Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

This plan describes the systematic approach for: inspecting the physical condition of monitoring wells at Y-12, determining maintenance needs that extend the life of a well, and identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment. The inspection and maintenance of groundwater monitoring wells is one of the primary management strategies of the Y-12 Groundwater Protection Program (GWPP) Management Plan, that is, the “proactive stewardship of the extensive monitoring well network at Y-12" (Consolidated Nuclear Security, L.L.C. [CNS], 2018). Effective stewardship, and a program of routine inspections of the physical condition of each monitoring well, ensures that representative water-quality samples and hydrologic data are obtained from the well network and protects the subsurface environment. In accordance with the Y-12 GWPP Monitoring Optimization Plan (MOP) for Groundwater Monitoring Wells at the Y-12 National Security Complex, Oak Ridge, Tennessee (CNS, 2017), the status designation (active or inactive) for each well determines the scope and extent of well inspections and maintenance activities. This plan, in conjunction with the above document, formalizes the GWPP approach to focus available resources on monitoring wells which provide the most useful data, and for that reason the GWPP inspects and performs maintenance on the wells sampled by the GWPP. This plan applies to groundwater monitoring wells installed at Y-12 and the related waste management facilities located within the three hydrogeologic regimes: (1) the Bear Creek Hydrogeologic Regime (Bear Creek Regime), (2) the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and (3) the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses the section of Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV west of Scarboro Road. The Chestnut Ridge Regime is directly south of Y-12 and encompasses a section of Chestnut Ridge that is bounded to the west by a surface drainage feature (Dunaway Branch, located immediately west of Industrial Landfill II) and by Scarboro Road to the east. The GWPP maintains an extensive database of geographic and construction details and related information for the monitoring wells in each hydrogeologic regime in the Updated Subsurface Database for Bear Creek Valley, Chestnut Ridge, and Parts of Bethel Valley on the U.S. DOE Oak Ridge Reservation (CNS, 2019). A detailed description of the hydrogeologic framework at Y-12 can be found in the GWPP Management Plan (CNS, 2018).

54 ENVIRONMENTAL SCIENCES↗

An Architectural Survey of the REECo Maintenance Compound, Area 6, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to install a 26.45-mile-long 138-kilovolt (kV) transmission line on the Nevada National Security Site (NNSS) in Nye County, Nevada. This new transmission line will upgrade the electrical transmission system and provide reliable power between Mercury Switching Station in Area 23 and the U1a Facility in Area 1. The proposed upgrade to the power transmission system constitutes an undertaking subject to review under Section 106 of the National Historic Preservation Act (NHPA) (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800. A portion of this new transmission line will cross the western perimeter of the Reynolds Electrical and Engineering Company (REECo) Maintenance Compound located in Area 6 of the NNSS. This compound with its trade shops, storage sheds, and yards served as a general construction facility that supported nuclear testing activities on the NNSS from 1967 to 1992. Although three architectural resources in the compound have previously been recorded and evaluated for the National Register of Historic Places (NRHP), other resources within it have not, nor has the compound been recorded and evaluated as a potential district. The State Historic Preservation Officer (SHPO) concurred with NNSA/NFO’s determination that the unevaluated REECo Maintenance Compound will be adversely affected by the proposed undertaking (Reed 2021). The NNSA/NFO, in consultation with the SHPO, then developed the Memorandum of Agreement DE-GM58-22NA25553 between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Installation of a 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility and the Removal of the Historic 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility in Areas 1, 3, 5, 6, and 23 of the Nevada National Security Site, Nye County, hereafter referred to as the MOA. This architectural survey report was prepared in accordance with MOA Stipulation III.B. It describes the origins, history, layout, and functions of the REECo Maintenance Compound during the Cold War and identifies contributing and noncontributing resources. The report defines a district boundary based on archival research and the field survey and concludes with an appendix that presents digital color images of the compound with descriptions and a map key showing image viewpoints and directions. Although none of the architectural resources are recommended individually eligible, the district evaluation concludes the REECo Maintenance Compound is eligible as a historic district for listing in the NRHP under the Secretary of the Interior’s Significance Criteria A and C at the local level. The historic district retains all seven aspects of integrity and conveys its significance under the abovementioned criteria.

138 kV↗

Report on Year-4 of Water NSTF Matrix Testing: Facility Maintenance and Accident Testing

Under support from the Department of Energy (DOE) and the Office of Advanced Reactor Technologies (ART), a large-scale test facility has been constructed at Argonne National Laboratory to generate NQA-1 qualified validation data for passive decay heat removal systems in advanced reactors. The Natural convection Shutdown heat removal Test Facility (NSTF) reflects key features of a ½ scale, water-based, Reactor Cavity Cooling System (RCCS) and is intended to study the behavior, bound performance, and ultimately guide design decisions for passive decay heat removal systems for advanced reactors. In addition to the experimental activities detailed in this report, a supportive computational modeling effort is on-going which has been demonstrated to significantly strengthen the experimental program while also improving accuracy of the computer models. Together these create a mutually beneficial relationship integral to meeting the overall program objective of examining the heat removal performance of the RCCS concept. This report serves as a summary of maintenance and experimental activities during the program’s fourth year of water-based operation. A planned six-month maintenance period began in August 2021, during which major inspections, repairs, cleaning, and installation of new instrumentation and data acquisition hardware were conducted. Most significantly, two heaters that faulted during Year-3 were repaired, allowing the facility to resume use of the full heated section area and full range of available electric power. The remainder of the year consisted of eight months of test operations, during which the facility logged 211 hours of active heating across one bake-out (following the maintenance period) and seven matrix tests; five classifieds as Accepted per NQA-1, one as Trending, and one as Failed. Testing began by performing two repeat cases to confirm expected facility response and behavior during both single- and two-phase flow conditions, ensuring no changes were introduced during the maintenance period that might have altered the thermal-hydraulic characteristics of the facility. In continuation of the power parametric series initiated in previous years, a high-power test case was then performed examining heat removal performance at a decay heat load equivalent to 2.4 MWt, full-scale, a level exceeding maximum design targets. Additional testing then introduced various blockage scenarios along the network piping, examining the effects of partial and complete blockages of the flow paths on the system behavior and heat removal performance. A study of static boiling tests directed at understanding the geysering two-phase instability was also conducted. The loop was filled only to the bottom of the tank outlet, creating an open loop configuration that prevents any natural circulation flow from occurring, and the heaters were powered on until the facility reached saturation conditions. Following, a series of quasi-steady-state conditions were introduced by adjusting the inventory level in the adiabatic chimney piping at decreasingly lower elevations above the heated region. A strong correlation of geysering characteristics and loop level was observed, with flow and temperature excursions decreasing in intensity, but increasing in frequency, as the fill were reduced to lower elevations along the chimney piping. Once the level fell very low in the chimney, at points near the top of the heated section, the system reached a stable state of continuous boiling without any occurrence of geysering eruptions. A final significant testing accomplishment this year was successful completion of an “accident scenario” test, whose operating conditions were based on a prototypic decay heat curve provided by Framatome and scaled for the NSTF. This test began by establishing steady-state, single-phase “normal operation” conditions, before simulating an accident trip where the availability of active cooling systems was lost. Loop temperatures gradually increased until reaching saturation and subsequent two-phase boiling flow. Over the course of an extended operational period along the defined decay heat curve, steam boil-off caused gradual but continued depletion of liquid inventory until reaching a critically low level causing flow stagnation and cessation of natural circulation heat removal. At this point, after nearly 72 hours of continuous operation, a cold refill was performed to replenish the system inventory and allow the facility to re-establish closed loop natural circulation flow and return to a safe operational state.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Assessment of Cloud-Based Applications Enabling a Scalable Risk-Informed Predictive Maintenance Strategy Across the Nuclear Fleet

The current light water reactor fleet uses time-based or failure-based maintenance strategies to achieve high-capacity factors. But to make nuclear more competitive in the energy market, these reactors could utilize emerging technologies in terms of artificial intelligence (AI) and cloud computing to enable a cost-effective, predictive maintenance strategy. This report examines the feasibility of cloud computing for the nuclear industry’s needs in terms of the cloud’s computing capabilities, feasibility, and regulatory concerns. The technical viability of cloud computing was analyzed using one year worth of data from a boiling water reactor’s safety relief valve. Models were hosted on a local desktop, Idaho National Laboratory’s high-performance computer, and Microsoft Azure. Data was loaded, processed, and two types of models were trained in an A/B fashion. Based on the speed at which these actions were completed, it was used to determined that cloud computing has adequate computing resources. Additionally, the computing power can scale with the demanded load. To enable cloud computing in the existing fleet, additional sensors, networks, and other requirements must be implemented to ensure a smooth transition from current maintenance strategies. However, there is a benefit as the plant no longer needs manage their own servers, software, cybersecurity, and IT support staff. Many of these features can be offloaded on to the cloud provider. A comprehensive analysis was completed that showed the current annual cost of operating is more expensive than using cloud computing resources. Lastly, the regulatory framework does not explicitly address AI or autonomous control. Currently, the NRC and other regulatory bodies are evaluating providing guidance to address gaps rather than new regulations to address the use of AI and ML. But since many of the AI applications are focused on non-safety related applications, such as balance-of-plant components, they will likely have little or no regulatory restrictions or necessary approvals. Demonstrating how AI can improve maintenance and operation of these non-safety related systems seems like the likely path forward for implementing AI and cloud computing resources inside nuclear power plants (NPPs).

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Adaptive Framework for Maintenance Scheduling Based on Dynamic Preventive Intervals and Remaining Useful Life Estimation

Data-based prognostic methods exploit sensor data to forecast the remaining useful life (RUL) of industrial settings to optimize the scheduling of maintenance actions. However, implementing sensors may not be cost-effective or practical for all components. Traditional preventive approaches are not based on sensor data; however, they schedule maintenance at equally spaced intervals, which is not a cost-effective approach since the distribution of the time between failures changes with the degradation state of other parts or changes in working conditions. This study introduces a novel framework comprising two maintenance scheduling strategies. In the absence of sensor data, we propose a novel dynamic preventive policy that adjusts intervention intervals based on the most recent failure data. When sensor data are available, a method for RUL prediction, designated k-LSTM-GFT, is enhanced to dynamically account for RUL prediction uncertainty. The results demonstrate that dynamic preventive maintenance can yield cost reductions of up to 51.8% compared to conventional approaches. The predictive approach optimizes the exploitation of RUL, achieving costs that are only 3–5% higher than the minimum cost achievable while ensuring the safety of critical systems since all of the failures are avoided.

Nunes, Pedro (ORCID:0000000180012172)↗

Method and computer program product for maintenance and modernization backlogging

According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

97 MATHEMATICS AND COMPUTING↗

Assessment of Cloud-based Applications for Enabling a Scalable Riskinformed Predictive Maintenance Strategy

The current light-water reactor fleet uses time-based maintenance strategies to achieve high-capacity factors. But to make nuclear more competitive in the energy market, these reactors could utilize emerging artificial intelligence (AI) and cloud computing technologies to achieve a cost-effective, predictive-maintenance strategy. This paper presents discussion and results on the application of cloud computing in the nuclear industry. The technical viability of cloud computing was analyzed using data from a boiling-water reactor’s safety relief valve. The models were hosted on three different systems: a local personal computer, Idaho National Laboratory’s high-performance computer system, and Microsoft Azure. The data were loaded and processed, and two types of models were trained in an A/B fashion. Based on the speed at which these actions were completed, it was determined that cloud computing affords adequate computing resources. Additionally, the computing power can scale with the demanded load. To enable cloud computing in the existing fleet, additional sensors, networks, and other requirements must be implemented to ensure a smooth transition from current maintenance strategies. However, the benefit is that the plants no longer need to manage their own servers, software, cybersecurity, and information technology support staff for in-house data analytics purpose. Many of these features can be offloaded to the cloud provider for a potential cost savings. Demonstrating how AI can improve the maintenance and operation of non-safety-related systems seems the likely path forward for implementing AI and cloud computing resources inside nuclear power plants.

azure↗

Autocrine Semaphorin3A signaling is essential for the maintenance of stem-like cells in lung cancer

Cancer stem-like cells (CSCs) exist in tumor tissues composed of heterogeneous cell population and are characterized by their self-renewal capacity and tumorigenicity. Many studies demonstrate that eradication of CSCs prevents development and recurrences of tumor; yet, molecules critical for the maintenance of CSCs have not been completely understood. We previously reported that Semaphorin3A (Sema3a) knockdown suppressed the tumorigenicity and proliferative capacity of Lewis lung carcinoma (LLC) cells. Therefore, we identified Sema3a as an essential factor for the establishment or maintenance of CSCs derived from LLC (LLC-stem cell). shRNA against Sema3a was introduced into LLC cells to establish a LLC-stem cell line and its effects on tumorigenesis, sphere formation, and mTORC1 activity were tested. Sema3a knockdown completely abolished tumorigenicity and the sphere-formation and self-renewal ability of LLC-stem cells. The Sema3a knockdown was also associated with decreased expression of mRNA for stem cell markers. The self-renewal ability abolished by Sema3a knockdown could not be recovered by exogenous addition of recombinant SEMA3A. In addition, the activity of mammalian target of rapamycin complex 1 (mTORC1) and the expression of its substrate p70S6K1 were also decreased. These results demonstrate that Sema3a is a potential therapeutic target in eradication of CSCs. - Highlights: • Sema3a enhances tumorigenic capacity of cancer stem-like cells. • Sema3a is essential for the maintenance of cancer stem-like cells. • Sema3a can be a therapeutic target to eradicate cancer stem-like cells.

60 APPLIED LIFE SCIENCES↗

Cross-domain digital twin architecture for predictive maintenance via machine learning and Large Language Models

This research introduces a comprehensive framework for creating and deploying a digital twin platform for continuous monitoring and predictive maintenance within industrial settings. Through utilizing advanced technologies, including Unreal Engine 5, Unity 3D, the Message Queue Telemetry Transport protocol, Random Forest machine learning algorithms, and Large Language Models (LLMs), we establish a platform that digitally reproduces physical equipment and translates digital controls into real-world actions. This facilitates preventive maintenance approaches and improves operational effectiveness. The digital twin platform gathers sensor data from operational equipment, analyzes it using machine learning, and delivers practical insights to prevent potential malfunctions and enhance equipment performance. Furthermore, the incorporation of a web portal enables efficient monitoring and access to historical data, educational materials, and equipment status information. Preliminary findings indicate that digital twins can transform industrial equipment management and maintenance methodologies.

97 MATHEMATICS AND COMPUTING↗

Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtual model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance & Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.

42 ENGINEERING↗

Toward the application of the Risk-Based Maintenance approach to a hydrogen-fueled manufacturing plant

Safety, reliability, and maintenance of hydrogen-based equipment, including Risk-Based Maintenance (RBM), have recently gained increasing attention, as hydrogen, while key to decarbonizing hard-to-abate sectors, raises safety concerns. However, two literature gaps limit the development of risk-based strategies for hydrogen technologies. First, existing RBM methodologies do not account for hydrogen-specific components, such as electrolyzers, which differ from conventional equipment. Second, available studies on electrolyzer reliability remain largely qualitative or laboratory-scale. This study addresses these gaps by proposing an adapted RBM methodology tailored to hydrogen-fueled manufacturing facilities. Integrating qualitative tools (e.g., FMEA) with probabilistic models (e.g., Bayesian Networks) enables comprehensive hazardous scenarios identification and likelihood estimation. A conceptual layout of a glass furnace supplied by a 3 MW PEM electrolyzer is considered as a case study to demonstrate the feasibility of the adapted RBM framework in identifying high-risk components and enabling maintenance prioritization, potentially improving plant safety.

08 HYDROGEN↗

Operations & Maintenance Best Practices - A Guide to Achieving Operational Efficiency (Release 3)

This guide highlights operations and maintenance programs targeting energy and water efficiency that are estimated to save 5% to 20% on energy bills without a significant capital investment. The purpose of this guide is to provide you, the Operations and Maintenance (O&M)/Energy manager and practitioner, with useful information about O&M management, technologies, energy and water efficiency, and cost-reduction approaches. To make this guide useful and to reflect your needs and concerns, the authors met with O&M and Energy managers via Federal Energy Management Program (FEMP) workshops. In addition, the authors conducted extensive literature searches and contacted numerous vendors and industry experts. The information and case studies that appear in this guide resulted from these activities. It needs to be stated at the outset that this guide is designed to provide information on effective O&M as it applies to systems and equipment typically found at Federal facilities. This guide is not designed to provide the reader with step-by-step procedures for performing O&M on any specific piece of equipment. Rather, this guide first directs the user to the manufacturer's specifications and recommendations. In no way should the recommendations in this guide be used in place of manufacturer's recommendations. The recommendations in this guide are designed to supplement those of the manufacturer, or, as is all too often the case, provide guidance for systems and equipment for which all technical documentation has been lost. As a rule, this guide will first defer to the manufacturer's recommendations on equipment operation and maintenance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Wind Energy Computerized Maintenance Management System (CMMS): Data Collection Recommendations for Reliability Analysis

This report addresses the general data requirements for reliability analysis of fielded wind turbines and other wind plant equipment. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific data recommendations for a Computerized Maintenance Management System (CMMS) to support automated analysis. This data collection recommendations report was written by Sandia National Laboratories to address the general data requirements for reliability analysis of operating wind turbines. This report is intended to help develop a basic understanding of the data needed for reliability analysis from a Computerized Maintenance Management System (CMMS) and other data systems. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific recommendations for a CMMS to support automated analysis. Though written for reliability analysis of wind turbines, much of the information is applicable to a wider variety of equipment and analysis and reporting needs. The 'Motivation' section of this report provides a rationale for collecting and analyzing field data for reliability analysis. The benefits of this type of effort can include increased energy delivered, decreased operating costs, enhanced preventive maintenance schedules, solutions to issues with the largest payback, and identification of early failure indicators.

17 WIND ENERGY↗

Maintenance Engineering Basics & Best Practices

The purpose of this document is to concisely describe the basics of maintenance engineering, summarize maintenance policies at Los Alamos National Laboratory, and also review current industry best-practices through the use of case studies. Maintenance engineering incorporates the study of failure, reliability, policies, and procedures in order to optimize cost and equipment availability. Each of these topics will be covered within this report.

42 ENGINEERING↗

Windfarm Operations and Maintenance cost-Benefit Analysis Tool (WOMBAT)

This report provides technical documentation and background on the newly-developed Wind Operations and Maintenance cost-Benefit Analysis Tool (WOMBAT) software. WOMBAT is an open-source model that can be used to obtain cost estimates for operations and maintenance of land-based or offshore wind power plants. The software was designed to be flexible and modular to allow for implementation of new strategies and technological innovations for wind plant maintenance. WOMBAT uses a process-based simulation approach to model day-to-day operations, repairs, and weather conditions. High-level outputs from WOMBAT, including time-based availability and annual operating costs, are found to agree with published results from other models.

17 WIND ENERGY↗

Explainable Artificial Intelligence Technology for Predictive Maintenance

The domestic nuclear power plant fleet has relied on labor-intensive and time-consuming preventive maintenance programs, thus driving up operation and maintenance costs to achieve high-capacity factors. Artificial intelligence and machine learning can help simplify complex problems, such as diagnosing equipment degradation, to enable more effective decision-making. Benefits will be felt not only within existing analog and digital instrumentation and control, but also work processes, the integration of people with technology, and most importantly, the business case. Together, these hold promise to make nuclear power more efficient and reduce costs associated with operation and maintenance. While the artificial intelligence and machine learning technologies hold significant promise in the nuclear industry, there are challenges or barriers to their adoption. This report outlines the those different machine learning adoption barriers (categorized as historical, technical, economic, regulatory, and user) that the industry must overcome to realize the full benefits of artificial intelligence and machine learning capabilities for long-term economic sustainability. This report also provides solutions for some of these barriers by focusing on improving the explainability of machine learning to encourage trust from the end-user. Trust and explainability are essential to machine learning adoption. This report focuses on research-developed solutions to some of these barriers while analyzing a non-safety-related system, namely the circulating water system. This system frequently experiences waterbox fouling which our models preemptively diagnoses then explains to the operator how those conclusions were reached. This report presents and discusses the inherent trade-off between machine learning performance (in terms of accuracy) and explainability, where highly accurate machine learning methods (such as deep-learning) are the least explainable, and the most explainable methods (such as decision trees) are the least accurate. In addition, explainability of artificial intelligence techniques in terms of transparency and post-hoc metrics are discussed. This report outlines the importance of data novelty and value of new information in evaluating both the explainability and trustworthiness. Novelty detection helps to establish consistency or inconsistency of the new data with respect to the training data. On the other hand, value of information could be a part of the user-centric visualization recommendation system that request additional information to be collected, thereby strengthening the machine learning outcomes. During this project, a copyrighted user-centric visualization that aligns with a human-in-the-loop approach was developed. The user-centric visualization presents different levels of information and can be tailored as per user credentials to gain user confidence. One of the salient features of the user-centric visualization is it presents machine learning methods with explainability metrics. A simplified version of the user-centric visualization was presented to 32 users with varying levels of machine learning expertise. Feedback was solicited to test the hypothesis that the app contained sufficient explainability and that the users would trust the algorithm. Overall, the app was positively received, and the hypothesis was supported. This report discusses the trust-but-verify framework – a potential approach to build user trust artificial intelligence. The framework discusses trust from the human level to artificial intelligence level. The fundamental premise of the trust but verify framework is derived from an observation of nuclear safety culture (i.e., nuclear power plant personnel do not rely on a singular source of data to make a decision). This also ties back to the user-centric visualization that presents different levels of information to achieve both explainability and trustworthiness of artificial intelligence. Even so, the adoption of artificial intelligence and machine learning in the nuclear industry faces additional barriers, namely regulatory and stakeholder readiness. To overcome these challenges, new solutions must gain regulatory approval and cater to stakeholder needs. The Nuclear Regulatory Committee has a 5-year strategic plan which prepares them for reviewing artificial intelligence technologies in licensee submissions. Early and frequent engagement with the regulator is encouraged. Additionally, artificial intelligence solutions should incorporate human-in-the-loop considerations and offer explainability. Stakeholders must prepare by hiring or training staff to adapt to advancing technology in everyday plant tasks.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Demonstration and Evaluation of Explainable and Trustworthy Predictive Technology for Condition-based Maintenance

The domestic nuclear power plant (NPP) fleet has historically relied on labor-intensive and time-consuming predictive maintenance (PdM) programs, thus driving up operation and maintenance (O&M) costs to achieve high-capacity factors. Artificial intelligence (AI) and machine-learning (ML) can help simplify complex problems such as diagnosing equipment degradation to enable more effective decision-making efforts. The benefits of AI will be felt through more efficient plant O&M, improved work processes, and better integration of people and technology. Together, these benefits hold the promise to make nuclear power more sustainable by reducing O&M costs while improving employee engagement. While AI and ML technologies hold significant promise for the nuclear industry, there are challenges or barriers to their adoption. Explainability and trustworthiness of AI are two salient challenges that need to be addressed for wider deployment of these technologies in NPPs. This research focuses specifically on addressing the explainability and trustworthiness of AI technologies to advance the human, technical, and organization (HTO) readiness levels in adopting a risk-informed PdM strategy at commercial NPPs. In addition, this approach can be adapted to enhance the acceptability of AI in other nuclear applications with a few application-specific modifications. The technical approach ensuring wider adoption of AI technologies was developed by Idaho National Laboratory (INL)—in collaboration with Public Service Enterprise Group (PSEG), Nuclear, LLC—by utilizing the circulating water system (CWS) at two PSEG-owned plant sites for demonstration. Focused user studies were performed in collaboration with subject matter experts (SMEs) from PSEG and other nuclear domains to enhance human and organization readiness by building trust in AI-informed technologies. VIsualization for PrEdictive maintenance Recommendation (VIPER)—a Battelle Energy Alliance, LLC, copyrighted software—was developed and expanded to provide a user-centric visualization by incorporating inputs from the collaborating utility, human factors engineering guidelines, and data analysts. The VIPER software enables users, who may be unfamiliar with ML in general, to be interactively engaged by asking technical questions about PdM, work orders, diagnosis results and their confidence levels, the kind of data being used, and the types of ML algorithms employed. This interactive engagement enhances explainability and builds trust. One of the enabling accomplishments was the integration of large language models (LLMs), both text-based and vision-based, in the VIPER software.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2005-2006 Annual Progress Report.

The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program designed to enhance both subsistence fishing, educational opportunities for Tribal members of the Shoshone-Paiute Tribes, and recreational fishing facilities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program also intends to afford and maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was the least productive as a result of high turbidity levels and constraining water quality parameters. Lake Billy Shaw trout were in poorer condition than in previous years potentially as a result of water quality or other factors. Mountain View Reservoir trout exhibit the best health of the three reservoirs and was the only reservoir to receive constant flows of water.

13 HYDRO ENERGY↗