Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ESPCS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Development and Demonstration of Energy Savings Perform Contracting Methodologies for Hydroelectric Facilities (CRADA Final Report)

This CRADA explores the opportunities and challenges of funding federal hydro dam refurbishment projects through ESPCs. It assesses legal authorities for rehabilitating dams through ESPCs; roles and responsibilities of each party including the dam owner, Power Marketing Administration (PMA), ESCO, and preference customers; potential contract structure and flow of money; measurement andverification processes; risk and responsibility allocation; and financial viability of projects.

13 HYDRO ENERGY↗

M&V Guidelines: Measurement and Verification for Federal Energy Projects (V3.0)

This document provides guidelines and methods for measuring and verifying energy, water, and cost savings associated with federal energy savings performance contracts (ESPCs). An ESPC is a contracting method in which the contractor provides and arranges financing and implementation of energy improvements and is repaid over the contract term from the cost savings generated by the improvements.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Federal Energy Savings Performance Contracts Frequently Asked Questions on the Scope of 42 U.S.C. § 8287 et. seq.

The U.S. Department of Energy's Federal Energy Management Program (FEMP) is issuing this document to provide clarifications and guidance on issues commonly raised regarding the scope of 42 U.S.C. § 8287 et seq. This document is intended to supplement FEMP's extensive collection of materials that are available to assist federal agencies execute successful energy savings performance contracting (ESPC) projects.

42 U.S.C. § 8287 et. seq.↗

Federal Energy Savings Performance Contracts: Frequently Asked Questions on the Scope of 42 U.S.C. § 8287 et seq.

Document provides clarification and guidance on issues commonly raised regarding the scope of 42 U.S.C. § 8287 et seq. It is a supplement to the Federal Energy Management Program's extensive collection of materials that are available to assist federal agencies execute successful energy savings performance contract (ESPC) projects.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Supplement to M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0

Measurement and verification (M&V) are key to determining and confirming the continued operation of, and savings associated with, performance-based contracts. The Federal Energy Management Program (FEMP) updates these guidelines to reflect the evolution of M&V to incorporate industry best practices and ensure that savings from these performance-based projects are properly planned, communicated, and realized. FEMP released M&V Guidelines: Measurement and Verification for Federal Energy Projects Version 3.0 in 2008. This document was developed with input from industry-government working groups, previous M&V guideline authors, and national laboratory subject matter experts. The document provided the methods and guidelines, with a focus on federal energy savings performance contracts (ESPCs). When FEMP released M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0 in 2015, FEMP expanded the intended audience to include anyone (energy managers, procurement officers, and contractors) involved in implementing performance-based contracts. The streamlined M&V Guidelines Version 4.0 provided the procedures and guidelines needed to quantify savings resulting from installing energy-efficient equipment, water conservation, improved operation and maintenance (O&M), renewable energy, and cogeneration projects with a performance-based contract; however, it removed some of the associated details on topics such as developing regression models and sampling plans. The details and information provided in M&V Guidelines v. 3.0 are still pertinent to M&V for performance-based contracts. The objective is to keep FEMP M&V version 4.0 condensed, providing the reference document for specifying M&V methods and procedures and a resource for developing project-specific M&V plans; this supplement provides additional details. The content of this supplement has been updated to include pertinent revisions between M&V version 3.0 and M&V version 4.0 by providing details and updating the content to ensure relevancy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Internal Financing for Carbon Reduction Projects

This fact sheet summarizes 6 common internal financing modes and provides examples for each: Capital Expenditure/Operating Outlay, Self-Funded Energy Performance Contracts (ESPC), Carbon Fee Funds, Green Bonds, Green Revolving Funds, and Capital Investment Funds.

financing, carbon reduction, carbon emissions, ESP↗

Best Practices for Smart Grid-Interactive Efficient Building Ready Performance Contracts

Grid-interactive efficient building (GEB) measures reduce costs and optimize energy use for additional grid services by coordinating building energy loads and providing continuous demand management. Incorporating GEB energy conservation measures (ECMs) in performance contracts is reliant upon multiple factors. These factors include site selection with utility tariffs and incentives favorable to GEB, the identification of GEB as a priority in the initial stages of the contracting process, integration of GEB within comprehensive performance contracts with multiple other ECMs, and careful consideration of GEB measurement and verification (M&V) for energy savings performance contracts (ESPCs) and performance assurance for utility energy service contracts (UESCs).

building energy loads↗

Analysis of Integrated Vapor Transport Biases

Abstract High-fidelity analyses and forecasts of integrated vapor transport (VT) are central to the study of Earth’s hydrological cycle as well as high-impact phenomena such as monsoons and atmospheric rivers. The impact of the in-line analysis correction-based additive inflation (ACAI) on IVT biases and forecast errors is examined within the Navy Earth System Prediction Capability (Navy ESPC) global coupled system. The ACAI technique uses atmospheric analysis corrections from the data assimilation system to approximate model bias and as a representation of stochastic model error to simultaneously reduce systematic and random errors and improve ensemble performance. ACAI reduces the global average magnitude of the 7- and 14-day IVT bias by 16%–17% during Northern Hemisphere summer, reaching 70% reductions in some tropical regions. The global average IVT bias reduction is similar to the bias reduction for low-level wind speed bias and considerably smaller than the bias reduction in total precipitable water. The localized regions where ACAI increases IVT bias occur where the control IVT biases change sign and structure with increasing forecast lead time, such as the South Asian monsoon region. Substituting analyzed wind or moisture fields for the forecast fields when calculating the forecast IVT confirms that, on average, wind errors dominate the IVT error calculation in the tropics, although wind and moisture error contributions are comparable in the extratropics. The existence of regions where using either analyzed winds or analyzed moisture increases IVT bias or mean absolute error reveals areas with compensating errors.

Reynolds, Carolyn A.↗

Y-12 Site Sustainability Plan

The accomplishments to date and the long-range planning of the Y-12 Energy Management and Sustainability and Stewardship programs support the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) vision for a commitment to energy effi ciency and sustainability and to achievement of the Guiding Principles. Specifi cally, the Y-12 vision is to support the Environment, Safety and Health Policy and the DOE Strategic Sustainability Performance Plan (SSPP), while promoting overall sustainability and reduction of greenhouse gas (GHG) emissions. The mission of the Y-12 Energy Management program is to incorporate energy-efficient technologies site-wide and to position Y-12 to meet NNSA energy requirement needs through 2025 and beyond. This plan addresses: Greenhouse Gas Reduction and Comprehensive Greenhouse Gas Inventory; Buildings, ESPC Initiative Schedule, and Regional and Local Planning; Fleet Management; Water Use Efficiency and Management; Pollution Prevention and Waste Reduction; Sustainable Acquisition; Electronic Stewardship and Data Centers; Renewable Energy; Climate Change; and Budget and Funding.

99 GENERAL AND MISCELLANEOUS↗

Estimating customer electricity savings from projects installed by the U.S. ESCO industry

The U.S. energy service company (ESCO) industry has a well-established track record of delivering substantial energy and dollar savings in the public and institutional facilities sector, typically through the use of energy savings performance contracts (ESPC) (Larsen et al. 2012; Goldman et al. 2005; Hopper et al. 2005, Stuart et al. 2013). This ~$6.4 billion industry, which is expected to grow significantly over the next five years, may play an important role in achieving demand-side energy efficiency under local/state/federal environmental policy goals. To date, there has been little or no research in the public domain to estimate electricity savings for the entire U.S. ESCO industry. Estimating these savings levels is a foundational step in order to determine total avoided greenhouse gas (GHG) emissions from demand-side energy efficiency measures installed by U.S. ESCOs. We introduce a method to estimate the total amount of electricity saved by projects implemented by the U.S. ESCO industry using the Lawrence Berkeley National Laboratory (LBNL) /National Association of Energy Service Companies (NAESCO) database of projects and LBNL’s biennial industry survey. We report two metrics: incremental electricity savings and savings from ESCO projects that are active in a given year (e.g., 2012). Overall, we estimate that in 2012 active U.S. ESCO industry projects generated about 34 TWh of electricity savings—15 TWh of these electricity savings were for MUSH market customers who did not rely on utility customer-funded energy efficiency programs (see Figure 1). This analysis shows that almost two-thirds of 2012 electricity savings in municipal, local and state government facilities, universities/colleges, K-12 schools, and healthcare facilities (i.e., the so-called “MUSH” market) were not supported by a utility customer-funded energy efficiency program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Efficiency Program Financing

In this technical brief we characterize the programmatic energy efficiency financing market from a quantitative perspective. Financing in this report refers to provision of capital—which is paid back over time—to cover upfront costs of energy efficiency. It does not refer to rebates and other types of incentives. We gather and report data on the volume of capital for energy efficiency financing that originated from five programmatic sources: on-bill programs; other utility financing programs; property assessed clean energy (PACE) programs; state energy office (SEO) revolving loan funds (RLF); and energy savings performance contracting (ESPC) programs. We estimate the amount of investment moving through EE financing programs, the sources of capital they employ, and program availability and activity by geography and market sector (residential and non-residential). We also present information on trends in investment by program type, and on the presence or absence of certain program design features, such as credit enhancements and interest rate buydowns. The result is a much more comprehensive accounting of programmatic energy efficiency financing activity than exists elsewhere.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

PV Production - Conceptual Location Analysis

The purpose of a Conceptual Location Analysis is to identify potential project/building sites in the planning phase of a project. The analysis includes review and comment on the potential sites by relevant disciplines. Site criteria encompasses DOE and NNSA requirements pertaining to real property and environmental stewardship and additionally addresses SNL site planning objectives such as sustainability and efficiency. This analysis is intended to be used as a tool to provide a comprehensive perspective on siting decisions, and is not intended to supersede previous siting decisions or agreements. This conceptual location analysis is for the siting of PV for power production. The goal of this Conceptual Location Analysis is to weigh different sites, and come to a consensus on preferred sites for potential solar arrays through an Energy Savings Performance Contract (ESPC) or a Utility Energy Service Contract (UESC).

14 SOLAR ENERGY↗

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. Procurement options available to all federal agencies include utility energy services contracts (UESC), energy savings performance contracts (ESPC), and utility services contracts (USC); other mechanisms such as a power purchase agreement (PPA), enhanced use lease (EUL), and utility privatization (UP) may also be useful to agencies that have the authority to use them. Implementing a microgrid in a comprehensive effort that also includes energy efficiency can provide an important savings component, while reducing power requirements for critical loads, thus reducing the cost of the microgrid and associated distributed energy resources (DER). However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. When a site is deciding if a microgrid is the best solution, activities early in the process include identifying critical loads and existing DERs, conversations with the local electric utility, and implementation options that work best for the agency and site. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗