range in Japan. The Safety Inhibit Timeline Tool was a pathfinder approach for reviewing software that controls the electrical inhibits. The Safety Inhibit Timeline Tool strengthens the Safety Analysts understanding of the removal of inhibits during the IT process with safety critical software. With this tool, the Safety Analyst can confirm proper safe configuration of a spacecraft during each IT test, track inhibit and software configuration changes, and assess software criticality. In addition to understanding inhibits and controls during IT, the tool allows the Safety Analyst to better communicate to engineers and management the changes in inhibit states with each phase of hardware and software testing and the impact of safety risks. Lessons learned from participating in the GPM campaign at NASA and JAXA will be discussed during this session.

Inhibits↗

Challenges of Sustaining the International Space Station Through 2020 and Beyond: Reassessing Confidence Targets for System Availability

The International Space Station (ISS) was originally designed to operate until 2015 with a plan for deorbiting the ISS in 2016. Currently, the international partnership has agreed to extend the operations until 2020 and discussions are underway to extend the life even further to 2028. Each partner is responsible for the sustaining engineering, sparing, and maintenance of their own segments. National Aeronautics and Space Administration's (NASA's) challenge is to purchase the needed number of spares to maintain the functional availability of the ISS systems necessary for the United States On-Orbit Segment s contribution. This presentation introduces an analytical approach to assessing uncertainty in ISS hardware necessary to extend the life of the vehicle. Some key areas for consideration are: establishing what confidence targets are required to ensure science can be continuously carried out on the ISS, defining what confidence targets are reasonable to ensure vehicle survivability, considering what is required to determine if the confidence targets are too high, and whether sufficient number of spares are purchased. The results of the analysis will provide a methodological basis for reassessing vehicle subsystem confidence targets. This analysis compares the probability of existing spares exceeding the total expected unit demand of the Orbital Replacement Unit (ORU) in functional hierarchies approximating the vehicle subsystems. In cases where the functional hierarchies' availability does not meet subsystem confidence targets, the analysis will further identify which ORUs may require additional spares to extend the life of the ISS. The resulting probability is dependent upon hardware reliability estimates. However, the ISS hardware fleet carries considerable epistemic uncertainty which must be factored into the development and execution of sparing risk postures. In addition, it is also recognized that uncertainty in the assessment is due to disconnects between modeled functions and actual subsystem operations. Perhaps most importantly, it is acknowledged that conservative confidence targets per subsystem are currently accepted. This presentation will also discuss how subsystem confidence targets may be relaxed based on calculating the level of uncertainty for each corresponding ORU-function. The presentation will conclude with the various strengths and limitations for implementing the analytical approach in sustaining the ISS through end of life; 2020 and beyond.

Lutomski, Michael G.↗

NASA’s Surface Deformation and Change Mission Study

The National Academies of Science, Engineering and Medicine 2017 Decadal Survey of Earth Science and Applications identified geodetic measurements of surface deformation and related change as one of the top five “observables” to be prioritized in NASA’s future program. In response, NASA commissioned a multi-center Surface Deformation and Change(SDC) team to perform a five year study of mission architectures that would support SDC observables and provide the most value to the diverse science and applications communities it serves. The study is being conducted in phases, in which the science and applications capabilities identified in the Decadal Survey are refined, candidate architectures and associated technologies to support these needs are identified, architectures are assessed against a science value framework specific to SDC, and recommendations to NASA are made. Ultimately, NASA will decide which amongst these recommendations will proceed to mission formulation. As synthetic aperture radar (SAR) was identified as the prime sensor technology to satisfy SDC observational needs, a key component of the SDC study is to assess the current state of the art in SAR sensor and supporting technology. The number of SAR systems, both civil and commercial, is growing rapidly, requiring that mission architectures not only consider technology, but availability of data from other missions, possible partnerships or collaborations, and even data purchase. The mechanism for assessment involves development of an end-to-end science performance evaluation tool for multi-satellite con-stellations, which feeds into a science value framework that con-siders science performance, technological programmatic risks, and cost. This paper will present an overview of the ongoing study including the candidate architectures and the technology road map needed to achieve the objectives of the mission.

Stephen Horst↗

NASA's Surface Deformation and Change Mission Study

The National Academies of Science, Engineering and Medicine 2017 Decadal Survey of Earth Science and Applications identified geodetic measurements of surface deformation and related change as one of the top five "observables" to be prioritized in NASA's program going forward. In response, NASA commissioned a multi-center Surface Deformation and Change (SDC) team to perform a five year study of mission architectures that would support SDC observables and provide the most value to the diverse science and applications communities it serves. The study is being conducted in phases, in which the science and applications capabilities identified in the Decadal Survey are interpreted and refined, candidate mission architectures and associated technologies to support these needs are identified, architectures are assessed against a science value framework specific to SDC, and recommendations to NASA are made. Ultimately, NASA will decide which amongst these recommendations will proceed to mission formulation. As synthetic aperture radar (SAR) was identified as the prime sensor technology to satisfy SDC observational needs, a key component of the SDC study is to assess the current state of the art in SAR sensor and spacecraft systems and components. The number of SAR systems, both civil and commercial, is growing rapidly, requiring that mission architectures not only consider technology, but availability of data from other missions, possible partnerships or collaborations, and even data purchase. The mechanism for assessment involves development of an end-to-end science performance evaluation tool for multi-satellite constellations, which feeds into a science value framework that considers science performance, technological programmatic risks, and cost. This paper will present an overview of the ongoing study including the architectures under consideration and the technology road map needed to achieve the objectives of the mission.

Rosen, Paul↗

Extended Duration: The SIRIUS 21 Crew Perspective

The SIRIUS (Scientific International Research In a Unique terrestrial Station) missions represent a collaborative effort between NASA and Russia’s Institute for Biomedical Problems (IBMP) to conduct a series of long duration isolation and confinement spaceflight analog missions. Three missions of 17-day, 4-month, and 8-month duration (SIRIUS 17, 19, and 21) have been completed at IBMP’s Ground-Based Experimental Complex / Nazemnyy eksperimental'nyy kompleks (NEK) in Moscow, Russia. The international SIRIUS 21 crew comprising representatives from the United States, United Arab Emirates and Russia recently completed the 8-month analog lunar mission. The extended duration mission included simulated lunar transit, orbital, and surface operations with corresponding deep space communication delay, during which the crew participated in nearly 70 studies, eight of which were sponsored by NASA’s Human Research Program. The studies examined the effect of isolation and confinement on the behavioral health of research subjects, and investigated medical countermeasures, team performance, crew dynamics, crew autonomy, food system risks, consequences of confinement and associated physiological stressors. SIRIUS 21 crewmembers also participated in operational tasks such as Rover and CubeSat assembly, simulated lunar sample assessment, VR activities, robotic arm training, environmental systems monitoring, exercise, greenhouse maintenance and 3D printing. Communication with Mission Control was limited to 30-minute periods every two hours. Since access to the internet and email was restricted, simulated ground support provided the Crew’s primary source of daily news and mission information. This panel discussion will include presentations from the US SIRIUS 21 crewmembers – William Brown and Ashley Kowalski – about their experience participating in the mission and science. A facilitated question and answer session will follow with attendees encouraged to ask questions and join in discussion with the SIRIUS 21 crewmembers about their experiences. William Brown came to SIRIUS 21 with experience spread across multiple industries, including the military, defense contracting, healthcare consulting, software engineering, and logistics. He has lived in the Middle East, Central Asia, and Russia. A former Boren Scholar, Brown is fluent in Russian. He holds a Master of International Business degree from the University of South Carolina’s Darla Moore School of Business. Prior to that, he earned a bachelor’s degree in Russian language, literature, and culture from the University of South Carolina. There, he also completed additional undergraduate coursework in computer science. Ashley Kowalski is a Project Leader in The Aerospace Corporation’s International Partnerships Department, where she works with, represents, and provides technical support to the the U.S. Space Force Space Systems Command International Affairs (SSC/IA) office. Through her numerous national and international assignments (Russia, China, and Germany), she has worked on topics related to international space systems, national security space systems, civil systems (including human spaceflight and civil launch projects), space policy, satellite industry analysis, and satellite manufacturing start-ups. She is proficient in Russian and German, and fluent in Polish. Kowalski received her Bachelor of Science and Master of Science degrees in mechanical and aerospace engineering from George Washington University in 2011 and 2012, respectively.

S. E. Whiting↗

Managing a Safe and Successful Multi-User Spaceport

Encouraged by the creation of the Office of Commercial Space Transportation within the U.S. Federal Aviation Administration (FAA) in 1984 and the Commercial Space Act of 1998, the National Aeronautics and Space Administration (NASA) now relies on an extensive network of support from commercial companies and organizations. At NASA's Kennedy Space Center (KSC), this collaboration opens competitive opportunities for launch providers, including repurposing underutilized Shuttle Program resources, constructing new facilities, and utilizing center services and laboratories. The resulting multi-user spaceport fosters diverse activity, though it engenders risk from hazards associated with various spaceflight processing activities. The KSC Safety & Mission Assurance (S&MA) Directorate, in coordination with the center's Spaceport Integration and Center Planning & Development organizations, has developed a novel approach to protect NASA's workforce, critical assets, and the public from hazardous, space-related activity associated with KSC's multi-user spaceport. For NASA KSC S&MA, the transformation to a multi-user spaceport required implementing methods to foster safe and successful commercial activity while resolving challenges involving: Retirement of the Space Shuttle program; Co-location of multiple NASA programs; Relationships between the NASA programs; Complex relationships between NASA programs and commercial partner operations in exclusive-use facilities; Complex relationships between NASA programs and commercial partner operations in shared-use facilities. NASA KSC S&MA challenges were met with long-term planning and solutions involving cooperation with the Spaceport Integration and Services Directorate. This directorate is responsible for managing active commercial partnerships with customer advocacy and services management, providing a dedicated and consistent level of support to a wide array of commercial operations. This paper explores these solutions, their relevance to the current commercial space industry, and the challenges that continue to drive improvement with a focus on areas of safety management and risk assessment that have been crucial in KSC's evolution into a multi-user spaceport. These solutions may be useful to government entities and private companies looking to partner with the commercial space industry.

Range↗

Integration of Advanced Concepts and Vehicles Into the Next Generation Air Transportation System: Introduction, Key Messages, and Vehicle Attributes - Volume 1

Raytheon, in partnership with NASA, is leading the way in ensuring that the future air transportation continues to be a key driver of economic growth and stability and that this system provides an environmentally friendly, safe, and effective means of moving people and goods. A Raytheon-led team of industry and academic experts, under NASA contract NNA08BA47C, looked at the potential issues and impact of introducing four new classes of advanced aircraft into the next generation air transportation system -- known as NextGen. The study will help determine where NASA should further invest in research to support the safe introduction of these new air vehicles. Small uncrewed or unmanned aerial systems (SUAS), super heavy transports (SHT) including hybrid wing body versions (HWB), very light jets (VLJ), and supersonic business jets (SSBJ) are the four classes of aircraft that we studied. Understanding each vehicle's business purpose and strategy is critical to assessing the feasibility of new aircraft operations and their impact on NextGen's architecture. The Raytheon team used scenarios created by aviation experts that depict vehicles in year 2025 operations along with scripts or use cases to understand the issues presented by these new types of vehicles. The information was then mapped into the Joint Planning and Development Office's (JPDO s) Enterprise Architecture to show how the vehicles will fit into NextGen's Concept of Operations. The team also identified significant changes to the JPDO's Integrated Work Plan (IWP) to optimize the NextGen vision for these vehicles. Using a proven enterprise architecture approach and the JPDO s Joint Planning Environment (JPE) web site helped make the leap from architecture to planning efficient, manageable and achievable. Very Light Jets flying into busy hub airports -- Supersonic Business Jets needing to climb and descend rapidly to achieve the necessary altitude Super-heavy cargo planes requiring the shortest common flight path -- are just a few of the potential new operations in the future National Airspace System. To assess the impact of these new scenarios on overall national airspace operations, the Raytheon team used the capabilities of a suite of tools such as NASA's Airspace Concepts Evaluation System (ACES), the Flight Optimization System (FLOPS), FAA's Aviation Environmental Design Tool (AEDT), Intelligent Automations Kinematic Trajectory Generator (KTG) and the Aviation Safety Risk Model (ASRM). Detailed metroplex modeling, surface delay models for super heavy transports, prioritized routing and corridors for supersonics business jets, and VLJ demand models are some of the models developed by the Raytheon team to study the effect of operating these new vehicles in the future NAS. Using this suite of models, several trade studies were conducted to evaluate these effects in terms of delays, equity in access, safety, and the environment. Looking at the impact of each vehicle, a number of critical issues were identified. The Raytheon team concluded that strict compliance to NextGen's 4-dimensional trajectory (4DT) management will be required to accommodate these vehicles unique operations and increased number of flights in the future air space system. The next section provides a discussion of this and the other key findings from our study.

Zellweger, Andres↗

Integrated Mid-Continent Stacked Carbon Storage Hub Project Phase II (Final Summary Report)

The Phase II Integrated Midcontinent Stacked Carbon Storage Hub (IMSCS-HUB) is part of the Carbon Storage Assurance Facility Enterprise (CarbonSAFE) established by the United States Department of Energy (DOE) National Energy Technology Laboratory (NETL). CarbonSAFE is phased to support the development of commercial-scale (50 million metric tonnes [Mt] over a 30-year period) carbon capture, utilization, and storage (CCUS) in the United States. The IMSCS-HUB study area comprises carbon dioxide (CO 2 ) sources in Iowa, Kansas, and Nebraska (the source corridor), and CO 2 sinks in Kansas and Nebraska (the storage corridor), representing the first large-scale project for the Midcontinent region. The stacked storage corridor is characterized by alternating sequences of deep saline formations, oil-bearing reservoirs, shale, and evaporite units that are conducive to vertically stacked CO 2 injection for geologic storage and enhanced oil recovery (EOR). Three sites within the IMSCS-HUB stacked storage corridor were evaluated in Phase II for commercial CCUS feasibility: one in southwest-central Nebraska, Sleepy Hollow Field (SHF), a second in southwestern Nebraska near Madrid (Madrid), and a third in southwestern Kansas, the Patterson Site (composed of the Patterson, Heinitz, Hartland, and Oslo fields). In Phase II, the team assessed the feasibility of storage complexes at the potential storage sites in Nebraska and Kansas to support a commercial-scale storage hub that integrates proven CO 2 capture technology and transport from nearby ethanol sources. Building on lessons learned from the DOE-NETL Regional Carbon Sequestration Partnerships (RCSPs), the Project Team has identified a clear strategy to meet DOE’s 2025 objective of commercial carbon capture and storage (CCS) implementation by developing a CO 2 market and infrastructure that relies on multiple ethanol-based CO 2 sources in the short term and the incorporation of multiple coal-fired power plant CO 2 sources when commercial capture is economically viable. The team also leveraged the updated 45Q tax credit to develop capture and transport infrastructure. Commercial-scale CCUS is feasible at two candidate storage sites studied, the Madrid, Nebraska Site and the Patterson Site in Kearny County, Kansas. The Sleepy Hollow Field in Nebraska was found to be an attractive candidate for stacked storage with CO 2 -EOR (Battelle 2020e). Outreach efforts facilitated engagement from industry, government, and research sectors (Battelle and GPI, 2020) and an outreach plan for future phases of the project was developed to address issues that are of concern in the IMSCS-HUB project area (Battelle, 2020f). All components of a CCUS project were determined to be feasible in the IMSCS-HUB region and Risk Mitigation Plan was developed and includes strategies to mitigate risks associated with each project component (Battelle, 2020j). A roadmap was developed to obtain the required UIC permits for an integrated CCUS project (Battelle, 2020k). The regional storage resource characterization demonstrated significant opportunity for commercial-scale projects in the IMSCS-HUB storage corridor with 577.4 Mt of stacked CO 2 storage capacity and the potential to produce 181.9 MMbbls of oil via EOR across 17 individual storage areas (Battelle and ARI, 2020). The pipeline assessment study found viable pipeline routes that connected 45Q-eligible ethanol plants, coal fired power plants, and other sources in the IMSCS-HUB corridor. The comprehensive results of subsurface characterization, modeling efforts, outreach assessment, and regulatory analysis from were integrated to develop a Detailed Commercial Development Plan for the IMSCS-HUB (Battelle, 2020n). Commercialization efforts will involve obtaining Class VI UIC permits, establishing and finalizing the pipeline route, and evaluating capture projects at participating CO 2 sources. Phases I and II of the IMSCS-HUB CarbonSAFE provide a strong foundation for safely, efficiently, and cost-effectively characterizing and permitting commercial-scale project sites in the region. The plan for implementation of commercial-scale CCUS projects in the IMSCS-HUB is aligned with the objectives of CarbonSAFE Phase III: Site Characterization and CO 2 Capture Assessment.

20 FOSSIL-FUELED POWER PLANTS↗

NASA Plans for In Situ Resource Utilization (ISRU) Development, Demonstration, and Implementation

The United States (US) National Aeronautics and Space Administration’s (NASA) Artemis Moon to Mars program has four major goals: (1) Returning Americans to the Moon: 1st Woman & 1st Person of Color, (2) Learning to live and work on the Moon, (3) Translating lessons learned so that the United States has capabilities and operational experience for a mission to Mars, and (4) Inspires the next generation of explorers, researchers, scientists, and engineers worldwide. Overarching all of this, the NASA Artemis program also continues to follow Space Policy Directive One (SPD-1) which directs the US to lead an innovative and sustainable exploration program with commercial and international partners. A major objective to achieve the Artemis program goals and SPD-1 is to understand and characterize the resources that exist at these destinations, and to learn how to utilize these resources for sustained human exploration and the commercialization of space. This ability, commonly known as In Situ Resource Utilization (ISRU), involves any hardware or operation that harnesses and utilizes local resources to create products and services for robotic and human explo-ration. The NASA ISRU program is focused on the production of mission consumables and com-modities to enable sustained human exploration, such as rocket propellants, life support consuma-bles, fuel cell reactants, feedstock for manufacturing and construction, and nutrients for food and plant growth. In particular, propellants make up a significant fraction of the mass launched from Earth, are critical to mission success, and can reduce the cost for reusable transportation. Important for enabling long term surface stays, greater independence from Earth, and growing lunar infra-structure are the abilities to perform construction and manufacturing from in situ-derived metals and materials to create and expand on the infrastructure and reduce the logistical resupply needed for sustained surface and space operations. To achieve these ISRU capabilities, NASA, in partner-ship with industry, academia, and international partners has initiated a multi-faceted program which involves (i) Determining Customer Needs (Type and Quantity of Commodities), (ii) supporting ground Development of Hardware and Systems until Ready for Lunar Flight, (iii) utilize Commer-cial Lunar Payload Services (CLPS) flights to fly resource assessment missions with the Science Mission Directorate (SMD), and public-private partnership (PPP) ISRU demonstrations of critical technologies and processes, and (iv) performing commercial-led end-to-end ‘Pilot’ Plant production of commodities and demonstration of usage at a scale and duration that minimizes or eliminates risk for full implementation of ISRU-derived commodities in mission critical applications. This paper will discuss the technologies, mission studies, and accomplishments achieved to date for the ISRU multi-faceted program, and plans for continued ground development and flight missions to reduce the risk of full ISRU implementation.

In situ resource utilization↗

Williston Basin Resource Study for Commercial-Scale Subsurface Hydrogen Storage

The Energy & Environmental Research Center (EERC), in partnership with the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL), the EERC’s State Energy Research Center (SERC), MPLX Operations LLC, and TC Energy Development Holdings Inc. (a subsidiary of TC Energy Corporation), studied the potential for subsurface hydrogen storage and recovery in the Williston Basin of western North Dakota. The project’s goal was to evaluate the feasibility of large-scale, secure geologic H 2 storage to support future hydrogen generation, storage, and use. This work included laboratory testing, H 2 –rock–fluid exposure experiments, literature reviews on H 2 embrittlement, and reservoir modeling and simulations. The study included an assessment of storage potential across three types of storage reservoirs using both reservoir simulation and DOE’s web-based tool SHASTA-HELP (Subsurface Hydrogen Assessment, Storage, and Technology Acceleration – Hydrogen Estimator for Logistical Planning), as well as investigation of potential H 2 production and markets for commercial-scale deployment. Building on prior EERC gas storage research, three storage options were selected for detailed evaluation: the Broom Creek Formation (a clastic saline reservoir), the Dickinson Lodgepole Mounds (DLM) complex (carbonate mud mound structures) of the Lodgepole Formation (an active oil and gas producing reservoir), and the Dunham Salt Interval of the Piper Formation (to be used for engineered salt cavern development). These targets were prioritized based on prior EERC research using datasets related to seal capacity, reservoir quality, mechanical integrity, and injectivity. Exposure tests on Broom Creek and DLM samples showed mineral dissolution and precipitation that increased brine salinity and altered reservoir rock surfaces. Although these results provide useful insight, they are limited by small sample sizes and short-term (30-day) exposure, requiring further study to assess long-term storage integrity. Salt formations were not tested because of their known nonreactivity and established mechanical stability. Results of reservoir simulations performed for a single site demonstrated that the Broom Creek Formation may be capable of receiving up to 42,000 tonnes of injected H 2 over 7 months via one well. H 2 recovery took place over 5 months, resulting in approximately 26,000 tonnes (~62% without cushion gas [CG]). This work suggests water production may be important and subsequent cycles of injection and production may perform more efficiently; however, significant site-specific work in the future is needed to assess actual reservoir performance of injection and withdrawal of H 2 storage. For oil reservoir potential, a multiple-well model was used to simulate injection of approximately 32,000 tonnes of H 2 into a single wellbore while simultaneously producing in place reservoir fluids from four offset wells to maintain reservoir pressure. The simulation results suggested a high recovery (~98%); in addition, cost advantages through existing infrastructure could be realized. Challenges in this reservoir include vi managing gas purity and leakage risks. In both scenarios, production of H 2 takes place in a single-well scenario with 10 cycles (7 months of injection and 5 months of production) over 10 years. Finally, the use of engineered caverns in the Dunhan Salt was evaluated, and the results suggest that while they have a smaller capacity (<1000 tonnes per cavern), they exhibit nearly complete gas recovery (>99%), fast response times, and low purity risk. While caverns in North Dakota may be smaller in capacity, fields can be developed in galleries to accommodate the volumetric needs and rapid turnaround times necessary to meet market demands. Geographic limitations and thin salt intervals in North Dakota may represent less total storage potential than salt domes elsewhere, but significant opportunities exist to expand this market for gas storage in North Dakota. A basinwide assessment was performed to estimate a first-of-its-kind value for H 2 storage on a large scale. DOE’s SHASTA-HELP, combined with EERC simulation work, was used to perform the assessment. Estimated H 2 storage potential varied widely for each formation type. The Broom Creek saline formation was estimated to have a storage potential of approximately 1.7–90.5 million tonnes (MMt). The DLM oil reservoirs were estimated to have 0.07–0.19 MMt of capacity. Notably, each of these estimates relies on significant assumptions regarding reservoir thickness, porosity, permeability, and CG needed for operation. Much research is needed to understand the true site-specific storage resource potential of each formation. Using the Dunham Salt Interval for cavern development may result in as much as 4.79 MMt (up to 2.87 MMt working gas) of H 2 storage potential. An important note for consideration is that the values presented here need significantly more geological characterization and engineering assessments prior to gaining confidence in performance. This will be a focal point for future research and development needs. The basinwide evaluation also indicated that North Dakota has significant H 2 generation potential, with estimates up to a possible 13 MMt annually, suggesting a substantial opportunity for H 2 market development and thus the need for commercial-scale H 2 storage to facilitate growth and resilience. Key Recommendations 1. Conduct detailed site characterization (3D seismic, well logs, core sampling) to reduce geologic uncertainty. 2. Perform techno-economic analyses incorporating market, regulatory, and incentive frameworks. 3. Investigate long-term interactions among H 2 , CGs, well materials, and formations to assess risks. 4. Develop pilot- and field-scale demonstrations to validate models and establish best practices.

03 NATURAL GAS↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗