Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LAUNCHING FACILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Computing Response Of A Structure To Random Transient Pressures

Improved method of computing vibrational response of structure to transient random acoustic excitation at predominantly low frequencies devised, called "deterministic". Motivated by need to analyze more accurately vibro/acoustic responses of structures at spacecraft-launching facilities and determine whether need for reinforcement or redesign to withstand launch environment. Also used to study such phenomena as earthquake motions, ocean waves, aircraft pressure gusts, responses of bridges to winds, and effects to jet-engine noise on aircraft structures.

Sepcenko, Valentin↗

Launch Control Systems: Moving Towards a Scalable, Universal Platform for Future Space Endeavors

The redirection of NASA away from the Constellation program calls for heavy reliance on commercial launch vehicles for the near future in order to reduce costs and shift focus to research and long term space exploration. To support them, NASA will renovate Kennedy Space Center's launch facilities and make them available for commercial use. However, NASA's current launch software is deeply connected with the now-retired Space Shuttle and is otherwise not massively compatible. Therefore, a new Launch Control System must be designed that is adaptable to a variety of different launch protocols and vehicles. This paper exposits some of the features and advantages of the new system both from the perspective of the software developers and the launch engineers.

Sun, Jonathan↗

Strategies for Validation Testing of Ground Systems

In order to accomplish the full Vision for Space Exploration announced by former President George W. Bush in 2004, NASA will have to develop a new space transportation system and supporting infrastructure. The main portion of this supporting infrastructure will reside at the Kennedy Space Center (KSC) in Florida and will either be newly developed or a modification of existing vehicle processing and launch facilities, including Ground Support Equipment (GSE). This type of large-scale launch site development is unprecedented since the time of the Apollo Program. In order to accomplish this successfully within the limited budget and schedule constraints a combination of traditional and innovative strategies for Verification and Validation (V&V) have been developed. The core of these strategies consists of a building-block approach to V&V, starting with component V&V and ending with a comprehensive end-to-end validation test of the complete launch site, called a Ground Element Integration Test (GEIT). This paper will outline these strategies and provide the high level planning for meeting the challenges of implementing V&V on a large-scale development program. KEY WORDS: Systems, Elements, Subsystem, Integration Test, Ground Systems, Ground Support Equipment, Component, End Item, Test and Verification Requirements (TVR), Verification Requirements (VR)

Annis, Tammy↗

Evolution of area access safety training required for gaining access to Space Shuttle launch and landing facilities

Assuring personnel and equipment are fully protected during the Space Shuttle launch and landing operations has been a primary concern of NASA and its associated contractors since the inception of the program. A key factor in support of this policy has been the area access safety training requirements for badging of employees assigned to work on Space Shuttle Launch and Facilities. This requirement was targeted for possible cost savings and the transition of physical on-site walkdowns to the use of television tapes has realized program cost savings while continuing to fully satisfy the area access safety training requirements.

Willams, M. C.↗

FUTURE OF LARGE LAUNCH VEHICLES

Nova launch vehicle design program, considering mission, payload, cost, launch facility, and reusability requirements

BOOSTER↗

The First Development of Human Factors Engineering Requirements for Application to Ground Task Design for a NASA Flight Program

The National Aeronautics and Space Administration has long applied standards-derived human engineering requirements to the development of hardware and software for use by astronauts while in flight. The most important source of these requirements has been NASA-STD-3000. While there have been several ground systems human engineering requirements documents, none has been applicable to the flight system as handled at NASA's launch facility at Kennedy Space Center. At the time of the development of previous human launch systems, there were other considerations that were deemed more important than developing worksites for ground crews; e.g., hardware development schedule and vehicle performance. However, experience with these systems has shown that failure to design for ground tasks has resulted in launch schedule delays, ground operations that are more costly than they might be, and threats to flight safety. As the Agency begins the development of new systems to return humans to the moon, the new Constellation Program is addressing this issue with a new set of human engineering requirements. Among these requirements is a subset that will apply to the design of the flight components and that is intended to assure ground crew success in vehicle assembly and maintenance tasks. These requirements address worksite design for usability and for ground crew safety.

Dischinger, H. Charles, Jr.↗

Commercial space infrastructure - Giving industry a lift

Private sector initiatives directed toward establishing a commercial space sector in the fields of commercial space transportation, payload processing, upper stages, launch facilities, and other facilities and equipment are presented. Consideration is given to a payload processing facility that is capable of providing all prelaunch services required by communications satellites targeted for launch on U.S. launch systems. Attention is given to NASA's efforts to promote commercial infrastructure development for the creation of new products and services, leading to new markets and businesses.

Stone, Barbara A.↗

Low Earth Orbit Raider (LER) winged air launch vehicle concept

The need to launch small payloads into low earth orbit has increased dramatically during the past several years. The Low Earth orbit Raider (LER) is an answer to this need. The LER is an air-launched, winged vehicle designed to carry a 1500 pound payload into a 250 nautical mile orbit. The LER is launched from the back of a 747-100B at 35,000 feet and a Mach number of 0.8. Three staged solid propellant motors offer safe ground and flight handling, reliable operation, and decreased fabrication cost. The wing provides lift for 747 separation and during the first stage burn. Also, aerodynamic controls are provided to simplify first stage maneuvers. The air-launch concept offers many advantages to the consumer compared to conventional methods. Launching at 35,000 feet lowers atmospheric drag and other loads on the vehicle considerably. Since the 747 is a mobile launch pad, flexibility in orbit selection and launch time is unparalleled. Even polar orbits are accessible with a decreased payload. Most importantly, the LER launch service can come to the customer, satellites and experiments need not be transported to ground based launch facilities. The LER is designed to offer increased consumer freedom at a lower cost over existing launch systems. Simplistic design emphasizing reliability at low cost allows for the light payloads of the LER.

Feaux, Karl↗

Brief, Why the Launch Equipment Test Facility Needs a Laser Tracker

The NASA Kennedy Space Center Launch Equipment Test Facility (LETF) supports a wide spectrum of testing and development activities. This capability was originally established in the 1970's to allow full-scale qualification of Space Shuttle umbilicals and T-O release mechanisms. The LETF has leveraged these unique test capabilities to evolve into a versatile test and development area that supports the entire spectrum of operational programs at KSC. These capabilities are historically Aerospace related, but can certainly can be adapted for other industries. One of the more unique test fixtures is the Vehicle Motion Simulator or the VMS. The VMS simulates all of the motions that a launch vehicle will experience from the time of its roll-out to the launch pad, through roughly the first X second of launch. The VMS enables the development and qualification testing of umbilical systems in both pre-launch and launch environments. The VMS can be used to verify operations procedures, clearances, disconnect systems performance &margins, and vehicle loads through processing flow motion excursions.

Yue, Shiu H.↗

External tank aft cargo carrier

The External Tank (ET) Aft Cargo Carrier (ACC) is a low cost, low risk augmentation of the Space Transportation System (STS). It almost doubles the cargo volume of the STS while minimally impacting other STS elements (orbiter, ET and solid rocket boosters SRBs, launch facilities and STS operations. In addition to increasing the potential volume of cargo carried on a Shuttle launch, the ACC provides the following additional benefits: (1) Increased STS competitiveness for payloads; (2) Increased cargo manifest flexibility; (3) Increased spacecraft design options; (4) Alternate manifesting for special payloads; and (5) Future space platform/station design options.

Mobley, T. B.↗

NASA's Space Launch System: Progress Report

After more than four decades exploring the space environment from low Earth orbit and developing long-duration spaceflight operational experience with the International Space Station (ISS), NASA is once again preparing to send explorers into deep space. Development, test and manufacturing is now underway on the launch vehicle, the crew spacecraft and the ground processing and launch facilities to support human and robotic missions to the moon, Mars and the outer solar system. The enabling launch vehicle for these ambitious new missions is the Space Launch System (SLS), managed by NASA's Marshall Space Flight Center (MSFC). Since the program began in 2011, the design has passed Critical Design Review, and extensive development, test and flight hardware has been produced by every major element of the SLS vehicle. Testing continues on engines, boosters, tanks and avionics. While the program has experienced engineering challenges typical of a new development, it continues to make steady progress toward the first SLS mission in roughly two years and a sustained cadence of missions thereafter. This paper will discuss these and other technical and SLS programmatic successes and challenges over the past year and provide a preview of work ahead before first flight.

Cook, Jerry↗

Athena: Advanced air launched space booster

The infrastructure for routine, reliable, and inexpensive access of space is a goal that has been actively pursued over the past 50 years, but has yet not been realized. Current launch systems utilize ground launching facilities which require the booster vehicle to plow up through the dense lower atmosphere before reaching space. An air launched system on the other hand has the advantage of being launched from a carrier aircraft above this dense portion of the atmosphere and hence can be smaller and lighter compared to its ground based counterpart. The goal of last year's Aerospace Engineering Course 483 (AE 483) was to design a 227,272 kg (500,000 lb.) air launched space booster which would beat the customer's launch cost on existing launch vehicles by at least 50 percent. While the cost analysis conducted by the class showed that this goal could be met, the cost and size of the carrier aircraft make it appear dubious that any private company would be willing to invest in such a project. To avoid this potential pitfall, this year's AE 483 class was to design as large an air launched space booster as possible which can be launched from an existing or modification to an existing aircraft. An initial estimate of the weight of the booster is 136,363 kg (300,000 lb.) to 159,091 kg (350,000 lb.).

Booker, Corey G.↗

Shuttle LOX Loading Transient Study

The configuration and operation of the LOX loading facilities to be used for the space shuttle main propulsion test article at the National Space and Technology Laboratories (NSTL), and for the space shuttle launch facilities at John F. Kennedy Space Center (KSC) was investigated. The acceptability of these LOX loading facilities for each application was determined along with the degree of similarity between the systems with respect to the applicability of data developed during operations at NSTL a to the launch site operations at KSC. Results are summarized and final data comparisons, conclusions, and recommendations are presented.

Glasgow, V. L.↗

Orbital Launch Operations: Escape Window Analysis

The analysis of the gross aspects of the flight mechanics for lunar trajectories from orbital launch is presented. An attempt is made to define the launch requirements from an earth orbit, the geometrical relationships existing between an Orbital Launch Facility in earth orbit and the moon in its orbit, the departure trajectory sensitivity to energy and time requirements, the launch-on-time problem and the orbital "escape window".

ESCAPE↗

Plans for West Coast STS launch capability

The layout and scope of operations of the Vandenberg AFB West Coast Launch Site for the Space Shuttle are examined. The launch site intended for the first West Coast launch in December 1983 is being constructed by the United States Air Force. Topic discussed include site/selection/management/concepts, Shuttle hardware flow and related facilities, launch pad operations, orbiter erection at SLC-6 VAFB, solid rocket booster operations, and payload ground processing. In conclusion it is noted that NASA and DOD personnel are working together to ensure that the launch site is completed on schedule at minimum cost.

Murphy, W. P.↗

Mechanical features of the shuttle rotating service structure

With the development of the space shuttle launching facilities, it became mandatory to develop a shuttle rotating service structure to provide for the insertion and/or removal of payloads at the launch pads. The rotating service structure is a welded tubular steel space frame 189 feet high, 65 feet wide, and weighing 2100 tons. At the pivot column the structure is supported on a 30 inch diameter hemispherical bearing. At the opposite terminus the structure is supported on two truck assemblies each having eight 36 inch diameter double flanged wheels. The following features of the rotating service structure are discussed: (1) thermal expansion and contraction; (2) hurricane tie downs; (3) payload changeout room; (4) payload ground handling mechanism; (5) payload and orbiter access platforms; and (6) orbiter cargo bay access.

Crump, J. M.↗

Payload Utilization in NASA's Space Launch System

A revitalized National Space Council has directed NASA to return to the moon, with a series of preparatory missions paving the way for eventual human exploration. NASA's new deep space exploration system -- the heavy-lift Space Launch System (SLS), the Orion crew spacecraft and revitalized launch facilities at Kennedy Space Center -- will enable NASA and its commercial and international partners to meet these goals for human deep space exploration. SLS will be the most capable launch vehicle for these efforts, with an initial Block 1 capability of at least 26 metric tons (t) to trans-lunar injection (TLI). A more powerful Block 1B, available in crew and cargo configurations, with have the power to loft more than 37 t to TLI; the ultimate Block 2 variant will lift more than 45 t to TLI. For payload utilization, the Block 1 vehicle will carry 13 6U CubeSats as secondary payloads while the Block 1B crew vehicle will provide as much volume as the space shuttle payload bay in a Universal Stage Adapter (USA). Block 1B cargo vehicles will offer 8.4 m fairings in 19.1 m and 27.4 m lengths, with enough volume to accommodate habitat modules and landers. For missions beyond the Earth-moon system, SLS offers greater characteristic energy (C3), enabling faster transit or heavier payloads to the outer planets. The first mission of SLS and Orion, launching no earlier than December 2019, will send Orion into lunar distant retrograde orbit (DRO) on an approximately 25-day shakedown cruise known as Exploration Mission-1 (EM-1), enabling NASA to verify and validate new systems before sending astronauts to deep space on the next exploration mission. The SLS program and its prime contractors have made significant progress toward first launch, with several major components of the vehicle completed and delivered to the Exploration Ground Systems (EGS) Program at Kennedy Space Center. Major forward work includes integrating tanks, engines and other major sections into the EM-1 core stage at Michoud Assembly Facility and then shipping the entire core stage assembly to Stennis Space Center. There, it will be installed in the refurbished B-2 test stand for a series of integrated stage tests culminating in a green run hotfire test. The Program's Spacecraft Payload Integration and Evolution (SPIE) Office, responsible for the in-space stage, adapters and payload interfaces, has largely completed its effort on the Block 1 vehicle and is supporting manufacture of the first Block 1B vehicle. This paper will provide an overview of the Block 1 vehicle, its expected capabilities, secondary payload accommodations and manufacturing status, including structural testing and the challenges of developing a new launch vehicle. A lookahead to the Block 1B vehicle and the payload utilization opportunities it will provide in the 2020s will also be discussed, including the unique capabilities of the vehicle.

Creech, Stephen D.↗

Evaluation of the national launch system as a booster for the HL-20

The capability of a proposed national launch system (NLS) to boost the personnel launch system (PLS) manned vehicle has been examined. A reference NLS configuration, the NLS-2 1.5 stage vehicle, and a reference HL-20 PLS configuration were used for the study. Performance has been analyzed for several PLS insertion orbits to support the Space Station Freedom resupply mission. The reliability of the NLS launch vehicle and its contribution to crew safety requirements have been determined. The launch-processing and launch facility requirements of these combined systems were also analyzed. Previous studies of these two systems have focused on either the PLS manned element or NLS launch vehicle. This paper combines the results of prior studies in an analysis of the integrated NLS/PLS configuration. This analysis has found the proposed NLS 1.5 stage launch vehicle to be an excellent booster for the PLS. Predicted performance margins for this launch-vehicle configuration are more than adequate, and acceptable reliability and safety levels are anticipated. Integration of this NLS/PLS configuration into NASA mixed-fleet launch architectures is feasible.

Duffy, James B.↗