Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Earned Value Management (EVM): Reference Guide for Project-Control Account Managers

The purpose of this guide is intended to be a quick reference for a Project-Control Account Manager (P CAM) or technical manager empowered with a project’s cost, schedule, and technical responsibilities of a control account(s) when Earned Value Management (EVM) is required. The overall objective is to support the P CAM in performing their responsibilities as they relate to EVM. In addition, the reference guide describes at a summary level how the scope, schedule, and budget of a project integrate for optimal planning and control of prime contracts and in-house projects.

Control Account Manager↗

New Cap Design Expands Capacity of DOE Environmental Management Waste Management Facility (EMWMF) Oak Ridge, Tennessee - 19185

UCOR, an AECOM-led partnership with Jacobs, manages the cleanup of the 2,200-acre East Tennessee Technology Park (ETTP) for its client, the U.S. Department of Energy (DOE), in Oak Ridge, Tennessee. The ETTP site was contaminated with radioactive, hazardous and industrial wastes generated by more than 40 years of national defense and energy missions. Onsite waste disposal is a key component of DoE's cleanup strategy. Less expensive onsite disposal allows remaining funding to be used to accelerate cleanup activities. The initial cover design was intended to be revised and updated as the Environmental Management Waste Management Facility (EMWMF) neared closure. However, accelerating review and modification of the design resulted in additional waste disposal volume that will extend the life of the EMWMF. Two design modifications were implemented: 1) reducing the final cover thickness from 14 ft to 11 ft while maintaining protectiveness, and 2) changing the height of the landfill by reducing the width of the top deck. These two design changes resulted in an additional 130,000 cubic yards of landfill capacity for Oak Ridge Reservation (ORR) demolition and remediation waste and extended the expected life of the EMWMF by approximately 2 years. The addition of more inexpensive onsite waste disposal capacity will continue to facilitate cost-effective cleanup activities at the ORR. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

[NASA/DOD Aerospace Knowledge Diffusion Research Project. Report 3:] Technical communications in aeronautics: Results of an exploratory study. An analysis of profit managers' and nonprofit managers' responses

Data collected from an exploratory study concerned with the technical communications practices of aerospace engineers and scientists were analyzed to test the primary assumption that profit and nonprofit managers in the aerospace community have different technical communications practices. Five assumptions were established for the analysis. Profit and nonprofit managers in the aerospace community were found to have different technical communications practices for one of the five assumptions tested. It was, therefore, concluded that profit and nonprofit managers in the aerospace community do not have different technical communications practices.

Pinelli, Thomas E.↗

Managing systems faults on the commercial flight deck: Analysis of pilots' organization and prioritization of fault management information

In rare instances, flight crews of commercial aircraft must manage complex systems faults in addition to all their normal flight tasks. Pilot errors in fault management have been attributed, at least in part, to an incomplete or inaccurate awareness of the fault situation. The current study is part of a program aimed at assuring that the types of information potentially available from an intelligent fault management aiding concept developed at NASA Langley called 'Faultfinde' (see Abbott, Schutte, Palmer, and Ricks, 1987) are an asset rather than a liability: additional information should improve pilot performance and aircraft safety, but it should not confuse, distract, overload, mislead, or generally exacerbate already difficult circumstances.

Rogers, William H.↗

Earth-Mars Telecommunications and Information Management System (TIMS): Antenna Visibility Determination, Network Simulation, and Management Models

This report presents the results of our research on Earth-Mars Telecommunications and Information Management System (TIMS) network modeling and unattended network operations. The primary focus of our research is to investigate the feasibility of the TIMS architecture, which links the Earth-based Mars Operations Control Center, Science Data Processing Facility, Mars Network Management Center, and the Deep Space Network of antennae to the relay satellites and other communication network elements based in the Mars region. The investigation was enhanced by developing Build 3 of the TIMS network modeling and simulation model. The results of several 'what-if' scenarios are reported along with reports on upgraded antenna visibility determination software and unattended network management prototype.

Odubiyi, Jide↗

X-33/RLV System Health Management/ Vehicle Health Management

To reduce operations cost, the RLV must include the following elements: highly reliable, robust subsystems designed for simple repair access with a simplified servicing infrastructure and incorporating expedited decision making about faults and anomalies. A key component for the Single Stage to Orbit (SSTO) RLV System used to meet these objectives is System Health Management (SHM). SHM deals with the vehicle component- Vehicle Health Management (VHM), the ground processing associated with the fleet (GVHM) and the Ground Infrastructure Health Management (GIHM). The objective is to provide an automated collection and paperless health decision, maintenance and logistics system. Many critical technologies are necessary to make the SHM (and more specifically VHM) practical, reliable and cost effective. Sanders is leading the design, development and integration of the SHM system for RLV and X-33 SHM (a sub-scale, sub-orbit Advanced Technology Demonstrator). This paper will present the X-33 SHM design which forms the baseline for RLV SHM. This paper will also discuss other applications of these technologies.

Garbos, Raymond J.↗

A Vehicle Management End-to-End Testing and Analysis Platform for Validation of Mission and Fault Management Algorithms to Reduce Risk for NASA's Space Launch System

The development of the Space Launch System (SLS) launch vehicle requires cross discipline teams with extensive knowledge of launch vehicle subsystems, information theory, and autonomous algorithms dealing with all operations from pre-launch through on orbit operations. The characteristics of these systems must be matched with the autonomous algorithm monitoring and mitigation capabilities for accurate control and response to abnormal conditions throughout all vehicle mission flight phases, including precipitating safing actions and crew aborts. This presents a large complex systems engineering challenge being addressed in part by focusing on the specific subsystems handling of off-nominal mission and fault tolerance. Using traditional model based system and software engineering design principles from the Unified Modeling Language (UML), the Mission and Fault Management (M&FM) algorithms are crafted and vetted in specialized Integrated Development Teams composed of multiple development disciplines. NASA also has formed an M&FM team for addressing fault management early in the development lifecycle. This team has developed a dedicated Vehicle Management End-to-End Testbed (VMET) that integrates specific M&FM algorithms, specialized nominal and off-nominal test cases, and vendor-supplied physics-based launch vehicle subsystem models. The flexibility of VMET enables thorough testing of the M&FM algorithms by providing configurable suites of both nominal and off-nominal test cases to validate the algorithms utilizing actual subsystem models. The intent is to validate the algorithms and substantiate them with performance baselines for each of the vehicle subsystems in an independent platform exterior to flight software test processes. In any software development process there is inherent risk in the interpretation and implementation of concepts into software through requirements and test processes. Risk reduction is addressed by working with other organizations such as S&MA, Structures and Environments, GNC, Orion, the Crew Office, Flight Operations, and Ground Operations by assessing performance of the M&FM algorithms in terms of their ability to reduce Loss of Mission and Loss of Crew probabilities. In addition, through state machine and diagnostic modeling, analysis efforts investigate a broader suite of failure effects and detection and responses that can be tested in VMET and confirm that responses do not create additional risks or cause undesired states through interactive dynamic effects with other algorithms and systems. VMET further contributes to risk reduction by prototyping and exercising the M&FM algorithms early in their implementation and without any inherent hindrances such as meeting FSW processor scheduling constraints due to their target platform - ARINC 653 partitioned OS, resource limitations, and other factors related to integration with other subsystems not directly involved with M&FM. The plan for VMET encompasses testing the original M&FM algorithms coded in the same C++ language and state machine architectural concepts as that used by Flight Software. This enables the development of performance standards and test cases to characterize the M&FM algorithms and sets a benchmark from which to measure the effectiveness of M&FM algorithms performance in the FSW development and test processes. This paper is outlined in a systematic fashion analogous to a lifecycle process flow for engineering development of algorithms into software and testing. Section I describes the NASA SLS M&FM context, presenting the current infrastructure, leading principles, methods, and participants. Section II defines the testing philosophy of the M&FM algorithms as related to VMET followed by section III, which presents the modeling methods of the algorithms to be tested and validated in VMET. Its details are then further presented in section IV followed by Section V presenting integration, test status, and state analysis. Finally, section VI addresses the summary and forward directions followed by the appendices presenting relevant information on terminology and documentation.

Trevino, Luis↗

Performance Management: Should We Manage to a Single Data Point? A NASA/Goddard Space Flight Center Perspective

With today's changing environment, meeting project commitments can be challenging. The Flight Projects Directorate at NASA's Goddard Space Flight Center (GSFC) has a portfolio of over 60 missions in various stages of the space flight life cycle. Numerous methods and approaches are used to monitor and track project performance and utilization of tools can provide valuable information to help manage missions. However, challenges can arise when these approaches are viewed as the sole data point for assessing the project status. At GSFC, performance management metric-based tools have provided insightful information for evaluating the programmatic health of space projects. These tools have provided the awareness and foresight desired to effectively manage and meet commitments, which is tremendously beneficial on the road to achieving mission success.

Peters, Wanda↗

Air Traffic Management Technology Demonstration-1 (ATD-1) Avionics Phase 2 Flight Test Training for Interval Management

Prior to the successful flight test validation of a new avionics prototype, participants from Boeing, Honeywell, and United Airlines underwent group training at NASA Langley Research Center. New prototype software for an algorithm which enables greater efficiency in high-density airspace, called Interval Management, was to be incorporated into Electronic Flight Bags and placed in the cockpit for pilot usage. The goals of the training were to teach the flight test pilots how to operate the new software, establish techniques to simultaneously position three aircraft prior to each test scenario, and ensure a common communication protocol among team members when coordinating the position of aircraft for the next scenario. The multi-tiered interactive training regimen consisted of a process that continually built upon previous foundational material. The primary learning elements were 1) a portable computer-based trainer that was provided to the pilots prior to classroom training sessions, 2) classroom learning, 3) full mock-up simulator training, and 4) refresher training just prior to the flight test. Each part of the regimen was designed to repeat and build upon the previous element. The purpose of this Technical Memorandum is to inform the aviation industry how flight training for Interval Management was conducted at Langley Research Center in order to reduce overall development costs of future Interval Management training programs. Secondly, the paper provides insight regarding the decision-making process when attempting to conduct a flight test.

Roper, Roy D.↗

Managing Spacecraft Risk With Space Environments Testing Via Process Safety Management At The NASA Neil A. Armstrong Test Facility

The NASA Glenn Research Center’s Neil A. Armstrong Test Facility (GRC-ATF) is home to several unique, world class aerospace test facilities, including the In-Space Propulsion (ISP) Facility. The ISP Facility is NASA’s largest chamber designed to store and transfer large quantities of liquid hydrogen and liquid oxygen; and is designed to support developmental testing of upper stage chemical propulsion systems as well as fully integrated stages. The facility is also capable of providing thermal-vacuum simulation services to support testing of aerospace hardware, Cryogenic Fluid Management (CFM) systems and other In-Space propulsion programs. The U.S. Occupational Safety and Health Administration’s (OSHA) Process Safety Management (PSM) of Highly Hazardous Chemicals Standard (29 CFR 1910.119) is an analytical tool focused on preventing the release of chemicals and other energy sources. In a short timeframe, GRC-ATF was required to restore a PSM Program at the Facility. Although the summarized work is specific to the ground testing of rockets and space vehicles, the ISP Facility is used to verify system level requirements, some of these are safety requirements, and thus key to managing risks in space.

Safety↗

Managing Spacecraft Risk with Space Environments Testing via Process Safety Management at the NASA Neil A. Armstrong Test Facility (GRC-ATF)

The NASA Glenn Research Center’s Neil A. Armstrong Test Facility (GRC-ATF) is home to several unique, world class aerospace test facilities, including the In-Space Propulsion (ISP) Facility. The ISP Facility is NASA’s largest chamber designed to store and transfer large quantities of liquid hydrogen and liquid oxygen; and is designed to support developmental testing of upper stage chemical propulsion systems as well as fully integrated stages. The facility is also capable of providing thermal-vacuum simulation services to support testing of aerospace hardware, Cryogenic Fluid Management (CFM) systems and other In-Space propulsion programs. The U.S. Occupational Safety and Health Administration’s (OSHA) Process Safety Management (PSM) of Highly Hazardous Chemicals Standard (29 CFR 1910.119) is an analytical tool focused on preventing the release of chemicals and other energy sources. In a short timeframe, GRC-ATF was required to restore a PSM Program at the Facility. Although the summarized work is specific to the ground testing of rockets and space vehicles, the ISP Facility is used to verify system level requirements, some of these are safety requirements, and thus key to managing risks in space.

Safety↗

Transformer power management controllers and transformer power management methods

Transformer power management controllers and transformer power management methods are described. According to one aspect, a transformer power management controller includes processing circuitry configured to monitor an electrical characteristic of electrical energy which is received from a secondary of a transformer of an electric power system, use the monitored electrical characteristic to determine transformer loading information which is indicative of an amount of power which is being supplied by the secondary of the transformer to a plurality of loads which are coupled with the secondary of the transformer, and use the transformer loading information to adjust an amount of the electrical energy which is supplied by the secondary of the transformer to at least one of the loads which is coupled with the secondary of the transformer.

Pratt, Richard M.↗

A modeling framework for designing and evaluating curbside traffic management policies at Dallas-Fort Worth International Airport

Emerging mobility technologies are changing the transportation system landscape. This is especially evident at airports, such as the Dallas-Fort Worth International Airport (DFW). Without careful analysis, these changes could lead to inefficient and costly airport operations. This paper presents a modeling framework that integrates travel mode encoding, demand projection, and microsimulation to enable airports to develop, simulate, and evaluate curbside traffic managements policies and measure their impact. Here, the framework is utilized to analyze several traffic scenarios and policies for DFW: a baseline scenario which represents DFW traffic pattern as observed in 2018 and projected to 2045, a transit network company (TNC) electrification policy, a TNC queuing policy, a policy that increased transit ridership, a bus-only policy which considers the use of only buses inside DFW, an autonomous vehicle (AV) policy which investigates the impact of autonomous vehicle (AV) adoption on airport operations, and an example COVID-19 scenario which models the impact of the COVID19 pandemic. The simulations’ results demonstrate that: increasing the DFW transit ridership postpones the need for airport curbside expansion the most; encouraging shared-mobility with the bus-only policy produces the most savings in curbside congestion delays; automation and electrification for all passenger vehicle trips to/from DFW generates the most saving in fuel consumption and emissions; and uncontrolled AV adoption incurs the highest increase in fuel consumption, delay, and emissions and could require immediate airport capacity extension. Without policy intervention or investment in additional infrastructure capacity, these results predict the current operations would face significant congestion on high demand days starting as early as 2028. While derived in close partnership with DFW, the methodology presented here can be generalized to any airport.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ADP-Based Home Energy Management System: A Case Study Using Dynamo: Preprint

This paper explores Home Energy Management System (HEMS) algorithms to minimize household cost while maintaining comfort when faced with uncertain weather, and demand. Specifically, we consider a HEMS that optimizes forward looking schedules for a home's heating, ventilation, and air conditioning (HVAC); water heater (WH); and electric vehicle (EV) charging while considering uncertainty in outside temperature, hot water usage, and non-controllable load (NCL). We adopt a Dynamic Programming (DP) formulation and utilize the Dynamic programming for Adaptive Modeling and Optimization (DYNAMO) toolkit to implement DP and approximate dynamic programming (ADP) algorithms. Simulation results under a single tariff plan compare the quality of the solution generated by ADP to that of DP, and show significant improvement in computation time while maintaining acceptable solution accuracy.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Management of Risks Associated with Application of Novel Materials in Novel Operating Environments in Novel Reactor Designs

There is currently no widely agreed, detailed general method for licensing a novel plant incorporating novel materials (or materials being deployed in novel environments); in many such situations, there are no directly applicable engineering code cases for decision-makers (including regulators) to rely on. This paper discusses a framework for solving this problem that is based on the Reliability and Integrity Management (RIM) approach delineated in ASME BPVC Section XI Division 2. NRC Regulatory Guide 1.246, Rev. 0, endorses, with conditions, the subject portion of the ASME Code. The proposed framework is meant to support development of a licensing case by addressing certain technical challenges. The framework discussed here is compatible with the Licensing Modernization Project, but applying it in a specific case will call for advances in the state of practice, if not the state of the art. The RIM approach calls for applicants to (a) allocate reliability targets to plant structures, systems, and components (SSCs), (b) show that they are able to relate the currently observed physical condition of each SSC in the program to its failure probability well enough to determine whether the target reliability allocations are being satisfied, allowing for uncertainty related to the novelty of the materials/designs/operating environments, and (c) be able to demonstrate that the proposed program of surveillances will reliably detect unacceptable degradation of an SSC before SSC failure occurs. These challenges are discussed in the paper, and a potentially applicable modeling approach based on cumulative damage rather than failure rates is briefly illustrated.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

When management gets serious about managing software

This paper describes JPL's approach to improving the management of software. It discusses the various products, services and training that were developed, describes the deployment approach used, and concludes with several 'lessons learned' about changing how software is managed, developed and acquired.

software management↗

A Vision for Coupling Operation of US Fusion Facilities with HPC Systems and the Implications for Workflows and Data Management

The operation of large US Department of Energy (DOE) research facilities, like the DIII-D National Fusion Facility, results in the collection of complex multi-dimensional scientific datasets, both experimental and model-generated. In the future, it is envisioned that integrated data analysis coupled with large-scale high performance computing (HPC) simulations will be used to improve experimental planning and operation. Practically, massive data sets from these simulations provide the physics basis for generation of both reduced semi-analytic and machine-learning-based models. Storage of both HPC simulation datasets (generated from US DOE leadership computing facilities) and experimental datasets presents significant challenges. In this paper, we present a vision for a DOE-wide data management workflow that integrates US DOE fusion facilities with leadership computing facilities. Data persistence and long-term availability beyond the length of allocated projects is essential, particularly for verification and recalibration of artificial intelligence and machine learning (AI/ML) models. Because these data sets are often generated and shared among hundreds of users across multiple leadership computing facility centers, they would benefit from cross-platform accessibility, persistent identifiers (e.g. DOI, or digital object identifier), and provenance tracking. Here, the ability to handle different data access patterns suggests that a combination of low cost, high latency (e.g. for storing ML training sets) and high cost, low latency systems (e.g. for real-time, integrated machine control feedback) may be needed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗