Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LICENSES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

An Examination of the Hydropower Licensing and Federal Authorization Process

Site-permitting and regulation are necessary to ensure hydropower projects (both original and relicensed) comply with statutory requirements and address multiple stakeholder priorities that consider a range of factors, including water quality, species protection, cultural resource impacts, and recreation. However, the time involved in acquiring a license for an individual hydropower project can be highly variable by project, leading to increased project costs, financial risks, and uncertainties. In part, this variability is the result of a regulatory structure that has evolved over time to include multiple approvals and compliance requirements administered by the Federal Energy Regulatory Commission (FERC), U.S. Army Corp of Engineers (USACE), federal land management agencies, federal and state resource agencies, and Indian Tribes. Ultimately, the time, benefits, costs, and risks to developers associated with hydropower regulatory processes and/or the preparation (e.g., studies) required for regulatory agency review are not well documented or synthesized in the public domain, which may increase uncertainty and variability within the process. This report addresses these needs by presenting results of a comprehensive examination of hydropower licensing including quantitative and qualitative analyses of timelines, causal factors, and their combined effect on risk and costs to developers.

13 HYDRO ENERGY↗

Special Report on "Allegations of Conflict of Interest Regarding Licensing of PROTECT by Argonne National Laboratory"

In February 2009, the Office of Inspector General received a letter from Congressman Mark Steven Kirk of Illinois, which included constituent allegations that an exclusive technology licensing agreement by Argonne National Laboratory was tainted by inadequate competition, conflicts of interest, and other improprieties. The technology in question was for the Program for Response Options and Technology Enhancements for Chemical/Biological Terrorism, commonly referred to as PROTECT. Because of the importance of the Department of Energy's technology transfer program, especially as implementation of the American Recovery and Reinvestment Act matures, we reviewed selected aspects of the licensing process for PROTECT to determine whether the allegations had merit. In summary, under the facts developed during our review, it was understandable that interested parties concluded that there was a conflict of interest in this matter and that Argonne may have provided the successful licensee with an unfair advantage. In part, this was consistent with aspects of the complaint from Congressman Kirk's constituent.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Extremely Low Resource Optical Identifier: A License Plate for Your Satellite

Space object identification is vital for operating spacecraft, space traffic control, and space situational awareness, but initial determination, maintenance, and recovery of identity are all difficult, expensive, and error prone, especially for small objects like CubeSats. Attaching a beacon or license plate with a unique identification number to a space object before launch would greatly simplify the task, but radio beacons are power hungry and can cause interference. This work describes a new concept for a satellite license plate: the extremely low resource optical identifier. The extremely low resource optical identifier is a milliwatt-scale self-powered autonomous optical beacon that can be attached to any space object to transmit a persistent identification signal to ground stations. A system appropriate for a low-Earth-orbit CubeSat or other small space object can fit in a package with the area of a postage stamp and a few millimeters thick; and it requires no power, data, or control from the host object. The concept has been validated with ground tests, and the first flight-test unit is scheduled for launch in 2018. The unique identification number of a low-Earth-orbit satellite can be determined unambiguously in a single orbital pass over a low-cost ground station.

79 ASTRONOMY AND ASTROPHYSICS↗

Challenges of Fusion Power Plant Licensing: Differences and Commonalities with Existing Systems

At present, there are no regulatory guidelines to follow for US fusion power plant construction and operation. Thus far, the Department of Energy (DOE) has been regulating existing fusion experiments, following the 1996-1999 DOE Fusion Standards and using the spirit of the ASME (American Society of Mechanical Engineers) code. Considering this reality, a few options emerged for licensing ARIES-type power plants and the like. Developing new fusion-specific regulations stands out as the most logical option, but requires well-coordinated effort between DOE, regulatory agencies, and the fusion community with considerable funding and long lead-time. Nevertheless, a few recent developments seem promising: (1) The US Nuclear Regulatory Commission (NRC) plans to assert regulatory jurisdiction over commercial fusion devices, and (2) the ongoing effort within ASME will develop rules for the construction of fusion-energy-related components. The most recent NRC, ASME and fusion licensing developments are reviewed in this paper. In addition, an interesting comparison with ITER was made to foresee how US fusion power plants could leverage from ITER.

99 GENERAL AND MISCELLANEOUS↗

Modular High Temperature Gas-Cooled Reactor: Licensing Part I

NRC PRA Policy Statement motivates risk-informed, performance-based (RIPB) approach to modular High Temperature Gas-cooled Reactor (HTGR) licensing Complements traditional deterministic design approach to increase use of risk insights in design and licensing decisions Risk-informed approach: Explicit consideration to a broader set of challenges Logical prioritization of challenges Consideration of broader set of resources to defend against challenges Explicitly identifying and quantifying sources of uncertainty Better decision making by testing for sensitivity to key assumptions Performance-Based Approach: Measurable (or calculable) parameters for monitoring Objective criteria to assess performance

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Unique Regulatory Approach for Licensing the Port Hope Remediation Project in Canada - 13315

The Port Hope remediation project is a part of a larger initiative of the Canadian Federal Government the Port Hope Area Initiative (PHAI) which is based upon a community proposal. The Government of Canada, through Natural Resources Canada (NRCan) is investing $1.28 billion over 10 years to clean up historic low-level radioactive waste in the Port Hope Area and to provide long-term safe management of the low-level radioactive wastes in the Port Hope Area. These wastes arose from the activities of a former Federal Crown Corporation (Eldorado Nuclear) and its private sector predecessors. In Canada, historic waste are defined as low-level radioactive waste that was managed in a manner no longer considered acceptable, but for which the original producer cannot reasonably be held responsible or no longer exists and for which the Federal Government has accepted responsibility. In Canada, under the current regulatory framework, the environmental remediation is not considered as a distinct phase of the nuclear cycle. The regulatory approach for dealing with existing sites contaminated with radioactive residues is defined on the basis of risk and application of existing regulations. A unique regulatory approach was taken by the Canadian Nuclear Safety Commission (CNSC) to address the various licensing issues and to set out the requirements for licensing of the Port Hope Project within the current regulatory framework. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Licensing of the national repository for LILW waste in Bulgaria - 15609

Radioactive waste arises from the operation and decommissioning of the Bulgarian nuclear power plants and from other sources in research, medical applications and industry. The need for building the National Disposal Facility (NDF) is recognized by the Bulgarian government, and described and justified in the Environment Impact Assessment Decision. The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is endeavoring to build a near-surface repository for short-lived low and intermediate level radioactive waste (SL-LILW). The European Union finances the establishment of the NDF through the Kozloduy International Decommissioning Support Fund. The Bulgarian government has defined the NDF as a Project of National Importance. At the conclusion of an international tendering process, SERAW awarded the contract for development of the NDF design, including Intermediate Safety Analysis Report (ISAR), to the Consortium of Westinghouse Electric Spain S.A.U, DBE Technology GmbH of Germany, and ENRESA, the Spanish National Waste Management Agency. Two Bulgarian companies also participate in the project as subcontractors;KK-Project and EQE-Bulgaria. The project 'Technical Design and ISAR Preparation for the National Disposal Facility at Bulgaria' is identified within SERAW as 'R-Project 5'. Since obtaining SERAW's approval for the preferred repository design variant, R Project 5 has focused on the development of the Technical Design and on preparation of the ISAR, which demonstrates the safety and suitability of the proposed NDF design. The Consortium submitted to SERAW the Technical Design for revision on March 2013. SERAW's experts immediately started the review of the design. In addition, SERAW invited independent, highly qualified Bulgarian experts and scientists to participate in the review. In November 2013, SERAW approved the Technical Design. The Consortium submitted the Intermediate Safety Analysis Report to SERAW for review following a similar process in July 2014. Both documents were meanwhile handed over to the appropriate Bulgarian licensing authorities. SERAW's goal is to receive a license for construction of the NDF in early 2015. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Licensing of Irradiated Uranyl Nitrate Liquid Containers and Applicable Loading and Packaging System - 18481

Irradiated highly enriched uranyl nitrate liquid (HEUNL) solutions are typically residual materials resulting from the processing of uranium target materials in the production of radioisotopes. Traditionally, these residual materials have been processed and stored at the site of origin, due to the lack of an option for packaging, transportation and disposition. Modern alternatives to process, stabilize, package and dispose of these materials have been developed, but until recently there has not been a viable Type B package solution that could be used to ship these materials in sufficient quantities to justify the cost of an off-site disposition strategy. For this reason, most facilities that generate irradiated HEUNL materials have implemented on-site storage tanks or containers, resulting in the significant accumulation of HEUNL inventories worldwide. This paper provides an overview of the design and licensing activities for the development of sealed irradiated HEUNL transport containers to permit safe transportation of this material in the NAC Legal Weight Truck (NAC-LWT) cask. A description of the robust HEUNL container, licensing and fabrication is also presented. In addition, NAC has developed a specialized loading system to optimize the process to load, package and un-package HEUNL materials to minimize worker exposure during loading, and execute the packaging process efficiently for safe transport and retrieval. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Community Engagement - A Citizen-Centric Approach to Seeking a Social License - 20017

The long regulatory road has finally been completed-after years of effort a Record of Decision has been signed and a Permit to Construct has been granted or a Permit to Operate has been obtained. But what about the other road that should be taken in parallel-community engagement? Working with the public is not a sequential activity, rather it is a consequential one and needs to be integrated with overall project planning. Unless you have effectively, meaningfully, and patiently engaged with the project's communities of impact, you may find your project trying to obtain a social license or a social license to operate (SLO). The SLO has its origins in the mining industry and its roots in the business model of corporate social responsibility and sustainability. These latter practices are well known to the US DOE and its contractor community. Aspects of the SLO are emerging as individuals and communities are becoming more informed and have increased expectations for being able to influence and shape decisions. When local community issues are not sought out, listened to, or addressed early, and questions are left unanswered, they can become agenda items for larger unaffiliated groups, and project loss (through delays and/or cancellation) can occur. Issues can transition from resolvable to intractable, a type of SLO face-off. Social media campaigns, serial negative media coverage, and protest signs at project sites opposing regulatory decisions already made are no longer anomalies. These types of incidents demonstrate the increasingly delicate relationship between approved regulatory/technical decisions and public acceptance of those decisions. A SLO is not a requirement. However, the building-blocks of a SLO - working with members of affected communities to build understanding, potentially to obtain and maintain community acceptance or even gain approval or support - are evidence of leadership by project sponsors. Actions taken, or not taken, by project sponsors truly have the ability to influence an outcome. While projects are not assured of success or failure, engaging the community in an empowered process is an investment of time and resources toward success for the project and thus for the communities of impact. Authors Note: Extensive literature searches were performed in developing this paper. The majority of the published literature on SLO as a 'movement' was found from sources in Canada, the European Union (Germany and France in particular), South Asia, South Korea, and many Latin American countries. The literature addressed resource development (mining), infrastructure, and energy projects. Articles written by US sources often spoke to origins and structural theory, specific project issues such as Not in My Back Yard (NIMBY) and to protests/demonstrations related to those projects, rather than systemic opposition/conflict phenomena. For these reasons many international SLO experiences and sources are cited in the discussion. The authors recognize these non-US experiences with SLO as having a 'forecast' value to US projects, especially those related to nuclear projects of any type, waste treatment and disposal, energy development (especially fossil fuels as well as alternative sources), mining, and infrastructure. The body of future SLO experiences in the US will shape the future responses to it. (authors)

99 GENERAL AND MISCELLANEOUS↗

How systems engineering and human factors can assist SMR vendors with the licensing process - 345

There is growing interest in the development of small modular reactors (SMRs) as a cost-effective renewable source of energy. Most of the current conceptual designs propose advanced and automated control and monitoring technologies which would require complex human system interfaces. The proposals also include a reduction in the number of staff, and partial or full remote control of the facilities. The human factors challenges of such a design philosophy range from identification of information requirements of users to assessing workload to deciding on best information visualization techniques to ensure situation awareness is maintained in a remote control facility. Addressing these challenges will require a systems engineering approach where user requirements are identified through a systematic approach for various contexts, including normal, abnormal, and accident conditions. A systems engineering process will integrate human factors as well as other specialty disciplines such as reliability and design optimization in a coherent fashion that would lead to realization of a successful system that addresses user requirements. The licensing model in Canada is based upon a graded approach and is largely technology neutral. A key factor in ensuring effective licensing effort is identification of regulatory requirements. This paper discusses how adopting a systems engineering approach and early consideration of human factors principles and requirements will not only ensure an efficient design process, but will also help with developing a design that meets the regulatory requirements. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Trends in Light and Temperature Sensitivity Recommendations among Licensed Biotechnology Drug Products

Inherent structural and functional properties of biotechnology-derived therapeutic biologics make them susceptible to light- and temperature-induced degradation and consequently can influence their quality. Photosensitivity of therapeutic proteins continues to be examined, but the commonalities and trends of storage conditions and information about light and temperature sensitivity among currently licensed therapeutic proteins has not been previously surveyed. Using a comprehensive and relational database approach, we conducted a scientific survey of all licensed biotechnology-derived drug products with the goal of providing evidence-based information about recommended storage conditions of formulations sorted by light- and temperature-related attributes as described for each product at licensure. We report the prevalence of indications for light and temperature sensitivity in formulations categorized by their presentation type, number of doses, container type, dosage form and active molecule type. We also report the storage temperature range across formulations and diluents for reconstitution and dilution. Formulations with excipients that potentially facilitate light-induced and thermal degradation were also noted. The result of our analysis indicates that light and temperature sensitivity are prevalent across therapeutic protein formulations. However, when a formulation is reconstituted or diluted, both light and temperature sensitivity are less clear. In addition, light and temperature sensitivity are more well defined in liquid formulations than lyophilized powder formulations, and more well defined in products manufactured in autoinjectors, prefilled-syringes, and pens than products in vials. Overall, our report provides a data-driven summary of storage conditions among therapeutic protein formulations to support the development of future biologic drug products.

60 APPLIED LIFE SCIENCES↗

Versatility of the adenovirus-vectored foot-and-mouth disease vaccine platform across multiple foot-and-mouth disease virus serotypes and topotypes using a vaccine dose representative of the AdtA24 conditionally licensed vaccine

We investigated the serotype- and topotype versatility of a replication-deficient human adenovirus serotype 5 vectored foot-and-mouth disease (FMD) vaccine platform (AdtFMD). Sixteen AdtFMD recombinant subunit monovalent vaccines targeting twelve distinct FMD virus (FMDV) serotype/topotypes in FMD Regional Pools I-VII were constructed. The AdtA24 serotype conditionally licensed vaccine served as the basis for vaccine design and target dose for cattle clinical trials. Several vaccines contained an additional RGD motif genetic insertion in the adenovector fiber knob, and/or a full-length 2B gene insertion in the FMDV P1 gene cassette. In 13 of the 22 efficacy studies conducted, naïve control and AdtFMD vaccinated cattle were challenged intradermolingually at 2 weeks post-vaccination using a FMDV strain homologous to the AdtFMD vaccine strain. Each of the 16 AdtFMD vaccines were immunogenic based on the presence of homologous neutralizing antibodies in the serum of approximately 90% of total vaccinates (n = 375) on the day of challenge. Importantly, for 75% of vaccines tested, the effective dose that conferred 100% protection against clinical FMD was identical to or in some cases lower than, the minimum protective dose for the conditionally licensed AdtA24 vaccine formulated with ENABL® adjuvant. Results also confirmed the capability of the AdtFMD vaccine platform to differentiate infected from vaccinated animals (DIVA) across the five FMDV serotypes evaluated. Collectively, this comprehensive set of FMD cattle vaccine dose ranging studies highlights the serotype- and topotype versatility of the AdtFMD vaccine platform for further development, licensure, and application in FMD outbreak control and disease eradication efforts.

59 BASIC BIOLOGICAL SCIENCES↗

A scanning-to-incision switch in TFIIH-XPG induced by DNA damage licenses nucleotide excision repair

Nucleotide excision repair (NER) is critical for removing bulky DNA base lesions and avoiding diseases. NER couples lesion recognition by XPC to strand separation by XPB and XPD ATPases, followed by lesion excision by XPF and XPG nucleases. Here, we describe key regulatory mechanisms and roles of XPG for and beyond its cleavage activity. Strikingly, by combing single-molecule imaging and bulk cleavage assays, we found that XPG binding to the 7-subunit TFIIH core (coreTFIIH) stimulates coreTFIIH-dependent double-strand (ds)DNA unwinding 10-fold, and XPG-dependent DNA cleavage by up to 700-fold. Simultaneous monitoring of rates for coreTFIIH single-stranded (ss)DNA translocation and dsDNA unwinding showed XPG acts by switching ssDNA translocation to dsDNA unwinding as a likely committed step. Pertinent to the NER pathway regulation, XPG incision activity is suppressed during coreTFIIH translocation on DNA but is licensed when coreTFIIH stalls at the lesion or when ATP hydrolysis is blocked. Moreover, ≥15 nucleotides of 5'-ssDNA is a prerequisite for efficient translocation and incision. Our results unveil a paired coordination mechanism in which key lesion scanning and DNA incision steps are sequentially coordinated, and damaged patch removal is only licensed after generation of ≥15 nucleotides of 5'-ssDNA, ensuring the correct ssDNA bubble size before cleavage.

59 BASIC BIOLOGICAL SCIENCES↗

Model and Analytic Processes for Export License Assessments

This paper represents the Department of Energy Office of Nonproliferation Research and Development (NA-22) Simulations, Algorithms and Modeling (SAM) Program's first effort to identify and frame analytical methods and tools to aid export control professionals in effectively predicting proliferation intent; a complex, multi-step and multi-agency process. The report focuses on analytical modeling methodologies that alone, or combined, may improve the proliferation export control license approval process. It is a follow-up to an earlier paper describing information sources and environments related to international nuclear technology transfer. This report describes the decision criteria used to evaluate modeling techniques and tools to determine which approaches will be investigated during the final 2 years of the project. The report also details the motivation for why new modeling techniques and tools are needed. The analytical modeling methodologies will enable analysts to evaluate the information environment for relevance to detecting proliferation intent, with specific focus on assessing risks associated with transferring dual-use technologies. Dual-use technologies can be used in both weapons and commercial enterprises. A decision-framework was developed to evaluate which of the different analytical modeling methodologies would be most appropriate conditional on the uniqueness of the approach, data availability, laboratory capabilities, relevance to NA-22 and Office of Arms Control and Nonproliferation (NA-24) research needs and the impact if successful. Modeling methodologies were divided into whether they could help micro-level assessments (e.g., help improve individual license assessments) or macro-level assessment. Macro-level assessment focuses on suppliers, technology, consumers, economies, and proliferation context. Macro-level assessment technologies scored higher in the area of uniqueness because less work has been done at the macro level. An approach to developing testable hypotheses for the macro-level assessment methodologies is provided. The outcome of this works suggests that we should develop a Bayes Net for micro-level analysis and continue to focus on Bayes Net, System Dynamics and Economic Input/Output models for assessing macro-level problems. Simultaneously, we need to develop metrics for assessing intent in export control, including the risks and consequences associated with all aspects of export control.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Review of Exemptions and General Licenses for Fissile Material in 10 CFR 71

Title 10 of the United States (US) Code of Federal Regulations (CFR), Part 71, Packaging and Transportation of Radioactive Material, includes requirements for the transport of fissile material in packages. These regulations provide requirements for packages that are certified by the U.S. Nuclear Regulatory Commission (NRC) to transport fissile material. 10 CFR 71 also includes provisions for exemptions from classification as fissile material (10 CFR 71.15) and permits general licenses for limited quantities of fissile material and plutonium-beryllium special form sources (10 CFR 71.22 and 10 CFR 71.23, respectively). These provisions were extensively revised by the NRC as part of a broad rule-making effort in 2004. The exemption and general license provisions are used frequently for a wide-variety of fissile material shipping operations, and consignors must interpret the regulations for particular shipping situations. The purpose of this document is to provide explanatory information on the background, intent, and anticipated use of the provisions in an effort to assist fissile material licensees in their interpretation and application of the provisions such that criticality safety is ensured during transportation activities. A variety of examples are presented and discussed to illustrate how the regulations should be applied.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

SAM Co-Development to Support Fluoride-salt-cooled High-temperature Reactor Design and Licensing (CRADA 2018-18177 Final Report)

This project aims to raise the SAM code's technical and commercial maturity level to enable the Kairos Power ("Kairos") to use SAM to support its KP-FHR design analysis and licensing application. Argonne National Laboratory ("Argonne") has actively developed and maintained SAM, a modern system-level analysis tool for advanced nonlight water reactors safety analysis. Kairos is currently actively pursuing development of an FHR design and associated technology, and consequently requires a pedigreed safety analysis tool. The purpose of this project is to increase the maturity of the SAM code for the modeling and simulation of the KP-FHR design, thus enabling its use in safety analyses that support licensing application. Argonne will primarily be responsible for software design, development, and testing; while Kairos will be responsible for software requirements, assessment of software capabilities, needs, gaps, and priorities, and development of proprietary models. The research and development activities for the joint SAM development project include: a series of identification and prioritization studies on design characteristics, event sequences, relevant phenomena, and software capabilities; SAM capability enhancements for specific KP-FHR systems and components; performing code verification and validations; integrating uncertainty quantification (UQ), model calibration, and sensitivity analysis (SA) techniques in safety analyses; and raising the software quality rigor level for commercial-grade applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Conceptual Design of Engineering-Scale Molten Salt Spill Tests to Support Molten Salt Reactor Licensing

Nuclear accident progression analysis codes for reactor licensing must be validated using experimental data that was generated at a large enough scale so that the results are representative of full-scale accidents. This report describes a conceptual design of engineering-scale molten salt spill tests that will provide the necessary datasets to support molten salt reactor (MSR) licensing. Design considerations, salt compositions, test variables, processes to be quantified, and suitable measurement techniques are presented and discussed. Aspects of the conceptual engineering-scale molten salt spill test design presented in this report were made using insights from recent laboratory-scale molten salt spill tests conducted at Argonne. Additional input from model developers, MSR vendors, and technical experts will benefit the design of the proposed engineering-scale molten salt spill tests.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Preliminary Design of Engineering-Scale Salt Accident Analysis Facility to Support Molten Salt Reactor Licensing

Systems-level nuclear accident analysis codes for reactor licensing must be validated using experimental data that represent behaviors expected during actual full-scale accidents. Some behaviors may arise from coupled processes and only manifest at large scales. This report presents the preliminary design of the Salt Accident Analysis Facility (SAAF, pronounced “safe”), which is an experimental test facility to be constructed at Argonne that can be used to conduct integrated salt accident tests at an engineering scale. The measurement capabilities of the SAAF are based on previously developed methods and will provide the representative datasets that are needed to support molten salt reactor (MSR) licensing. Details of the design, the processes to be quantified, the measurement techniques for quantifying the processes, the variables that can be adjusted to simulate different accident scenarios, and operational considerations are presented herein. This report provides stakeholders the opportunity to give feedback on the test facility capabilities and planned analyses before it is constructed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗