Short-Baseline neutrino oscillation searches with the ICARUS detector at FNAL [Poster]
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The PIP-II Project will see international shipment of cryomodules Proton Improvement Plan-II from Europe to the United States, and as such, the shocks which can occur during shipment pose a risk to the internal components. Of particular concern is the coupler ceramic window and surrounding brazes, which will see stresses during an excitation event. Since the antenna design is new, and because of the setback failure would create, a cyclic stress test was devised for the antenna. This paper presents the experimental methods, setup, and results of the test.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Report on the status of superconducting magnet test facility at Fermilab.
Explore the source record for details and available documents.
In this talk I will present the most recent results from the ICARUS T600 detector.
This presentation provides an overview of the ongoing MicroTCA-related work at Fermilab.
We are presenting an overview of our (MTD) collaboration with NIU on superconducting magnet development. Through multiple endeavors over the last years we succeeded building a strong collaboration and attracted additional support for it. One of the key aspects of the collaboration is that it heavily benefits NIU students who are offered excellent opportunities to work with world leading experts in the field, make a mark for themselves and possibly start a carrier in an area they start to appreciate and like.
The US High-Luminosity LHC Accelerator Upgrade Project (AUP) collaborates with CERN to deliver 10 cryo-assemblies for the High-Luminosity LHC upgrade at CERN. Those comprise the Q1/Q3 quadrupole optical elements in the accelerator and are based on Nb3Sn technology, for the first time in a large particle accelerator. So far three cryo-assemblies were tested at the Fermilab’s horizontal magnet test facility, specifically redesigned to serve those needs. This work gives an overview of the facility and its necessary evolution as the campaign progressed; main results and observations from the cryo-assembly tests are presented and discussed in the context of overall performance and expectations toward the completion of efforts. Lessons learned after multiple cryo-assembly tests by the same team are critical to ensure continuous success of the whole enterprise – those are openly shared.
Explore the source record for details and available documents.
The U.S. High-Luminosity LHC Accelerator Upgrade Project (AUP) is fabricating ten cryogenic assemblies for the HL-LHC Q1/Q3 quadrupole optics at CERN, each integrating two Nb_{3}Sn-based magnets. Fermilab has tested three assemblies (LQXFA/B01–03) at its upgraded horizontal test stand under 1.9 K conditions. Overview of the test stand and the cryo-assembly tests is given along with main results. Challenges met and lessons learned are discussed. Successful testing validates the design and integration of U.S.-produced cryo-assemblies, keeping the project on track for timely delivery to CERN.
The Side-CoupledLinac (SCL) section oftheFNAL linac acceleratesthe beamfrom 117 MeV to 401.5 MeV, operatingat 22-24mA beam current. Transverse focusing is performedby32 quadrupoles, and the beam orbit is guidedby19dipolecorrectors andmeasuredby29 BPMs. The bunch length is measured in a single location by a Bunch Shape Monitor (BSM). This paper presents a three-step reconstruction of the machine optics. First, the transverse and longitudinal Twiss parameters at the start of the SCL section are determined using quadrupole scans and BSM measurements at different settings o fan upstream cavity. Second, the quadrupole calibrations are adjusted based on differential-trajectory measurements. Finally, the beam is propagated along the SCL linac using the code Trace Win. A comparison between Trace Win simulations and the beam envelope measured bythe12wirescanners of the SCL linac was performed. Transverse and longitudinal beam parameters at the entrance of the transition section will be reported
The Short Baseline Neutrino Program at Fermilab aims at delivering, in the short term, a rich and compelling physics opportunity, including the ability to perform the most sensitive search to date for sterile neutrinos at the eV mass-scale through both appearance and disappearance oscillation channels.It consists of the three liquid argon TPC detectors SBND, MicroBooNE and ICARUS, exposed to the Booster Neutrino Beamline (BNB) at different baselines. Current status and perspectives of the program and the single detectors are hereby presented.
The ICARUS T600 detector completed in 2013 a successful three-year physics run at the underground LNGS laboratory and after a significant overhaul at CERN, it has been installed at Fermilab. In June 2022 a new data taking started and ICARUS is presently recording neutrino events from BNB and NuMI off-axis beams. ICARUS aims at first to investigate the claim by Neutrino-4 short-baseline reactor experiment and to perform with the NuMI beam measurements of neutrino cross sections in LAr and several BSM searches. ICARUS will soon jointly search for evidence of sterile neutrinos with the Short-Baseline Near Detector (SBND). In this proceeding the status of the T600 detector and preliminary results from the ICARUS data analysis with the BNB and NuMI beams will be shortly described.
A coaxial blade tuner has been selected for the 1.3GHz SRF cavities of the Fermilab SRF Accelerator Test Facility. Results from tuner cold tests in the Fermilab Horizontal Test Stand are presented. Fermilab is constructing the SRF Accelerator Test Facility, a facility for accelerator physics research and development. This facility will contain a total of six cryomodules, each containing eight 1.3 GHz nine-cell elliptical cavities. Each cavity will be equipped with a Slim Blade Tuner designed by INFN Milan. The blade tuner incorporates both a stepper motor and piezo actuators to allow for both slow and fast cavity tuning. The stepper motor allows the cavity frequency to be statically tuned over a range of 500 kHz with an accuracy of several Hz. The piezos provide up to 2 kHz of dynamic tuning for compensation of Lorentz force detuning and variations in the He bath pressure. The first eight blade tuners were built at INFN Milan, but the remainder are being manufactured commercially following the INFN design. To date, more than 40 of the commercial tuners have been delivered.
The Lorentz force can dynamically detune pulsed Superconducting RF cavities. Considerable additional RF power can be required to maintain the accelerating gradient if no effort is made to compensate for this detuning. Compensation systems using piezo actuators have been used successfully at DESY and elsewhere to control Lorentz Force Detuning (LFD). Recently, Fermilab has developed an adaptive compensation system for cavities in the Horizontal Test Stand, in the SRF Accelerator Test Facility, and for the proposed Project X.