Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EVM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Innovative Approaches to Remote Sensing in NASA's Earth System Science Pathfinder (ESSP) Program

NASA's Earth Venture class (EV) of mission are competitively selected, Principal Investigator (PI) led, relatively low cost and narrowly focused in scientific scope. Investigations address a full spectrum of earth science objectives, including studies of the atmosphere, oceans, land surface, polar ice regions, and solid Earth. EV has three program elements: EV-Suborbital (EVS) are suborbital/airborne investigations; EV-Mission (EVM) element comprises small complete spaceborne missions; and EV-Instrument (EVI) element develops spaceborne instruments for flight as missions-of-opportunity (MoO). To ensure the success of EV, the management approach of each element is tailored according to the specific needs of the element.

Peri, Frank↗

Impacts into a Strength‐Layered Target: The Time Evolution of the Excavation‐Stage Flow

Impact cratering has dominated the evolution and modification of planetary surfaces throughout the history of the solar system. Impact craters can serve as probes to understanding the details of a planetary subsurface; for example, Oberbeck and Quaide suggested that crater morphology can be used to estimate the thickness of a regolith layer on top of a more competent unit. Lunar craters show a morphological progression from a simple bowl shape to flat‐floored and concentric craters as diameter increases for a given regolith thickness. The final shape of the impact crater is a result of the subsurface flow‐field initiated as the projectile transfers its energy and momentum to the target surface at the moment of impact. Therefore, when a regolith layer is present over a stronger substrate, such as is the case on the lunar mare, the substrate modifies the flow‐field resulting in the distinctive final crater morphology. Here we report on a series of experimental impacts into targets composed of a thin (2 cm) layer of loose sand on top of a stronger substrate. We use the Ejection‐Velocity Measurement System (EVMS, Fig.1) developed by [3] to examine the ejecta kinematics at specific times during the formation of these craters in strength‐layered targets.

J. L. B. Anderson↗

Wide Bandgap Semiconductor Devices & Systems for Communications in Extreme Environment

The feasibility of Ka-band gallium nitride (GaN) based high power amplifier (HPA) for signal amplification in extreme planetary environment is investigated and its measured performance is presented. The data includes Pout, PAE, EVM for several waveforms and data rates, output spectrum, IMD, Noise Figure, and Gain. The data indicates excellent overall performance. Potential application of this HPA includes communication systems required to operate in the extreme hot environment of Mercury and Venus, extreme cold and high radiation environment of Jupiter’s icy moons, and Artemis missions that involve human/robotic exploration and long-term presence on the Moon.

Gallium Nitride↗

Design of a Thermal Testbed for Metrology of Active Antennas

NASA mission requirements have driven an increased interest in active phased array antennas (APAA) for space-based user communication terminals. Recent advancements in 5G technology have driven down the cost of APAA development and manufacturing all while providing a technology solution that covers many existing Ka-Band satellite communication spectrum bands. While these developments have provided ample opportunities to leverage new chips and arrays for use in space, there is also a need to evaluate these antennas in a relevant environment. Active arrays, as designed for use in 5G, require thermal management to avoid damage to the device as well as to maintain performance. Measured performance under various thermal conditions is essential both for understanding overall APAA performance and ensuring operation is within required tolerances. To address these measurement needs, the SmallSat Ka-band Operations User Terminal (SKOUT) project at the NASA Glenn Research Center (GRC) developed a test environment that combines traditional antenna and communication system metrology with a conduction cooling/heating thermal control system to simulate the space thermal environment. This paper will address the metrologysystem design and performance specifications as well as test article setup and operation. Tests that are typically performed at ambient temperature can now be performed over the typical temperature range of a Low Earth Orbit (LEO) mission. These tests include error vector magnitude (EVM), gain to noise temperature (G/T), antenna patterns, and non-linear characterization. The paper will cover the configuration for each test and provide results from a recent test campaign. Results illustrate the importance of higher fidelity environmental testing when evaluating the performance of an APAA.

active phased array↗

Demonstration of a Switched Wideband GaN High-Power Amplifier for Future Space Missions

In this paper, we present the architecture of a Ka-band switched, wideband, high efficiency gallium nitride based high-power amplifier. The architecture is validated by characterizing the driver and power amplifier chain. The measured results include Pout, Gain, PAE, RMS EVM for QPSK, Offset-QPSK, 8PSK, 16APSK, and 16QAM constellations, 3rd order IMD products, and noise figure. The wide bandwidth and high output power of the amplifier will enable future user terminals to interoperate between multiple service provider’s space networks.

high power amplifier↗

Demonstration of a Switched Wideband GaN High-Power Amplifier for Future Space Missions

In this paper, we present the architecture of a Ka-band switched, wideband, high efficiency gallium nitride based high-power amplifier. The architecture is validated by characterizing the driver and power amplifier chain. The measured results include Pout, Gain, PAE, RMS EVM for QPSK, Offset-QPSK, 8PSK, 16APSK, and 16QAM constellations, 3rd order IMD products, noise figure, and added phase noise. The wide bandwidth and high output power of the amplifier will enable future user terminals to interoperate between multiple service provider’s space networks.

Rainee N. Simons↗

Demonstration of a Switched Wideband GaN High-Power Amplifier for Future Space Missions

In this paper, we present the architecture of a Ka-band switched, wideband, high efficiency gallium nitride based high-power amplifier. The architecture is validated by characterizing the driver and power amplifier chain. The measured results include Pout, Gain, PAE, RMS EVM for QPSK, Offset-QPSK, 8PSK, 16APSK, and 16QAM constellations, 3rd order IMD products, noise figure, and added phase noise. The wide bandwidth and high output power of the amplifier will enable future user terminals to interoperate between multiple service provider’s space networks.

High power amplifier↗

Benefits of Ka-band GaN MMIC High Power Amplifiers With Wide Bandwidth and High Spectral/Power Added Efficiencies for Cognitive Radio Platforms

A cognitive radio on a future NASA near-Earth spacecraft will be capable of sensing its environment and dynamically adapting its operating parameters to provide the desired SATCOM service to the mission. A key component that can enable this type of operation is a high-power amplifier (HPA) that resides on the radio platform. In this paper, we present the RF performance characteristics of a Ka-band gallium nitride (GaN) monolithic microwave integrated circuit (MMIC) based HPA for cognitive radio platforms. These characteristics include the output power, gain, power added efficiency (PAE), RMS error vector magnitude (EVM), spectral efficiency, 3rd-order intermodulation distortion (IMD) products, spectrum, spectral regrowth, noise figure (NF), and phase noise. The data presented indicates that the HPA meets NTIA, military, and commercial spectral mask requirements. In addition, we discuss the benefits offered by the above performance characteristics toward the design and implementation of a cognitive radio platform. Furthermore, as examples, we discuss three potential use cases that apply artificial intelligence (AI) and machine learning (ML) techniques and exploit the performance characteristics discussed above to provide a knowledge-based cognitive radio platform design for SATCOM. Thus, cognitive radios with performance flexibility can enable roaming and provide seamless interoperability autonomously in the future between NASA, commercial, and other space networks owned by U.S. government agencies.

Gallium nitride↗

Benefits of Ka-band GaN MMIC High Power Amplifiers With Wide Bandwidth and High Spectral/Power Added Efficiencies for Cognitive Radio Platforms

A cognitive radio on a future NASA near-Earth spacecraft will be capable of sensing its environment and dynamically adapting its operating parameters to provide the desired SATCOM service to the mission. A key component that can enable this type of operation is a high-power amplifier (HPA) that resides on the radio platform. In this report, we present the RF performance characteristics of a Ka-band gallium nitride (GaN) monolithic microwave integrated circuit (MMIC) based HPA for cognitive radio platforms. These characteristics include the output power, gain, power added efficiency (PAE), RMS error vector magnitude (EVM), spectral efficiency, 3rdorder intermodulation distortion (IMD) products, spectrum, spectral regrowth, noise figure (NF), phase noise, and group delay. The data presented indicates that the HPA meets NTIA, military, and commercial spectral mask requirements. In addition, we discuss the benefits offered by the above performance characteristics toward the design and implementation of a cognitive radio platform. Furthermore, as examples, we discuss three potential use cases that apply artificial intelligence (AI) and machine learning (ML) techniques and exploit the performance characteristics discussed above to provide a knowledge-based cognitive radio platform design for SATCOM. Thus, cognitive radios with performance flexibility can enable roaming and provide seamless interoperability autonomously in the future between NASA, commercial, and other space networks owned by U.S. government agencies.

Gallium nitride↗

Ka-Band GaN-on-SiC MMIC Balanced High Power Amplifier for NASA's Lunar Missions

The feasibility of Ka-band GaN-on-SiC MMIC based balanced high power amplifier (HPA) for science data downlinks from NASA’s Lunar mission assets in space is investigated. The HPA combines the RF output power from two PAs using a rectangular waveguide based 3-dB hybrid coupler. The investigation includes characterizing the HPA for the overall RF output power, Gain, PAE, RMS EVM for offset-QPSK, 8PSK, 16APSK, and 32APSK waveforms, Spectrum, 3rd order IMD products, noise figure, phase noise, & group delay. The HPA has high Pout and good linearity and can support high data rate downlinks from the surface and vicinity of the Moon to Earth.

Rainee.N. Simons↗

Demonstration of GaN HEMT MMIC High-Power Amplifier for Lunar Proximity Communications

In this paper, we demonstrate a Ka-band high power, high efficiency, GaN HEMT MMIC based power amplifier for communications from the lunar orbit to lunar surface. The measured results include Pout, Gain, PAE, RMS EVM for Offset-QPSK, 8PSK, 16APSK, and 32APSK waveforms, 3rd-order IMD products, noise figure, and phase noise.

Ka-band↗

Environmental cleanup of the East Tennessee Technology Park - Year three - A status report - 15522

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (Reservation) in Tennessee. Under the contract, the base period scope of work to be completed by 2016 includes demolition of both the K-25 and K-31 gaseous diffusion buildings and all demolition waste dispositioned, initiation of demolition on the remaining K-27 gaseous diffusion building, safe storage of transuranic (TRU) waste for eventual transfer to the Transuranic Waste Processing Center, previously designated -No-Path-To-Disposition Waste- dispositioned to the extent possible, and completion of design and engineering of a mercury treatment system to be installed at the Y-12 National Security Complex (Y-12). UCOR will have also managed DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and Y-12 in a safe and cost-effective manner. Since assuming responsibilities as the ETTP and Oak Ridge Reservation cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; completed the deactivation and demolition (D and D) of the 44-acre K-25 gaseous diffusion building; removed and disposed of a contaminated underground storage tank (Tank W-1A) at ORNL; dispositioned mercury-contaminated storage tanks at Y-12; completed closure of the Toxic Substances Control Act Incinerator; disposed of more than 158,000 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF); and conducted operations, surveillance, and maintenance activities at 180 DOE EM facilities at ETTP, ORNL, and Y-12 in a safe and cost-effective manner. In 2014, UCOR completed the removal and disposal of all of the K-25 demolition debris; completed the removal of asbestos-laden transite siding on the K-31 gaseous diffusion building and began demolition of that 17-acre building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2015; advanced the design and engineering of a Mercury Treatment Facility to be located at Y-12; continued the cost-effective and safe disposition of all cleanup wastes; and readied ETTP for Voluntary Protection Program Star Status Assessment in 2015. Project performance as of December 31, 2014, continued to be excellent: - Cost Performance Index - 1.12 - Schedule Performance Index - 1.02 At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its excellent project performance. Through calendar year 2014, UCOR's recordable injury rate was 1.04 occurrences per 200,000 work hours, and the lost workday case rate was 0.52. This performance continues to be due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key enablers included: - Selected and deployed experienced staff in key leadership positions throughout the organization, continually re-energizing the organization with new leaders - Implemented previously successful safety programs and initiatives from other DOE sites, such as DOE's Voluntary Protection Program - Brought fresh thinking and innovation to tackling tough project issues, such as the deactivation of the Technetium-99-contaminated areas of K-27, applying lessons learned from the D and D of K-25; and implementing a -waste factory- approach to cleanup - Maintained continuing alignment between UCOR's contract with DOE and its Performance Measurement Baseline - rapidly addressing contract changes when they arose - Maintained a readiness both from a process as well as experienced personnel perspective to support DOE OREM in performing other significant Oak Ridge Reservation cleanup activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Completing the Cleanup of the US Department of Energy's East Tennessee Technology Park - Four Years Early - 16067

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its $2.6 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (ORR) in Tennessee. Under the contract, the scope of work to be completed includes demolition of all gaseous diffusion buildings, namely K-25, K-31 and K-27, as well as other facilities such as the Toxic Substance Control Act (TSCA) Incinerator, the K-1200 Centrifuge Complex and the K-1037 Barrier Plant. Additionally, UCOR will remove contaminated soils and treat contaminated groundwater. Waste generated by these cleanup activities will be disposed at onsite as well as offsite facilities. UCOR will also continue to manage hundreds of the DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities across the ORR. Due largely to funding challenges early in the project, the DOE estimated in their October 2013 Program Plan 2014-2024 that ETTP cleanup would not be achieved until 2024, four years later than originally scheduled in UCOR's contract with the DOE. In November 2014, the DOE Manager for OREM, Susan Cange, publicly shared her 'vision' for ETTP cleanup by 2020, four years earlier than the DOE's current plan. As part of Vision 2020, all gaseous diffusion buildings would be demolished by the end of 2016. In response to Ms. Cange's vision, UCOR published a Strategic Plan describing how ETTP could be cleaned up by 2020, provided that a number of funding and programmatic and technical challenges could be overcome. UCOR is in the midst of implementing its Strategic Plan, and progress is being made to that end. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline (PMB); received its Earned Value Management System (EVMS) certification; completed the D and D of the 44-acre K-25 and 17-acre K-31 gaseous diffusion buildings; completed the K-1070- B Burial Ground remediation project; completed RCRA closure of the TSCA Incinerator; and disposed of more than 541,411 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF). In 2015, UCOR achieved safety 'Star Status' under the DOE's Voluntary Protection Program (VPP); completed the demolition of the K-31 gaseous diffusion building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2016; and began characterization activities in the K-1037 Barrier Plant as well as a number of facilities in the Poplar Creek Area of the ETTP Site. Project performance through December 31, 2015, is as follows: Cost Performance Index - 1.12, Schedule Performance Index - 1.02. Since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its project performance. Through calendar year 2015, UCOR's recordable injury rate was 0.94 occurrences per 200,000 work hours, and the day away case rate was 0.31. These rates are both below the DOE and UCOR goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design, Construction, and Commissioning of the RH LLW Disposal Facility at INL - 19445

The newly-commissioned Remote-Handled Low-Level Waste (RH LLW) Disposal Facility at Idaho National Laboratory (INL) provides permanent disposal capability critical for continuing INL nuclear research and Naval Reactors missions at the Idaho site. The facility mission need [critical decision (CD)- 0] was approved in 2009. Alternative selection (CD-1) was finalized in 2011. The project performance baseline (CD-2/3) was approved and design was initiated in 2014 and construction began in 2015. Construction was completed and transitioned to Materials and Fuels Complex (MFC) Operations in 2017. The facility successfully achieved readiness with authorization to begin operations (CD-4) in 2018. The $77 M line-item capital-acquisition project was completed six months ahead of the congressional commitment date and significantly under budget. This paper presents highlights of the RH LLW Disposal Facility project delivery and a summary of facility features and critical characteristics. Highlights include: - As a hazard category II nuclear facility, the project complied with United States Department of Energy (DOE) requirements for incorporation of nuclear safety into facility design and construction as identified in DOE-STD-1189 as well as 10 CFR 835 Subpart K requirements for incorporation of ALARA principles in facility design. - From an environmental compliance perspective, the facility was subject to National Environmental Policy Act requirements resulting in a Finding of No Significant Impact as determined by an Environmental Assessment. An operating disposal authorization statement from the Low-Level Waste Disposal Facility Federal Review Group (LFRG) authorizing waste disposal operations in accordance with DOE Order 435.1 was obtained. - The project was delivered using a design-build delivery method with a firm-fixed price with incentive fee contracting mechanism. The project was executed as a line-item capital-acquisition project, in full compliance with DOE Order 413.3B under INL's certified Earned Value Management System (EVMS) program. - The facility supports twenty years of waste disposal operations with five disposal vault configurations in four vault arrays supporting six different cask/canister system configurations. Three of the six cask/canister systems currently exist and three will be developed to support future operations. There are a total of 446 waste disposal vaults that will accommodate disposal of a total of 939 stainless steel radioactive waste canisters. The facility is designed to accommodate canisters with contact radiation dose rates as high as 600 Sievert/hour (60,000 Rem/hour). - The facility underwent a rigorous readiness review process in accordance with DOE Order 425.1D. Readiness activities included rigorous facility testing and shakedown activities, a management-self assessment, a contractor operational readiness review, and a DOE operational readiness review. Readiness was demonstrated for an existing cask/canister system (the MFC HFEF-5 cask). Separate readiness activities will be conducted for each cask/canister system as they are brought online for facility operations. INL's successful delivery of the project has provided waste disposal capability to ensure long-term viability of planned and current facilities and missions associated with both INL and the Naval Reactors Facility. Successful execution of the project has proven to be strategically important to future capital investments in capabilities necessary to advance INL's mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of the V1 Nuclear Power Plant Jaslovske Bohunice - 20270

The paper focuses on introducing the approach and method applied for decommissioning of the V1 nuclear power plant (further the 'V1 NPP') located in Jaslovske Bohunice in the Slovak Republic, to the conference participants. The Paper outlines activities and steps necessary to comply with the requirements contained in the decision of the Slovak government from 1999 regarding the early shutdown of the V1 NPP. The company responsible for the V1 NPP decommissioning is Jadrova a vyradovacia spolocnost, a.s., (further JAVYS) with the State as a sole shareholder. On the basis of the V1 NPP Decommissioning Conceptual Plan, out of four assessed options, JAVYS selected the immediate decommissioning option (the 'IDO') for the V1 NPP. On the basis of multi-criteria analysis, the IDO specified the approach of immediate and continuous dismantling of equipment followed by demolition of buildings and preparation of the site for its further potential use. The IDO also included the summary of technical, environmental, legislative information as well as the determination of assumed costs for decommissioning of the V1 NPP. Prior to commencement of the V1 NPP decommissioning, within the process of termination of operation, activities connected with de-fuelling, monitoring, processing of historical waste and, not to forget, the process of obtaining the license for the V1 NPP decommissioning were executed. JAVYS decided to divide the decommissioning process into two stages. In 2011, JAVYS obtained a license for the first stage of the V1 NPP decommissioning. Within this stage, dismantling of inactive equipment, demolitions of inactive buildings, monitoring of systems and preparatory works for the upcoming stage of decommissioning were implemented. In 2015, in line with the license for the 2. stage of the V1 NPP decommissioning, the activities of decontamination and dismantling of contaminated and active equipment as well as demolitions of remaining buildings began. In this stage radioactive waste (RAW) produced during the decommissioning is to be processed. After decontamination, the material fulfilling the free release criteria is to be released into the environment, the site is to be cleared from the scope of the Atomic Act and released from the surveillance of the national regulators. Future application of certain methods and techniques for decontamination and dismantling in similar environments might bring an added value to the operators. Paper includes a description of best practices for Nuclear Power Plant VVER type reactors decommissioning. Schedule comparison is given to show how the critical path of certain projects is being managed. Application of the International Standard for Decommissioning Costing (ISDC) methodology provides a uniform method which enables comparison of cost estimates to other nuclear facilities under decommissioning. The cost estimate for the V1 NPP decommissioning has been continuously updated based on more advanced and detailed information on the decommissioning activities and projects. Monitoring of progress of the V1 NPP decommissioning is performed via four key-performance indicators. The Earned Value Management (EVM) methodology is used for evaluating time and cost aspect of decommissioning activities while waste conditioning index is calculated by comparing the actually produced waste to planned values of waste for a respective monitored period. Radiological safety index is assessed by comparison of the personnel records on the individual yearly doses received by each respective employee to the boundary value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Baseline Review (IBR) Handbook

The purpose of this handbook is intended to be a how-to guide to prepare for, conduct, and close-out an Integrated Baseline Review (IBR). It discusses the steps that should be considered, describes roles and responsibilities, tips for tailoring the IBR based on risk, cost, and need for management insight, and provides lessons learned from past IBRs. Appendices contain example documentation typically used in connection with an IBR. Note that these appendices are examples only, and should be tailored to meet the needs of individual projects and contracts. Following the guidance in this handbook will help customers and suppliers preparing for an IBR understand the expectations of the IBR, and ensure that the IBR meets the requirements for both in-house and contract efforts.

IBR↗

Integrated Baseline Review (IBR) Handbook

The purpose of this handbook is intended to be a how-to guide to prepare for, conduct, and close-out an Integrated Baseline Review (IBR). It discusses the steps that should be considered, describes roles and responsibilities, tips for tailoring the IBR based on risk, cost, and need for management insight, and provides lessons learned from past IBRs. Appendices contain example documentation typically used in connection with an IBR. Note that these appendices are examples only, and should be tailored to meet the needs of individual projects and contracts.

Project↗

Integrated Baseline Review (IBR) Handbook

The purpose of this handbook is intended to be a how-to guide to prepare for, conduct, and close-out an Integrated Baseline Review (IBR). It discusses the steps that should be considered, describes roles and responsibilities, tips for tailoring the IBR based on risk, cost, and need for management insight, and provides lessons learned from past IBRs. Appendices contain example documentation typically used in connection with an IBR. Note that these appendices are examples only, and should be tailored to meet the needs of individual projects and contracts. Following the guidance in this handbook will help customers and suppliers preparing for an IBR understand the expectations of the IBR, and ensure that the IBR meets the requirements for both in-house and contract efforts.

Project↗