Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Door Panel”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Results of an investigation elevon hinge moments and dual panel elevon effectiveness using an .0405-scale model (16-0) of the configuration 140C space shuttle orbiter in the Rockwell International NAAL low speed wind tunnel (OA119B)

Experimental aerodynamic investigations were conducted on a sting mounted .0405-scale representation of the 140C outer mold line space shuttle orbiter in a 7.75 x 11.00 foot low speed wind tunnel during the time period from August 22, 1974 to September 6, 1974. The primary test objectives were to define dual panel elevon/aileron effectiveness and to investigate elevon hinge-moments for the 140C orbiter configuration with wing/elevon upper hingeline sealing flapper doors. The elevon parametric variations, consisting of the basic elevons with 6 inch gaps and flapper doors, elevons with no flapper doors and completely open upper hingeline gap, and an entirely sealed solid elevon, were tested with elevon deflections from +20 to -35 deg at various aileron deflections. Aerodynamic force and moment data were measured in the body axis system by a 2.5 inch task type internal strain gage balance.

Mennell, R. C.↗

Quiet Clean Short-haul Experimental Engine (QCSEE) Under-The-Wing (UTW) composite nacelle subsystem test report

The element and subcomponent testing conducted to verify the under the wing composite nacelle design is reported. This composite nacelle consists of an inlet, outer cowl doors, inner cowl doors, and a variable fan nozzle. The element tests provided the mechanical properties used in the nacelle design. The subcomponent tests verified that the critical panel and joint areas of the nacelle had adequate structural integrity.

Stotler, C. L., Jr.↗

Shuttle Hypervelocity Impact Database

With three flights remaining on the manifest, the shuttle impact hypervelocity database has over 2800 entries. The data is currently divided into tables for crew module windows, payload bay door radiators and thermal protection system regions, with window impacts compromising just over half the records. In general, the database provides dimensions of hypervelocity impact damage, a component level location (i.e., window number or radiator panel number) and the orbiter mission when the impact occurred. Additional detail on the type of particle that produced the damage site is provided when sampling data and definitive analysis results are available. The paper will provide details and insights on the contents of the database including examples of descriptive statistics using the impact data. A discussion of post flight impact damage inspection and sampling techniques that were employed during the different observation campaigns will be presented. Future work to be discussed will be possible enhancements to the database structure and availability of the data for other researchers. A related database of ISS returned surfaces that are under development will also be introduced.

Hyde, James I.↗

Shuttle Hypervelocity Impact Database

With three missions outstanding, the Shuttle Hypervelocity Impact Database has nearly 3000 entries. The data is divided into tables for crew module windows, payload bay door radiators and thermal protection system regions, with window impacts compromising just over half the records. In general, the database provides dimensions of hypervelocity impact damage, a component level location (i.e., window number or radiator panel number) and the orbiter mission when the impact occurred. Additional detail on the type of particle that produced the damage site is provided when sampling data and definitive analysis results are available. Details and insights on the contents of the database including examples of descriptive statistics will be provided. Post flight impact damage inspection and sampling techniques that were employed during the different observation campaigns will also be discussed. Potential enhancements to the database structure and availability of the data for other researchers will be addressed in the Future Work section. A related database of returned surfaces from the International Space Station will also be introduced.

Hyde, James L.↗

STS-114: Discovery Day 6 Post MMT Meeting

Wayne Hale, Space Shuttle Deputy Program Manager and Steve Poulos, Orbiter Program Manager, discuss the damage assessment from the tiles that came off the Space Shuttle Discovery during launch. Poulos presents charts and discusses in detail the following topics: 1) Composite Tile Damage/Gap Filler Sites Evaluation; 2) Protruding Ceramic Shim Aft of the Nose Landing Gear Door (NLGD); 3) Protruding Chine Gap Filler; 4) RH NLGD Tile Damage; 5) RH NLGD Damage Analysis; 6) Left Wing Tile Damage; 7) Comparison of Ground Test Results vs. FD5 Focused Inspection; 8) Current Status: Focused Inspection 721L07-01 ITVC FD5 Image of Panel 7L Apex 9) Current Status: Focused Inspection Lower Panel 7L721L07-02; 10) Current Status Focused Inspection 721L10-02 Lower Panel 10L Close-up view; and 11) Window 1 Blanket. The presentation ends with a question and answer period from the news media.

Source record↗

Experimental Aerothermodynamics In Support Of The Columbia Accident Investigation

The technical foundation for the most probable damage scenario reported in the Columbia Accident Investigation Board's final report was largely derived from synergistic aerodynamic/aerothermodynamic wind tunnel measurements and inviscid predictions made at NASA Langley Research Center and later corroborated with engineering analysis, high fidelity numerical viscous simulations, and foam impact testing near the close of the investigation. This report provides an overview of the hypersonic aerothermodynamic wind tunnel program conducted at NASA Langley and illustrates how the ground-based heating measurements provided early insight that guided the direction and utilization of agency resources in support of the investigation. Global surface heat transfer mappings, surface streamline patterns, and shock shapes were measured on 0.0075 scale models of the Orbiter configuration with and without postulated damage to the thermal protection system. Test parametrics include angle of attack from 38 to 42 degs, sideslip angles of 38 to 42 degs, sideslip angles of plus or minus 1 deg, Reynolds numbers based upon model length from 0.05 x 10(exp 6) to 6.5 x 10(exp 6), and normal shock density ratios of 5 (Mach 6 Air) and 12 (Mach 6 CF4). The primary objective of the testing was to provide surface heating characteristics on scaled Orbiter models with outer mold line perturbations to simulate various forms of localized surface damage to the thermal protection system. Initial experimental testing conducted within two weeks of the accident simulated a broad spectrum of thermal protection system damage to the Orbiter windward surface and was used to refute several hypothesized forms of thermal protection system damage, which included gouges in the windward thermal protection system tiles, breaches through the wing new the main landing gear door, and protuberances along the wing leading edge that produced asymmetric boundary layer transition. As the forensic phase of the investigation developed and the condition of recovered debris was examined, increasing emphasis was placed on identifying wing leading edge damage (partially and fully missing reinforced carbon-carbon panels, and eventually holes in the wing leading edge with venting to the wing upper surface) that produced off-nominal heating trends consistent with extracted Orbiter flight recorder temperature data.

Horvath, Thomas J.↗

Emergency in-flight egress opening for general aviation aircraft

In support of a stall/spin research program, an emergency in-flight egress system is being installed in a light general aviation airplane. To avoid a major structural redesign for a mechanical door, an add-on 11.2 kg pyrotechnic-actuated system was developed to create an opening in the existing structure. The airplane skin will be explosively severed around the side window, across a central stringer, and down to the floor, creating an opening of approximately 76 by 76 cm. The severed panel will be jettisoned at an initial velocity of approximately 13.7 m/sec. System development included a total of 68 explosive severance tests on aluminum material using small samples, small and full scale flat panel aircraft structural mock-ups, and an actual aircraft fuselage. These tests proved explosive sizing/severance margins, explosive initiation, explosive product containment, and system dynamics.

Bement, L. J.↗

Emergency in-flight egress opening for general aviation aircraft

An emergency in-flight egress system was installed in a light general aviation airplane. The airplane had no provision for egress on the left side. To avoid a major structural redesign for a mechanical door, an add on 11.2 kg (24.6 lb) pyrotechnic-actuated system was developed to create an opening in the existing structure. The skin of the airplane was explosively severed around the side window, across a central stringer, and down to the floor, creating an opening of approximately 76 by 76 cm. The severed panel was jettisoned at an initial velocity of approximately 13.7 m/sec. System development included a total of 68 explosive severance tests on aluminum material using small samples, small and full scale flat panel aircraft structural mockups, and an actual aircraft fuselage. These tests proved explosive sizing/severance margins, explosive initiation, explosive product containment, and system dynamics. This technology is applicable to any aircraft of similar construction.

Bement, L. J.↗

The Reconstruction and Failure Analysis of The Space Shuttle Columbia

This viewgraph presentation describes a very detailed reconstruction plan and failure analysis of The Space Shuttle Columbia accident. The contents include: 1) STS-107 Timeline; 2) Foam Impact; 3) Recovery; 4) Reconstruction; 5) Reconstruction Plan; 6) Reconstruction Hanger; 7) Pathfinders; 8) Aluminum Pathfinder; 9) Early Analysis - Left MLG Door Area; 10) Emphasis Switched to Left Hand Wing Leading Edge; 11) Wing Leading Edge Subsystem (LESS); 12) 3D Reconstruction of Left WLE; 13) Left Wing Tile Table; 14) LESS Observations; 15) Left Hand Wing Debris Points to RCC 8/9 - Slumped Tile; 16) Reconstructed View of LC/P 9 tile with I/B Tile; 17) Reconstructed View of Lower C/P 9 Tile; 18) Carrier Panel 8 - Upper; 19) Left Hand Wing Debris Points to RCC 8/9 - Erosion and RCC with attach hole intact; 20) Erosion on Panel 8 Upper Outboard Rib; 21) RCC Panels 8 & 9 Erosion Features; 22) Slumping Source for Carrier Panel 9 Tile was Revealed; 23) Debris Indicated Highest Probability Initiation Site; 24) Left Hand Wing Debris Points to RCC 8/9- Metallic Deposits; 25) Relative Metallic Deposition on L/H Wing Materials; 26) Metallic Deposit Example, LH RCC 8; 27) High Level Questions; 28) Analysis Plan Challenges; 29) Analysis Techniques; 30) Analysis Approach; 31) RCC Panel 8 Erosion Features; 32) Radiographic Features; 33) Radiography WLE LH Panel 8; 34) LH RCC 8 Upper Apex; 35) LH RCC 8 - Deposit Feature: Thick Tear Shaped; 36) LH RCC 8 - Deposit Feature: Thick Globules; 37) LH RCC 8 - Deposit Feature: Spheroids; 38) LH RCC 8 - Deposit Feature: Uniform Deposit; 39) Significant Findings - Sampling All Other panels; 40) Proposed Breach Location and Plasma Flow; 41) Corroborating Information - RCC Panel Debris Locations; 42) Corroborating Information - LH OMS Pod Analysis; 43) Corroborating Information - Impact Testing; and 44) Overall Forensic Conclusions.

Russell, Richard W.↗

Advanced Lightweight Metallic Fuselage Project Manufacturing Trade Study

Recent advances in large-scale flow forming of integrally stiffened cylinders (ISCs) have motivated evaluation of available technologies for rapid manufacturing of metallic fuselages. The current state-of-the-art in flow forming of ISCs produces 10-ft. diameter, 5-ft. long barrels with integral longitudinal blade stiffeners, and these single-piece ISCs are produced in approximately 1.5 hours. While other manufacturing processes are required to incorporate additional structural elements (ASE) such as circumferential ring frames, reinforcements around window and door cut-outs, and floors to the ISCs to complete the fuselage structure, flow forming technology may assist the aerospace industry in meeting manufacturing rate demands. In order to evaluate this technology, a fuselage manufacturing demonstration article (MDA) fabricated from two ISCs is scheduled for fabrication and delivery to NASA Langley Research Center (LaRC) by the end of 2022. In this study, eight manufacturing technologies were assessed to downselect candidate manufacturing processes for adding ASE to complete the MDA. A literature review and evaluation of contractor-produced panels covering a spectrum of welding and additive manufacturing (AM) processes were conducted at NASA LaRC. The analytical hierarchy process (AHP) was used to evaluate figures of merit (FOMs) for selecting manufacturing process(es) to integrate ASE with the ISCs to form a fuselage MDA. The AHP results revealed that scalability, structural performance, and distortion control were the most valued criteria for downselecting the manufacturing process to construct the internal stiffening structures. Based on the FOMs, this study concluded that a welding process is best suited for integrating the majority of the ASE, namely the circumferential ring frames. All of the welding processes received higher scores than AM processes due to higher maturity, higher structural performance, fewer post-processing requirements in machining and heat treating, and faster deposition rates. Among the welding processes, cold metal transfer (CMT) welding was ranked the most favorable process for assembling the MDA, with the other welding processes (laser welding (LW), friction stir welding (FSW), and refill friction stir spot welding (RFSSW)) scoring slightly lower. This was a consequence of the perceived maturity of the CMT welding process and its relatively high structural performance and low distortion resulting from the low heat input. Among the AM processes, CMT AM showed the greatest promise due to benefits derived from its scalability, lower 1st order process complexity, and low distortion. The AM processes may have potential for select applications, such as adding structural reinforcements around window and door cut-outs, but are not considered optimal for integrating the entire MDA.

Manufacturing↗

Smart Process Planning for Automated Fiber Placement

Many industries, including aerospace, automotive, wind energy, maritime, and sporting goods, rely on strong, lightweight materials called composites. These materials are made by layering fibers, which can come in the form of narrow strips or wider sheets, and setting them in a polymer matrix. One of the most advanced ways to make these parts is through automated fiber placement, where a machine lays down the fibers in precise patterns. This method can create very efficient and strong designs, but it is complex, expensive, and often depends heavily on the experience of skilled engineers. Today, the design, manufacturing, and inspection stages of composite production are usually handled separately. This separation means that important information, such as how a part will be built or what defects might occur, is not always shared between stages. As a result, parts may not be as lightweight, strong, or defect-free as possible, and the process can take longer and cost more. This research develops a smart process planning system that connects design, manufacturing, and inspection into one continuous process. Built as software that works with existing tools, the system can automatically plan how the fibers are placed, predicting and reducing defects while improving both manufacturability and strength. The system optimizes not only individual layers but also how defects are distributed across all layers, preventing them from stacking up in ways that weaken the final part. It also uses inspection results from completed parts to improve future designs, creating a feedback loop where each stage informs the others. The system was tested by designing a composite panel using this new approach and comparing it to a panel made with state-of-the-art manual planning methods. The results showed that the system could intentionally control where defects appeared and increase the efficiency of the planning process. By unifying design, manufacturing, and inspection, this research shows a way to make advanced composite manufacturing more efficient, consistent, and cost-effective. This approach lowers the barrier to using automated fiber placement and opens the door for its wider adoption not only in aerospace but also in industries such as automotive, wind energy, maritime, and sporting goods, where strong and lightweight structures are essential.

Computer-Aided Process Planning↗

Standard Spacecraft Interfaces and IP Network Architectures: Prototyping Activities at the GSFC

Advancements in fright semiconductor technology have opened the door for IP-based networking in spacecraft architectures. The GSFC believes the same signlJicant cost savings gained using MIL-STD-1553/1773 as a standard low rate interface for spacecraft busses cun be realized for highspeed network interfaces. To that end, GSFC is developing hardware and software to support a seamless, space mission IP network based on Ethernet and MIL-STD-1553. The Ethernet network shall connect all fright computers and communications systems using interface standards defined by the CCSDS Standard Onboard InterFace (SOIF) Panel. This paper shall discuss the prototyping effort underway at GSFC and expected results.

Schnurr, Richard↗

Dust Removal Technology Demonstration for a Lunar Habitat

We have developed an Electrodynamic Dust Shield (EDS), an active dust mitigation technology with applications to solar panels, thermal radiators, optical systems, visors, seals and connectors. This active technology is capable of removing dust and granular material with diameters as large as several hundred microns. In this paper, we report on the development of three types of EDS systems for NASA's Habitat Demonstration Unit (HDU). A transparent EDS 20 cm in diameter with indium tin oxide electrodes on a 0.1 mm-thick polyethylene terephtalate (PET) film was constructed for viewport dust protection. Two opaque EDS systems with copper electrodes on 0.1 mm-thick Kapton were also built to demonstrate dust removal on the doors of the HDU. A lotus coating that minimizes dust adhesion was added to one of the last two EDS systems to demonstrate the effectiveness of the combined systems.

Calle, C. I.↗

Ariane 5 Fairing Preparations for James JWST Space Telescope

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The Ariane 5 payload faring (PLF), as shown in Figure 1, interior and Vehicle Equipment Bay membranes received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. Investigation of PLF cleanliness began early in the JWST program to test the Fairing Acoustic Protection (FAP) panels. Initial PLF cleaning was performed at RUAG in Switzerland prior to shipment to the launch site in collaboration with NASA and ESA. The cleaning procedure used at RUAG premises was based on heritage of the PLF cleaning procedure for ESA/Herschel-Planck and NASA/Mars2020 missions on an Atlas V launcher. The Ariane 5 fairing was packaged in a clean manner and inspected and cleaned upon arrival to CSG. Silicon wafers and particle fall out (PFO) plates were used to monitor the internal fairing cleanliness prior to encapsulation. Just after encapsulation, PFO plates and calcium fluoride (CaF2) crystals were placed inside the fairing on a specific tool door for monitoring the cleanliness inside the fairing during the ventilation phase. The fairing itself was specially sealed to protect the inner environment with just a small, doored porthole accessible via diving board for final closeout of the purge interface. Fairing cleanliness was achieved and mitigated contamination distribution upon launch.

James Webb Space Telescope↗

Characterization of MODIS Solar Diffuser On-orbit Degradation

MODIS reflective solar bands (RSB) are calibrated on-orbit by a solar diffuser (SD) and a solar diffuser stability monitor (SDSM). The SD bi-directional reflectance factor (BRF) was characterized pre-launch by the instrument vendor using reference samples traceable to NIST reflectance standards. Its on-orbit degradation is regularly monitored by the SDSM. It consists of a solar integration sphere (SIS) with 9 filtered detectors with wavelengths ranging from 0.41 to 0.94 micrometer, a rotating mirror assembly, and an electronics module. During each SD/SDSM calibration, the SDSM views the sunlight directly and the sunlight diffusely reflected from the SD panel. The time series of SDSM measurements (ratio of the SD view response to the Sun view response) is used to compute the SD BRF degradation at each SDSM detector wavelength. Since launch Terra MODIS has operated for more than seven years and Aqua for nearly five years. The SD panel on each MODIS instrument has experienced noticeable degradation with the largest changes observed in the VIS spectral region. Following a brief description of the MODIS RSB calibration methodology and SD/SDSM operational activities, this paper illustrates the SD on-orbit degradation results for both Terra and Aqua MODIS. It discusses the impacts on the SD RF degradation due to sensor operational conditions and SD solar exposure time. For Aqua MODIS, operated under the same conditions, the SD annual degradation rate is approximately 2.9% at 0.41 micrometers, 1.6% at 0.47 micrometers, and less than 1.1% at wavelengths above 0.53 micrometers. For Terra MODIS, however, an SD door (SDD) related anomaly in May 2003 had led to a decision to keep the SDD permanently at its open position. Since then its SD has experienced a much faster SD degradation rate.

Xiong, X.↗

High Energy Physics Network Requirements Review (Final Report, July-October 2020)

Throughout 2020, ESnet and the Office of High Energy Physics (HEP) of the DOE SC organized an ESnet requirements review of HEP-supported activities. Preparation for this event included identification of key stakeholders: program and facility management, research groups, technology providers, and a number of external observers. These individuals were asked to prepare formal case study documents about their relationship to the HEP program to build a complete understanding of the current, near-term, and long-term status, expectations, and processes that will support the science going forward. A series of pre-planning meetings better prepared case study authors for this task, along with guidance on how the review would proceed in a virtual fashion.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

NOAA-20 Visible Infrared Imaging Radiometer Suite day–night band on-orbit calibration and performance

The NOAA-20 Visible Infrared Imaging Radiometer Suite (VIIRS) instrument has been successfully operating on orbit since November 28, 2017. The day–night band (DNB) onboard NOAA-20 VIIRS is a panchromatic channel covering wavelengths from 0.5 to 0.9 μm, capable of observing the Earth scene in visible/near-infrared spectral range at a spatial resolution of 750 m. The DNB operates at low-, mid-, or high-radiometric gain stages, and it uses an onboard solar diffuser (SD) panel for low-gain stage calibration. The SD observations also provide a means to compute gain ratios between low-to-mid and mid-to-high-gain stages. With their large dynamic range and high sensitivity, the DNB detectors can make observations during both daytime and nighttime. We provide an assessment of the DNB on-orbit performance and behavior in the first two-year mission period and beyond. The calibration methodology used by the VIIRS Characterization Support Team in support of the NASA Earth science community has been described. The trending of on-board calibrators dark-offsets, SD gains, and gain ratios, and signal-to-noise ratio at minimum radiance have been analyzed, especially during key events such as the nadir and cryocooler doors opening. Furthermore, we performed intercomparison studies between Suomi National Polar-orbiting Partnership and NOAA-20 instruments and evaluated DNB radiometric calibration and characterization, including the SD degradation, detector gains, gain ratios, and straylight correction, as well as the calibration comparison between the NOAA Interface Data Processing Segment look-up-tables and our delivery results.

VIIRS↗

An Early Assessment of JPSS-1/NOAA-20 VIIRS Day-Night Band On-Orbit Calibration and Performance

The JPSS-1 (now named NOAA-20) VIIRS instrument has been successfully operating on orbit since November 28th, 2017. The Day-Night Band (DNB) is a panchromatic channel covering wavelengths from 0.5 to 0.9 m that is capable of observing the Earth scene in visible/near-Infrared spectral range at spatial resolution of 750 m. The DNB operates at low, mid, or high radiometric gain stages, and it uses an onboard solar diffuser (SD) panel for low gain stage calibration. The SD observations also provide a mean to compute gain ratios between low-to-mid and mid-to-high gain stages. With their large dynamic range and high sensitivity, the DNB detectors can make observations during both daytime and nighttime. This paper provides an early assessment of the DNB on-orbit performance and behavior in the first 90-day post launch test (PLT) period and beyond. The calibration methodology used by the VIIRS Characterization Support Team (VCST) in support of the NASA earth science community will be presented. The trending of OBC dark-offsets, SD gains and gain ratios, and signal-to-noise ratio (SNR) at minimum radiance have been analyzed, especially during key events such as the Nadir and Cryo-cooler doors opening. Furthermore, we performed inter-comparison studies between SNPP and JPSS-1 instruments and evaluated DNB radiometric calibration and characterization, including the SD degradation, detector gains and gain ratios, as well as the calibration comparison between the IDPS LUTs and our VCST delivery results.

Chen, H.↗