Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Monitoring”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Hydrogen wide area monitoring of LH2 releases

The characterization of liquid hydrogen (LH2) releases has been identified as an international research priority to expand the safe use of hydrogen as an energy carrier. The elucidation of LH2 release behavior will require the development of dispersion and other models, guided and validated by empirical field measurements such as those afforded by Hydrogen Wide Area Monitoring (HyWAM). HyWAM can be defined as the quantitative spatial and temporal three-dimensional monitoring of planned or unintentional hydrogen releases. With support provided through the FCH JU Prenormative Research for the Safe Use of Liquid Hydrogen (PRESLHY) program, HSE performed a series of LH2 releases to characterize the dispersion and pooling behavior of cold hydrogen releases. The NREL Sensor Laboratory developed a HyWAM system based upon a distributed array of point sensors that is amenable for profiling cold hydrogen plumes. The NREL Sensor Laboratory and HSE formally committed to collaborate on profiling the LH2 releases. This collaboration included the integration of the NREL HyWAM into the HSE LH2 release hardware. This was achieved through a deployment plan jointly developed by the NREL and HSE personnel. Under this plan, the NREL Sensor Laboratory provided multiple HyWAM modules that accommodated 32 sampling points for near-field hydrogen profiling during the HSE PRESLHY LH2 releases. The NREL HyWAM would be utilized throughout the LH2 release study performed under PRESLHY by HSE, including Work Package 3 (WP3—Release and Mixing--Rainout) and subsequent work packages (WP4—Ignition and WP5—Combustion). Under the auspices of the PRESLHY WP6 (Implementation), data and findings from the HSE LH2 Releases are to be made available to stakeholders in the hydrogen community. Comprehensive data analysis and dissemination is ongoing, but the integration of the NREL HyWAM into the HSE LH2 Release Apparatus and its performance as well as some key outcomes of the LH2 releases in WP3 are presented.

08 HYDROGEN↗

SIX YEARS OF FERMI-LAT AND MULTI-WAVELENGTH MONITORING OF THE BROAD-LINE RADIO GALAXY 3C 120: JET DISSIPATION AT SUB-PARSEC SCALES FROM THE CENTRAL ENGINE

We present multi-wavelength monitoring results for the broad-line radio galaxy 3C 120 in the MeV/GeV, sub-millimeter, and 43 GHz bands over 6 yr. Over the past 2 yr, the Fermi-Large Area Telescope sporadically detected 3C 120 with high significance and the 230 GHz data also suggest an enhanced activity of the source. After the MeV/GeV detection from 3C 120 in MJD 56240–56300, 43 GHz Very Long Baseline Array (VLBA) monitoring revealed a brightening of the radio core, followed by the ejection of a superluminal knot. Since we observed the γ-ray and VLBA phenomena in temporal proximity to each other, it is naturally assumed that they are physically connected. This assumption was further supported by the subsequent observation that the 43 GHz core brightened again after a γ-ray flare occurred around MJD 56560. We can then infer that the MeV/GeV emission took place inside an unresolved 43 GHz core of 3C 120 and that the jet dissipation occurred at sub-parsec distances from the central black hole (BH), if we take the distance of the 43 GHz core from the central BH as ∼0.5 pc, as previously estimated from the time lag between X-ray dips and knot ejections. Based on our constraints on the relative locations of the emission regions and energetic arguments, we conclude that the γ rays are more favorably produced via the synchrotron self-Compton process, rather than inverse Compton scattering of external photons coming from the broad line region or hot dusty torus. We also derived the electron distribution and magnetic field by modeling the simultaneous broadband spectrum.

79 ASTRONOMY AND ASTROPHYSICS↗

Integrated Monitoring Volume: A Summary of Monitoring Studies Conducted in Niagaran Carbonate Pinnacle Reefs During Enhanced Oil Recovery with CO 2

The Midwest Regional Carbon Sequestration Partnership (MRCSP) was founded in 2003 as part of the U.S. Department of Energy’s (DOE’s) Regional Carbon Sequestration Partnership initiative. Since its founding, MRCSP has made significant strides toward making CCUS a viable option for states in the region. The public/private consortium, funded through the DOE Regional Carbon Sequestration Initiative, brings together nearly 40 industry partners and 10 states. Battelle, as the project lead, oversees research, development and operations and coordinates activities among the partners. The incremental, phased approach has built a valuable knowledge base for the industry and paved the way for commercial-scale adoption of CCUS technologies. From 2008 to 2020, MRCSP Phase III focused on the development of large-scale injection projects. This report is part of a series of reports prepared under the Midwestern Regional Carbon Sequestration Partnership (MRCSP) Phase III (Development Phase). These reports summarize and detail the findings of the work conducted under the Phase III project. During the MRCSP Phase III monitoring period, over 1 million metric tons of CO 2 was injected into ten Silurian-age (Niagaran) pinnacle reef reservoirs in Otsego County, Michigan that are operated by Core Energy, LLC. There are over 800 pinnacle reefs in northern Michigan, and collectively, these geologic features have sufficient capacity to store several hundred million metric tons of CO 2 . Moreover, most of the reefs are oil-bearing and went through primary production in the 1970s and 1980s; therefore, by injecting CO 2 into the reefs, there is a real opportunity to realize additional (enhanced) oil recovery (EOR) and to permanently store CO 2 after EOR. A key objective of the MRCSP Phase III project is to evaluate the effectiveness of various technologies for monitoring CO 2 that has been injected into deep geologic formations. Monitoring may be required at CO 2 storage sites for a variety of reasons, including to meet UIC Class II (EOR sites) or Class VI (storage only sites) permit requirements or EPA greenhouse gas reporting rule requirements or to qualify for tax credits under the 45Q tax credit rule. The results of this monitoring study should prove useful to operators considering using carbonate pinnacle reefs of Northern Michigan for CO 2 storage.

01 COAL, LIGNITE, AND PEAT↗

Design, construction, and use of a shipping case for radioactive sources used in the calibration of portal monitors in the radiation portal monitoring project

Pacific Northwest National Laboratory is working with US Customs and Border Protection to assist in the installation of radiation portal monitors. We need to provide radioactive sources – both gamma- and neutron-emitting – to ports of entry where the monitors are being installed. The monitors must be calibrated to verify proper operation and detection sensitivity. We designed a portable source-shipping case using numerical modeling to predict the neutron dose rate at the case’s surface. The shipping case including radioactive sources meets the DOT requirements for “limited quantity.” Over 300 shipments, domestic and international, were made in FY2008 using this type of shipping case.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Comparison Measurements of Silicon Carbide Temperature Monitors

As part of the efforts initiated through the Advanced Test Reactor (ATR) National Scientific User Facility (NSUF) program to make Silicon Carbide (SiC) temperature monitors available, a capability was developed at the Idaho National Laboratory (INL) to complete post-irradiation evaluations of these monitors. INL selected the resistance measurement approach for detecting peak irradiation temperature from SiC temperature monitors. To demonstrate this new capability, comparison measurements were completed by INL and Oak Ridge National Laboratory (ORNL) on identical samples subjected to identical irradiation conditions. Results reported in this paper indicate that the resistance measurement approach can yield similar peak irradiation temperatures if appropriate equipment is used and appropriate procedures are followed.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Scientific Opportunities for Monitoring at Environmental Remediation Sites (SOMERS): Integrated Systems-Based Approaches to Monitoring

Through an inter-disciplinary effort, DOE is addressing a need to advance monitoring approaches from sole reliance on cost- and labor-intensive point-source monitoring to integrated systems-based approaches such as flux-based approaches and the use of early indicator parameters. Key objectives include identifying current scientific, technical and implementation opportunities and challenges, prioritizing science and technology strategies to meet current needs within the DOE complex for the most challenging environments, and developing an integrated and risk-informed monitoring framework.

54 ENVIRONMENTAL SCIENCES↗

Multi-Isotope Process (MIP) Monitor: A Near-Real-Time Monitor For Reprocessing Facilities

INTRODUCTION The threat of protracted diversion of Pu from commercial reprocessing operations is perhaps the greatest concern to national and international agencies tasked with safeguarding these facilities. While it is generally understood that a method for direct monitoring of process on-line and in near-real time (NRT) would be the best defense against protracted diversion scenarios, an effective method with these qualities has yet to be developed. Here, we attempt to bridge this gap by proposing an on-line NRT process monitoring method that should be sensitive to minor alterations in process conditions and compatible with small, easily deployable, detection systems. This Approach is known as the Multi-Isotope Process (MIP) Monitor and involves the determination and recognition of the contaminant pattern within a process stream for a suite of indicator (radioactive) elements present in the spent fuel as a function of process variables. Utilization of a suite of radio-elements, including ones with multiple oxidation states, decreases the likelihood that attempts to divert Pu by altering the ReDox environment within the process would go undetected. In addition, by identifying gamma-emitting indicator isotopes, this Approach might eliminate the need for bulky neutron detection systems, relying instead on small, portable, high-resolution gamma detectors easily deployable throughout the facility.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Comprehensive Monitoring for Heterogeneous Geographically Distributed Storage

Storage capacity at CMS Tier-1 and Tier-2 sites reached over 100 Petabytes in 2014, and will be substantially increased during Run 2 data taking. The allocation of storage for the individual users analysis data, which is not accounted as a centrally managed storage space, will be increased to up to 40%. For comprehensive tracking and monitoring of the storage utilization across all participating sites, CMS developed a space monitoring system, which provides a central view of the geographically dispersed heterogeneous storage systems. The first prototype was deployed at pilot sites in summer 2014, and has been substantially reworked since then. In this paper we discuss the functionality and our experience of system deployment and operation on the full CMS scale.

Ratnikova, N.↗

Towards 5G-Enabled Operational Technology for Process Monitoring and Network Slicing

Cyber-Physical Systems (CPS) are deployed to monitor physical processes in critical cyber-enabled services like power generation. However, CPS ecosystems are typically designed without robust security. While it is important to ensure optimal performance of the Operational Technology (OT) environments, security cannot be overlooked. To modernize traditional OT services, 5G technology is being integrated. 5G technology offers low latency and high availability, making it a suitable infrastructure for managing and monitoring physical processes. How-ever, integrating 5G mechanisms into large-scale OT networks introduces new implementation and performance challenges. Therefore, this paper presents a 5G-enabled CPS architecture (5G-CPS) that describes the necessary components, services, and communication protocols and conducts feasibility study to integrate 5G technology in industrial control system networks to understand the performance merits. The 5G-CPS architecture aims to minimize implementation and operational challenges associated with integrating 5G technology into constrained OT.

Aguayo, Jared M.↗

Integrating 5G Technology for Improved Process Monitoring and Network Slicing in ICS

Industrial Control Systems (ICS) are crucial for monitoring physical processes that support essential cyber-enabled services like power generation. The use of proprietary communication and lack of effective intrusion detection mechanisms pose constraints for efficient operation. Therefore, there is a need to modernize these systems with decentralized technologies like Edge Computing and 5G. However, integrating 5G and Edge Computing into large-scale ICS networks presents implementation and performance challenges. To address these challenges, this paper proposes an integrated ICS architecture that combines 5G and Edge Computing technologies with traditional ICS protocols. The objective is to minimize implementation and operational difficulties while improving the monitoring of physical processes and enabling robust intrusion detection. The proposed architecture outlines the necessary components, services, and communication protocols required for the integration of 5G and Edge Computing.

Aguayo, Jared M.↗

The Mu2e Solenoid Cold Mass Position Monitor System

The Mu2e experiment at Fermilab is designed to search for charged-lepton flavor violation by looking for muon to electron conversions in the field of the nucleus. The concept of the experiment is to generate a low momentum muon beam, stopping the muons in a target and measuring the momentum of the outgoing electrons. The implementation of this approach utilizes a complex magnetic field composed of graded solenoidal and toroidal fields. The location of the solenoid cold mass relative to external fiducials is needed for alignment as well as monitoring coil movements during cool down and magnet excitation. This study describes a novel design of a Cold Mass Position Monitor System (CMPS) that will be implemented for the Mu2e experiment.

43 PARTICLE ACCELERATORS↗

Long-term ultrasonic monitoring of concrete affected by alkali-silica reaction

This article presents continuous monitoring results of alkali-silica reaction (ASR) development in concrete specimens for over 400 days using ultrasonic testing and expansion measurements. Eight concrete specimens with nonreactive aggregate (Control), reactive coarse aggregate, and reactive fine aggregates were cast with two reinforced confinement conditions. The specimens were conditioned in an environmental chamber with high temperature and humidity (38°C and 90% relative humidity) to accelerate the ASR development. A multichannel ultrasonic monitoring system was developed to collect ultrasonic signals automatically, and the expansions in three directions were measured periodically. Results showed that the relative velocity change could detect the ASR initiation in all reactive specimens and show a correlation with expansion in the early stage. However, these correlations are inconsistent for different ASR specimens, and the velocity change becomes less sensitive to ASR damage in the late stage (after 300 days). Irrecoverable velocity drop was observed during every chamber shutdown period, especially in specimens with higher levels of ASR damage. This phenomenon suggests that the nonlinear ultrasonic response caused by the ambient temperature variation may indicate the ASR damage.

Engineering↗

Multiple Synchrotron Light Monitors for Transverse Matching and Monitoring at CEBAF

Beam setup at the Continuous Electron Beam Accelerator Facility (CEBAF) involves threading beam through the machine and monitoring global transfer functions to identify and address cumulative lattice errors. Transverse beam emittance may grow by as much as two orders of magnitude, mediated by synchrotron radiation. Re-matching the enlarged beam phase space into successive re-circulation arcs minimizes this emittance growth but requires knowledge of the actual beam distribution. This is now accomplished through quadrupole scans using wire profile monitors, the most time-consuming activity in our setup process. We propose to use Synchrotron Light Monitors (SLMs) to image the beam at homologous points in the four super-period recirculation arc lattices. Benefits include real-time monitoring of beam parameters and reduced elapsed time for initial setup.These SLMs will be installed in Arc 7 of the CEBAF machine, where Synchrotron Radiation contributes moderately to emittance growth. One of four required SLMs will be installed and commissioned this year, with the rest being installed next year.

Freeman, B.↗

Geophysical Monitoring of Foam used to Deliver Remediation Treatments within the Vadose Zone

Foam is a promising vehicle for delivering amendments into the vadose zone for in situ remediation; it is an approach being considered for in situ treatment and stabilization of metals and radionuclides located within the deep vadose zone of the Department of Energy (DOE) Hanford site, WA. A central aspect of evaluating the effectiveness of this approach is the ability to monitor foam distribution, its transformation, and the reactions that it induces in the subsurface, ideally in a non-invasive manner. In this study, we performed laboratory experiments to evaluate the potential of geophysical methods (complex resistivity and time domain reflectometry, TDR) as tools for monitoring foam assisted amendment delivery in the deep vadose zone. Our results indicated great sensitivity of electrical methods to foam transportation and evolution in unsaturated porous media that were related to foam bubble coalescence and drainage processes. Specifically, we observed (1) a decrease of electrical resistivity (increase of electrical conductivity) by over an order of magnitude in both silica sand and natural sediment matrices during foam transportation; (2) an increase of resistivity (decrease of conductivity) by over two fold during foam coalescence and drainage; (3) a distinct phase and imaginary conductivity signature related to the evolution of water films on sediment grains during foam injection and evolution processes. To assist with the interpretation of these data, TDR measurements were used to monitor moisture content, which provided complementary information about foam distribution and drainage. Our results clearly demonstrated the sensitivity of electrical and TDR signals to foam transportation and evolution in unsaturated porous media and suggested the potential of these methods for monitoring the response of a system to foam based remediation treatments at field scales.

Hanford↗

Los Alamos National Laboratory 2018 Monitoring Season for storm water and atmospheric deposition samples from Bandelier National Monument under Permit # BAND-2018-SCI-0006 - 2018 Monitoring Season Summary

Los Alamos National Laboratory (LANL) completed the 2018 monitoring season for a multi-year monitoring project to characterize background/baseline conditions around and distal to the Pajarito Plateau, Northern New Mexico. The following media were included in the 2018 monitoring season: precipitation, storm water, and atmospheric deposition. Data generated in this study will be used to characterize and quantify the impacts to water quality from natural background sediments and atmospheric deposition of persistent organic pollutants such as polychlorinated biphenyls [PCBs]. Details specific to 2018 monitoring season are presented below.

54 ENVIRONMENTAL SCIENCES↗

Geophysical Characterization and Monitoring of the 200 Area Treated Effluent Disposal Facility to Support Permit Renewal; TEDF Geophysical Monitoring

The Treated Effluent Disposal Facility (TEDF), located in the 200 East Area of the Hanford Site, is a site where non-hazardous and non-radioactive liquid wastes are disposed into two state-permitted infiltration basins. In 2016, the Washington State Department of Ecology denied a permit renewal request for TEDF due to the inability to adequately assess the impact of TEDF discharge water on the underlying groundwater quality. TEDF overlies the relatively impermeable Ringold Lower Mud (RLM) unit, whose upper contact lies in the vadose zone approximately 30 m below ground surface and approximately 10 m above the water table boundary. The RLM is assumed to isolate TEDF discharge water from the natural groundwater aquifer, which is monitored using wellbores screened below the RLM. Therefore, samples collected from monitoring wells near TEDF are not considered representative of TEDF discharge water. Rather, TEDF discharge water is assumed to mound on top of the RLM to form a perched aquifer. To support permitting of the TEDF, a new monitoring well is required that can be used to sample water from the presumed perched water aquifer above the RLM. Ideally, the screened section of the well would be located at the peak of the perched water mound(s), which presumably occurs at the point of maximum vertical flux from TEDF to the RLM, or equivalently where the dominant infiltration flow paths reach the RLM. This report describes how time-lapse 3D electrical resistivity tomography (ERT) was used in conjunction with nominal TEDF discharge operations to image the dominant flow paths from each pond to the RLM. Results are summarized in Figure ES.1. Figure ES.1A shows a satellite image of the TEDF overlain by an array of surface ERT electrodes. The solid and dashed black circles denote the zones of maximum vertical flux at the RLM within the south and north ponds, respectively, and presumably the regions where perched water peaks during discharge. Figure ES.1B shows time-lapse difference imaging results approximately 15 days after switching discharge from the south pond to the north pond. Blue iso-surfaces beneath the north pond denote regions of increasing bulk electrical conductivity caused by increasing saturation due to infiltrating water. Red iso-surfaces beneath the south pond denote regions that were previously saturated during the south pond discharge and are now de-saturating, causing a decrease in bulk electrical conductivity. In both cases, the zones of maximum change mark the dominant flow paths to the RLM. Figure ES.1C shows time-lapse imaging results approximately 15 days after switching discharge from the north pond to the south pond. In this case, blue iso-surfaces mark the dominant flow paths to the RLM from the south pond. The red iso-surfaces mark the dominant flow paths that existed during discharge to the north pond. The regions of maximum change in bulk conductivity (due to saturation or desaturation) that mark the primary flow paths are equivalent in both cases and denoted by the dashed solid and black circles. If a perched water zone forms on the RLM, it is likely to mound within or near the dashed circle during discharge to the north pond, and in the solid circle during discharge to the south pond. In other words, if perched water mounding occurs, the circles mark the optimum locations suggested by the ERT imaging for monitoring boreholes to be placed, enabling samples to be collected that are representative of TEDF discharge impacts on groundwater quality.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗