Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Demonstration Projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Unreviewed Disposal Question Evaluation: Disposal of the West Valley Demonstration Project Contaminated Concrete and General Debris at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This Unreviewed Disposal Question Evaluation (UDQE) assesses whether the West Valley Demonstration Project (WVDP) Contaminated Concrete and General Debris (WVDP000000013, Revision 12 [WVDP 2017]) is suitable for shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). Disposal of the WVDP Contaminated Concrete and General Debris waste stream meets all U.S. Department of Energy (DOE) Manual DOE M 435.1-1, Radioactive Waste Management Manual, Chapter IV, Section P performance objectives (DOE 1999). The WVDP Contaminated Concrete and General Debris is recommended for acceptance with the condition that the total radium-226 (226Ra) activity not exceed 8.1E9 becquerels (Bq).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unreviewed Disposal Question Evaluation: Disposal of the West Valley Demonstration Project Drum Cell Cement Solidified Waste at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This Unreviewed Disposal Question Evaluation (UDQE) assesses whether the West Valley Demonstration Project (WVDP) Drum Cell Cement-Solidified Waste (WVDP000000018, Revision 4 [WVDP 2017]) is suitable for shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). Disposal of the WVDP Drum Cell Cement-Solidified Waste meets all performance objectives in U.S. Department of Energy (DOE) Manual DOE M 435.1-1, Radioactive Waste Management Manual , Chapter IV, Section P (DOE 1999). The WVDP Drum Cell Cement-Solidified Waste is recommended for acceptance without conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Special Analysis for the Disposal of the West Valley Demonstration Project Extraction Cell 2 Low Density Waste Stream at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This special analysis (SA) evaluates whether the West Valley Demonstration Project (WVDP) Extraction Cell 2 Low Density waste stream is suitable for disposal by shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). The WVDP Low Density waste stream consists of debris contaminated during the decontamination and decommissioning (D&D) of Extraction Cell 2 at the WVDP (WVDP 2015). The WVDP Low Density waste stream required an SA because the radium-226 (226Ra) activity concentration exceeds the NNSS Waste Acceptance Criteria (WAC) Action Level (U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office [NNSA/NFO] 2013). The effect of adding the WVDP Low Density waste stream inventory to the inventory of waste disposed through the end of FY 2014 was evaluated with the A5 RWMS v 4.119 PA model. The results indicate that all performance objectives can be met with disposal of the WVDP Low Density in a SLB trench. Addition of the WVDP Low Density inventory slightly increases the 222Rn flux density, but the maximum mean and 95th percentile flux density remain less than the performance objective throughout the compliance period. The WVDP Low Density waste stream had no significant effect on the maximum mean and 95th percentile for all other PA results. The WVDP Low Density waste stream, therefore, is suitable for disposal by SLB at the Area 5 RWMS.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unreviewed Disposal Question Evaluation: Disposal of the West Valley Demonstration Project Fuel Receiving and Storage Debris and Filters at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This Unreviewed Disposal Question Evaluation assesses whether the West Valley Demonstration Project (WVDP) Fuel Receiving and Storage (FRS) Debris and Filters waste stream is suitable for shallow land burial at the Area 5 Radioactive Waste Management Site on the Nevada National Security Site. Disposal of the WVDP FRS Debris and Filters low-level waste meets all DOE M 435.1-1 performance objectives. The WVDP FRS Debris and Filters waste stream is recommended for acceptance with the condition that the total 226Ra activity not exceed 2E9 Bq.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unreviewed Disposal Question Evaluation: Disposal of the West Valley Demonstration Project Asbestos Contaminated Low-Level Waste Debris at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This Unreviewed Disposal Question Evaluation assesses whether the West Valley Demonstration Project (WVDP) Asbestos Contaminated Low-Level Waste (LLW) Debris is suitable for shallow land burial at the Area 5 Radioactive Waste Management Site on the Nevada National Security Site. Disposal of the WVDP Asbestos Contaminated LLW Debris meets all performance objectives in DOE M 435.1-1, “Radioactive Waste Management Manual,” Chapter IV, Section P. The WVDP Asbestos Contaminated LLW Debris is recommended for acceptance with the condition that the total radium-226 (226Ra) waste stream activity shall not exceed 2E+9 Bq.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

UNREVIEWED DISPOSAL QUESTION EVALUATION: Disposal of the West Valley Demonstration Project Asbestos Contaminated Low-Level Waste Debris at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This Unreviewed Disposal Question Evaluation (UDQE) assesses whether the West Valley Demonstration Project (WVDP) Asbestos Contaminated Low-Level Waste Debris (WVDP000000023, Revision 3 [WVDP 2018a]) is suitable for shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). Disposal of the WVDP Asbestos Contaminated Low-Level Waste Debris meets all performance objectives of U.S. Department of Energy (DOE) Manual DOE M 435.1-1, Radioactive Waste Management Manual, Chapter IV, Section P (DOE 1999). The WVDP Asbestos Contaminated Low-Level Waste Debris is recommended for acceptance with the condition that the total radium-226 (226Ra) waste stream activity shall not exceed 1.4E8 Bq.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Phase 1 Characterization sampling and analysis plan West Valley demonstration project.

The Phase 1 Characterization Sampling and Analysis Plan (CSAP) provides details about environmental data collection that will be taking place to support Phase 1 decommissioning activities described in the Phase 1 Decommissioning Plan for the West Valley Demonstration Project, Revision 2 (Phase I DP; DOE 2009). The four primary purposes of CSAP data collection are: (1) pre-design data collection, (2) remedial support, (3) post-remediation status documentation, and (4) Phase 2 decision-making support. Data collection to support these four main objectives is organized into two distinct data collection efforts. The first is data collection that will take place prior to the initiation of significant Phase 1 decommissioning activities (e.g., the Waste Management Area [WMA] 1 and WMA 2 excavations). The second is data collection that will occur during and immediately after environmental remediation in support of remediation activities. Both data collection efforts have a set of well-defined objectives that encompass the data needs of the four main CSAP data collection purposes detailed in the CSAP. The main body of the CSAP describes the overall data collection strategies that will be used to satisfy data collection objectives. The details of pre-remediation data collection are organized by WMA. The CSAP contains an appendix for each WMA that describes the details of WMA-specific pre-remediation data collection activities. The CSAP is intended to expand upon the data collection requirements identified in the Phase 1 Decommissioning Plan. The CSAP is intended to tightly integrate with the Phase 1 Final Status Survey Plan (FSSP). Data collection described by the CSAP is consistent with the FSSP where appropriate and to the extent possible.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Role of Occupant Behavior in Achieving Net Zero Energy: A Demonstration Project at Fort Carson

This study, sponsored by the U.S. General Services Administration’s Office of Federal High-Performance Green Buildings, aimed to understand the potential for institutional and behavioral change to enhance the performance of buildings, through a demonstration project with the Department of Defense in five green buildings on the Fort Carson, Colorado, Army base. To approach this study, the research team identified specific occupant behaviors that had the potential to save energy in each building, defined strategies that might effectively support behavior change, and implemented a coordinated set of actions during a three-month intervention.

Army↗

The Adaptive Optics and Transmit System for NASA's Laser Communications Relay Demonstration Project

The Laser Communication Relay Demonstration is NASA’s multi-year demonstration of laser communication to a geosynchronous satellite. We are currently assembling the optical system for the first of the two baseline ground stations. The optical system consists of an adaptive optics system, the transmit system and a camera for target acquisition. The adaptive optics system is responsible for compensating the downlink beam for atmospheric turbulence and coupling it into the modem’s single mode fiber. The adaptive optics system is a woofer/tweeter design, with one deformable mirror correcting for low spatial frequencies with large amplitude and a second deformable mirror correcting for high spatial frequencies with small amplitude. The system uses a Shack-Hartmann wavefront sensor. The transmit system relays four beacon beams and one communication laser to the telescope for propagation to the space terminal. Both the uplink and downlink beams are centered at 1.55 microns. We present an overview of the design of the system as well as performance predictions including time series of coupling efficiency and expected uplink beam quality.

Laser Communication↗

Education & Collection Facility GSHP Demonstration Project

The Denver Museum of Nature & Science (DMNS) designed and implemented an innovative ground source heat pump (GSHP) system for heating and cooling its new Education and Collection Facility (ECF) building addition. The project goal was to successfully design and install an open-loop GSHP system that utilized water circulating within an underground municipal recycled (non-potable) water system as the heat sink/source as a demonstration project. The expected results were to significantly reduce traditional GSHP installation costs while increasing system efficiency, reduce building energy consumption, require significantly less area and capital to install, and be economically implemented wherever access to a recycled water system is available. The project added to the understanding of GSHP technology by implementing the first GSHP system in the United States utilizing a municipal recycled water system as a heat sink/source. The use of this fluid through a GSHP system has not been previously documented. This use application presents a new opportunity for local municipalities to develop and expand the use of underground municipal recycled (non-potable) water systems. The installation costs for this type of technology in the building structure would be a cost savings over traditional GSHP costs, provided the local municipal infrastructure was developed. Additionally, the GSHP system functions as a viable method of heat sink/source as the thermal characteristics of the fluid are generally consistent throughout the year and are efficiently exchanged through the GSHP system and its components. The use of the recycled water system reduces the area required for bore or loop fields; therefore, presenting an application for building structures that have little to no available land use or access. This GSHP application demonstrates the viability of underground municipal recycled (non-potable) water systems as technically achievable, environmentally supportive, and an efficient system.

15 GEOTHERMAL ENERGY↗

NASA Systems Autonomy Demonstration Project - Development of Space Station automation technology

A 1984 Congressional expansion of the 1958 National Aeronautics and Space Act mandated that NASA conduct programs, as part of the Space Station program, which will yield the U.S. material benefits, particularly in the areas of advanced automation and robotics systems. Demonstration programs are scheduled for automated systems such as the thermal control, expert system coordination of Station subsystems, and automation of multiple subsystems. The programs focus the R&D efforts and provide a gateway for transfer of technology to industry. The NASA Office of Aeronautics and Space Technology is responsible for directing, funding and evaluating the Systems Autonomy Demonstration Project, which will include simulated interactions between novice personnel and astronauts and several automated, expert subsystems to explore the effectiveness of the man-machine interface being developed. Features and progress on the TEXSYS prototype thermal control system expert system are outlined.

Bull, John S.↗

Virginia Demonstration Project Encouraging Middle School Students in Pursuing STEM Careers

Encouraging students at all grade levels to consider pursuing a career in Science, Technology, Engineering, and Mathematics (STEM) fields i s a national focus. In 2005, the Naval Surface Warfare Center, Dahlgren Division (NSWCDD), a Department of Defense laboratory located in Da hlgren, Virginia, began work on the Virginia Demonstration Project (VDP) with the goal of increasing more student interest in STEM educatio n and pursuing STEM careers. This goal continues as the program enters its sixth year. This project has been successful through the partici pation of NSWCDD's scientists and engineers who are trained as mentor s to work in local middle school classrooms throughout the school year, As an extension of the in-class activities, several STEM summer aca demies have been conducted at NSWCDD, These academies are supported by the Navy through the VDP and the STEM Learning Module Project. These projects are part of more extensive outreach efforts offered by the National Defense Education Program (NDEP), sponsored by the Director, Defense Research and Engineering. The focus of this paper is on the types of activities conducted at the summer academy, an overview of the academy planning process, and recommendations to help support a nati onal plan of integrating modeling and simulation-based engineering and science into all grade levels. based upon the lessons learned

Bachman, Jane T.↗

Wildlife habitat evaluation demonstration project

To support the deer range improvement project in Michigan, the capability of LANDSAT data in assessing deer habitat in terms of areas and mixes of species and age classes of vegetation is being examined to determine whether such data could substitute for traditional cover type information sources. A second goal of the demonstration project is to determine whether LANDSAT data can be used to supplement and improve the information normally used for making deer habitat management decisions, either by providing vegetative cover for private land or by providing information about the interspersion and juxtaposition of valuable vegetative cover types. The procedure to be used for evaluating in LANDSAT data of the Lake County test site is described.

Burgoyne, G. E., Jr.↗

Technology Performance Report: Duke Energy Notrees Wind Storage Demonstration Project

Duke Energy Renewables owns and operates the Notrees Wind Farm in west Texas’s Ector and Winkler counties. The wind farm, which was commissioned in April 2009, has a total capacity of 152.6 MW generated by 55 Vestas V82 turbines, one Vestas 1-V90 experimental turbine, and 40 GE 1.5-MW turbines. The Vestas V82 turbines have a generating capacity of 1.65 MW each, the Vestas V90 turbine has a generating capacity of 1.86 MW, and the GE turbines have a generating capacity of 1.5 MW each. The objective of the Notrees Wind Storage Demonstration Project is to validate that energy storage increases the value and practical application of intermittent wind generation and is commercially viable at utility scale. The project incorporates both new and existing technologies and techniques to evaluate the performance and potential of wind energy storage. In addition, it could serve as a model for others to adopt and replicate. Wind power resources are expected to play a significant part in reducing greenhouse gas emissions from electric power generation by 2030. However, the large variability and intermittent nature of wind presents a barrier to integrating it within electric markets, particularly when competing against conventional generation that is more reliable. In addition, wind power production often peaks at night or other times when demand and electricity prices are lowest. Energy storage systems can overcome those barriers and enable wind to become a valuable asset and equal competitor to conventional fossil fuel generation.

17 WIND ENERGY↗

Formal methods demonstration project for space applications

The Space Shuttle program is cooperating in a pilot project to apply formal methods to live requirements analysis activities. As one of the larger ongoing shuttle Change Requests (CR's), the Global Positioning System (GPS) CR involves a significant upgrade to the Shuttle's navigation capability. Shuttles are to be outfitted with GPS receivers and the primary avionics software will be enhanced to accept GPS-provided positions and integrate them into navigation calculations. Prior to implementing the CR, requirements analysts at Loral Space Information Systems, the Shuttle software contractor, must scrutinize the CR to identify and resolve any requirements issues. We describe an ongoing task of the Formal Methods Demonstration Project for Space Applications whose goal is to find an effective way to use formal methods in the GPS CR requirements analysis phase. This phase is currently under way and a small team from NASA Langley, ViGYAN Inc. and Loral is now engaged in this task. Background on the GPS CR is provided and an overview of the hardware/software architecture is presented. We outline the approach being taken to formalize the requirements, only a subset of which is being attempted. The approach features the use of the PVS specification language to model 'principal functions', which are major units of Shuttle software. Conventional state machine techniques form the basis of our approach. Given this background, we present interim results based on a snapshot of work in progress. Samples of requirements specifications rendered in PVS are offered to illustration. We walk through a specification sketch for the principal function known as GPS Receiver State processing. Results to date are summarized and feedback from Loral requirements analysts is highlighted. Preliminary data is shown comparing issues detected by the formal methods team versus those detected using existing requirements analysis methods. We conclude by discussing our plan to complete the remaining activities of this task.

Divito, Ben L.↗

The Northwest Geysers EGS Demonstration Project, California

Our project goal is to demonstrate the feasibility of stimulating a deep high-temperature reservoir (HTR) (up to 400 °C, 750 °F). There were two previously abandoned wells, Prati State 31 (PS-31) and Prati 32 (P-32), reopened and deepened to be used as an injection and production doublet to stimulate the HTR. The deepened portions of both wells have conductive temperature gradients of 10 °F/100 ft (182 °C/km), produce connate native fluids and magmatic gas, and the rocks were isotopically unexchanged by meteoric water. The ambient temperature meteoric water injected into these hot dry rocks has evidently created a permeability volume of several cubic kilometers as determined by seismic monitoring. Preliminary isotopic analyses of the injected and produced water indicate that 50–75% of the steam from the created EGS reservoir is injection-derived.

15 GEOTHERMAL ENERGY↗

2 kWe Solar Dynamic Ground Test Demonstration Project: Fabrication and Test Report - Volume 3

The Solar Dynamic Ground Test Demonstration (SDGTD) project has successfully designed and fabricated a complete solar-powered closed Brayton electrical power generation system and tested it in a relevant thermal vacuum facility at NASA Lewis Research Center (LeRC). In addition to completing technical objectives, the project was completed 3-l/2 months early, and under budget.

Alexander, Dennis↗

Reducing Plug Loads in Office Spaces: Hawaii and Guam Energy Improvement Technology Demonstration Project

As part of its overall strategy to meet its energy goals, the Naval Facilities Engineering Command (NAVFAC) partnered with the Department of Energy's National Renewable Energy Laboratory (NREL) to rapidly demonstrate and deploy cost-effective renewable energy and energy efficiency technologies. This project was one of several demonstrations of new or underutilized commercial energy technologies. The common goal was to demonstrate and measure the performance and economic benefit of the system while monitoring any ancillary impacts to related standards of service and operation and maintenance (O&M) practices. In short, demonstrations at naval facilities simultaneously evaluate the benefits and compatibility of the technology with the U.S. Department of Defense (DOD) mission, and with NAVFAC's design, construction, operations, and maintenance practices, in particular. This project demonstrated the performance of commercially available advanced power strips (APSs) for plug load energy reductions in building A4 at Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗