Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Flange seal”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

87 records · Page 5

Bayonet for superfluid helium transfer in space

A prototype superfluid helium bayonet for potential space applications has been developed and evaluated with a low heat leak test apparatus. Measured heat leak of the 13 mm (1/2 inch) bayonet pair is 0.21 W at 1.8 K with an uncertainty of +0.09/-0.05 W. Bayonets are fabricated with thin, electron beam (EB) welded tubes which are EB welded to machined nose and flange pieces. Low heat leak structural integrity is provided by a 0.9 mm thickness of filament wound fiberglass-epoxy. Superfluid creep is restricted by KEL-F nose seals which form vacuum-tight extensions to the bayonet cold end pieces.

Mcintosh, G. E.↗

Spiral-wound gasket forms low-temperature seal

Spiral-wound cryogenic gasket with one component requires no encapsulant and is easily produced with self-locking features. Seal either opens and closes or is fixed. It is made by skiving strip from circumference of disk of glass-filled material. Successive turns of strip are spirally wrapped in groove machined into one flange surface. Closing joint compresses gasket.

Irick, S. C.↗

Spill-Resistant Alkali-Metal-Vapor Dispenser

A spill-resistant vessel has been developed for dispensing an alkali-metal vapor. Vapors of alkali metals (most commonly, cesium or rubidium, both of which melt at temperatures slightly above room temperature) are needed for atomic frequency standards, experiments in spectroscopy, and experiments in laser cooling. Although the present spill-resistant alkali-metal dispenser was originally intended for use in the low-gravity environment of outer space, it can also be used in normal Earth gravitation: indeed, its utility as a vapor source was confirmed by use of cesium in a ground apparatus. The vessel is made of copper. It consists of an assembly of cylinders and flanges, shown in the figure. The uppermost cylinder is a fill tube. Initially, the vessel is evacuated, the alkali metal charge is distilled into the bottom of the vessel, and then the fill tube is pinched closed to form a vacuum seal. The innermost cylinder serves as the outlet for the vapor, yet prevents spilling by protruding above the surface of the alkali metal, no matter which way or how far the vessel is tilted. In the event (unlikely in normal Earth gravitation) that any drops of molten alkali metal have been shaken loose by vibration and are floating freely, a mesh cap on top of the inner cylinder prevents the drops from drifting out with the vapor. Liquid containment of the equivalent of 1.2 grams of cesium was confirmed for all orientations with rubbing alcohol in one of the prototypes later used with cesium.

Klipstein, William↗

Design, Manufacturing, and Installation of DIII-D Lower Hybrid Current Drive Outer Wall Waveguides and Expandable Vacuum Interface

High field side lower hybrid current drive (HFS LHCD) is promising method for efficient, off axis current drive. To operate this system, development of an expandable combination radio frequency (RF) and vacuum interface was necessary to allow the long (~2 m) waveguides to thermally expand with respect to the DIII-D 0 degree R-1 port extension without damage to the waveguide or excessive force on the vacuum seals which was previously observed when baking the waveguides during operations that were installed in 2024. Design of a custom bellows assembly with RF feedthrough that allows >20mm of waveguide thermal expansion is presented. Fabrication of this bellows assembly required simultaneously vacuum brazing multiple 304 stainless steel flanges to an oxygen free high conductivity copper waveguide section which required significant manufacturing development.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Thermal Hydraulic Experimental Test Article (FY21 Final Report)

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that will be used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility will simulate nominal conditions as well as protected/unprotected loss of flow accidents in a sodium-cooled fast reactor (SFR). High fidelity distributed temperature profiles of the developed flow field will be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility is being designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. THETA is comprised of a traditional primary and secondary system. The primary system is submerged in the pool of sodium and consists of a pump, electrically heated core, intermediate heat exchanger, and connected piping and thermal barriers (redan). The secondary system, located outside of the sodium pool, consists of a pump, sodium to air heat exchanger, and connected piping and valves. Figure 1 illustrates the main components of the primary system. THETA has been installed in the Mechanisms Engineering Test Loop (METL) with the primary system in the 28 inch Test Vessel #4, Figure 2 and Figure 3. Since the FY20 THETA status report, further water shakedown testing was performed, some final welding modifications were performed, all system components were sanitized, dry assembled, and commissioned. The THETA submersible electromagnetic flowmeter was welded closed to hermetically seal internal components from sodium followed by a helium leak check for the final time. Following installation of THETA into vessel #4, all data acquisition and control systems were brought online and commissioned at room temperature in the argon gas space of the empty vessel. The vessel zone 1 heaters were reinstalled and the flange was then insulated. The vessel 4 heaters were brought to a temperature of 100 °C and the THETA pump was jogged at 600 RPM to ensure it was functioning correctly. The secondary, AC Conduction based electromagnetic pump from CMI Novacast (product number CA-15) was ordered and will be delivered in late calendar year 2021. The custom designed permanent magnet based secondary flowmeter was designed, a drawing package and manufacturing specification created and quote requested from a machine shop. The intermediate heat exchanger design was completed and a drawing package is currently in progress. During the middle of calendar year 2021 the Building 308 sodium scrubber system was shut down in order to replaced some corroded piping and facilitate improvements on the system, thus requiring the sodium in METL to remain frozen. This has imposed a delay in filling vessel 4 with sodium to begin THETA testing. Sodium testing is expected to begin in early fiscal year 2022 as all THETA primary systems are operational.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Compact raised face flange

In an example, a raised face flange assembly, comprises an upper flange to couple to a lower flange using one or more bolts: wherein the upper flange or the lower flange comprises: a bolting face defining one or more openings for the one or more bolts, respectively; a pair of raised faces including a first raised face and a second raised face to make contact with a mating surface of the other of the upper flange or the lower flange; wherein a distance between an area of the second raised face and a plane corresponding to the bolting face is greater than a distance between an area of the first raised face and the plane to distribute contact force with a mating surface over the area of the second raised face to maintain a seal.

Liszkai, Tamas↗

Interface gasket for building envelope

A gasket assembly for attaching a window to a panel opening includes an inner frame, an outer frame, and an elastic material connecting the inner frame to the outer frame. The elastic material extends contiguously and circumferentially to couple the outer frame to the inner frame. The outer frame and inner frame can include gap flanges and the elastic material can include opposing lateral side portions. The gap flanges are embedded in the lateral side portions of the elastic material. The outer frame includes connecting structure for coupling of the outer frame to the panel opening. The inner frame includes a connecting structure for coupling of the gasket assembly to the window. The gasket assembly is configured to support the window in the panel opening and form a seal between the panel opening and the window. A method of making a gasket assembly is also disclosed.

Aaron, Adam M.↗

Ampoule sealing apparatus and process

An apparatus 10 for effecting sealing of a fused quartz ampoule 24 while maintaining a vacuum on the ampoule via system 12 is disclosed. A plug 28 of fused quartz is lowered into the vertically disposed ampoule 24 (while maintaining the vacuum thereon) and heat sealed therein to prevent any vapor escape from, or contamination of, the contained semiconductor growth charge 29 during subsequent semiconductor crystal growth processes. A rotary vacuum feed-through mechanism 16 selectively rotates axle 34 and spool 32 to unwind wire 30 for lowering of plug 28 into the reduced diameter portion 24b of ampoule 24. Ampoule 24 is hermatically connected to vacuum housing 18 by quick release flange 20 wherein O-ring 22 retains ampoule 24.

Debnam, Jr., William J.↗

Tool For Driving Many Fasteners Simultaneously

Proposed tool tightens or loosens several bolts, screws, nuts, or other threaded fasteners arranged in circle on compressor head, automotive wheel, pipe-end flange, or similar object. Enables assembly or disassembly in fraction of time needed to tighten fasteners one at a time. Simultaneously applies same torque to all fasteners, preventing distortion and enhancing reliability. Concept not limited to circular fastener patterns. Adapted to rectangular configurations like on engine intake manifolds, by adding gears to drive train to provide proper spacing. Designed to deliver fixed or adjustable maximum torque. To ensure even seal loading, piston pressure simultaneously ramped from initial to final values to maintain relatively constant torque loading on all fasteners until final specifications limit achieved.

Cook, Joseph S., Jr.↗

Lightweight structural design of a bolted case joint for the Space Shuttle Solid Rocket Motor

This paper presents the structural design of a bolted joint with a static face seal which can be used to join Space Shuttle Solid Rocket Motor (SRM) case segments. Results from numerous finite element parametric studies indicate that the bolted joint meets the design requirement of preventing joint opening at the O-ring locations during SRM pressurization. A final design recommended for further development has the following parameters: 180 1-inch-diameter studs, stud center line offset of .5 inches radially inward from the shell wall center line, flange thickness of 0.75 inches, bearing plate thickness of 0.25 inches, studs prestressed to 70 percent of ultimate load, and the intermediate alcove. The design has a mass penalty of 1096 lbm, which is 164 lbm greater than the currently proposed capture tang redesign.

Dorsey, John T.↗

Lightweight structural design of a bolted case joint for the space shuttle solid rocket motor

The structural design of a bolted joint with a static face seal which can be used to join Space Shuttle Solid Rocket Motor (SRM) case segments is given. Results from numerous finite element parametric studies indicate that the bolted joint meets the design requirement of preventing joint opening at the O-ring locations during SRM pressurization. A final design recommended for further development has the following parameters: 180 one-in.-diam. studs, stud centerline offset of 0.5 in radially inward from the shell wall center line, flange thickness of 0.75 in, bearing plate thickness of 0.25 in, studs prestressed to 70 percent of ultimate load, and the intermediate alcove. The design has a mass penalty of 1096 lbm, which is 164 lbm greater than the currently proposed capture tang redesign.

Dorsey, John T.↗

STS-133 Space Shuttle External Tank Intertank Stringer Crack Investigation Stress Analysis

The first attempt to launch the STS-133 Space Shuttle mission in the fall of 2010 was halted due to indications of a gaseous hydrogen leak at the External Tank ground umbilical carrier plate seal. Subsequent inspection of the external tank (figure 1) hardware and recorded video footage revealed that the foam insulation covering the forward end of the intertank near the liquid oxygen tank had cracked severely enough to have been cause for halting the launch attempt on its own (figure 2). An investigation into the cause of the insulation crack revealed that two adjacent hat-section sheet metal stringers (figure 3) had cracks up to nine inches long in the forward ends of the stringer flanges, or feet, near the fasteners that attach the stringer to the skin of the intertank (figure 4). A repair of those two stringers was implemented and the investigation effort widened to understand the root cause of the stringer cracks and to determine whether there was sufficient flight rationale to launch with the repairs and the other installed stringers.

Steeve, Brian E.↗

Tool for Insertion of a Fiber-Optic Terminus in a Connector

A tool has been developed for the special purpose of inserting the terminus of an optical fiber in a cable connector that conforms to NASA Specification SSQ- 21635. What prompted the development of the tool was the observation that because of some aspects of the designs of fiber-optic termini and of springs, sealing rings, and a grommet inside the shell of such a connector, there is a tendency for the grommet to become damaged and detached from the sealing rings during installation. It is necessary to ensure the integrity of the grommet for proper sealing and proper functioning of the connector. The special-purpose tool provides the needed protection for the grommet. The grommet-protection tool resembles a funnel into which an axial slit has been cut (see figure). Prior to insertion, the grommet-protection tool is rolled so that one side of the slit overlaps the other side. The rolled-up grommet-protection tool is inserted in one of the connector holes that accommodate the fiber-optic termini and is pushed in until the flange (the wider of the two conical portions) of the tool becomes seated on the connector grommet. Then a special-purpose installation tool is inserted in the flange of the grommet-protection tool and pressed in until it becomes seated in the flange. This operation expands the narrower of the two conical portions of the grommet-protection tool. The installation tool is removed and the grommet-protection tool remains expanded due to the flat surfaces on the axial slit. By use of a standard contact-insertion tool, a fiber-optic terminus is inserted, through the grommet-protection tool, into the connector cavity. By use of a pair of forceps or needle-nose pliers, the grommet-protection tool is then pulled out of the cavity. Finally, the grommet-protection tool is removed from around the installed fiber-optic cable by pulling the cable through the axial slit. Unlike in some prior procedures for installing the fiber-optic termini in the connector, the procedure that involves the use of the present grommet-protection tool does not include the use of lubricants that can contaminate the interior of the connector. The grommet-protection tool is made of a fluoropolymer, taking advantage of the flexibility of such polymers and further taking advantage of the inherent slipperiness of fluoropolymers. Although the tool is designed primarily for insertion of a fiber-optic terminus, it might also be useful for extracting a previously installed fiber-optic terminus.

King, Wes↗

Evaluation of an Active Clearance Control System Concept

Reducing blade tip clearances through active tip clearance control in the high pressure turbine can lead to significant reductions in emissions and specific fuel consumption as well as dramatic improvements in operating efficiency and increased service life. Current engines employ scheduled cooling of the outer case flanges to reduce high pressure turbine tip clearances during cruise conditions. These systems have relatively slow response and do not use clearance measurement, thereby forcing cold build clearances to set the minimum clearances at extreme operating conditions (e.g., takeoff, reburst) and not allowing cruise clearances to be minimized due to the possibility of throttle transients (e.g., step change in altitude). In an effort to improve upon current thermal methods, a first generation mechanically-actuated active clearance control (ACC) system has been designed and fabricated. The system utilizes independent actuators, a segmented shroud structure, and clearance measurement feedback to provide fast and precise active clearance control throughout engine operation. Ambient temperature performance tests of this first generation ACC system assessed individual seal component leakage rates and both static and dynamic overall system leakage rates. The ability of the nine electric stepper motors to control the position of the seal carriers in both open- and closed-loop control modes for single and multiple cycles was investigated. The ability of the system to follow simulated engine clearance transients in closed-loop mode showed the system was able to track clearances to within a tight tolerance (0.001 in. error).

Steinetz, Bruce M.↗

Evaluation of an Active Clearance Control System Concept

Reducing blade tip clearances through active tip clearance control in the high pressure turbine can lead to significant reductions in emissions and specific fuel consumption as well as dramatic improvements in operating efficiency and increased service life. Current engines employ scheduled cooling of the outer case flanges to reduce high pressure turbine tip clearances during cruise conditions. These systems have relatively slow response and do not use clearance measurement, thereby forcing cold build clearances to set the minimum clearances at extreme operating conditions (e.g., takeoff, reburst) and not allowing cruise clearances to be minimized due to the possibility of throttle transients (e.g., step change in altitude). In an effort to improve upon current thermal methods, a first generation mechanically-actuated active clearance control (ACC) system has been designed and fabricated. The system utilizes independent actuators, a segmented shroud structure, and clearance measurement feedback to provide fast and precise active clearance control throughout engine operation. Ambient temperature performance tests of this first generation ACC system assessed individual seal component leakage rates and both static and dynamic overall system leakage rates. The ability of the nine electric stepper motors to control the position of the seal carriers in both open- and closed-loop control modes for single and multiple cycles was investigated. The ability of the system to follow simulated engine clearance transients in closed-loop mode showed the system was able to track clearances to within a tight tolerance ( 0.001 in. error).

Steinetz, Bruce M.↗