Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Line outage”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Exploring Wildfire & Energy data toward State Prioritization Index (WESPI)

Energy infrastructure can both induce and suffer risks from wildfires ranging from direct damage to energy assets such as substations and power lines to Public Safety Power Shutoffs. Recent wildfire events underscore the need for data-driven approaches that help states and utilities proactively plan for wildfire risk. Existing national tools such as Federal Emergency Management Agency (FEMA)’s National Risk Index (NRI) are valuable for community hazard planning. However, they are less suited for energy infrastructure, as they emphasize population and building exposure rather than system vulnerabilities. In this paper, we explore relationships between energy and wildfire data and present a Wildfire-Energy State Prioritization Index (WESPI). Our methodology combines data from the US Forest Service’s Fire Simulation (FSIM) dataset with energy resilience metrics, historical fire incidents, and geospatial data on transmission lines and fire stations. Correlation analyses suggest that FSIM burn probability is more strongly associated with power outage metrics (ρ = 0.32) than NRI wildfire frequency, and counties with a greater density of fire stations experience more frequent, but less intense wildfires. We further leverage data for burn probability, transmission line density, and fire station density to develop a Wildfire-Energy State Prioritization Index (WESPI) to highlight counties where wildfire hazard, infrastructure exposure, and limited suppression capacity converge. The index provides a consistent, scalable framework for state energy offices and utilities to screen counties for vegetation management, optimization of outage management system deployment, and to inform wildfire mitigation plans.

Critical infrastructure↗

Wildfire and power grid nexus in a changing climate

Global wildfire events have had increasingly severe impacts in recent years, particularly in the western USA, driven by extreme fire-weather conditions, fuel accumulation and multiple ignition sources. Wildfires sparked by power lines tend to be larger and more destructive, as they often occur during high winds, which accelerate the spread of fires. Moreover, efforts to contain wildfires frequently result in power outages, causing considerable economic disruption. Here, in this Review, we examine wildfire risks related to power-line-induced ignitions, infrastructure damage, climate-induced environmental impacts, grid operational risks, real-time grid management risks, vegetation management risks, and financial and funding risks in the context of a changing climate and their interdependence with power grid infrastructures. We then explore the resilience of power grids under wildfire threats, looking at risk analysis, prediction and mitigation strategies. The Review also shares practical insights and experiences in the USA to inform researchers, policymakers and industry professionals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Rolling Optimization of Transmission Network Recovery and Load Restoration Considering Hybrid Wind-Storage System and Cold Load Pickup

A common solution to deal with the stochasticity introduced by fast-ramping wind power integration is to equip wind farms (WFs) with energy storage systems (ESSs) to formulate hybrid WF-ESSs. In addition to leveling off wind power fluctuations during normal operations, a hybrid WF-ESS can be a flexible power source to accumulate the power system restoration. In this paper, we propose a rolling optimization model for transmission network recovery and load restoration considering the contributions of WF-ESSs. The proposed model is formulated as a mixed integer linear programming problem that simultaneously optimizes the amount and location of restorable load blocks as well as the restoration lines. The cold load pickup features of interrupted loads considering the outage duration are modeled in detail. A chance-constrained method is employed to deal with the uncertainty of wind power, and a rolling horizon-based framework is adopted to reduce the influence of forecast error. Case studies are conducted on both New England 39-bus system and part of a provincial power system in China. The results show that the load restoration process can be significantly accelerated by employing the proposed method and contributions of hybrid WF-ESSs to power system restoration are validated.

chance-constrained optimization↗

Statistical analysis of cascading failures in power grids

We introduce a new microscopic model of cascading failures in transmission power grids. This model accounts for automatic response of the grid to load fluctuations that take place on the scale of minutes, when optimum power flow adjustments and load shedding controls are unavailable. We describe extreme events, caused by load fluctuations, which cause cascading failures of loads, generators and lines. Our model is quasi-static in the causal, discrete time and sequential resolution of individual failures. The model, in its simplest realization based on the Directed Current description of the power flow problem, is tested on three standard IEEE systems consisting of 30, 39 and 118 buses. Our statistical analysis suggests a straightforward classification of cascading and islanding phases in terms of the ratios between average number of removed loads, generators and links. The analysis also demonstrates sensitivity to variations in line capacities. Future research challenges in modeling and control of cascading outages over real-world power networks are discussed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Strategic Placement and Sizing of Distributed Generation for Resilience Enhancement of Distribution Grids With Microgrid Formation

The rise in frequency and severity of extreme weather events highlights the need for resilient power distribution networks. Microgrids can help improve the resilience of distribution grids by providing continuous power supply using local distribution generation (DG) when the distribution grid fails. In this paper, we propose an approach for optimal placement and sizing of DG to form multiple microgrids throughout the distribution network by restoration actions such as switching operations in case of distribution grid outages caused by extreme weather events. Considering the randomness of damaged distribution lines, the DG placement and sizing problem is formulated as a two-stage stochastic mixed-integer program, with the first stage determining the placement and size of DG, and the second stage focusing on minimizing the amount of load shedding through network restoration and microgrid formations for each scenario. Due to the large number of scenarios, the sample average approximation (SAA) method is employed to solve the problem. The results of case studies on a modified IEEE 33 bus distribution grid demonstrate the effectiveness of the proposed DG placement and sizing strategy in improving the resilience of distribution grids by allowing the formation of multiple microgrids. In addition, the robustness and accuracy of the SAA method are validated through various case studies.

Distributed generation planning↗

Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the efficiency of the plant units, and a power increase of nearly 20 MW was achieved at both plant units. PELE wonderfully manifests one of the strategic goals of our company; developing the competence of our in-house personnel by working in projects. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Preliminary Analysis of Nuclear-Powered Data Center Scenarios

This report provides a comprehensive analysis of the potential for nuclear energy to meet the growing energy demands of data centers (DCs). It evaluates the technical, economic, and socio-environmental implications of coupling Nuclear Power Plants (NPPs) with DCs, providing initial responses to several key research questions: What is the potential increased energy demand from DCs in the U.S., in the short, medium and long term? The U.S. is experiencing a rapid increase in energy demand from DCs, with projections indicating a total increase of 24-74 GWy(e) by 2028. Meeting this demand with nuclear energy would require 27–85 GWe of installed capacity. While this surge is expected to slow in the long term, the DC industry needs reliable, scalable, and clean energy sources. How much nuclear capacity can be deployed to meet DC demand and in which timeframe? Several pathways for increasing nuclear capacity were identified, including uprates, restarts of recently retired reactors, power purchase agreements with existing fleet, and new construction. Approximately 20‒28 GWe of nuclear capacity could be dedicated to DCs by the early 2030s. How much High Assay Low Enriched Uranium (HALEU) would be needed to support some nuclear deployment scenarios for DCs? Meeting the deployment targets announced by Google and Amazon for the Kairos Power Fluoride-Salt-Cooled High-Temperature Reactor or KP-FHR (~500 MWe by 2035) and the Xe-100 (~1 GWe by 2040), respectively, requires ramping up 19.75% enriched HALEU production to ~6 t/yr by 2040. What types of nuclear energy/DC coupling options exist, and what are the different benefits/challenges? Five coupling options were analyzed, ranging from grid-connected configurations to colocated, behind-the-meter setups. Key design considerations include the proximity to high- and/or medium-voltage transmission lines, the desired internal fault tolerance, and the sources of alternative/backup power during outages. Each coupling option offers unique benefits and challenges in terms of reliability, system costs, regulation, timeline, etc. A list of NPP/DC deployment scenarios was developed, considering existing or newly built NPP or DC projects. Colocated DCs with new small modular reactors or large reactors on greenfield and brownfield sites are the focus of this report. What types of reactors, especially what size, may be incentivized by DCs? Reactor sizing optimization revealed that the ideal reactor size and number of units depend on DC demand, coupling configurations defined in this report, and other economic factors. Larger reactors are preferred for high-demand DCs and grid-connected systems, while larger number of smaller reactors are better suited for DC configurations without grid backup. Which sites may be compatible with co-located nuclear-powered DCs? Siting those projects is a complicated evaluation factoring local water resources, grid connection availability and reliability, IT infrastructure, local work force, proximity to population zones, etc. For this effort greenfield and brownfield sites such as retired coal-fired plants were used to evaluate this question. This evaluation is not meant to recommend any particular site but it highlights key siting criteria and demonstrates large-scale site availability. What are the socio-economic impacts of co-located nuclear-powered DCs? Those projects generate substantial economic benefits to the local economy, particularly in urban settings. Hyperscale DCs colocated with nuclear power plants (sized around 1 GW of power) can create nearly 1,700 jobs for annual operations and more than 7,300 jobs among the supply chain and local businesses as a result of increased household spending. Rural projects also provide significant benefits, but at lower magnitudes compared to urban deployments.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Wind Power Plant Voltage Stability Evaluation: Preprint

Voltage stability refers to the ability of a power system to maintain steady voltages at all buses in the system after being subjected to a disturbance from a given initial operating condition. Voltage stability depends on a power system's ability to maintain and/or restore equilibrium between load demand and supply. Instability that may result occurs in the form of a progressive fall or rise of voltages of some buses. Possible outcomes of voltage instability are the loss of load in an area or tripped transmission lines and other elements by their protective systems, which may lead to cascading outages. The loss of synchronism of some generators may result from these outages or from operating conditions that violate a synchronous generator's field current limit, or in the case of variable speed wind turbine generator, the current limits of power switches. This paper investigates the impact of wind power plants on power system voltage stability by using synchrophasor measurements.

17 WIND ENERGY↗

Automated power management and control

A comprehensive automation design is being developed for Space Station Freedom's electric power system. A joint effort between NASA's Office of Aeronautics and Exploration Technology and NASA's Office of Space Station Freedom, it strives to increase station productivity by applying expert systems and conventional algorithms to automate power system operation. The initial station operation will use ground-based dispatches to perform the necessary command and control tasks. These tasks constitute planning and decision-making activities that strive to eliminate unplanned outages. We perceive an opportunity to help these dispatchers make fast and consistent on-line decisions by automating three key tasks: failure detection and diagnosis, resource scheduling, and security analysis. Expert systems will be used for the diagnostics and for the security analysis; conventional algorithms will be used for the resource scheduling.

Dolce, James L.↗

The Commercial Development of Water Repellent Coatings for High Voltage Transmission Lines

The purpose of the Cooperative Research and Development Agreement (CRADA) between UT-Battelle, LLC and Southwire Company was to jointly develop a low cost, commercially viable, water-repellant anti-icing coating system for high voltage transmission lines. Icing of power lines and other structures caused by freezing rain events occurs annually in the United States, and leads to severe and prolonged power outages. These outages cause untold economic and personal distress for many American families and businesses. Researchers at the Department of Energy's Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee have previously developed a set of superhydrophobic coatings with remarkable anti-icing properties that could potentially be sprayed or painted onto high-tension power lines and pylons. These coatings drastically reduce ice accumulation on these structures during freezing rain events. The project involved obtaining technical input, supplies and test high voltage cables from Southwire, along with the joint development of anti-icing coating techniques, which would result in a commercial license agreement between Southwire and ORNL, and potentially other companies requiring water repellent anti-icing coatings.

Hunter, Scott Robert↗

The commercial development of water repellent coatings for high voltage transmission lines

The purpose of the Cooperative Research and Development Agreement (CRADA) between UT-Battelle, LLC and Southwire Company was to jointly develop a low cost, commercially viable, water-repellant anti-icing coating system for high voltage transmission lines. Icing of power lines and other structures caused by freezing rain events occurs annually in the United States, and leads to severe and prolonged power outages. These outages cause untold economic and personal distress for many American families and businesses. Researchers at the Department of Energy's Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee have previously developed a set of superhydrophobic coatings with remarkable anti-icing properties that could potentially be sprayed or painted onto high-tension power lines and pylons. These coatings drastically reduce ice accumulation on these structures during freezing rain events. The project involved obtaining technical input, supplies and test high voltage cables from Southwire, along with the joint development of anti-icing coating techniques, which would result in a commercial license agreement between Southwire and ORNL, and potentially other companies requiring water repellent anti-icing coatings.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Ultra-Wideband Communications: Interference Challenges and Solutions

The idea of ultra-wideband (UWB) communications for short ranges (up to a few tens of meters) has been around for nearly three decades. However, despite significant efforts by the industry, UWB deployment has not yet reached its predicted potential. This article, thus, seeks to rectify this situation by providing a practical examination of UWB interference conditions. Through a spectrum survey of today's wireless environments, we explore the interference that UWB devices may face from a perspective of outage probability in both high- and low-rate configurations. We find that by suppressing interference, the outage probability can be reduced by one or more orders of magnitude. In the non-line-of-sight channels, in particular, we find that both interference suppression and bandwidth expansion are required to support the minimum data rates suggested in the IEEE802.15.4 series of standards. Here, we connect these findings to a recently proposed UWB signaling method based on filter banks and show this method fulfills the above requirements for implementing effective UWB systems.

99 - GENERAL AND MISCELLANEOUS↗

Identification of Potential Locations for Placement of Strategic Transformers Reserve in Puerto Rico

Extreme weather events such as tropical storms cause extensive damage to energy infrastructures including generator stations, substations, poles, transformers, power transmission lines, etc. due to their presence in hazardous locations. Often these damages lead to long term power outage as was seen in Puerto Rico (PR) following the landfall of Hurricane Maria (2017). A potential solution to long-term power outage is strategic placement of reserve generators and transformers that would ensure continued power supply to enable restoration and recovery activities. The strategic placement of energy storage devices requires identification of potential sites such that (i) the damage from extreme events to energy infrastructures is minimized, (ii) power supply is optimized, and (iii) installation of these infrastructures is cost effective. To meet this goal, in this research, a Multi-Criteria Evaluation (MCE) technique-based site suitability analysis was implemented to identify potential sites for reserve generators and transformers in PR. To determine suitable sites and existing government facilities, the following steps were implemented: (i) identify physical, environmental, technical and socio-economic factors contributing to site suitability; (ii) determine siting constraints based on guidelines and standards used for energy sector (i.e., siting of nuclear plants, solar or wind farms), (iii) implement a raster data model using 30m x 30m spatial resolution to create suitability layers for each factor, (iv) combine suitability and exclusionary layers to create the final suitability layer. Results show that six hospitals, four colleges and universities, and five correctional facilities are in very high suitability areas and could be used for to store reserve generators. These facilities are in the eastern, south-eastern, south-western, and southern part of the island except for one correctional facility that is in the northern part of PR. Not surprisingly, coastal areas were found to be unsuitable for siting any energy facility. More than half (55.9%) of the island was also found to be unsuitable while only 14% of the island was found to be very highly suitable. Further assessment of current power plants and sub-stations indicated that only 16% and 42% of existing power plants and sub-stations respectively are in suitable areas. Given that northern part of the island lacks any facility that could be used for placement of reserve generators, suitable sites identified in this region could be used for placement of storage devices.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hydrogen Energy Storage System at Borrego Springs Towards an H2 Enabled 100 Renewable Microgrid

San Diego Gas & Electric's Borrego Springs Microgrid is one of the largest microgrids in the USA, serving 2500 residential customers, 300 commercial and industrial customers, and has a peak demand of approximately 14 MW. This microgrid is located at the end of a long transmission line, and is subjected to extreme weather events like storms, wildfires, and flooding, which frequently cause grid outages. The microgrid currently relies on 3.65 MW of diesel-powered generators to provide grid-forming services during these outages, which results in greenhouse gas and criteria pollutant emissions. However, the microgrid has access to approximately 37 MW of installed solar generation and struggles with overgeneration and curtailment. 1.5 MW/4.5 MWh of grid-scale batteries have been installed to capture some the overgeneration and provide resiliency, but a longer-duration low-greenhouse gas emission energy storage solution is needed. In our project, the team will evaluate in the lab and demonstrate in the field a grid-forming fuel cell inverter that can provide grid-forming services while utilizing hydrogen's energy storage scalability. We will first utilize NREL's Renewable Energy Integration and Optimization (REopt) platform to perform analyses on future microgrid scenarios that use hydrogen assets to reduce or eliminate the need for diesel backup generators. We will then evaluate the grid-forming inverter through power hardware-in-the-loop and controller hardware-in-the-loop experiments at ARIES, and de-risk the field deployment and operation of hydrogen assets in the microgrid setting. Finally, this project will demonstrate the operation of the fuel cell inverter and updated microgrid controller by operating in grid-forming mode in the Borrego Springs microgrid.

Borrego Springs↗

Hydrogen Energy Storage System at Borrego Springs Towards an H2 Enabled 100% Renewable Microgrid

San Diego Gas & Electric's Borrego Springs Microgrid is one of the largest microgrids in the USA, serving 2500 residential customers, 300 commercial and industrial customers, and has a peak demand of approximately 14 MW. This microgrid is located at the end of a long transmission line, and is subjected to extreme weather events like storms, wildfires, and flooding, which frequently cause grid outages. The microgrid currently relies on 3.65 MW of diesel-powered generators to provide grid-forming services during these outages, which results in greenhouse gas and criteria pollutant emissions. However, the microgrid has access to approximately 37 MW of installed solar generation and struggles with overgeneration and curtailment. 1.5 MW/4.5 MWh of grid-scale batteries have been installed to capture some the overgeneration and provide resiliency, but a longer-duration low-greenhouse gas emission energy storage solution is needed. In our project, the team will evaluate in the lab and demonstrate in the field a grid-forming fuel cell inverter that can provide grid-forming services while utilizing hydrogen's energy storage scalability. We will first utilize NREL's Renewable Energy Integration and Optimization (REopt) platform to perform analyses on future microgrid scenarios that use hydrogen assets to reduce or eliminate the need for diesel backup generators. We will then evaluate the grid-forming inverter through power hardware-in-the-loop and controller hardware-in-the-loop experiments at ARIES, and de-risk the field deployment and operation of hydrogen assets in the microgrid setting. Finally, this project will demonstrate the operation of the fuel cell inverter and updated microgrid controller by operating in grid-forming mode in the Borrego Springs microgrid.

blackstart with fuel cells↗

AGC-4 Experiment Irradiation Monitoring Data Qualification Final Report

The Graphite Technology Development Program ran a series of six experiments to quantify the effects of irradiation on nuclear grade graphite. This report focuses on the fourth experiment, Advanced Graphite Creep 4 (AGC 4). The Advanced Reactor Development (ARD) Technology Development Office (TDO) Program for research and development activities require documentation of qualified monitoring data to design and license the first high-temperature reactor nuclear plant. Qualified data meets the requirements for use as described in the experiment planning and quality assurance documents. Failed data do not meet the requirements and provide no useable information. Trend data may not meet all requirements but still provide some useable information. Use of Trend data requires assessment of how any deficiencies affect a particular use of the data. AGC-4 began with Advanced Test Reactor (ATR) Cycle 157D on May 30, 2015. After irradiating the graphite for two cycles, the capsule was removed from the reactor after ATR Cycle 158A, which ended on January 2, 2016, due to interference with another experiment. Irradiation was resumed with Cycle 162A on October 7, 2017 after the interfering experiment was removed from the reactor. AGC-4 irradiation completed by the end of Cycle 166B on January 10, 2020. Between Cycles 162A and 166B, AGC-4 capsule was removed from the reactor core during two Powered Axial Locator Mechanism (PALM) Cycles 163A and 165A to avoid overheating. All thermocouples (TCs) have functioned throughout the AGC-4 experiment. A total of 9,256,184 out of all 11,167,213 temperature records (or 82.9%) are Qualified for use by the ARD Program and 1,911,029 missing values are Failed. Argon, helium, and total gas flow data were within expected ranges, except only eight out-of-range values occurred during outages. A total of 21,240,627 out of all 22,288,5103 gas flow rates (or 92.8%) are Qualified for use by the ARD Program and 1,644,476 are Failed records mostly due to missing values. Discharge gas line moisture values were consistently low during full ATR power, except for 162B, when moisture content was increasing to more than 200 ppmv by the end of this cycle. During outages, moisture content reached as high as 700 ppmv. 1,089,941 out of a total of 1,107,331 moisture values (or 98.4%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 17,390 missing moisture values are Failed. Graphite creep specimens were subjected to one of three loads: 393, 491, or 589 lbf. For a brief period during Cycle 157D between 12:19 on June 2, 2015, and 08:23 on June 11, 2015, the load cells were wired incorrectly, resulting in missing stack load data. Missing stack loads were estimated from measured ram pressures using regression equations developed from the existing data from Cycle 157D. Estimated stack loads during this period are considered to be an accurate representation of actual load applied to the stacks. These loads deviate slightly from the planned loads. This deviation does not prevent the data from being Qualified for use but must be taken into account when analyzing the effect of load on creep. 6,095,728 out of a total of 6,403,985 moisture values (or 95.2%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 308,257 missing load values are Failed. Stack displacement increased consistently throughout the eight cycles, with total displacement reached highest value of 2.4 in by the end of irradiation. During ATR outages, a set of pneumatic rams raised the stacks of graphite creep specimens to ensure the specimens were not stuck within the test train. This stack raising was performed seven times throughout irradiation. All stacks were raised successfully each time. 4,744,974 out of a total of 6,094,513 displacement values (or 77.9%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 1,349,539 displacement values are Failed mostly due to missing values. Analyses were conducted on correlations between TCs to look for trends and step changes that might indicate instrument degradation or failure. Correlation analysis was used to identify instances when TCs form short circuits, referred to as virtual junctions, which result in TCs reporting temperatures from some location in the capsule other than the location where they were intended to read. No evidence of virtual junctions was found. Analyses were also conducted on control charts of temperature differences of between two TCs, which are expected to behave consistently throughout the entire irradiation period. Upward or downward trend over time indicates at least one TC in the pair was drifted. Examining control charts for all 66 possible pairs out of twelve TCs installed in the AGC-4 capsules reveal no clear drift failures occurred, except unstable behavior of two TCs in Zone 3, TC-7 and TC-8, over irradiation time. In conclus

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Electric Power Outage Forecasting: Model

Electric distribution networks are the final leg of the network that moves electric power from generating stations to end users. The vast majority of the circuits in these networks are above ground, where they are exposed to direct damage from strong winds, broken tree limbs, toppled trees, and flying debris. These systems are also susceptible to winter storms. The combined stress of the weight of ice (icing), the increased wind resistance of the conductors, and broken tree limbs can damage lines, poles, and support structures.

24 POWER TRANSMISSION AND DISTRIBUTION↗