Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mixed-integer optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Optimization of a Mixed Fleet of Aerial Drones for Medical Supplies: A Case Study of Blood Delivery Logistics

Aerial drones have emerged as an innovative solution for faster transportation of time-sensitive items (e.g., emergency medical supplies), potentially reducing the transmission of contagious diseases and enhancing healthcare availability through contactless autonomous delivery. We study fleet sizing and efficient scheduling of a mixed fleet of drones for delivering time-sensitive medical items having distinct release and due times to minimize the required fleet size and fleet composition, the required number of additional batteries, and the total energy consumption. We continuously track the remaining battery energy of drones to determine the optimal timing for battery replacement, rather than replacing the battery at each node. Using actual drone flight test data, we employed a machine learning (ML) method to estimate the energy consumption of different drone types during flight segments for different operating parameters. We present a novel mixed-integer programming model to efficiently formulate the problem that integrates the estimated energy consumption functions from ML. We propose a new greedy heuristic (GH) algorithm and a customized genetic algorithm (GA) for solving large-scale instances of this problem faster. Results demonstrate that the GH algorithm is substantially faster than the accelerated CPLEX and the GA, while sacrificing the solution quality by a small amount. Results based on an actual blood sample delivery case study from Pendleton, Oregon, United States, show that using a mixed fleet of drones reduces the total cost and total energy consumption up to 18.18% and 28.7%, respectively, compared to using a homogeneous fleet.

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

Model predictive control for optimal dispatch of chillers and thermal energy storage tank in airports

Cost of energy consumption is one of the biggest operational cost for airports, and it is increasing from time to time as airports expand to support growing number of passengers. Various factors affect the energy consumption including efficiency of airport Heating Ventilation and Air conditioning (HVAC) systems, which in turn depends on the efficiency of individual subsystems. Here, in this paper, we present an optimal scheduling method for the central plant system at Dallas Fort Worth airport, involving chillers, pumps, and a thermal energy storage (TES) system. A model predictive control (MPC) problem is formulated to minimize both energy and demand charge costs while satisfying the cooling needs of the airport. The proposed Mixed-Integer Nonlinear Programming (MINLP) formulation includes performance curve based models for chillers and pumps and a simplified state of charge model for TES. The formulation also includes predictions of cooling load and chilled water return temperature. Simulation results for a month in summer show savings around 10% compared to the baseline. Initial recommendations based on insights from simulation results to the manual operation procedures resulted in significant savings. Field test results show a 7% chiller efficiency improvement.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Strategic Placement and Sizing of Distributed Generation for Resilience Enhancement of Distribution Grids With Microgrid Formation

The rise in frequency and severity of extreme weather events highlights the need for resilient power distribution networks. Microgrids can help improve the resilience of distribution grids by providing continuous power supply using local distribution generation (DG) when the distribution grid fails. In this paper, we propose an approach for optimal placement and sizing of DG to form multiple microgrids throughout the distribution network by restoration actions such as switching operations in case of distribution grid outages caused by extreme weather events. Considering the randomness of damaged distribution lines, the DG placement and sizing problem is formulated as a two-stage stochastic mixed-integer program, with the first stage determining the placement and size of DG, and the second stage focusing on minimizing the amount of load shedding through network restoration and microgrid formations for each scenario. Due to the large number of scenarios, the sample average approximation (SAA) method is employed to solve the problem. The results of case studies on a modified IEEE 33 bus distribution grid demonstrate the effectiveness of the proposed DG placement and sizing strategy in improving the resilience of distribution grids by allowing the formation of multiple microgrids. In addition, the robustness and accuracy of the SAA method are validated through various case studies.

Distributed generation planning↗

Heuristic solutions to the single depot electric vehicle scheduling problem with next day operability constraints

This study focuses on the single depot electric vehicle scheduling problem (SDEVSP) within the broader context of the vehicle scheduling problem (VSP). By developing an effective scheduling model using mixed-integer linear programming, we generate bus blocks that accommodate electric vehicles (EVs), ensuring successful completion of each block while considering recharging requirements between blocks and during off-hours. Next day operability constraints are also incorporated, allowing for seamless repetition of blocks on subsequent days. The SDEVSP is known to be computationally complex, deriving optimal solutions unattainable for large-scale problems within reasonable timeframes. To address this, we propose a two-step solution approach: first solving the single depot VSP, and then addressing the block chaining problem (BCP) using the blocks generated in the first step. The BCP focuses on optimizing block combinations to facilitate recharging between consecutive blocks, considering operational constraints. Further, a case study conducted reveals that nearly 100% electrification for Chicago, IL and Austin, TX transit buses is viable yet requires 1.6 EVs at 150-mile range per diesel vehicle.

33 ADVANCED PROPULSION SYSTEMS↗

DEPLOYING FAST CHARGING INFRASTRUCTURE FOR ELECTRIC VEHICLES IN URBAN NETWORKS: AN ACTIVITY-BASED APPROACH

This paper explores an important problem under the domain of network modeling, the optimal configuration of charging infrastructure for electric vehicles (EVs) in urban networks considering EV users' daily activities and charging behavior. This study proposes a charging behavior simulation model considering different initial state of charge (SOC), travel distance, availability of home chargers, and the daily schedule of trips for each traveler. The proposed charging behavior simulation model examines the complete chain of trips for EV users as well as the interdependency of trips traveled by each driver. The problem of finding the optimum charging configuration is then formulated as a mixed-integer nonlinear programming problem that considers the dynamics of travel time and travel distance, the interdependency of trips made by each driver, limited range of EVs, remaining battery capacity for recharging, waiting time in queue, and detour to access a charging station. This problem is solved using a metaheuristic approach for a large-scale case network. A series of examples are presented to demonstrate the model efficacy and explore the impact of energy consumption on the final SOC and the optimum charging infrastructure.

Chain of Trips↗

Solving the Grid Optimization Competition Challenge 3 Problem

The Grid Optimization Competition Challenge 3 Problem posed a multiperiod security-constrained unit commitment problem with base-case AC power flow. The problem formulation includes binary unit commitment decisions, nonlinear AC power flow and balance, dispatchable loads, and linearized contingency real power flow, among other features. This talk will present a modified consensus ADMM algorithm, which splits the problem into mixed-integer linear and nonlinear components, as a heuristic solution method for this large-scale mixed integer nonlinear program. We will present some computational results from the competition for our implementation and reflect on the challenges of participating the grid optimization competition.

AC power flow↗

Bi-Level Adaptive Storage Expansion Strategy for Microgrids Using Deep Reinforcement Learning

Battery energy storage (BES) is a versatile resource for the secure and economic operation of microgrids (MGs). Prevailing stochastic optimization-based approaches for BES expansion planning for MGs are computationally complicated. This work proposes a data-driven bi-level multi-period BES expansion planning framework to determine the siting, sizing, and timing of BES installations. The proposed planning framework unifies deep reinforcement learning (DRL) and linear programming, thereby decoupling the determinations for the integer and continuous decision variables in two time scales, respectively. In the upper level, a rainbow DRL agent with quantile regression is trained to provide dynamic planning policies to accommodate stochastic renewable energy resources (RESs), load, and battery price changes efficiently. Further, the lower level computes the optimal operation of MGs with frequency constraints to hedge the islanding contingency. The two levels communicate with one another by exchanging storage configuration and operating expenses in order to accomplish the shared goal of minimizing investment and operation costs. Comparative case studies on an MG are carried out to demonstrate the superiority of the proposed DRL-based solution to the mixed-integer linear programming counterpart on efficiency, scalability, and adaptability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-parametric analysis for mixed integer linear programming: An application to transmission upgrade and congestion management

Upgrading the capacity of existing transmission lines is essential for meeting the growing energy demands, facilitating the integration of renewable energy, and ensuring the security of the transmission system. This study focuses on the selection of lines whose capacities and by how much should be expanded from the perspective of the Independent System Operators (ISOs) to minimize the total system cost. We employ advanced multi-parametric programming and an enhanced branch-and-bound algorithm to address complex mixed-integer linear programming (MILP) problems, considering multi-period time constraints and physical limitations of generators and transmission lines. To characterize the various decisions in transmission expansion, we model the increased capacity of existing lines as parameters within a specified range. This study first relaxes the binary variables to continuous variables and applies the Lagrange method and Karush-Kuhn-Tucker (KKT) conditions to obtain optimal solutions and identify critical regions associated with active and inactive constraints. Moreover, we extend the traditional branch-and-bound (B&B) method by determining the problem’s upper and lower bounds at each node of the B&B decision tree, helping to manage computational challenges in large-scale MILP problems. Here, we compare the difference between the upper and lower bounds to obtain an approximate optimal solution within the decision-makers’ tolerable error range. In addition, the first derivative of the objective function on the parameters of each line is used to inform the selection of lines for easing congestion and maximizing social welfare. Finally, the capacity upgrades are selected by weighing the reductions in system costs against the expense of upgrading line capacities. The findings are supported by numerical simulations and provide transmission-line planners with decision-making guidance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cooperative Transmission Expansion Planning Experiment Data and Results

GO WEST is an open-source power grid modeling framework for U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BA) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of U.S. Western Interconnection created by Texas A&M University. Users can try and select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within GO WEST framework. In this sense, TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. TEP minimizes the total cost of the system which comprises the operational cost of satisfying electricity demand (i.e., generation cost), cost of loss of load (i.e., unserved energy), cost of power flow, and cost of new transmission capacity additions (i.e., investment cost). In order to use TEP model, users need to create scenarios with GO WEST framework. In this analysis, outputs from several models are used to create future inputs to GO WEST and TEP models, including GCAM-USA, TELL, CERF and reV. This dataset includes experiment inputs and outputs from three different transmission expansion scenarios (cooperative, intermediate, and individual) for 2019 and 2059. For 2019, a base scenario to illustrate the default (i.e., historical) power grid operations is also included. This study utilizes rcp45hotter_ssp3 scenario from a previous version of GCAM-USA simulations. Sources of the shapefiles in supplementary data are HIFLD Open and U.S. Energy Atlas. Please see the README file for a detailed description of the main and supplementary data.

Capacity Expansion Model↗

IM3 Projected U.S. Western Interconnection Grid Stress Dataset

This dataset provides projected grid stress and reliability results (including all model inputs and outputs from GO WEST and TEP) for Integrated Multisector, Multiscale Modeling (IM3) Phase 2 simulations across eight different scenarios for the U.S. Western Interconnection through 2055. The scenarios include combinations of two Shared Socioeconomic Pathways (SSP3 and SSP5) with four high-resolution climate projections specific to the United States from a set of Thermodynamic Global Warming (TGW) simulations. These climate projections include "hotter" and "cooler" variants for two Representative Concentration Pathways (RCP4.5 and RCP8.5). The resulting eight simulations are: rcp45cooler_ssp3 rcp45cooler_ssp5 rcp45hotter_ssp3 rcp45hotter_ssp5 rcp85cooler_ssp3 rcp85cooler_ssp5 rcp85hotter_ssp3 rcp85hotter_ssp5 GO WEST is an open-source power grid modeling framework for the U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BAs) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of the U.S. Western Interconnection (ACTIVSg10k). Users can select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on the GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within the GO WEST framework. The TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. In order to use TEP model, users need to create scenarios with the GO WEST framework. Please refer to README file for a detailed description of the dataset including individual files and references.

Capacity Expansion Model↗

Convex Relaxations of Maximal Load Delivery for Multi-Contingency Analysis of Joint Electric Power and Natural Gas Transmission Networks

Recent increases in gas-fired power generation have engendered increased interdependencies between natural gas and power transmission systems. These interdependencies have amplified existing vulnerabilities in gas and power grids, where disruptions can require the curtailment of load in one or both systems. Although typically operated independently, coordination of these systems during severe disruptions can allow for targeted delivery to lifeline services, including gas delivery for residential heating and power delivery for critical facilities. To address the challenge of estimating maximum joint network capacities under such disruptions, we consider the task of determining feasible steady-state operating points for severely damaged systems while ensuring the maximal delivery of gas and power loads simultaneously, represented mathematically as the nonconvex joint Maximal Load Delivery (MLD) problem. To increase its tractability, we present a mixed-integer convex relaxation of the MLD problem. Then, to demonstrate the relaxation’s effectiveness in determining bounds on network capacities, exact and relaxed MLD formulations are compared across various multi-contingency scenarios on nine joint networks ranging in size from 25 to 1191 nodes. The relaxation-based methodology is observed to accurately and efficiently estimate the impacts of severe joint network disruptions, often converging to the relaxed MLD problem’s globally optimal solution within ten seconds.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Optimal Economic Dispatch and Load-Following Strategies for Nuclear Integrated Energy Systems

The need for distributed and adaptable energy resources that can handle the growing unpredictability in both supply and demand is rising as the power system continues to modernize. In order to satisfy those needs and maintain grid resilience, nuclear power plants can dynamically control their output, despite typically being used as baseload generators. By incorporating energy storage and renewable energy sources, nuclear integrated energy systems are designed to satisfy the electrical and thermal demands of different end-user applications while ensuring flexible power operation. These systems generate revenue by participating in both wholesale and ancillary services electricity markets, as well as commodity markets for various byproducts generated from coupled industrial processes. This study addresses the economic dispatch efficiency of a tightly coupled nuclear integrated energy system comprising a gigawatt-scale light water reactor, commercialized in the U.S., a high-temperature steam electrolysis unit, a district heating network, and specified electrical loads. To demonstrate the nuclear power plant’s flexibility within the day-ahead unit commitment and economic dispatch framework, while maintaining equilibrium even during periods of refueling outages, this paper develops a mixed-integer linear programming framework that models the subsystems and components of its nuclear steam supply system. A systematic comparative analysis of flexible versus baseload nuclear power plant operation under varying levels of renewable energy integration indicates that flexible operation enhances system profitability by more than 18% while also increasing energy storage utilization, improving reactor responsiveness to load fluctuations, and allowing for greater participation across numerous electricity markets.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Near-Optimal Solutions for Day-Ahead Unit Commitment

Given the difficulty and the time pressure of solving unit commitment problems, near -optimal solutions (those with 0.1 or 0.001% optimality gaps) are often used in practice. The choice in which of the near -optimal solutions is used, however, is random. We investigate the impact of solution choice on the revenues obtained by generator owners across a variety of pricing schemes and problem instances.

market-clearing↗

Assessing the Reliability Benefits of Energy Storage as a Transmission Asset

Utilizing energy storage solutions to reduce the need for traditional transmission investments has been recognized by system planners and supported by federal policies in recent years. This work demonstrates the need for detailed reliability assessment for quantitative comparison of the reliability benefits of energy storage and traditional transmission investments. First, a mixed-integer linear programming expansion planning model considering candidate transmission lines and storage technologies is solved to find the least-cost investment decisions. Next, operations under the resulting system configuration are simulated in a probabilistic reliability assessment which accounts for weather-dependent forced outages. The outcome of this work, when applied to TPPs, is to further equalize the consideration of energy storage compared to traditional transmission assets by capturing the value of storage for system reliability.

co-optimization↗

Stochastic Unit Commitment: Model Reduction via Learning

As weather-dependent renewable generation increases its share in the generation mix of most electric energy systems, a stochastic unit commitment becomes the natural day-ahead scheduling tool. However, such a tool is generally computationally intractable if a detailed uncertainty description is considered. Taking this into account, we proposed a learning method to make the stochastic unit commitment problem tractable. Here, recent advances in statistical learning and machine learning to address optimization problems can be advantageously applied to the rather intractable stochastic unit commitment problem. Considering these advances, we explore simple learning techniques to drastically reduce the size of a stochastic unit commitment problem without significantly altering its optimal solution. The considered stochastic unit commitment problem is formulated as a two-stage stochastic programming problem. The first stage represents commitment decisions, while the second one represents the operation conditions under different scenarios. Taking into account historical solved instances (or proxies for them), we reduce the size (measured by numbers of constraints and variables) of the stochastic unit commitment problem by (i) fixing unchanged binary variables and by (ii) eliminating inactive inequality constraints. Our numerical results show that the reduced problem generally requires significantly less time to solve while obtaining high-quality solutions, which are very close to or indistinguishable from the one obtained by solving the original problem. We use an Illinois 200-bus system to illustrate and characterize the performance of the proposed problem-reduction method.

42 ENGINEERING↗

The value of concentrating solar power in ancillary services markets

Ancillary services, such as spinning reserves, can provide grid reliability and contribute to profitability of an energy resource. We exercise an existing dispatch optimization model to estimate the profitability of a concentrating solar power plant by incorporating the sale of spinning reserves in the ancillary service market using the National Renewable Energy Laboratory's System Advisor Model to simulate operations within a 72-h rolling horizon framework. Assuming a price-taker approach with day-ahead energy and spinning reserve prices from both the California Independent System Operator and the Electricity Reliability Council of Texas, we find that selling spinning reserves in addition to electric energy increases plant profitability by up to 7% with perfect knowledge of day-ahead pricing and solar resource availability. Here, this finding suggests that spinning reserve markets provide significant value streams to concentrating solar power plants that can leverage thermal energy storage to offer reliable production in the short-to-medium term.

14 SOLAR ENERGY↗

A Decomposition-Based Learn-To-Optimize Approach with Feasibility Layer Assistance for Sub-Hourly Unit Commitment

Sub-hourly unit commitment (UC) with 15-min intervals is gaining significant attention as a way to respond rapidly to the fluctuations in electricity supply and demand introduced by renewable resources. However, the increased temporal resolution and complex inter-temporal dependencies pose substantial computational challenges for traditional optimization methods. To this end, this paper explores a decomposition-based learn-to-optimize approach. Building on recent advances in machine learning, our method revisits the long- overlooked Lagrangian relaxation framework, which is a classical decomposition technique that enables tractable subproblem solving. These smaller subproblems are inherently well-suited for machine learning, as their reduced dimensionality and structural regularity allow predictive models to efficiently learn and generalize solution patterns. We thus propose a generic predictive model, which embeds Gated Recurrent Units (GRUs) and Attention in the encoder-decoder structure, and integrate a rule-based feasibility layer to capture temporal dependencies, reduce training effort, and improve feasibility w.r.t. unit-level constraints. Our method has been validated on the IEEE 118-bus system, demonstrating promising performance in solving sub-hourly UC problems efficiently and feasibly.

97 MATHEMATICS AND COMPUTING↗