Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “INJECTION WELLS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 Solid Waste Management Unit #041 Year 4 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 4 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 4 PMR extends from November 2022 through September 2023. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 4 reporting period was approximately 94%, with the majority of downtime attributed to associated groundwater sampling events, maintenance, and Hurricane Nicole. Almost five million gallons of groundwater were treated during Year 4 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 99%. This PMR describes the activities that were performed during Year 4 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 4 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 4 plume conditions. A supplemental DPT study conducted in 2022 and 2023. This study indicated that low-concentration plume conditions, where concentrations exceed State of Florida Groundwater Cleanup Target Levels, expanded westward to Kennedy Parkway North and northward to the vicinity of the railroad tracks. Based on these results, recommendations were made to install 14 wells to monitor the downgradient and boundary conditions of the expanded LCP. The contents of this Year 4 PMR were presented during the November 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Policy, Regulatory, Legal, and Permitting Case Study Subtask 3.2 – Topical Report

This report summarizes the policy, regulatory, legal, and permitting requirements to-date for the siting of a CO 2 injection and storage project in the CarbonSAFE Illinois East Sub-Basin pre-feasibility study area. Where applicable, the East Sub-Basin case study focuses on a proposed carbon capture and storage (CCS) site location in West Terre Haute, Indiana. Indiana has established the legal mechanisms to obtain rights to the subsurface mineral estate with the expectation to apply to reservoir pore space for CO 2 storage in an analogous manner to storage of natural gas, which is a common practice in Indiana. There is, however, no precedent in Indiana to take liability for stored CO 2 . There are currently no Indiana State incentives for CCS, but at the Federal level, tax credits for carbon capture and storage under 26. U.S. Code § 45Q constitute the greatest incentive targeted at CCS projects. The amendment to these credits put forth in the Bipartisan Budget Act (the FUTURE Act) of 2018 substantially increases the per-ton incentive for CCS—from $22.66 per ton in tax year 2017 up to $50 per ton in tax year 2027, for CO 2 not used as an injectant (i.e. saline storage). Additional economic opportunities may exist for the provision of CO 2 for potential EOR in the Illinois Basin. Policies that may support the development of CO 2 pipelines and/or CCS projects in Indiana include: 1) Title 41 of the FAST Act (2015), which created a new governance structure, procedures, and funding authorities in order to improve and expedite Federal review and authorization of covered infrastructure projects, including pipelines, and 2) the Eminent Domain for Transportation of Carbon Dioxide by Pipeline (IC 14-39, Indiana State, 2011), which declares pipeline transportation of CO 2 exclusively to a carbon management application, including sequestration, enhanced oil recovery, and deep saline injection as a benefit to the welfare of Indiana and the people. The US Environmental Protection Agency’s (EPA) Underground Injection Control (UIC) Program Class VI rule and permit requirements address all components pertaining to CO 2 injection and monitoring for long-term storage, and outline the minimum technical criteria to protect underground sources of drinking water at, and surrounding, injection well sites. The Class VI requirements also address financial responsibility for corrective action, post-injection site care, and site closure. In addition, UIC Program public notice requirements include that the EPA issue notice of the draft permit preparation to key stakeholders, and open a public comment period of not less than 30 days. A public hearing about the permit would also be held, if specifically requested by the public. A potential Class VI CO 2 injection well permit for the East Sub-Basin case study site would be obtained through the US EPA Region 5, because the State of Indiana does not have UIC Class VI primacy. Although no CO 2 injection wells have been permitted in Indiana, the US EPA Region 5 (which covers Illinois and Indiana) and the East Sub-Basin CarbonSAFE team (via the Midwest Geological Sequestration Consortium [MGSC]) have Class VI permitting experience from several projects located in Illinois. Based on our experience, applying for a Class VI permit can be an intensive and iterative process requiring clear communication and numerous interactions with EPA staff. In addition to gathering and preparing the data/models and documentation necessary for a permit application’s initial submittal, the subsequent public comments, EPA response and review, and answering of any follow-up questions/requests by the EPA could significantly increase the timeframe of draft permit issuance. The US EPA offers guidance documents regarding the specific Class VI permit requirements, and shows a general permitting timeline example from the FutureGen Alliance 2.0 covering one-and-a-half years from permit submittal to issuance. However, the overall permitting process to-date has a high degree of variability, and in MGSC’s project experience we observed a more extended timeline to receive Class VI permits for each of two CO 2 injection wells.

01 COAL, LIGNITE, AND PEAT↗

Geochemical Enhancement Of Enhanced Geothermal System Reservoirs: An Integrated Field And Geochemical Approach

The geochemical effects of injecting fluids into geothermal reservoirs are poorly understood and may be significantly underestimated. Decreased performance of injection wells has been observed in several geothermal fields after only a few years of service, but the reasons for these declines has not been established. This study had three primary objectives: 1) determine the cause(s) of the loss of injectivity; 2) utilize these observations to constrain numerical models of water-rock interactions; and 3) develop injection strategies for mitigating and reversing the potential effects of these interactions. In this study rock samples from original and redrilled injection wells at Coso and the Salton Sea geothermal fields, CA, were used to characterize the mineral and geochemical changes that occurred as a result of injection. The study documented the presence of mineral scales and at both fields in the reservoir rocks adjacent to the injection wells. At the Salton Sea, the scales consist of alternating layers of fluorite and barite, accompanied by minor anhydrite, amorphous silica and copper arsenic sulfides. Amorphous silica and traces of calcite were deposited at Coso. The formation of silica scale at Coso provides an example of the effects of untreated (unacidified) injectate on the reservoir rocks. Scanning electron microscopy and X-ray diffractometry were used to characterize the scale deposits. The silica scale in the reservoir rocks at Coso was initially deposited as spheres of opal-A 1-2 micrometers in diameter. As the deposits matured, the spheres coalesced to form larger spheres up to 10 micrometer in diameter. Further maturation and infilling of the spaces between spheres resulted in the formation of plates and sheets that substantially reduce the original porosity and permeability of the fractures. Peripheral to the silica deposits, fluid inclusions with high water/gas ratios provide a subtle record of interactions between the injectate and reservoir rocks. In contrast, fluid inclusions trapped prior to injection are relatively gas rich. These results suggest that the rocks undergo extensive microfracturing during injection and that the composition of the fluid inclusions will be biased toward the youngest event. Interactions between the reservoir rocks and injectate were modeled using the non-isothermal reactive geochemical transport code TOUGHREACT. Changes in fluid pH, fracture porosity, fracture permeability, fluid temperature, and mineral abundances were monitored. The simulations predict that amorphous silica will precipitate primarily within a few meters of the injection well and that mineral deposition will lead to rapid declines in fracture porosity and permeability, consistent with field observations. In support of Enhanced Geothermal System development, petrologic studies of Coso well 46A-19RD were conducted to determine the regions that are most likely to fail when stimulated. These studies indicate that the most intensely brecciated and altered rocks in the zone targeted for stimulation (below 10,000 ft (3048 m)) occur between 11,200 and 11,350 ft (3414 and 3459 m). This zone is interpreted as a shear zone that initially juxtaposed quartz diorite against granodiorite. Strong pervasive alteration and veining within the brecciated quartz diorite and granodiorite suggest this shear zone was permeable in the past. This zone of weakness was subsequently exploited by a granophyre dike whose top occurs at 11,350 ft (3459 m). The dike is unaltered. We anticipate, based on analysis of the well samples that failure during stimulation will most likely occur on this shear zone.

15 GEOTHERMAL ENERGY↗

Analysis of Hydrology and Interim Measure Performance in the Chromium Plume at Los Alamos National Laboratory - 20498

Hexavalent chromium, Cr(VI), is present in the regional aquifer beneath Los Alamos National Laboratory (LANL) at concentrations greater than the New Mexico groundwater standard (50 ppb). The source of the Cr is blowdown from a power plant where potassium dichromate was used as a corrosion inhibitor from 1956 to 1972. Blowdown comingled with effluent from another source and migrated approximately 3 miles down a canyon, primarily as surface flow, until reaching an alluvial infiltration zone. The infiltrating water moved vertically through a thick (approximately 900 ft), complex stratigraphic sequence of unsaturated tuffs, basalt, and unconsolidated alluvial deposits. Horizontal transport also took place within spatially limited perched groundwater horizons in the vadose zone (VZ). Breakthrough at the regional aquifer water table is thought to have occurred in multiple hydraulic windows or 'drip points' located approximately 3 miles from the initial release site at the power plant. The regional aquifer is highly heterogeneous and anisotropic, and displays unconfined behavior in an upper zone and confined behavior at depth. The Cr(VI) contamination has so far remained confined to the upper approximately 25 m of the aquifer. The ambient hydraulic gradient in the regional aquifer is toward the east/southeast, but the water table is extremely flat in the Cr plume area compared to surrounding areas. There is some local variability in flow direction, potentially related to effects of seasonal pumping from nearby Los Alamos county water-supply wells, which draw from the regional aquifer several hundred feet below the water table. An interim measure (IM) is currently operating at the site to achieve hydraulic control of plume migration using a series of extraction wells, ion-exchange treatment, and injection along the downgradient portion of the plume. The migration of Cr contamination in the aquifer has been previously evaluated using a calibrated probabilistic numerical model, which has also been used to design the spatial configuration of extraction and injection wells for the IM, and to identify locations for monitoring wells. The model is built using the Finite Element Heat and Mass (FEHM) transfer code, and the Model Analysis and Decision Support (MADS) software is used for analyses. To date, the portion of the IM system that has operated in a continuous manner has been very effective at hydraulic control. Modifications to the flow field associated with the influence of IM pumping and injection are evaluated here, with modeling constraints to be provided by recent observations of tracers injected into both monitoring wells and IM injection wells, as well as opportunistic observations of geochemical signatures of treated ion-exchange effluent injected into IM injection wells. The tracer and geochemical data provide insights into modified flow directions within the Cr plume area that cannot be otherwise obtained. Results of the modeling work are being used to inform adaptive management of IM operations and will be a valuable tool for development and refinement of long-term remediation strategies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydraulic Response to Thermal Stimulation Efforts at Raft River Based on Stepped Rate Injection Testing

The injection well stimulation project at the Raft River geothermal field tests the effect of long-term cold water injection and high pressure injection on well injectivity, improvements to which could reduce operating costs. The primary data for analysis and interpretation of the injection test are step-rate flow tests run before each new phase of the injection. These tests were analyzed using a combination of standard pump-test analytical solution methods and methods developed expressly for the observed conditions. The stepped rate injection tests, combined with long-term flow and pressure response data suggest that the well is located within a fractured formation of low transmissivity but high storativity. These calculated parameters appeared to increase with pressure during the first injection test and the higher values were reproduced during the second stepped rate test. Calculated transmissivity and storativity are on the order of 4E-5 m cm 2 and 1E-4 m Pa -1 , respectively. The apparent pressure dependence of fitted hydraulic parameters may reflect near-well fracture compliance that increased the effective radius of the wellbore during the first test. While the type curve fit analysis also suggests that the reservoir behaves as a uniformly fractured reservoir with a radial flow regime, the hydraulic parameters indicate that condition may exist only a very limited distance (<10 m) from the well. Longer-term pressure response suggests that flow in the system effectively reaches steady state in a period of less than a day, which may reflect pressure stabilization resulting from pressure-dependent permeability or a region of much higher permeability located with a few meters of the well. The transmissivity estimates obtained from this analysis, converted to approximate fracture density and aperture, provide useful constraints on the distance to which the thermal front may migrate from the well during the cold water injection phase of the stimulation project. We estimate that the cooling front will migrate less than a tenth of a kilometer over an approximately one-year injection period. Here, the effects of that cooling, however, may be substantial, because increases in permeability have maximum effect nearest the well.

cold water injection↗

Large-Scale Pumping Test Recommendations for the 200-ZP-1 Operable Unit

CH2M Hill Plateau Remediation Company (CHPRC) is currently assessing aquifer characterization needs to optimize pump-and-treat remedial strategies (e.g., extraction well pumping rates, pumping schedule/design) in the 200-ZP-1 operable unit (OU), and in particular for the immediate area of the 241 TX-TY Tank Farm. Specifically, CHPRC is focusing on hydrologic characterization opportunities that may be available for newly constructed and planned ZP-1 extraction wells. These new extraction wells will be used to further refine the 3-dimensional subsurface contaminant distribution within this area and will be used in concert with other existing pump-and-treat wells to remediate the existing carbon tetrachloride contaminant plume. Currently, 14 extraction wells are actively used in the Interim Record of Decision ZP-1 pump-and-treat system for the purpose of remediating the existing carbon tetrachloride contamination in groundwater within this general area. As many as 20 new extraction wells and 17 injection wells may be installed to support final pump-and-treat operations within the OU area. It should be noted that although the report specifically refers to the 200-ZP-1 OU, the large-scale test recommendations are also applicable to the adjacent 200-UP-1 OU area. This is because of the similar hydrogeologic conditions exhibited within these two adjoining OU locations.

54 ENVIRONMENTAL SCIENCES↗

Discharge Permit-1845 Quarterly Status Report October 2018

Trichloroethene (TCE) and nitrate have been identified as constituents of concern in groundwater at the Sandia National Laboratories, New Mexico (SNL/NM) Technical Area (TA)-V Groundwater (TAVG) Area of Concern (AOC) based on detections above the U.S. Environmental Protection Agency (EPA) maximum contaminant level (MCL) in samples collected from monitoring wells. The EPA MCLs and the State of New Mexico drinking water standards for TCE and nitrate are 5 micrograms per liter and 10 milligrams per liter (as nitrogen), respectively. A phased Treatability Study/Interim Measure (TS/IM) of in-situ bioremediation (ISB) is being implemented to evaluate the effectiveness of ISB as a potential technology to treat the groundwater contamination at the TAVG AOC (New Mexico Environment Department [NMED] April 2016). The NMED Hazardous Waste Bureau (HWB) approved the Revised Treatability Study Work Plan (TSWP) (SNL/NM March 2016) in May 2016 (NMED May 2016). The SNL/NM Environmental Restoration Operations personnel are responsible for implementing the TS/IM of ISB at TAVG AOC in accordance with the Revised TSWP. Per the Revised TSWP, up to three injection wells (TAV-INJ1, TAV-INJ2, and TAV-INJ3) would be installed at TA-V in the vicinity of the highest contaminant concentrations detected in groundwater at monitoring wells LWDS-MW1, TAV-MW6, and TAV-MW10. The injection wells would be used to gravity-inject substrate solution and biodegradation bacteria to groundwater. The substrate solution consists of an inert tracer as well as essential food and nutrients for biostimulation. The substrate solution would be prepared in aboveground tanks. The TS/IM would be conducted in two phases: Phase I includes a pilot test followed by full-scale injection at the first injection well (TAV-INJ1); Phase II includes full-scale injections at the second and third injection wells (TAV-INJ2 and TAV-INJ3). The NMED Ground Water Quality Bureau (GWQB) requires a groundwater Discharge Permit (DP) for the operation of injection wells. NMED GWQB issued the DP-1845 to the U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA) for the SNL/NM TA-V Treatability Study injection wells on May 26, 2017 (NMED May 2017). The DP-1845 term started on May 30, 2017 and ends on May 30, 2022. Attachment A provides a copy of DP-1845. This quarterly report provides responses to DP-1845 Operating Conditions Terms and Conditions #3 through #8 and Monitoring and Reporting Terms and Conditions #10 through #17 for the April 1 to June 30, 2018 reporting period. The other Terms and Conditions are NMED statements of fact and do not require a response.

54 ENVIRONMENTAL SCIENCES↗

Developing a Prototype Methodology to Rank CO2-EOR Wells and Assess Their Reuse Potential for Geologic Carbon Storage

This paper presents a prototype methodology to assess the possible transition of Class II carbon dioxide-enhanced oil recovery (CO2-EOR) wells to Class VI wells. The focus is on wellbore construction materials—casing, cement, tubing, and the packer—and includes comprehensive workflows to evaluate these materials, with primary emphasis on compliance with Environmental Protection Agency (EPA) Class VI well construction and conversion guidelines. These workflows systematically assess material properties and performance criteria to ensure regulatory compliance and optimize long-term wellbore integrity and functionality. Utilizing Python scripts and JavaScript Object Notation (JSON) representations, the study automates checks on digitized Texas Railroad Commission (TRRC) data to rank wells based on workflow criteria. By emphasizing critical factors such as casing integrity, cementing techniques, tubing compatibility, and packer selection, the methodology helps well owners and operators prioritize wells for potential reuse as CO2 injection wells. Given limitations in digitized data, manual user verification is required in some sections. Future improvements include integrating non-digitized data through web scraping and machine learning techniques. This research serves as a practical guide for stakeholders, supporting environmental compliance and sustainable well operations.

geologic carbon sequestration↗

The effects of gas-fluid-rock interactions on CO2 injection and storage: Insights from reactive transport modeling

Possible means of reducing atmospheric CO{sub 2} emissions include injecting CO{sub 2} in petroleum reservoirs for Enhanced Oil Recovery or storing CO{sub 2} in deep saline aquifers. Large-scale injection of CO{sub 2} into subsurface reservoirs would induce a complex interplay of multiphase flow, capillary trapping, dissolution, diffusion, convection, and chemical reactions that may have significant impacts on both short-term injection performance and long-term fate of CO{sub 2} storage. Reactive Transport Modeling is a promising approach that can be used to predict the spatial and temporal evolution of injected CO{sub 2} and associated gas-fluid-rock interactions. This presentation will summarize recent advances in reactive transport modeling of CO{sub 2} storage and review key technical issues on (1) the short- and long-term behavior of injected CO{sub 2} in geological formations; (2) the role of reservoir mineral heterogeneity on injection performance and storage security; (3) the effect of gas mixtures (e.g., H{sub 2}S and SO{sub 2}) on CO{sub 2} storage; and (4) the physical and chemical processes during potential leakage of CO{sub 2} from the primary storage reservoir. Simulation results suggest that CO{sub 2} trapping capacity, rate, and impact on reservoir rocks depend on primary mineral composition and injecting gas mixtures. For example, models predict that the injection of CO{sub 2} alone or co-injection with H{sub 2}S in both sandstone and carbonate reservoirs lead to acidified zones and mineral dissolution adjacent to the injection well, and carbonate precipitation and mineral trapping away from the well. Co-injection of CO{sub 2} with H{sub 2}S and in particular with SO{sub 2} causes greater formation alteration and complex sulfur mineral (alunite, anhydrite, and pyrite) trapping, sometimes at a much faster rate than previously thought. The results from Reactive Transport Modeling provide valuable insights for analyzing and assessing the dynamic behaviors of injected CO{sub 2}, identifying and characterizing potential storage sites, and managing injection performance and reducing costs.

54 ENVIRONMENTAL SCIENCES↗

Method for carbon dioxide sequestration

A method for geo-sequestration of a carbon dioxide includes selection of a target water-laden geological formation with low-permeability interbeds, providing an injection well into the formation and injecting supercritical carbon dioxide (SC--CO.sub.2) into the injection well under conditions of temperature, pressure and density selected to cause the fluid to enter the formation and splinter and/or form immobilized ganglia within the formation. This process allows for the immobilization of the injected SC--CO.sub.2 for very long times. The dispersal of scCO2 into small ganglia is accomplished by alternating injection of SC--CO.sub.2 and water. The injection rate is required to be high enough to ensure the SC--CO.sub.2 at the advancing front to be broken into pieces and small enough for immobilization through viscous instability.

54 ENVIRONMENTAL SCIENCES↗

Edible oil and MicroCED{sup TM} treatability study for enhanced attenuation of cVOCs at P Area, Savannah River Site - 15364

The purpose of the study is to evaluate the capability of Micro-organism Chlorinated Ethene Destruction (MicroCED) to degrade chlorinated volatile organic compounds (cVOCs) in an existing groundwater plume at the Savannah River Site (SRS). MicroCED is similar to other commercially sold Dehalococcoides microbes (i.e., BAV-1 and KB-1) that are used to degrade cVOCs in support of groundwater cleanup actions. However, a primary difference is that this microbe is indigenous to the Twin Lakes area near C Area at the SRS. The Savannah River National Laboratory (SRNL) and Clemson University have been studying the capability and toxicology of the microbe for many years. To assess the potential of MicroCED in an environmental setting, a Treatability Study [5] was developed and submitted to South Carolina Department of Health and Environmental Control (SCDHEC). Approval was received and implementation of the study was conducted during the dates of September 14, 2010 and September 30, 2011. During September - October 2010, approximately 423,966 liters of amendments (pH buffer [AquaBupH{sup TM}] and emulsified oil [EOS{sup TM}) and chase water were injected into a cVOC groundwater plume at P Area at a depth of 26 - 30.5 m below land surface. The amendments were injected to raise the groundwater pH and to convert an oxygenated groundwater system to a reducing environment better suited for MicroCED. MicroCED was injected in January and August 2011; however, only 140 liters of the 6,246 liters needed were injected. The insufficient number of growth chambers and project schedule limited the ability to grow and maintain the required amount of MicroCED needed for the study. Groundwater monitoring of the injection wells and monitoring points were conducted monthly to evaluate and assess changes to the existing cVOC groundwater plumes. Field data collected from the injection wells demonstrated a reducing environment suitable for MicroCED growth. However, nearby monitoring points located within the injection field did not indicate a change in groundwater chemistry. Further analysis of the injected material showed that the actual radius of influence was less than assumed. This resulted in conditions favorable for MicroCED growth to be located near the injection wells versus over a larger area, as expected. Data collected indicates biodegradation of the cVOCs via the MicroCED is encouraging but inconclusive. This could be a result of the insufficient quantity of MicroCED injected and limited time frame of monitoring after MicroCED injections. However, considering that the data were collected within six (6) months of the first MicroCED injection it could also be plausible that microbial growth is limited and is not measurable based on the time frame and quantity of microbes that were injected. But, concentrations of TCE metabolic products have been observed to increase as the study progressed and were most evident after the first MicroCED injection. Due to timing of the second MicroCED injection in August 2011, there are no data available to evaluate subsequent effects of this injection on cVOC concentrations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deep Vadose Zone Monitoring Test Bed (FY23 Status Report)

A subsurface air injection at the Hanford Site’s Deep Vadose Zone Monitoring Test Bed was completed to realize a change in subsurface hydrologic conditions in accordance with a soil desiccation remedy. The injection mimicked a previous injection at the site that was performed in accordance with a vadose zone treatability study. Unlike the previous test which relied on electrical methods only, the change in hydrologic conditions during the recent test was also monitored using cross-hole seismic sensing methods to assess the ability of the seismic methods to evaluate changes in moisture conditions of desiccated sediment at the field scale. Data from in situ neutron probes indicates a reduction of soil moisture in the vicinity of the injection well due to the air injection. Similar changes were observed in the time-lapse electrical resistivity and seismic data, which indicates a loss of soil moisture over time. Tomographic inversions of the time-lapse geophysical data illustrate the 2D and 3D features of the soil moisture distribution over time. Time-lapse electrical resistivity tomography (ERT) results show a reduction in the electrical conductivity of the subsurface in the vicinity of the injection well, with most changes occurring within the screened interval. Similar patterns are observed in the seismic tomography results, with both methods illustrating two lobe-shaped features of reduced soil moisture. Use of seismic and ERT technologies in tandem takes advantage of two complementary geophysical monitoring technologies, providing increased sensitivity to specific hydrologic conditions. The multiphysics approach, therefore, has the potential to improve the ability to estimate subsurface moisture conditions from sensor-based and remotely sensed geophysical data that will ultimately improve the ability of remediation contractors to evaluate remedy performance.

58 GEOSCIENCES↗

Method for carbon dioxide sequestration

A method for geo-sequestration of a carbon dioxide includes selection of a target water-laden geological formation with low-permeability interbeds, providing an injection well into the formation and injecting supercritical carbon dioxide (SC-CO.sub.2) and water or bine into the injection well under conditions of temperature, pressure and density selected to cause the fluid to enter the formation and splinter and/or form immobilized ganglia within the formation.

54 ENVIRONMENTAL SCIENCES↗

COMPARISON OF THREE TRACER TESTS AT THE RAFT RIVER GEOTHERMAL SITE

Three conservative tracer tests have been conducted through the Bridge Fault fracture zone at the Raft River Geothermal (RRG) site. All three tests were conducted between injection well RRG-5 and production wells RRG-1 (790 m distance) and RRG-4 (740 m distance). The injection well is used during the summer months to provide pressure support to the production wells. The first test was conducted in 2008 using 136 kg of fluorescein tracer. Two additional tracers were injected in 2010. The first 2010 tracer injected was 100 kg fluorescein disodium hydrate salt on June, 21. The second tracer (100 kg 2,6-naphthalene disulfonic acid sodium salt) was injected one month later on July 21. Sampling of the two productions wells is still being performed to obtain the tail end of the second 2010 tracer test. Tracer concentrations were measured using HPLC with a fluorescence detector. Results for the 2008 test, suggest 80% tracer recover at the two production wells. Of the tracer recovered, 85% of tracer mass was recovered in well RRG-4 indicating a greater flow pathway connection between injection well and RRG-4 than RRG-1. Fluorescein tracer results appear to be similar between the 2008 and 2010 tests for well RRG-4 with peak concentrations arriving approximately 20 days after injection despite the differences between the injection rates for the two tests (~950 gpm to 475 gpm) between the 2008 and 2010. The two 2010 tracer tests will be compared to determine if the results support the hypothesis that rock contraction along the flow pathway due to the 55 oC cooler water injection alters the flow through the ~140 oC reservoir.

15 GEOTHERMAL ENERGY↗

Coupled reservoir-geomechanical analysis of CO2 injection and ground deformations at In Salah, Algeria

In Salah Gas Project in Algeria has been injecting 0.5-1 million tonnes CO{sub 2} per year over the past five years into a water-filled strata at a depth of about 1,800 to 1,900 m. Unlike most CO{sub 2} storage sites, the permeability of the storage formation is relatively low and comparatively thin with a thickness of about 20 m. To ensure adequate CO{sub 2} flow-rates across the low-permeability sand-face, the In Salah Gas Project decided to use long-reach (about 1 to 1.5 km) horizontal injection wells. In an ongoing research project we use field data and coupled reservoir-geomechanical numerical modeling to assess the effectiveness of this approach and to investigate monitoring techniques to evaluate the performance of a CO{sub 2}-injection operation in relatively low permeability formations. Among the field data used are ground surface deformations evaluated from recently acquired satellite-based inferrometry (InSAR). The InSAR data shows a surface uplift on the order of 5 mm per year above active CO{sub 2} injection wells and the uplift pattern extends several km from the injection wells. In this paper we use the observed surface uplift to constrain our coupled reservoir-geomechanical model and conduct sensitivity studies to investigate potential causes and mechanisms of the observed uplift. The results of our analysis indicates that most of the observed uplift magnitude can be explained by pressure-induced, poro-elastic expansion of the 20 m thick injection zone, but there could also be a significant contribution from pressure-induced deformations within a 100 m thick zone of shaly sands immediately above the injection zone.

54 ENVIRONMENTAL SCIENCES↗

Analysis of Microseismicity and Reactivated Fault Size to Assess the Potential for Felt Events by CO 2 Injection in the Illinois Basin

The results of monitoring of carbon dioxide (CO 2 ) injection at the Illinois Basin—Decatur Project (IBDP) and the companion Illinois Industrial Carbon Capture and Sequestration Sources (IL-ICCS) project—have shown that reservoir response to fluid pressure changes can vary significantly at different injection locations within the same reservoir. Predrill reservoir characterization is important to identify potentially seismogenic faults. However, interpretations of newly reprocessed 3D seismic reflection data illustrate the challenges related to their identification in a region dominated by faulting with small vertical offsets. Faults interpreted in the 3D seismic volume range from ~300 to 1200 m wide and are in the same size range as faults that could have been the source of historical events up to Mw 2.7 in central Illinois. The array of monitoring sensors that was installed for the IBDP continues to collect data, as injection operates in IL-ICCS, the second injection well. CO 2 injection rates for the IL-ICCS well are on average 1.7 times the rates injected in the IBDP well, but a significantly reduced rate of induced seismicity is observed. This article presents results of passive seismic monitoring for the duration of the project to date, integrating active and passive seismic data to develop a new interpretation of the subsurface structure at the Decatur site that explicitly identifies pathways for fluid flow into the basement leading to induced seismicity, and provides a geological explanation for the sharp reduction of induced seismicity during injection at higher rates into the second well. The use of seismic moment to estimate the length of seismogenic slip planes in the local subsurface suggests that faults large enough to produce felt seismicity are unlikely to be present at or near the Decatur site.

Geochemistry & Geophysics↗

Geomechanical simulation of the stress tensor rotation caused by injection of cold water in a deep geothermal reservoir

We present a three-dimensional thermohydromechanical numerical study of the evolution and distribution of the stress tensor within the northwest part of The Geysers geothermal reservoir (in California), including a detailed study of the region around one injection well from 2003 to 2012. Initially, after imposing a normal faulting stress regime, we calculated local changes in the stress regime around injection wells. Our results were compared with previously published studies in which the stress state was inferred from inverting the focal plane mechanism of seismic events. Our main finding is that changes in stress tensor orientation are caused by injection-induced progressive cooling of the reservoir, as well as by the seasonal variations in injection rate. Because of the gravity flow and cooling around a liquid zone formed by the injection, the vertical stress reduction is larger and propagates far below the injection well. At the same time, the horizontal stress increases, mostly because of stress redistribution below and above the cooling area. These two phenomena cause the rotation of the stress tensor and the appearance of a strike-slip regime above, inside, and below the cooling area. The cooling and the associated rotation of the stress regime can play a significant role in the observed long-term deepening of the microseismicity below active injection wells.

58 GEOSCIENCES↗