Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Electric bus”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Lead-acid battery

A sealed, low maintenance battery (10, 100) is formed of a casing (14, 102) having a sealed lid (12, 104) enclosing cell compartments (22, 110) formed by walls (24, 132). The cells comprise a stack (26) of horizontally disposed negative active plates (30) and positive active plates (28) interspersed with porous, resilient separator sheets (30). Each plate has a set of evenly spaced tigs (40, 41) disposed on one side thereof; like polarity tigs being disposed on one side and opposite polarity tigs on the other. Columns of tigs are electrically and mechanically joined by vertical bus bars (46). The bus bars contain outwardly projecting arms (56) of opposite polarity which are electrically joined at each partition wall (24) to electrically connect the cells in series. The stack is compressed by biasing means such as resilient pad (58) attached to the lid or by joining the tigs (52) to the post (48) at a distance less than the thickness of the mat (124). The end bus bars (46) are joined to straps (60, 62) which connect to the terminals (16, 18). The negative plates contain more capacity than the positive plates and the starved electrolyte imbibed in the separator sheets permits pressurized operation during which oxygen diffuses through the separator sheet to the negative plate where it recombines. Excess pressure is relieved through the vent and pressure relief valve (20).

Edwards, Dean B.↗

A digital computer simulation and study of a direct-energy-transfer power-conditioning system

An investigation of the behavior of the power-conditioning system as a whole is a necessity to ensure the integrity of the aggregate system in the case of space applications. An approach for conducting such an investigation is considered. A description is given of the application of a general digital analog simulator program to the study of an aggregate power-conditioning system which is being developed for use on the International Ultraviolet Explorer spacecraft. The function of the direct energy transfer system studied involves a coupling of a solar array through a main distribution bus to the spacecraft electrical loads.

Burns, W. W., III↗

PC Software graphics tool for conceptual design of space/planetary electrical power systems

This paper describes the Decision Support System (DSS), a personal computer software graphics tool for designing conceptual space and/or planetary electrical power systems. By using the DSS, users can obtain desirable system design and operating parameters, such as system weight, electrical distribution efficiency, and bus power. With this tool, a large-scale specific power system was designed in a matter of days. It is an excellent tool to help designers make tradeoffs between system components, hardware architectures, and operation parameters in the early stages of the design cycle. The DSS is a user-friendly, menu-driven tool with online help and a custom graphical user interface. An example design and results are illustrated for a typical space power system with multiple types of power sources, frequencies, energy storage systems, and loads.

Truong, Long V.↗

Current collector for AMTEC

An electrode having higher power output is formed of an open mesh current collector such as expanded nickel covering an electrode film applied to a tube of beta-alumina solid electrolyte (BASE). A plurality of cross-members such as spaced, parallel loops of molybdenum metal wire surround the BASE tube. The loops are electrically connected by a bus wire. As the AMTEC cell is heated, the grid of expanded nickel expands more than the BASE tube and the surrounding loop of wire and become diffusion welded to the electrode film and to the wire loops.

Williams, Roger M.↗

Thin metal electrode for AMTEC

An electrode having higher power output is formed of a thin, porous film (less than 1 micrometer) applied to a beta-alumina solid electrolyte (BASE). The electrode includes an open grid, current collector such as a series of thin, parallel, grid lines applied to the thin film and a plurality of cross-members such as loop of metal wire surrounding the BASE tube. The loops are electrically connected by a bus wire. The overall impedance of the electrode considering both the contributions from the bulk BASE and the porous electrode BASE interface is low, about 0.5 OHM/cm.sup.2 and power densities of over 0.3 watt/cm.sup.2 for extended periods.

Williams, Roger M.↗

Network-Attached Solid-State Recorder Architecture

A document discusses placing memory modules on the high-speed serial interconnect, which is used by a spacecraft s computer elements for inter-processor communications, to allow all multiple computer system architectures to access the spacecraft data storage at the same time. Each memory board is identical electrically and receives its bus ID upon connection to the system. The computer elements are configured in a similar fashion. The architecture allows for multiple memory boards to be accessed simultaneously by different computer elements, and results in a scalable, strong, fault-tolerant system. The IEEE-1393 ring bus can be routed so that multiple card failures can occur and the mass memory storage will still function.

Cox, Brian↗

The electrical performance of Ag Zn batteries for the Venus multi-probe mission

An evaluation of 5 Ah and 21 Ah Silver-Zinc batteries was made to determine their suitability to meet the energy storage requirements of the bus vehicle, 3 small probes and large probe for the Venus multi-probe mission. The evaluation included a 4 Ah battery for the small probe, a 21 Ah battery for the large probe, one battery of each size for the bus vehicle power, a periodic cycling test on each size battery and a wet stand test of charged and discharged cells of both cell designs. The study on the probe batteries and bus vehicle batteries included both electrical and thermal simulation for the entire mission. The effects on silver migration and zinc penetration of the cellophane separators caused by the various test parameters were determined by visual and X-ray fluorescence analysis. The 5 Ah batteries supported the power requirements for the bus vehicle and small probe. The 21 Ah large probe battery supplied the required mission power. Both probe batteries delivered in excess of 132 percent of rated capacity at the completion of the mission simulation.

Palandati, C.↗

Hot Weather Impacts on Battery-Electric Transit Buses

Transit fleets considering integrating battery-electric buses (BEBs) can start by examining the impact of hot weather on BEBs and identifying key factors to optimize bus performance in high temperatures.

ADVANCED PROPULSION SYSTEMS↗

Radiation-Tolerant Dual Data Bus

An architecture, and a method of utilizing the architecture, have been proposed to enable error-free operation of a data bus that includes, and is connected to, commercial off-the-shelf (COTS) circuits and components that are inherently susceptible to singleevent upsets [SEUs (bit flips caused by impinging high-energy particles and photons)]. The architecture and method are applicable, more specifically, to data-bus circuitry based on the Institute for Electrical and Electronics Engineers (IEEE) 1394b standard for a high-speed serial bus.

Kinstler, Gary A.↗

Electrifying education: Exploring the electrification potential of U.S. School bus fleets

We analyze the operations of 270 diesel school buses across the United States to assess their electrification potential and evaluate the impact of various charging strategies on electricity demand. We find that school buses typically follow a two-route schedule on weekdays, featuring extended dwell times between morning and evening trips. Weekday trip distances average 25 miles, while weekend trips average 42 miles. Charging simulations indicate over 90% of the U.S. school bus fleet could be electrified using current technologies (300-mile range at 1.21 kWh/mile with 19.2-kW depot charging) without modifying existing operating patterns. Depot charging is a key enabler of school bus electrification, however, the strategic placement of charging stations at other locations (e.g., schools) can further increase electrification potential. Additionally, we find electric school bus charging to be highly flexible, with charge management capable of reducing peak charging loads at depots by up to 77%.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evolution of the Preliminary Fault Management Architecture and Design for the Psyche Mission

The Psyche Mission presents the first opportunity toexplore the largest metal asteroid in the solar system, (16)Psyche, which is believed to be the exposed core of a largerplanetesimal that was stripped of its rocky mantle throughmultiple collisions during early solar system formation. Themission was selected in January 2017 for a 2022 launch as partof NASA’s Discovery Program and is uniquely enabled by theintegration of a Solar Electric Propulsion (SEP) Chassisdelivered by Maxar Space Solutions with JPL’s core deepspace avionics, flight software, and fault managementarchitectures. One of the key design tasks is the development ofa fault management system capable of being responsive to theunique elements of the combined JPL and Maxar spacecraftarchitecture. This new design leverages the strengths of eachorganization, with Maxar delivering its well-proven highvoltage power bus and low-thrust electric propulsionsubsystem from its GEO communications satellite product line,and JPL delivering its deep space mission expertise and thehardware and software most critical to deep space missiondesign. The development of a robust low-thrust mission andthe integration of design philosophies and hardware from twoorganizations is not without its challenges though.A key challenge in the development of the Psyche faultmanagement architecture and design is in the integration ofdesign philosophies and hardware from JPL and Maxar. Atthe architecture level, Maxar GEO communications satellitesare developed under the premise of highly responsive groundin the loop for the resolution of anomalies, and theimplementation takes a fail-operational approach to minimizedown time for its customers. In contrast, a deep space missionmust be able to maintain safety with long periods of groundcommunication outage. Additionally, with no time-criticalevents after launch, the Psyche spacecraft will generally failsafe in the presence of anomalous conditions; specialconsideration is being given to this approach, however, tominimize the loss of electric propulsion thrust time, which iscritical to low-thrust missions. At the hardware level, thedetailed definition of interfaces between JPL and Maxarhardware presents a unique challenge in the development andflowdown of fault management requirements, the developmentand implementation of fault monitors and responses, and thedevelopment and verification of fault containment boundaries.This paper describes the evolution of the Psyche faultmanagement architecture and design from the concept studyinto the preliminary design phase, with a focus on the uniquechallenges associated with flying GEO communicationssatellite hardware in deep space, implementing a robust lowthrust mission, and the integration of design philosophies andhardware from JPL and Maxar. Details regarding how thesechallenges are addressed in the fault management design inorder to maximize heritage, leverage the strengths of eachorganization, and minimize risk across the design are alsodiscussed.

Marsh, Danielle↗

Zero-Emission Transit Bus Needs Assessment

The transition to zero-emissions vehicles (ZEVs) in public transit has gained traction due to significant federal investments from the Bipartisan Infrastructure Law (BIL) and the Inflation Reduction Act (IRA). This needs assessment, commissioned by the Joint Office of Energy and Transportation and conducted by researchers at the Idaho National Laboratory, explores the current state of electrification in transit agencies, identifying barriers to implementation, potential funding sources, and operational considerations necessary for a successful transition. The assessment involved qualitative interviews with representatives from 19 transit service providers across diverse geographic regions. Key findings highlight the challenges related to bus facilities and operations, which require careful planning for charging infrastructure and maintenance capabilities to accommodate battery electric buses (BEBs) and hydrogen fuel cell buses (HFCBs). Agencies reported operational hurdles due to the shorter range of BEBs compared to diesel buses, necessitating revised scheduling and routing strategies. Despite these challenges, many agencies expressed optimism about their capacity to adapt. Funding availability emerged as a critical factor influencing the transition to ZEVs. While agencies welcomed increased financial support, particularly from the Low or No Emission Grant Program (Lo-No), concerns about the sustainability of this funding and the ongoing operational costs were prevalent. The need for a comprehensive funding inventory was underscored to ensure transit agencies are aware of all available resources. Technological constraints were significant barriers to ZEV adoption. The limited range of BEBs was frequently cited as a concern, leading to operational challenges and reliability issues. Agencies reported difficulties in sourcing replacement parts, which exacerbated downtime and maintenance challenges. Workforce development and training were identified as pivotal for a successful transition. Many agencies rely heavily on manufacturers for technician training, highlighting the need for scalable training programs that equip staff with the necessary skills to maintain electric powertrains effectively. This assessment offers actionable recommendations for the Joint Office, including enhancing outreach to transit agencies, developing resources for effective utility partnerships, and facilitating comprehensive training programs. Establishing a zero-emission bus evaluation program to track performance metrics such as cost, range, and reliability could provide valuable insights for transit agencies. The needs assessment provides a detailed examination of the challenges and opportunities facing transit agencies in their transition to zero-emissions bus fleets. By addressing these issues through targeted support, stakeholders can collaboratively work towards a cleaner, more sustainable public transportation system that benefits all communities.

33 - ADVANCED PROPULSION SYSTEMS↗

Report of the Seasat Failure Review Board

The Seasat spacecraft failed on October 9, 1978, after satisfactory operation in orbit for 105 days, as a result of a loss of electrical power in the Agena bus that was used as a part of the spacecraft. The loss of power was caused by a massive and progressive short in one of the slip ring assemblies that was used to connect the rotating solar arrays into the power subsystem. The most likely cause of this short was the initiation of an arc between adjacent slip ring brush assemblies. The triggering mechanism of this arc could have been either a wire-to-brush assembly contact, a brush-to-brush contact, or a momentary short caused by a contaminant that bridged internal components of opposite electrical polarity.

Source record↗

Report of the Seasat Failure Review Board

The Seasat spacecraft failed on October 9, 1978, after satisfactory operation in orbit for 105 days, as a result of a loss of electrical power in the Agena bus that was used as a part of the spacecraft. This loss of power was caused by a massive and progressive short in one of the slip ring assemblies that was used to connect the rotating solar arrays into the power subsystem. The most likely cause of this short was the initiation of an arc between adjacent slip ring brush assemblies. The triggering mechanism of this arc could have been either a wire-to-brush assembly contact, a brush-to-brush contact, or a momentary short caused by a contaminant that bridged internal components of opposite electrical polarity. The slip ring assembly, as used in the Seasat spacecraft, was connected into the power subsystem in such a way that most of the adjacent brush assemblies were of opposite electrical polarity. This wiring arrangement, together with the congested nature of the design itself, made the Seasat slip ring assembly a unique, first-of-a-kind component that was particularly prone to shorting. The possibility of slip ring failures resulting from placing opposite electrical polarities on adjacent brush assemblies was known at least as early-as the summer of 1977 to other projects within the contractor's organization. Furthermore, failures of slip ring assemblies due to shorting between brushes had been experienced by the prime contractor on slip ring assemblies used by other programs. That the Seasat organization was not fully aware of these potential failure modes was due to a breakdown in communication within the contractor's organization.

Lundin, Bruce T.↗

High-Speed Ring Bus

The high-speed ring bus at the Jet Propulsion Laboratory (JPL) allows for future growth trends in spacecraft seen with future scientific missions. This innovation constitutes an enhancement of the 1393 bus as documented in the Institute of Electrical and Electronics Engineers (IEEE) 1393-1999 standard for a spaceborne fiber-optic data bus. It allows for high-bandwidth and time synchronization of all nodes on the ring. The JPL ring bus allows for interconnection of active units with autonomous operation and increased fault handling at high bandwidths. It minimizes the flight software interface with an intelligent physical layer design that has few states to manage as well as simplified testability. The design will soon be documented in the AS-1393 standard (Serial Hi-Rel Ring Network for Aerospace Applications). The framework is designed for "Class A" spacecraft operation and provides redundant data paths. It is based on "fault containment regions" and "redundant functional regions (RFR)" and has a method for allocating cables that completely supports the redundancy in spacecraft design, allowing for a complete RFR to fail. This design reduces the mass of the bus by incorporating both the Control Unit and the Data Unit in the same hardware. The standard uses ATM (asynchronous transfer mode) packets, standardized by ITU-T, ANSI, ETSI, and the ATM Forum. The IEEE-1393 standard uses the UNI form of the packet and provides no protection for the data portion of the cell. The JPL design adds optional formatting to this data portion. This design extends fault protection beyond that of the interconnect. This includes adding protection to the data portion that is contained within the Bus Interface Units (BIUs) and by adding to the signal interface between the Data Host and the JPL 1393 Ring Bus. Data transfer on the ring bus does not involve a master or initiator. Following bus protocol, any BIU may transmit data on the ring whenever it has data received from its host. There is no centralized arbitration or bus granting. The JPL design provides for autonomous synchronization of the nodes on the ring bus. An address-synchronous latency adjust buffer (LAB) has been designed that cannot get out of synchronization and needs no external input. Also, a priority-driven cable selection behavior has been programmed into each unit on the ring bus. This makes the bus able to connect itself up, according to a maximum redundancy priority system, without the need for computer intervention at startup. Switching around a failed or switched-off unit is also autonomous. The JPL bus provides a map of all the active units for the host computer to read and use for fault management. With regard to timing, this enhanced bus recognizes coordinated timing on a spacecraft as critical and addresses this with a single source of absolute and relative time, which is broadcast to all units on the bus with synchronization maintained to the tens of nanoseconds. Each BIU consists of up to five programmable triggers, which may be programmed for synchronization of events within the spacecraft of instrument. All JPL-formatted data transmitted on the ring bus are automatically time-stamped.

Wysocky, Terry↗