Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FINANCIAL PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Creating the National Renewable Energy Laboratory: Implications for New National Energy Research Institutes

The history of the design and development of the National Renewable Energy Laboratory (NREL) in the United States illustrates how the plans for a new institute can be realized and evolve over four decades. This history summarizes the process of planning and developing NREL as a new research institute to meet its mandated mission, including creating a research agenda and plans for R&D management, human resources, financial sustainability, and facilities. The NREL origin story, informed by the development of similar institutions around the world, also reveals generalized principles useful for decision makers across the globe who are designing their own research institute. These principles are described in this publication.

energy institute↗

Manpower and project planning

The purpose was to study how manpower and projects are planned at the Facilities Engineering Division (FENGD) within the Systems Engineering and Operations Directorate of the LaRC and to make recommendations for improving the effectiveness and productivity ot the tools that are used. The existing manpower and project planning processes (including the management plan for the FENGD, existing manpower planning reports, project reporting to LaRC and NASA Headquarters, employee time reporting, financial reporting, and coordination/tracking reports for procurement) were discussed with several people, and project planning software was evaluated.

Johnson, David W.↗

SYSTEM PLANNING WITH THE HANFORD WASTE OPERATIONS SIMULATOR

At the U. S. Department of Energy's Hanford Site in southeastern Washington State, 216 million liters (57 million gallons) of nuclear waste is currently stored in aging underground tanks, threatening the Columbia River. The River Protection Project (RPP), a fully integrated system of waste storage, retrieval, treatment, and disposal facilities, is in varying stages of design, construction, operation, and future planning. These facilities face many overlapping technical, regulatory, and financial hurdles to achieve site cleanup and closure. Program execution is ongoing, but completion is currently expected to take approximately 40 more years. Strategic planning for the treatment of Hanford tank waste is by nature a multi-faceted, complex and iterative process. To help manage the planning, a report referred to as the RPP System Plan is prepared to provide a basis for aligning the program scope with the cost and schedule, from upper-tier contracts to individual facility operating plans. The Hanford Tank Waste Operations Simulator (HTWOS), a dynamic flowsheet simulation and mass balance computer model, is used to simulate the current planned RPP mission, evaluate the impacts of changes to the mission, and assist in planning near-term facility operations. Development of additional modeling tools, including an operations research model and a cost model, will further improve long-term planning confidence. The most recent RPP System Plan, Revision 4, was published in September 2009.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A cost–benefit framework to evaluate capacity upgrade options in overhead line transmission planning

This paper presents the methodology behind the new Reconductoring Economic and Financial Analysis (REFA) tool, an open-access software, used by transmission utilities to evaluate transmission capacity enhancement options. The proposed methodology is intended to be used in a new planning stage, after the capacity expansion and prior to the individual transmission project engineering, allowing capacity upgrade options (reconductoring, rebuild or voltage upgrade), and respective conductor selection, to be compared under the same economic basis. Furthermore, the REFA tool implements a methodology to rank project options and conductor types based on economic criteria, considering an approximation of the ampacity and sag constraints. Results, using 5 real transmission lines in the US, show that least-cost combinations of project and conductor types can be very diverse, which emphasizes the need for the proposed methodology and tool.

Advanced conductors↗

Enhancing the EVI-X National Framework to Address Emerging Questions on Charging Infrastructure Deployment

As large national investments in EV charging continue to be made, this project seeks to improve the state-of-the-art in EV infrastructure analysis. New and improved quantitative analysis capabilities will position VTO to support EERE Leadership, assist the DOT/DOE Joint Office through timely analysis, and provide a strategy for the deployment of the national charging network. This project supports on-going development of NREL's EVI-X Suite of charging infrastructure analysis tools, including tools supporting large-scale network planning, local site design decisions, and comprehensive financial analysis. EVI-X development complements and leverages other VTO-funded efforts to ensure inputs to EVI-X and output produced by EVI-X are consistent with and well-integrated into the VTO portfolio (e.g., EV adoption scenarios from TEMPO, charging infrastructure design provided to EVs@Scale, etc.).

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Turkey opens electricity markets as demand grows

Turkey's growing power market has attracted investors and project developers for over a decade, yet their plans have been dashed by unexpected political or financial crises or, worse, obstructed by a lengthy bureaucratic approval process. Now, with a more transparent retail electricity market, government regulators and investors are bullish on Turkey. Is Turkey ready to turn the power on? This report closely examine Turkey's plans to create a power infrastructure capable of providing the reliable electricity supplies necessary for sustained economic growth. It was compiled with on-the-ground research and extensive interview with key industrial and political figures. Today, hard coal and lignite account for 21% of Turkey's electricity generation and gas-fired plants account for 50%. The Alfin Elbistan-B lignite-fired plant has attracted criticism for its lack of desulfurization units and ash dam facilities that have tarnished the industry's image. A 1,100 MW hard-coal fired plant using supercritical technology is under construction. 9 figs., 1 tab.

20 FOSSIL-FUELED POWER PLANTS↗

High Performance Teams Enable Mission Success for SRNL - 16363

The accomplishment of the DOE EM mission of cleaning up the radioactive waste generated as a byproduct of the development and maintenance of nuclear materials over the last 60 years is a daunting task. SRNL specializes in working directly with the 'owners' of the cleanup challenges to identify the desired outcome and develop a solution that can be put into practice. 'We put science to work' is not just a 'tag line' rather it is a concise statement of our values and approach to applying science and engineering to the cleanup objectives. The management of radioactive waste poses multi-decade challenges to DOE EM and the Nation. The ability to harness the depth of knowledge, experience, expertise and passion for safely and effectively solving the technical challenges has reached a critical junction. Perhaps too late to be a natural and organic transition the industry finds itself critically devoid of resources to effectively and efficiently keep focused on the highest order task: cleanup. When project managers plan the resources necessary to perform the planned scope they typically are focused on financial, human, and industrial resources that would be beneficial to project execution. The critical shortage we will be evaluating is experienced and skilled leaders, mentors and coaches in the workforce. The production of educated scientists and engineers is a primary focus at all levels of educational institutions with Science Technology Engineering and Mathematics (STEM) focused curricula beginning in elementary school. The need for leaders who are skilled in inspiring organizational creativity, adept in harnessing and focusing individual energy while effectively communicating to the work force and the clientele equally compelling messages, has never been greater, or their absence in the workforce more ominous. Managers trained in the classical management theory (insert references here) are aging out of the workforce. In many cases these managers have not retained close connection to advancements in their primary field of study but rather have succumbed to the administrivia burdens that typify highly regulated work. The current technically trained workforce while interested in the 'perks' of management (i.e. visibility, pay increases, advancing status) are driven to keep close connection to their technical 'roots' as a fall-back plan should they need to change their career path either by choice or necessity. The challenge is how to achieve the productive hum of a finely tuned organizational model that blends executive vision and drive with technical leadership and excellence in execution. If any of these three tenets of a high performance team falters the ability to recover erodes the performance of the team and begins to weaken the cultural foundation essential to sustaining high performance work teams. At SRNL, recognition of the need to adapt the management dynamics and the business model and to harness the energy of the workforce to sustain - and in fact increase - the level of performance is a driving force in the transformation of the organization. Examples of changes in organizations structure, business systems and employee engagement are discussed as they relate to the impact on accomplishing the cleanup mission and fostering the next generation of great leaders and innovators. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pursuing Energy Efficiency as a Hedge against Carbon Regulatory Risks: Current Resource Planning Practices in the West

Uncertainty surrounding the nature and timing of future carbon regulations poses a fundamental and far-reaching financial risk for electric utilities and their ratepayers. Long-term resource planning provides a potential framework within which utilities can assess carbon regulatory risk and evaluate options for mitigating exposure to this risk through investments in energy efficiency and other low-carbon resources. In this paper, we examine current resource planning practices related to managing carbon regulatory risk, based on a comparative analysis of the most-recent long-term resource plans filed by fifteen major utilities in the Western U.S. First, we compare the assumptions and methods used by utilities to assess carbon regulatory risk and to evaluate energy efficiency as a risk mitigation option. Although most utilities have made important strides in beginning to address carbon regulatory risk within their resource plan, we also identify a number of opportunities for improvement and offer recommendations for resource planners and state regulators to consider. We also summarize the composition and carbon intensity of the preferred resource portfolios selected by the fifteen Western utilities, highlighting the contribution of energy efficiency and its impact on the carbon intensity of utilities' proposed resource strategies. Energy efficiency and renewables are the dominant low-carbon resources included in utilities' preferred portfolios. Across the fifteen utilities, energy efficiency constitutes anywhere from 6percent to almost 50percent of the preferred portfolio energy resources, and represents 22percent of all incremental resources in aggregate.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Pursuing Energy Efficiency as a Hedge against Carbon Regulatory Risks: Current Resource Planning Practices in the West

Uncertainty surrounding the nature and timing of future carbon regulations poses a fundamental and far-reaching financial risk for electric utilities and their ratepayers. Long-term resource planning provides a potential framework within which utilities can assess carbon regulatory risk and evaluate options for mitigating exposure to this risk through investments in energy efficiency and other low-carbon resources. In this paper, we examine current resource planning practices related to managing carbon regulatory risk, based on a comparative analysis of the most-recent long-term resource plans filed by fifteen major utilities in the Western U.S. First, we compare the assumptions and methods used by utilities to assess carbon regulatory risk and to evaluate energy efficiency as a risk mitigation option. Although most utilities have made important strides in beginning to address carbon regulatory risk within their resource plan, we also identify a number of opportunities for improvement and offer recommendations for resource planners and state regulators to consider. We also summarize the composition and carbon intensity of the preferred resource portfolios selected by the fifteen Western utilities, highlighting the contribution of energy efficiency and its impact on the carbon intensity of utilities' proposed resource strategies. Energy efficiency and renewables are the dominant low-carbon resources included in utilities' preferred portfolios. Across the fifteen utilities, energy efficiency constitutes anywhere from 6percent to almost 50percent of the preferred portfolio energy resources, and represents 22percent of all incremental resources in aggregate.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

DOE-NE LWRS Integrated Program Plan - Physical Security Pathway

Domestic nuclear power is facing increased financial pressures from a variety of areas and there is pressure on these utilities to reduce their cost of operation. Currently, about 20%-30% of all on-site personnel are related to physical security. The LWRS Program recognized that R&D related to physical security could play a role in providing nuclear utilities technical and staffing efficiency options to meet their physical security commitments, but utilities often lack the technical basis or the ability to create the technical basis to realize or implement these efficiencies; towards this end, the LWRS Program created the Physical Security Pathway in September 2019. The pathway performs R&D to develop methods, tools, and technologies to optimize and modernize a nuclear power facility’s security posture. The pathway will: (1) conduct research on risk-informed techniques for physical security that account for a dynamic adversary; (2) apply advanced modeling and simulation tools to better inform physical-security scenarios and reduce uncertainties in force-on-force modeling; (3) assess benefits from proposed enhancements and novel mitigation strategies and explore changes to best practices, guides, or regulation to enable modernization; and (4) enhance and provide the technical basis for stakeholders to employ new security methods, tools, and technologies.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Evaluation of Early Performance Results for Massachusetts Homes in the National Grid Pilot Deep Energy Retrofit Program

In 2009, National Grid started a DER pilot program that offered technical support and financial incentives to qualified Massachusetts homeowners who planned and successfully completed a retrofit that incorporated the performance requirements and goals of the National Grid DER measures package. This DER measures package, developed through collaboration with Building Science Corporation (BSC), includes specific thermal and airtightness goals for the enclosure components as well as health, safety, durability, and indoor air quality requirements. By providing measures that can be included with common renovation activities such as roof replacement, window replacement, re-siding, basement remediation, and remodeling, this DER measures package is expected to have widespread application for existing homes in the New England area. The post-retrofit performance and cost ranges provided by this research project can provide concrete input for homeowners who are considering a DER. Field test data available for air tightness measured using blower door test. House 1 - Address Belchertown, MA 01007, Notes: Energy Savings: 75%, Company: Clark House 2-1 and 2 - Address (1) Brownsberger, MA 02478 and (2) Belmont, MA 02478, Notes Energy Savings: 73%, Company: Brownsberger House 3 - Address Millbury, MA 01527, Notes Energy Savings: 31%, Company: Tweedly House 4 - Address Milton, MA 02186 Notes Energy Savings: 42%, Company: Koh House 5 - Address Quincy, MA 02169, Notes Energy Savings: 57%, Company: Hall House 6-1 and 2 - Address Arlington, MA 02476, Notes Energy Savings: 55%, Company: Venable-Hwang House 7 - Address Newton, MA 02459, Notes Energy Savings: 42%, Company: Lavine House 8-1, 2, and 3 - Address Jamaica Plain, MA 02130, Notes Energy Savings: 43%, Company: Buhs House 9 - Address Northampton, MA 01060, Notes Energy Savings: 49%, Company: Wick House 10 - Address Lancaster, MA 01523, Notes Energy Savings: 40%, Company: Habitat for Humanity of North Central Massachusetts House 11 - Address Brookline, MA 02445, Notes Energy Savings: 27%, Company: Aquiline House 12 - Address Westford, MA 01886, Notes Energy Savings: 30%, Company: Atkins House 13 - Address Gloucester, MA 01930, Notes Energy Savings: 35%, Company: Cunningham

airtightness↗

Balancing renewable energy and river resources by moving from individual assessments of hydropower projects to energy system planning

As governments and non-state actors strive to minimize global warming, a primary strategy is the decarbonization of power systems which will require a massive increase in renewable electricity generation. Leading energy agencies forecast a doubling of global hydropower capacity as part of that necessary expansion of renewables. While hydropower provides generally low-carbon generation and can integrate variable renewables, such as wind and solar, into electrical grids, hydropower dams are one of the primary reasons that only one-third of the world’s major rivers remain free-flowing. This loss of free-flowing rivers has contributed to dramatic declines of migratory fish and sediment delivery to agriculturally productive deltas. Further, the reservoirs behind dams have displaced tens of millions of people. Thus, hydropower challenges the world’s efforts to meet climate targets while simultaneously achieving other Sustainable Development Goals. In this paper, we explore strategies to achieve the needed renewable energy expansion while sustaining the diverse social and environmental benefits of rivers. These strategies can be implemented at scales ranging from the individual project (environmental flows, fish passage and other site-level mitigation) to hydropower cascades to river basins and regional electrical power systems. While we review evidence that project-level management and mitigation can reduce environmental and social costs, we posit that the most effective scale for finding balanced solutions occurs at the scale of power systems. We further hypothesize that the pursuit of solutions at the system scale can also provide benefits for investors, developers and governments; evidence of benefits to these actors will be necessary for achieving broad uptake of the approaches described in this paper. We test this hypothesis through cases from Chile and Uganda that demonstrate the potential for system-scale power planning to allow countries to meet low-carbon energy targets with power systems that avoid damming high priority rivers (e.g., those that would cause conflicts with other social and environmental benefits) for a similar system cost as status quo approaches. We also show that, through reduction of risk and potential conflict, strategic planning of hydropower site selection can improve financial performance for investors and developers, with a case study from Colombia.

Opperman, Jeffrey J.↗

Discovery Planetary Mission Operations Concepts

The NASA Discovery Program of small planetary missions will provide opportunities to continue scientific exploration of the solar system in today's cost-constrained environment. Using a multidisciplinary team, JPL has developed plans to provide mission operations within the financial parameters established by the Discovery Program. This paper describes experiences and methods that show promise of allowing the Discovery Missions to operate within the program cost constraints while maintaining low mission risk, high data quality, and reponsive operations.

low cost planetary exploration Discovery mission o↗

A methodology for optimal MSW management, with an application in the waste transportation of Attica Region, Greece

Highlights: • A two-step (strategic and detailed optimal planning) methodology is used for solving complex MSW management problems. • A software package is outlined, which can be used for generating detailed optimal plans. • Sensitivity analysis compares alternative scenarios that address objections and/or wishes of local communities. • A case study shows the application of the above procedure in practice and demonstrates the results and benefits obtained. - Abstract: The paper describes a software system capable of formulating alternative optimal Municipal Solid Wastes (MSWs) management plans, each of which meets a set of constraints that may reflect selected objections and/or wishes of local communities. The objective function to be minimized in each plan is the sum of the annualized capital investment and annual operating cost of all transportation, treatment and final disposal operations involved, taking into consideration the possible income from the sale of products and any other financial incentives or disincentives that may exist. For each plan formulated, the system generates several reports that define the plan, analyze its cost elements and yield an indicative profile of selected types of installations, as well as data files that facilitate the geographic representation of the optimal solution in maps through the use of GIS. A number of these reports compare the technical and economic data from all scenarios considered at the study area, municipality and installation level constituting in effect sensitivity analysis. The generation of alternative plans offers local authorities the opportunity of choice and the results of the sensitivity analysis allow them to choose wisely and with consensus. The paper presents also an application of this software system in the capital Region of Attica in Greece, for the purpose of developing an optimal waste transportation system in line with its approved waste management plan. The formulated plan was able to: (a) serve 113 Municipalities and Communities that generate nearly 2 million t/y of comingled MSW with distinctly different waste collection patterns, (b) take into consideration several existing waste transfer stations (WTS) and optimize their use within the overall plan, (c) select the most appropriate sites among the potentially suitable (new and in use) ones, (d) generate the optimal profile of each WTS proposed, and (e) perform sensitivity analysis so as to define the impact of selected sets of constraints (limitations in the availability of sites and in the capacity of their installations) on the design and cost of the ensuing optimal waste transfer system. The results show that optimal planning offers significant economic savings to municipalities, while reducing at the same time the present levels of traffic, fuel consumptions and air emissions in the congested Athens basin.

42 ENGINEERING↗

Second Line of Defense Megaports Initiative Sustainment Plan - Port Klang Malaysia

To reduce the risk of illicit trafficking of special nuclear and other radiological materials, the Megaports Initiative installs radiation detection systems at international seaports. Port Klang, Malaysia, is one such seaport identified by the Megaports Initiative as a key area to install equipment to accomplish the mission of preventing the acquisition and smuggling of materials that could be used to create weapons of mass destruction or radiological dispersal devices. Sustainability is a critical factor of all components of the Megaports Initiative. The sustainability plan is developed to assist the partner country in securing the technical, financial, and policy commitments required to develop and implement a country-specific strategy. A robust sustainability plan will define the long-term relationship between the U.S. Department of Energy and the Government of Malaysia as well as promote the ongoing proficient radiation detection system operations at Port Klang, Malaysia.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Unlocking the Value of Deep Energy Retrofits

This publication is based on an extensive study conducted on behalf of the New York State Energy Research and Development Authority (NYSERDA) and the U S Department of Energy (DOE) to explore financial and risk products to accelerate the implementation of deep energy retrofit (DER) solutions to reduce costs These financial products are intended to speed market development via three fundamental themes: reallocating risk from building owners and lenders to insurers, quantifying and monetizing previously unrecognized value associated with DERs, and providing building owners and lenders with confidence in the performance of building systems Findings are based on a comprehensive analysis and characterization of 100+ existing DER case studies, and more than 40 qualitative interviews with industry experts, including insurers, researchers, building owners, and policymakers In addition, a quantitative model of overall project economics with baseline, high, and low cases was developed This data informed the analysis that resulted in three recommended financial product solutions, which were evaluated for their potential to raise projected cash flows and finance DERs: 1) Building System Performance and Energy Savings Guarantee; 2) Trade Credit Insurance; 3) Ancillary Revenue Contracts. This report identifies many value streams associated with DERs and introduces these three potential financial products, which aim to reallocate risks and reduce barriers to the adoption of advanced envelope DERs.

ancillary renenue contracts↗

Minnesota’s Combined Heat and Power (CHP) Action Plan

With funding from the Office of Energy Efficiency and Renewable Energy State Energy Program’s Competitive Financial Assistance program, the Minnesota’s Department of Commerce (COM) created a Combined Heat and Power (CHP) Action Plan that has the potential to double the state’s CHP capacity, help the state achieve its target of 1.5% annual energy savings, and improve the resilience of the distribution grid.

implementation model, combined heat and power acti↗

Planning for PV: The Value and Cost of Solar Electricity

This is a brochure developed specifically for residential home builders. It provides information on basic financial factors and additional resources to consider when incorporating solar technologies into building plans.

Solar, Solar Energy↗