Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Equipment Design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Hazard Analysis for the Pretreatment Engineering Platform (PEP)

The Pretreatment Engineering Platform (PEP) is designed to perform a demonstration on an engineering scale to confirm the Hanford Waste Treatment Plant Pretreatment Facility (PTF) leaching and filtration process equipment design and sludge treatment process. The system will use scaled prototypic equipment to demonstrate sludge water wash, caustic leaching, oxidative leaching, and filtration. Unit operations to be tested include pumping, solids washing, chemical reagent addition and blending, heating, cooling, leaching, filtration, and filter cleaning. In addition, the PEP will evaluate potential design changes to the ultrafiltration process system equipment to potentially enhance leaching and filtration performance as well as overall pretreatment throughput. The skid-mounted system will be installed and operated in the Processing Development Laboratory-West at Pacific Northwest National Laboratory (PNNL) in Richland, Washington.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feasibilities of a Coal-Biomass to Liquids Plant in Southern West Virginia

This project has generated comprehensive and realistic results of feasibilities for a coal-biomass to liquids (CBTL) plant in southern West Virginia; and evaluated the sensitivity of the analyses to various anticipated scenarios and parametric uncertainties. Specifically the project has addressed economic feasibility, technical feasibility, market feasibility, and financial feasibility. In the economic feasibility study, a multi-objective siting model was developed and was then used to identify and rank the suitable facility sites. Spatial models were also developed to assess the biomass and coal feedstock availabilities and economics. Environmental impact analysis was conducted mainly to assess life cycle analysis and greenhouse gas emission. Uncertainty and sensitivity analysis were also investigated in this study. Sensitivity analyses on required selling price (RSP) and greenhouse gas (GHG) emissions of CBTL fuels were conducted according to feedstock availability and price, biomass to coal mix ratio, conversion rate, internal rate of return (IRR), capital cost, operational and maintenance cost. The study of siting and capacity showed that feedstock mixed ratio limited the CBTL production. The price of coal had a more dominant effect on RSP than that of biomass. Different mix ratios in the feedstock and conversion rates led to RSP ranging from $104.3 - $157.9/bbl. LCA results indicated that GHG emissions ranged from 80.62 kg CO 2 eq to 101.46 kg CO2 eq/1,000 MJ of liquid fuel at various biomass to coal mix ratios and conversion rates if carbon capture and storage (CCS) was applied. Most of water and fossil energy were consumed in conversion process. Compared to petroleum-derived-liquid fuels, the reduction in GHG emissions could be between -2.7% and 16.2% with CBTL substitution. As for the technical study, three approaches of coal and biomass to liquids, direct, indirect and hybrid, were considered in the analysis. The process models including conceptual design, process modeling and process validation were developed and validated for different cases. Equipment design and capital costs were investigated on capital coast estimation and economical model validation. Material and energy balances and techno-economic analysis on base case were conducted for evaluation of projects. Also, sensitives studies of direct and indirect approaches were both used to evaluate the CBTL plant economic performance. In this study, techno-economic analysis were conducted in Aspen Process Economic Analyzer (APEA) environment for indirect, direct, and hybrid CBTL plants with CCS based on high fidelity process models developed in Aspen Plus and Excel. The process thermal efficiency ranges from 45% to 67%. The break-even oil price ranges from $86.1 to $100.6 per barrel for small scale (10000 bbl/day) CBTL plants and from $65.3 to $80.5 per barrel for large scale (50000 bbl/day) CBTL plants. Increasing biomass/coal ratio from 8/92 to 20/80 would increase the break-even oil price of indirect CBTL plant by $3/bbl and decrease the break-even oil price of direct CBTL plant by about $1/bbl. The order of carbon capture penalty is direct > indirect > hybrid. The order of capital investment is hybrid (with or without shale gas utilization) > direct (without shale gas utilization) > indirect > direct (with shale gas utilization). The order of thermal efficiency is direct > hybrid > indirect. The order of break-even oil price is hybrid (without shale gas utilization) > direct (without shale gas utilization) > hybrid (with shale gas utilization) > indirect > direct (with shale gas utilization).

01 COAL, LIGNITE, AND PEAT↗

Integrating human factors knowledge into certification: The point of view of the Internatioanal Civil Aviation Organization (ICAO)

It is appropriate here to repeat the analogy described in the introduction to this paper which is that: The consideration of human factors requirements during the design stage of advanced, new technology systems may be seen as resting over a three-legged stool. The first leg, the equipment that a system will utilize to achieve its goals, has traditionally attracted ergonomic considerations associated with equipment design, usually centered around 'knobs and dials.' Lately, this view has expanded to include the so-called other important aspect of Human Factor's study which deals with the cognitive, behaviorial and social processes of the human operators. Study in this area must be furthered. The second leg of the stool, the procedures to operate the equipment, however, has been largely unaddressed. Procedures are not inherent to equipment, but must be developed. The importance of proper human factors consideration in the design of procedures can not be overstated. Lastly, the third leg of the stool, the certification of personnel who will operate the equipment, is very much underway, but far from being complete. The real quest now, however, is to integrate these three legs into an indivisible one. Finally, and most importantly, this workshop and its topic are extremely timely in that we are at the dawn of the most ambitious development ever undertaken in international civil aviation. This would allow us the rather unique opportunity to put theory into practice in the near future by ensuring that the concepts developed and furthered by this workshop and the follow-up are implemented in the design and certification of the ICAO future CNS/ATM systems described earlier in this paper. Now is the time to incorporate human factors requirements during the certification processes of these systems. This might act as a test to the feasibility of these ideas. Such endeavors represent a challenge for the research, engineering, training, operational and regulatory communities. But there is certainly more to be gained by attempting to meet the challenge rather than refraining from progress by decrying the difficulties involved.

Maurino, Daniel↗

On the Development of a Distillation Process for the Electrometallurgical Treatment of Irradiated Spent Nuclear Fuel

As part of the spent fuel treatment program at the Idaho National Laboratory, a vacuum distillation process is being employed for the recovery of actinide products following an electrorefining process. Separation of the actinide products from a molten salt electrolyte and cadmium is achieved by a batch operation called cathode processing. A cathode processor has been designed and developed to efficiently remove the process chemicals and consolidate the actinide products for further processing. This paper describes the fundamentals of cathode processing, the evolution of the equipment design, the operation and efficiency of the equipment, and recent developments at the cathode processor. In addition, challenges encountered during the processing of irradiated spent nuclear fuel in the cathode processor will be discussed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Improved biomass feedstock materials handling and feeding engineering data sets, design methods, and modeling/simulation tools

Forest Concepts led a project to develop a set of tools which enable feedstock handing equipment designers to better understand and model the flowability of bulk particulate biomass materials. The work products included improved flowability mathematical models, data sets used to populate the models, and two new laboratory devices – a biomass-scale true cubical triaxial tester and a biomass-scale gas pycnometer. This work was funded in part by the US Department of Energy under contact DE-EE0008254.

09 BIOMASS FUELS↗

Leaning the tank closure process at the Savannah River Site - 15515

The Savannah River Site liquid waste system consists of multiple facilities that safely receive and store legacy radioactive waste prior to treatment and disposition. The liquid radioactive waste is stored in large underground tanks. The waste inventory currently stored in these tanks is a complex mixture of insoluble metal hydroxide solids and soluble salt supernate. The high-level (radioactive) portion of the waste is vitrified into a glass waste form, while the low-level waste is immobilized into a cementitious grout waste form called salt-stone. Once the waste is retrieved and processed, the tanks are closed. The closure process includes; waste removal, characterizing residuals, isolating the tank systems, and stabilizing the tank with tailored grout formulations. The core of Lean is to eliminate waste or non-value added steps from processes to maximize customer value. From the perspective of the customer, 'value' is defined as any action or process for which a customer would willingly pay. In this case our product is to safely and efficiently remove waste from the underground storage tanks and demonstrate operational closure to the State of South Carolina. Savannah River Remediation (SRR) initiated the use of the Lean process in late 2013 and identified the Tank Closure process as one of the targeted areas to improve. The first step in the Lean process is to 'map' out the value stream and identify areas where non-value added steps are present and then prioritize Rapid Improvement Events (RIE). Based on this mapping process, there were a number of areas that SRR determined warranted further evaluation for improvements, including; standard equipment design, characterization, standard work packages, regulatory documentation, tank characterization, structural evaluations, engineering documentation and equipment re-use. This paper focuses on the application of the Lean process at SRR and more specifically, effective application to the Tank Closure Process. This paper discusses the value stream mapping process for Tank Closures, as well as, summarizes the RIEs and demonstrate the realized benefits. Benefits can come in a variety of forms, from schedule compression to decreased costs. Through the Lean process we have been able to identify close to $10 M in savings over the life cycle of the tank closure process and a 4 year schedule compression. Cost and schedule savings are used to accomplish further risk reduction efforts. In addition to hard benefits, there are also soft benefits. These soft benefits are a result of the process itself and help drive improved efficiencies through better communication with key stakeholders, such as regulators and customers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Evaluation of a Three-Stage 5 cm Annular Centrifugal Contractor Remote Module at the INL

Development work using Annular Centrifugal Contactors (ACCs) to process spent nuclear fuel supporting Global Nuclear Energy Partnership (GNEP) program goals continues at the Idaho National Laboratory (INL). Previous work has resulted in defining and characterizing the performance of 5 cm and 12.5 cm single-stage units in a “cold” environment. The next logical step is to investigate the implementation of ACCs in a “hot” or radioactive environment. Following the design, construction, and hydraulic testing of a three-stage prototype module, the evaluation of the equipment design for use in remote environments was necessary. A remote evaluation of a three-stage CINC V-02 remote prototype module has successfully been completed. The evaluation included multiple removal and re-insertion iterations for each rotor/motor assembly. The iterations were performed using both master-slave (MSM) and electromechanical manipulators (EMM) in a remote mockup test facility. Results from the evaluation indicated that the rotor/motor assemblies can be effectively removed and re-installed with both the MSM and EMM equipment. The EMM is considered to be a better choice for rotor/motor assembly changeout due to a 20 pound at-wrist load capacity associated with the MSM. The sampling evaluation indicated the MSM would be a good choice for smaller, more intricate remote handling activities. A thorough investigation of remote operations personnel capabilities was not performed as the evaluations were considered quite routine as stated by the operator performing the lifts. Following the execution of the lifts, the equipment operator suggested two minimal modifications that would further ease rotor/motor changeouts. The first modification would be to simply re-position the lifting bail so the rotor/motor assembly hangs more vertical which better aligns the assembly when re-installing in the housing. The second modification is to add an additional ¼ to ½ in. length to the rear guide pin. This is a routinely practiced design addition that saves time and provides better alignment of a rotor/motor assembly prior to lowering into the housing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Scaleup and Site-Specific Engineering Design for Global Thermostat Direct Air Capture Technology

The overall goal of the project is completion of an initial design of a commercial-scale, Carbon Capture, Utilization, and Storage Direct Air Capture (CCUS-DAC) plant design at three different sites that captures a net of at least 100,000 tonnes per year (TPY) carbon dioxide (CO 2 ) from the atmosphere and considers compression and conditioning of the captured CO 2 for purpose of pipeline transportation to different geological formation sites for deep well injection and underground storage. In addition to the leading system consisting of a scaled-up Global Thermostat DAC unit, overall plant design includes a combined Heat and Power (CHP) unit integrated with a conventional liquid amine-based carbon capture system (90% capture) and compression facilities. These are considered balance of plant (BOP) systems and are required to provide low carbon-intensity steam and power to the DAC process. A second approach involving provision of DAC units modified to directly capture emissions from the CHP unit was initially assessed as an alternative and it was determined to be less mature than considered approach and not included in the scaled-up plant design efforts. Three geographically diverse continental United States locations were selected to better understand the effect of local/regional ambient conditions on scaled-up DAC system performance and project costs: Bucks, Alabama (hot wet climate), Odessa, Texas (dry hot climate), and Goose Creek, Illinois (mid continental climate). The team focused on initial engineering design activities, including the development of project design criteria, initiation of site-specific studies and investigations, completion of DAC system process and equipment design, and definition of balance of plant (BOP) engineering. The purpose of the activities were to develop Technoeconomic Analysis (TEA), Life-Cycle Analysis (LCA), and Environmental, Health, and Safety (EH&S) analysis, and Business Case Analysis (BCA) to validate that the project engineering and scale-up plans of the DAC systems, at each of the three distinct case studies considered, are technically, economically, and environmentally feasible for commercial-scale operation.

20 FOSSIL-FUELED POWER PLANTS↗

Basic Physics Questions Addressed by Astrophysics

Dark matter, dark energy, the Big Bang, testing relativity -- all are physics questions accessible to astrophysicists -- but all require new equipment. As Harwit's "Cosmic Discovery" pointed out, almost all great surprises in astronomy came from new equipment or new uses of equipment designed for other purposes, and many of those had military applications. I will outline prospects for new equipment and discuss how that equipment can be developed and built. Bigger and lighter mirrors, wavefront sensing and control, new detector technology, cryogenics -- each has its own social network, its own special possibilities, and its own funding sources outside science. I will discuss some examples drawn from real-life experience with the James Webb Space Telescope, a telescope that was said to have a "giggle factor" when it was proposed in 1995. Now each of the 10 major technologies has been brought to maturity, flight hardware is being built, and launch is planned for 2014. As an instrument builder all my life, I will speculate a little on what may be within our reach over the next few decades.

Mather, John C.↗

Solids Accumulation Scouting Studies

The objective of Solids Accumulation activities was to perform scaled testing to understand the behavior of remaining solids in a Double Shell Tank (DST), specifically AW-105, at Hanford during multiple fill, mix, and transfer operations. It is important to know if fissionable materials can concentrate when waste is transferred from staging tanks prior to feeding waste treatment plants. Specifically, there is a concern that large, dense particles containing plutonium could accumulate in poorly mixed regions of a blend tank heel for tanks that employ mixing jet pumps. At the request of the DOE Hanford Tank Operations Contractor, Washington River Protection Solutions, the Engineering Development Laboratory of the Savannah River National Laboratory performed a scouting study in a 1/22-scale model of a waste staging tank to investigate this concern and to develop measurement techniques that could be applied in a more extensive study at a larger scale. Simulated waste tank solids: Gibbsite, Zirconia, Sand, and Stainless Steel, with stainless steel particles representing the heavier particles, e.g., plutonium, and supernatant were charged to the test tank and rotating liquid jets were used to mix most of the solids while the simulant was pumped out. Subsequently, the volume and shape of the mounds of residual solids and the spatial concentration profiles for the surrogate for heavier particles were measured. Several techniques were developed and equipment designed to accomplish the measurements needed and they included: 1. Magnetic particle separator to remove simulant stainless steel solids. A device was designed and built to capture these solids, which represent the heavier solids during a waste transfer from a staging tank. 2. Photographic equipment to determine the volume of the solids mounds. The mounds were photographed as they were exposed at different tank waste levels to develop a composite of topographical areas. 3. Laser rangefinders to determine the volume of the solids mounds. The mounds were scanned after tank supernatant was removed. 4. Core sampler to determine the stainless steel solids distribution within the solids mounds. This sampler was designed and built to remove small sections of the mounds to evaluate concentrations of the stainless steel solids at different special locations. 5. Computer driven positioner that placed the laser rangefinders and the core sampler in appropriate locations over solids mounds that accumulated on the bottom of a scaled staging tank where mixing is poor. These devices and techniques were effective to estimate the movement, location, and concentrations of the solids representing heavier particles and could perform well at a larger scale The experiment contained two campaigns with each comprised of ten cycles to fill and empty the scaled staging tank. The tank was filled without mixing, but emptied, while mixing, in seven batches; the first six were of equal volumes of 13.1 gallons each to represent the planned fullscale batches of 145,000 gallons, and the last, partial, batch of 6.9 gallons represented a full-scale partial batch of 76,000 gallons that will leave a 72-inch heel in the staging tank for the next cycle. The sole difference between the two campaigns was the energy to mix the scaled staging tank, i.e., the nozzle velocity and jet rotational speed of the two jet pumps. Campaign 1 used 22.9 ft/s, at 1.54 rpm based on past testing and Campaign 2 used 23.9 ft/s at 1.75 rpm, based on visual observation of minimum velocity that allowed fast settling solids, i.e., sand and stainless steel, to accumulate on the scaled tank bottom.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Testing and Deployment of Remote Systems to Remove Highly Radioactive Soil at Hanford's 324 Building - 18043

U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CHPRC) is in the process of procuring, testing and deploying remotely operated tools to safely remove highly contaminated soil from beneath the 324 Building on the Hanford Site in southeastern Washington State. The 324 Building operated for more than 40 years, completing a variety of high-dose engineering development and demonstration activities inside six hot cells that shielded the workers from the highly radioactive materials. Activities to decommission, decontaminate and demolish the facility began in 2008. In 2010, soil contamination was found in the soil under one of the hot cells, and building deactivation was paused to evaluate the soil contamination. Sampling efforts, using borehole technology, revealed significant under-building contamination with dose rates measuring has high as 130 Sv/hr (13,000 R/hr). The highly-contaminated soil has to be removed before traditional open air deactivation activities can continue. CHPRC completed proof of concept testing and built a full-scale test facility to demonstrate the effectiveness of three primary tools that will accomplish the floor and soil removal. The tools include a commercially available concrete saw, and a commercially available excavator arm that have been modified to operate remotely in the high-radiation environment within the hot-cell. In order to reduce the wear on the hot-cell overhead cranes, a remote operated rail and cart system has been designed to transport soil and debris out of the hot-cell to an airlock area where the waste will be separated, according to its level of radioactivity. A camera and light system has been designed to provide visual and audio coverage of the hot-cell area that will allow the operations to proceed from remote control stations. This paper will describe the primary remote operated equipment designed for the project and the challenges and processes for developing, testing and deploying the equipment necessary to excavate the soil from below the 324 Building. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SEASAT A satellite scatterometer

The analyses performed in the early period of the program which formed the basis of the sensor design is reviewed, along with the sensor design. The test program is outlined, listing all tests performed and the environmental exposure (simulated) for each, as applicable. Ground support equipment designed and built for assembly integration and field testing is described. The software developed during the program and the algorithms/flow diagrams which formed the bases for the software are summarized.

Bianchi, R.↗

Space processing applications payload equipment study. Volume 2B: Payload interface analysis (power/thermal/electromagnetic compatibility)

As a part of the task of performing preliminary engineering analysis of modular payload subelement/host vehicle interfaces, a subsystem interface analysis was performed to establish the integrity of the modular approach to the equipment design and integration. Salient areas that were selected for analysis were power and power conditioning, heat rejection and electromagnetic capability (EMC). The equipment and load profiles for twelve representative experiments were identified. Two of the twelve experiments were chosen as being representative of the group and have been described in greater detail to illustrate the evaluations used in the analysis. The shuttle orbiter will provide electrical power from its three fuel cells in support of the orbiter and the Spacelab operations. One of the three shuttle orbiter fuel cells will be dedicated to the Spacelab electrical power requirements during normal shuttle operation. This power supplies the Spacelab subsystems and the excess will be available to the payload. The current Spacelab sybsystem requirements result in a payload allocation of 4.0 to 4.8 kW average (24 hour/day) and 9.0 kW peak for 15 minutes.

Hammel, R. L.↗

Process Feasibility Study in Support of Silicon Material, Task 1

During this reporting period, major activies were devoted to process system properties, chemical engineering and economic analyses. Analyses of process system properties was continued for materials involved in the alternate processes under consideration for solar cell grade silicon. The following property data are reported for silicon tetrafluoride: critical constants, vapor pressure, heat of varporization, heat capacity, density, surface tension, viscosity, thermal conductivity, heat of formation and Gibb's free energy of formation. Chemical engineering analysis of the BCL process was continued with primary efforts being devoted to the preliminary process design. Status and progress are reported for base case conditions; process flow diagram; reaction chemistry; material and energy balances; and major process equipment design.

Li, K. Y.↗

SILER: Seismic-Initiated events risk mitigation in Lead-cooled Reactors

SILER is a Collaborative Project, partially funded by the European Commission, aimed at studying the risk associated to seismic initiated events in Generation IV Heavy Liquid Metal reactors and developing adequate protection measures. The attention is focused on the evaluation of the effects of earthquakes (with particular regards to beyond design seismic events) and to the identification of mitigation strategies, acting both on structures and components design (as well as on the development of seismic isolation devices) which can also have positive effects on economics, leading to an high level of plant design standardization. Attention is also devoted to the identification of plant layout solutions able to avoid risks of radioactive release from both the core and other structures (i.e. the spent fuel storage pools). Specific effort is paid to the development of guidelines and design recommendations for addressing the seismic issue in next generation reactor systems. In addition, consideration will be devoted to transfer the knowledge developed in the project to Generation III advanced systems, in line with the objective of the SNE-TP SRA to support present and future Light Water Reactors and their further development, for which safety issues are key aspects to be addressed. Note, in this respect, that the benefits of base isolation in terms of response to design seismic actions are already widely recognized for Generation III LWRs, along with the possibility of a significant standardization of structural and equipment design. SILER activities started on October 1 st 2011 and are carried out by 18 partners: ENEA (Italy, Coordinator), AREVA NP SAS (France), SCK-CEN (Belgium), FIP Industriale (Italy), MAURER SOHENE (Germany), EC-JRC (Ispra (Italy)), SINTEC (Italy), KTH (Sweden), BOA-BKT (Germany), IDOM (Spain), ANSALDO (Italy), IPUL (Latvia), NUMERIA (Italy), VCE (Austria), SRS (Italy), CEA (France), EA (Spain), NUVIA (France). (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Control of the induced microgravity environment of the Man Tended Free Flyer (MTFF)

Induced disturbance sources have been identified on board the Man Tended Free Flyer (MTFF). Vibration responses at sensitive payload/spacecraft interfaces have been predicted by the application of an empirically found spacecraft dynamic transfer function. Vibrations from fluid loops (Freon, water) and of reaction wheels are assessed to be the main contributors to the induced microgravity environment. The expected payload acceleration response amplitudes presented here are more than one hundred times higher than the admissible values given by the MTFF system requirement, not considering the structural striction-friction effects which could be avoided by appropriate design. Real responses will be significantly lower because the derivation of excitation and transmission functions are based on worst case assumptions. The results indicate that future activities must be concentrated on equipment design improvement and the implementation of vibration reduction along the disturbance transmission path. The activities must be accompanied by early equipment and assembly development tests and transmissibility measurements with the integrated spacecraft engineering and structural models in order to improve the accuracy of payload response predictions.

Schlund, Juergen↗