Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Implementation of Recommendations from the One System Comparative Evaluation of the Hanford Tank Farms and Waste Treatment Plant Safety Bases

A Comparative Evaluation was conducted for One System Integrated Project Team to compare the safety bases for the Hanford Waste Treatment and Immobilization Plant Project (WTP) and Tank Operations Contract (TOC) (i.e., Tank Farms) by an Expert Review Team. The evaluation had an overarching purpose to facilitate effective integration between WTP and TOC safety bases. It was to provide One System management with an objective evaluation of identified differences in safety basis process requirements, guidance, direction, procedures, and products (including safety controls, key safety basis inputs and assumptions, and consequence calculation methodologies) between WTP and TOC. The evaluation identified 25 recommendations (Opportunities for Integration). The resolution of these recommendations resulted in 16 implementation plans. The completion of these implementation plans will help ensure consistent safety bases for WTP and TOC along with consistent safety basis processes. procedures, and analyses. and should increase the likelihood of a successful startup of the WTP. This early integration will result in long-term cost savings and significant operational improvements. In addition, the implementation plans lead to the development of eight new safety analysis methodologies that can be used at other U.S. Department of Energy (US DOE) complex sites where URS Corporation is involved.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Expected treatment dose construction and adaptive inverse planning optimization: Implementation for offline head and neck cancer adaptive radiotherapy

Purpose: To construct expected treatment dose for adaptive inverse planning optimization, and evaluate it on head and neck (h and n) cancer adaptive treatment modification. Methods: Adaptive inverse planning engine was developed and integrated in our in-house adaptive treatment control system. The adaptive inverse planning engine includes an expected treatment dose constructed using the daily cone beam (CB) CT images in its objective and constrains. Feasibility of the adaptive inverse planning optimization was evaluated retrospectively using daily CBCT images obtained from the image guided IMRT treatment of 19 h and n cancer patients. Adaptive treatment modification strategies with respect to the time and the number of adaptive inverse planning optimization during the treatment course were evaluated using the cumulative treatment dose in organs of interest constructed using all daily CBCT images. Results: Expected treatment dose was constructed to include both the delivered dose, to date, and the estimated dose for the remaining treatment during the adaptive treatment course. It was used in treatment evaluation, as well as in constructing the objective and constraints for adaptive inverse planning optimization. The optimization engine is feasible to perform planning optimization based on preassigned treatment modification schedule. Compared to the conventional IMRT, the adaptive treatment for h and n cancer illustrated clear dose-volume improvement for all critical normal organs. The dose-volume reductions of right and left parotid glands, spine cord, brain stem and mandible were (17 {+-} 6)%, (14 {+-} 6)%, (11 {+-} 6)%, (12 {+-} 8)%, and (5 {+-} 3)% respectively with the single adaptive modification performed after the second treatment week; (24 {+-} 6)%, (22 {+-} 8)%, (21 {+-} 5)%, (19 {+-} 8)%, and (10 {+-} 6)% with three weekly modifications; and (28 {+-} 5)%, (25 {+-} 9)%, (26 {+-} 5)%, (24 {+-} 8)%, and (15 {+-} 9)% with five weekly modifications. Conclusions: Adaptive treatment modification can be implemented including the expected treatment dose in the adaptive inverse planning optimization. The retrospective evaluation results demonstrate that utilizing the weekly adaptive inverse planning optimization, the dose distribution of h and n cancer treatment can be largely improved.

60 APPLIED LIFE SCIENCES↗

Review of Tools for Identifying, Planning, and Implementing Habitat Restoration for Pacific Salmon and Steelhead

Abstract A key challenge in watershed restoration is identifying the appropriate assessments, data, and analyses needed to identify disrupted natural processes, lost and degraded habitats, and limiting factors to ultimately identify and design successful restoration projects. This has proven particularly challenging for large restoration programs focused on recovery of threatened and endangered salmon and trout where numerous tools, models, and other assessments have been developed to assist with habitat restoration at the watershed, reach, and project scale. Unfortunately, it is often unclear which step in the restoration process these various assessment tools will actually address. To assist with identifying the appropriate assessment tool (e.g., model, data collection, analysis, and survey), we reviewed major categories of watershed restoration assessment tools to determine their goals, inputs, outputs, and their utility in helping plan, prioritize, and implement restoration actions. The major categories of assessment tools reviewed were: (1) life cycle and fish–habitat models, (2) watershed assessment methods and techniques, (3) reach assessments, (4) prioritization tools, and (5) common monitoring methods to identify, prioritize, and plan river and watershed restoration projects. We specifically indicated whether these assessment tools directly or indirectly assisted with the key steps in the restoration process that are required to develop successful restoration plans and projects. These steps involve assessing watershed conditions, identifying limiting habitats and life stages, identifying problems and restoration actions, selecting restoration techniques, prioritizing restoration actions, or designing actual restoration projects. It is important to recognize that no single assessment tool will address all the steps in the restoration process. Selecting appropriate assessment tools requires a clear understanding of the goals of the restoration program and which step in the restoration process will be addressed by a particular tool. We provide recommendations for how restoration practitioners and managers can use our review to help select the appropriate assessment tools needed for their watershed.

Roni, Philip↗

Soil Sampling Results for Closure of a Portion of Solid Waste Management Unit #16

The U.S. Department of Energy/National Nuclear Security Administration (DOE/ NNSA) and National Technology & Engineering Solutions of Sandia, LLC (NTESS), the management and operating contractor for Sandia National Laboratories/California (SNL/CA), has prepared this soil sampling results report for closure of a portion of Solid Waste Management Unit (SWMU) #16. The entire network of SNL/CA sanitary sewer lines, including building laterals, was identified as SWMU #16 under a Resource Conservation and Recovery Act (RCRA) Facility Assessment conducted for SNL/CA in April 1991 (DOE 1992). Along with the previous SWMU #16 investigation results (SNL/CA 2019), the results of this investigation are intended to support closure decisions by the San Francisco Bay Regional Water Quality Control Board (RWQCB), as discussed below. SNL/CA personnel completed upgrading its sanitary sewer discharge network in 2019. These upgrades included installing new sections of underground lines and decommissioning certain sections of the old piping system by capping in place. To date, several sections of the sewer line have been abandoned-in-place by capping as new sewer lines were installed or flow was rerouted to other existing lines. To formally close these abandoned sections of the sewer line, the RWQCB required that SNL/CA personnel collect soil samples to be analyzed for contaminants potentially released from the sewer lines. SNL/CA personnel hired Weiss Associates (Weiss) of Emeryville, California to prepare a sampling and analysis plan, implement the sampling plan and report the results of the investigation under Purchase Order #2166257. The Sampling and Analysis Plan for Partial Closure of Solid Waste Management Unit #16 (SAP) was submitted to the RWQCB on August 14, 2020 by Weiss on behalf of SNL/CA. The RWQCB approved the SAP on September 30, 2020 after Weiss updated the method detection limit and reporting limits for total polychlorinated biphenyls (PCBs) and individual aroclors. Soil sampling was conducted in accordance with the SAP except that fewer locations were sampled due to site constraints, as discussed below. This report presents the results of the sampling effort and documents all associated field activities including borehole clearing, soil sample collection, storage and transportation to the analytical laboratories, borehole backfilling and surface restoration, and storage of investigation-derived waste (IDW) for future profiling and disposal by SNL/CA waste management personnel.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Considerations for Developing a Regulatory Roadmap for Distributed Energy Resource (DER) Integration in Colombia

The USAID-NREL Partnership in Colombia, in conjunction with SURE and USEA, selected four action plan teams from the Young Professionals Leadership Program to receive tailored NREL technical assistance to support action plan implementation. The four plans selected represent various aspects associated with planning for the efficient integration of DERs, including electric mobility, residential and commercial energy applications, distributed generation modeling, and regulatory considerations. In response to national grid modernization, decentralization, digitalization, and electrification trends, CREG is looking to update Colombia's electric distribution code, with an emphasis on the integration of electric vehicles and charging stations, but also energy storage systems, non-conventional sources of renewable energy, and other distributed energy resources (DERs). CREG aims to establish the general steps that must be carried out to update the distribution code for the integration of DERs, with a view to the design and development of new markets. The objective of the TA provided to CREG was to support them in identifying and outlining the general processes and approaches to consider when updating Colombia's distribution code for the integration of electric vehicles, distributed renewable energy systems, and energy storage systems, with a view to the design and development of new markets.

24 POWER TRANSMISSION AND DISTRIBUTION↗

CWA 15793 2011 Planning and Implementation Tool

This software, built on an open source platform called Electron (runs on Chromium and Node.js), is designed to assist organizations in the implementation of a biorisk management system consistent with the requirements of the international, publicly available guidance document CEN Workshop Agreement 15793:2011 (CWA 15793). The software includes tools for conducting organizational gap analysis against CWA 15793 requirements, planning tools to support the implementation of CWA 15793 requirements, and performance monitoring support. The gap analysis questions are based on the text of CWA 15793, and its associated guidance document, CEN Workshop Agreement 16393:2012. The authors have secured permission from the publisher of CWA 15793, the European Committee for Standardization (CEN), to use language from the document in the software, with the understanding that the software will be made available freely, without charge.

Gross, Alan↗

Polar Drive Ignition Campaign: Conceptual Design

The Laboratory for Laser Energetics (LLE) at the University of Rochester is proposing a collaborative effort with Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratories (LANL), the Naval Research Laboratory (NRL), and General Atomics (GA) with the goal of developing a cryogenic polar drive (PD) ignition platform on the National Ignition Facility (NIF). The scope of this proposed project requires close discourse among theorists, experimentalists, and laser and system engineers. This document describes how this proposed project can be broken into a series of parallel independent activities that, if implemented, could deliver this goal in the 2017 timeframe. This Conceptual Design document is arranged into two sections: mission need and design requirements. Design requirements are divided into four subsystems: (1) A point design that details the necessary target specifications and laser pulse requirements; (2) The beam smoothing subsystem that describes the MultiFM 1D smoothing by spectral dispersion (SSD); (3) New optical elements that include continuous phase plates (CPP's) and distributed polarization rotators (DPR's); and (4) The cryogenic target handling and insertion subsystem, which includes the design, fabrication, testing, and deployment of a dedicated PD ignition target insertion cryostat (PD-ITIC). This document includes appendices covering: the primary criteria and functional requirements, the system design requirements, the work breakdown structure, the target point design, the experimental implementation plan, the theoretical unknowns and technical implementation risks, the estimated cost and schedule, the development plan for the DPR's, the development plan for MultiFM 1D SSD, and a list of acronym definitions. While work on the facility modifications required for PD ignition has been in progress for some time, some of the technical details required to define the specific modifications for a Conceptual Design Review (CDR) remain to be defined. In all cases, the facility modifications represent functional changes to existing systems or capabilities. The bulk of the scope yet to be identified is associated with the DPR's and MultiFM beam smoothing. Detailed development plans for these two subsystems are provided in Appendices H and I; additional discussion of subsystem requirements based on the physics of PD ignition is given in Section 3. Accordingly, LLE will work closely with LLNL to develop detailed conceptual designs for the PD-specific facility modifications, including assessments of the operational impact of implementation (e.g., changing optics for direct rather than indirect-drive illumination and swapping from a hohlraum-based ITIC to one that supports PD). Furthermore, the experimental implementation plan represents the current best understanding of the experimental campaigns required to achieve PD ignition. This plan will evolve based on the lessons learned from the National Ignition Campaign (NIC) and ongoing indirect-drive ignition experiments. The plan does not take the operational realities of the PD configuration into account; configuration planning for the proposed PD experiments is beyond the scope of this document.

42 ENGINEERING↗

SU-E-T-332: Dosimetric Impact of Photon Energy and Treatment Technique When Knowledge Based Auto-Planning Is Implemented in Radiotherapy of Localized Prostate Cancer

Purpose: The aim of this study was to investigate the dosimetric impact of the combination of photon energy and treatment technique on radiotherapy of localized prostate cancer when knowledge based planning was used. Methods: A total of 16 patients with localized prostate cancer were retrospectively retrieved from database and used for this study. For each patient, four types of treatment plans with different combinations of photon energy (6X and 10X) and treatment techniques (7-field IMRT and 2-arc VMAT) were created using a prostate DVH estimation model in RapidPlan™ and Eclipse treatment planning system (Varian Medical System). For any beam arrangement, DVH objectives and weighting priorities were generated based on the geometric relationship between the OAR and PTV. Photon optimization algorithm was used for plan optimization and AAA algorithm was used for final dose calculation. Plans were evaluated in terms of the pre-defined dosimetric endpoints for PTV, rectum, bladder, penile bulb, and femur heads. A Student’s paired t-test was used for statistical analysis and p > 0.05 was considered statistically significant. Results: For PTV, V95 was statistically similar among all four types of plans, though the mean dose of 10X plans was higher than that of 6X plans. VMAT plans showed higher heterogeneity index than IMRT plans. No statistically significant difference in dosimetry metrics was observed for rectum, bladder, and penile bulb among plan types. For left and right femur, VMAT plans had a higher mean dose than IMRT plans regardless of photon energy, whereas the maximum dose was similar. Conclusion: Overall, the dosimetric endpoints were similar regardless of photon energy and treatment techniques when knowledge based auto planning was used. Given the similarity in dosimetry metrics of rectum, bladder, and penile bulb, the genitourinary and gastrointestinal toxicities should be comparable among the selections of photon energy and treatment techniques.

60 APPLIED LIFE SCIENCES↗

National Emission Standards for Hazardous Air Pollutants for Major Sources: Industrial, Commercial, and Institutional Boilers - Guidance for Calculating Efficiency Credits Resulting from Implementation of Energy Conservation Measures

The purpose of this document is to provide guidance for developing a consistent approach to documenting efficiency credits generated from energy conservation measures in the Implementation Plan for boilers covered by the Boiler MACT rule (i.e., subpart DDDDD of CFR part 63). This document divides Boiler System conservation opportunities into four functional areas: 1) the boiler itself, 2) the condensate recovery system, 3) the distribution system, and 4) the end uses of the steam. This document provides technical information for documenting emissions credits proposed in the Implementation Plan for functional areas 2) though 4). This document does not include efficiency improvements related to the Boiler tune-ups.

Papar, Riyaz↗

National Emission Standards for Hazardous Air Pollutants for Major Sources: Industrial, Commercial, and Institutional Boilers - Guidance for Calculating Emission Credits Resulting from Implementation of Energy Conservation Measures

The purpose of this document is to provide guidance for developing a consistent approach to documenting efficiency credits generated from energy conservation measures in the Implementation Plan for boilers covered by the Boiler MACT rule (i.e., subpart DDDDD of CFR part 63). This document divides Boiler System conservation opportunities into four functional areas: 1) the boiler itself, 2) the condensate recovery system, 3) the distribution system, and 4) the end uses of the steam. This document provides technical information for documenting emissions credits proposed in the Implementation Plan for functional areas 2) though 4). This document does not include efficiency improvements related to the Boiler tune-ups.

boiler↗

FCC-ee: The Lepton Collider

Particle physics has arrived at an important moment of its history. The discovery of the Higgs boson, with a mass of 125 GeV, completes the matrix of particles and interactions that has constituted the “Standard Model” for several decades. This model is a consistent and predictive theory, which has so far proven successful at describing all phenomena accessible to collider experiments. On the other hand, several experimental facts do require the extension of the Standard Model and explanations are needed for observations such as the domination of matter over antimatter, the evidence for dark matter and the non-zero neutrino masses. Theoretical issues that need to be addressed include the hierarchy problem, the neutrality of the Universe, the stability of the Higgs boson mass upon quantum corrections and the strong CP problem. This report contains the description of a novel research infrastructure based on a highest-luminosity energy frontier electron-positron collider (FCC-ee) to address the open questions of modern physics. It will be a general precision instrument for the continued in-depth exploration of nature at the smallest scales, optimised to measure precisely the properties of the Higgs boson at the per-cent level, the Z and W bosons, the top quark and the Higgs coupling to the Z at the per-mil level. FCC-ee will provide unprecedented sensitivity to signs of new physics appearing either in the form of small deviations from the Standard Model or as rare decay processes. This collider will be implemented in stages, successively spanning the entire energy range from the Z pole over the WW threshold and H production peak to the t"t" ̅ threshold. Most of the infrastructure (e.g. underground structures, surface sites, electrical distribution, cooling & ventilation, RF systems) can be directly re-used for a subsequent highest-energy hadron collider (described in the FCC conceptual design report volume 3), serving the world-wide particle-physics community in a highly synergetic and cost-effective manner throughout the 21st century. The European Strategy for Particle Physics (ESPP) update 2013 stated “To stay at the forefront of particle physics, Europe needs to be in a position to propose an ambitious post-LHC accelerator project at CERN by the time of the next Strategy update”. The FCC study has implemented the ESPP recommendation by developing a long-term vision for an “accelerator project in a global context”. This document describes the detailed design and preparation of a construction project for a post-LHC circular lepton collider “in collaboration with national institutes, laboratories and universities worldwide”, and enhanced by a strong participation of industrial partners. Now, a coordinated preparation effort can be based on a core of an ever-growing consortium of already more than 135 institutes worldwide. The technology for constructing a high-energy, highest-luminosity circular lepton collider exists today. The FCC-ee concept comprises a power-saving twin-aperture magnet system, a continuous top-up injection scheme for stable operation and maximum integrated luminosity. Combined with an energy staging scheme, the FCC-ee represents the most efficient and most sustainable route for executing the research required to discover signs of new physics beyond the Standard Model. The step-wise energy increase of the FCC-ee does not require any additional civil engineering activities. Strategic R&D for FCC-ee aims at minimising construction cost and energy consumption, while maximising the socio-economic impact. It will mitigate residual technology-related risks and ensure that industry can benefit from an acceptable economic utility. Concerning the implementation, a preparatory phase of about eight years is both necessary and adequate to establish the project governance and organisation structures, building the international machine and experiment consortia, developing a territorial implementation plan in agreement with the host-states’ requirements, optimising the disposal of land and underground volumes and preparing the civil engineering project. Such a large-scale, international fundamental research infrastructure, tightly involving industrial partners and providing training at all education levels, will be a strong motor of economic and societal development in all participating nations. The FCC study has implemented a set of actions towards a coherent vision for the world-wide high-energy and particle physics community, providing a collaborative framework for topically complementary and geographically well-balanced contributions. This conceptual design report lays the foundation for a subsequent infrastructure preparatory and technical design phase.

43 PARTICLE ACCELERATORS↗

Spectrum Interference from Commercial devices in 6 & 7/8 GHz

FCC repurposed spectrum in the 6 GHz band allocated to DOE for commercial use of Wi-Fi 6E/7 in 2020.The 2024 National Spectrum Strategy (NSS) implementation plan is now considering 7/8 GHz band as well for co-existence of commercial devices with federal incumbents such as DOE. This poster summarizes INL’s work on a scientific study on the potential harmful interference caused by the commercial devices in real-world scenarios. It includes research in INL for the following projects funded by DOE: 1) DOE-CIO: Spectrum security for advanced wireless technologies; 2) DOE-OE: 7 GHz Spectrum interference study; 3) DOE-CESER: Harmful interference in 6 GHz from commercial Wi-Fi 6E/7 devices on utility links in the energy sector; 4) DOE/NTIA for NSS Implementation plan: Interference study in 7/8 GHz bands identified in the NSS. 5) NSF: Spectrum Innovation Initiative- National Radio Dynamic Zones (SII-NRDZ).

6 GHz↗

Energy Options Analysis Project (Final Report)

This Bear River Band of Rohnerville Rancheria (BRB) Energy Options Analysis Project provides a rigorous and comprehensive near-term renewable energy implementation plan that aligns with the BRB’s long term strategic vision of “zero net annual utility energy consumption.” Final recommendations were arrived at by following four key project phases:A gas and electricity load assessment was conducted for all existing buildings using historic consumption data, and projected loads of new or anticipated buildings using building designs. A renewable energy resource assessment was conducted that estimated the gross generation potential of solar and wind, constrained to areas that could potentially be developed. Other renewable generation technologies were not considered feasible to meet the loads of the BRB. Demand-side efficiency and fuel switching opportunities were identified that can reduce electrical and gas consumption. These opportunities were not integrated into the load assessment in order to provide a conservative implementation plan, but are recommended to be pursued in order to cost-optimize projects during a feasibility assessment. A strategic vision advisory committee was organized and consulted when iterating on the viability of possible projects. These project phases resulted in finalizing the following three solar PV projects for the near term, which also lay the foundation for a future community-scale or multiple-facility microgrid for added resiliency. Additional solar PV on the hillside south of the Tish-Non Community Center. Solar plus battery storage microgrid at the Pump & Play fuel station. Solar PV at the Casino.

14 SOLAR ENERGY↗

Approaches for Planning and Implementing Sustainable Energy Growth in a Complex World: Preprint

The subject of sustainable energy development has been widely discussed and debated in recent years. However, despite widespread interest, progress toward this goal has been limited. This paper will build on current thinking related to sustainable development, energy forecasting, and complexity theory and show how past roadmapping methodologies fall short. While proposing ways of thinking aboutour responses to global changes, we consider how we can create and discover the pathways through those unpredictable changes toward high global renewables penetration.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Oak Ridge National Laboratory Support of Non-light Water Reactor Technologies: Capabilities Assessment for NRC Near-term Implementation Action Plans for Non-light Water Reactors

The Oak Ridge National Laboratory (ORNL) has a rich history of support for light water reactor (LWR) and non-LWR technologies. The ORNL history involves operation of 13 reactors at ORNL including the graphite reactor dating back to World War II, two aqueous homogeneous reactors, two molten salt reactors (MSRs), a fast-burst health physics reactor, and seven LWRs. Operation of the High Flux Isotope Reactor (HFIR) has been ongoing since 1965. Expertise exists amongst the ORNL staff to provide non-LWR training; support evaluation of non-LWR licensing and safety issues; perform modeling and simulation using advanced computational tools; run laboratory experiments using equipment such as the liquid salt component test facility; and perform in-depth fuel performance and thermal-hydraulic technology reviews using a vast suite of computer codes and tools. Summaries of this expertise are included in this paper.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗