Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “IDS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

5-ID SRX Beamline Radiation Shielding Analysis

This note documents the radiation shielding analysis of Submicron Resolution X-ray Spectroscopy (SRX, 5 ID) beamline at 500 mA, including Gas Bremsstrahlung (GB) and Synchrotron Radiation (SR).

36 MATERIALS SCIENCE↗

28-ID XPD Beamline Radiation Shielding Analysis

This note documents the radiation shielding analysis of X-ray Powder Diffraction (XPD, 28 ID) beamline at 500 mA, including Gas Bremsstrahlung (GB) and Synchrotron Radiation (SR).

36 MATERIALS SCIENCE↗

Beamline XPD (28-ID, DW 100) Commissioning Radiation Survey Report

A radiological survey of the Beamline XPD (28ID, Damping Wiggler) was conducted on February 19, 2015 between 0030 and 0320 in accordance with the Beamline XPD (28-ID) Radiation Survey Plan [1]. This comprehensive survey was limited in scope because the FE slits were not fully open and the filters were not ALL out.

36 MATERIALS SCIENCE↗

HEX 2-piece ID Absorber: Steady and Transient Thermal FEA

Radiation fans from Insertion Devices and Bending Magnets are “trimmed” by various water-cooled absorbers located strategically downstream of those sources. Mostly, the absorber surfaces onto which power is deposited are constructed from Glidcop Al-15 (rarely OFHC copper). On the basis of Tech Note 327 a re-design for improved thermal performance has evolved to a two-piece ID Absorber configuration; one between dipole chamber and quadrupole, another after the sextupole, each with reduced incident angle. The ring’s Active Interlock (AI) system protects against overheating by disabling mis-steered beam within an allotted time. SRP (Synchrotron Radiation Protection) protocol has a limiting maximum allowable temperature of 100*C at any point when subject to mis-steered beam for a fixed period before AI activation. After 0.2 msec, radiation exceeding +/- 0.5mm offset and +/- 0.25 mrad angular error from the HEX SCW will trip in fault. AI specification allows 1.0 msec to fully dump the electron beam.

36 MATERIALS SCIENCE↗

Mixed Material Scintillator Systems Particle ID Modelling Report

AMixed-Material Scintillator System (MMSS) is a radiation detector using a scintillator made of a heterogeneous, structured mixture of two or more materials. MMSSs are designed so that the structured mixing of materials encodes properties of the radiation detected in the scintillator. This allows for new radiation detectors with advantages over detectors using traditional homogeneous scintillators. This report contains results from this project’s second task, to model and quantify the promise of the MMSSs invented earlier in the project. Those inventions have been divided into two categories, and this report focuses on the first category: MMSS inventions the use zones of differently-colored scintillators to detect and characterize neutron sources. We call this category particle-ID, or PID, detectors. Inventions using gradients designed to encode the position of radiation interactions using gradients will be discussed in a future report.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Dose Measurement and Monte Carlo FLUKA simulations for the FE and FOE of the 27-ID HEX Beamline

The 27-ID High Energy Engineering X-ray Scattering (HEX) beamline, commissioned in 2024, operates within the Hard X-ray Scattering and Spectroscopy program at Brookhaven Lab’s National Synchrotron Light Source II (NSLS-II). The high energy spectrum at the HEX beamline extends up to several hundred keV, making it well suited for applications such as imaging large engineering samples, including fully assembled batteries, fuel cells, etc.

43 PARTICLE ACCELERATORS↗

Certification of Completion of ASC FY08 Level-2 Milestone ID #2933

This report documents the satisfaction of the completion criteria associated with ASC FY08 Milestone ID No.2933: 'Deploy Moab resource management services on BlueGene/L'. Specifically, this milestone represents LLNL efforts to enhance both SLURM and Moab to extend Moab's capabilities to schedule and manage BlueGene/L, and increases portability of user scripts between ASC systems. The completion criteria for the milestone are the following: (1) Batch jobs can be specified, submitted to Moab, scheduled and run on the BlueGene/L system; (2) Moab will be able to support the markedly increased scale in node count as well as the wiring geometry that is unique to BlueGene/L; and (3) Moab will also prepare and report statistics of job CPU usage just as it does for the current systems it supports. This document presents the completion evidence for both of the stated milestone certification methods: Completion evidence for this milestone will be in the form of (1) documentation--a report that certifies that the completion criteria have been met; and (2) user hand-off. As the selected Tri-Lab workload manager, Moab was chosen to replace LCRM as the enterprise-wide scheduler across Livermore Computing (LC) systems. While LCRM/SLURM successfully scheduled jobs on BG/L, the effort to replace LCRM with Moab on BG/L represented a significant challenge. Moab is a commercial product developed and sold by Cluster Resources, Inc. (CRI). Moab receives the users batch job requests and dispatches these jobs to run on a specific cluster. SLURM is an open-source resource manager whose development is managed by members of the Integrated Computational Resource Management Group (ICRMG) within the Services and Development Division at LLNL. SLURM is responsible for launching and running jobs on an individual cluster. Replacing LCRM with Moab on BG/L required substantial changes to both Moab and SLURM. While the ICRMG could directly manage the SLURM development effort, the work to enhance Moab had to be done by Moab's vendor. Members of the ICRMG held many meetings with CRI developers to develop the design and specify the requirements for what Moab needed to do. Extensions to SLURM are used to run jobs on the BlueGene/L architecture. These extensions support the three dimensional network topology unique to BG/L. While BG/L geometry support was already in SLURM, enhancements were needed to provide backfill capability and answer 'will-run' queries from Moab. For its part, the Moab architecture needed to be modified to interact with SLURM in a more coordinated way. It needed enhancements to support SLURM's shorthand notation for representing thousands of compute nodes and report this information using Moab's existing status commands. The LCRM wrapper scripts that emulated LCRM commands also needed to be enhanced to support BG/L usage. The effort was successful as Moab 5.2.2 and SLURM 1.3 was installed on the 106496 node BG/L machine on May 21, 2008, and turned over to the users to run production.

99 GENERAL AND MISCELLANEOUS↗

Minimizing Experimental Setup Time and Effort at APS beamline 1-ID through Instrumentation Design

Sector 1-ID at the APS accommodates a number of dif-ferent experimental techniques in the same spatial enve-lope of the E-hutch end station. These include high-energy small and wide angle X-ray scattering (SAXS and WAXS), high-energy diffraction microscopy (HEDM, both near and far field modes) and high-energy X-ray tomography. These techniques are frequently combined to allow the users to obtain multimodal data, often attaining 1 μm spatial resolution and <0.05º angular resolution. Furthermore, these techniques are utilized while the sam-ple is thermo-mechanically loaded to mimic real operat-ing conditions. The instrumentation required for each of these techniques and environments has been designed and configured in a modular way with a focus on stability and repeatability between changeovers. This approach allows the end station to be more versatile, capable of collecting multi-modal data in-situ while reducing time and effort typically required for set up and alignment, resulting in more efficient beam time use. Key instrumentation de-sign features and layout of the end station are presented.

Benda, Erika↗