Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DOE Contracts”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

NASA Glenn Research Center Support of the Advanced Stirling Radioisotope Generator Project

A high-efficiency radioisotope power system was being developed for long-duration NASA space science missions. The U.S. Department of Energy (DOE) managed a flight contract with Lockheed Martin Space Systems Company to build Advanced Stirling Radioisotope Generators (ASRGs), with support from NASA Glenn Research Center. DOE initiated termination of that contract in late 2013, primarily due to budget constraints. Sunpower, Inc., held two parallel contracts to produce Advanced Stirling Convertors (ASCs), one with Lockheed Martin to produce ASC-F flight units, and one with Glenn for the production of ASC-E3 engineering unit "pathfinders" that are built to the flight design. In support of those contracts, Glenn provided testing, materials expertise, Government-furnished equipment, inspection capabilities, and related data products to Lockheed Martin and Sunpower. The technical support included material evaluations, component tests, convertor characterization, and technology transfer. Material evaluations and component tests were performed on various ASC components in order to assess potential life-limiting mechanisms and provide data for reliability models. Convertor level tests were conducted to characterize performance under operating conditions that are representative of various mission conditions. Despite termination of the ASRG flight development contract, NASA continues to recognize the importance of high-efficiency ASC power conversion for Radioisotope Power Systems (RPS) and continues investment in the technology, including the continuation of the ASC-E3 contract. This paper describes key Government support for the ASRG project and future tests to be used to provide data for ongoing reliability assessments.

Technology Transfer↗

Stirling to Flight Initiative

NASA has a consistent need for radioisotope power systems (RPS) to enable robotic scientific missions for planetary exploration that has been present for over four decades and will continue into the foreseeable future, as documented in the most recent Planetary Science Decadal Study Report. As RPS have evolved throughout the years, there has also grown a desire for more efficient power systems, allowing NASA to serve as good stewards of the limited plutonium-238 (238Pu), while also supporting the ever-present need to minimize mass and potential impacts to the desired science measurements. In fact, the recent Nuclear Power Assessment Study (NPAS) released in April 2015 resulted in several key conclusion regarding RPS, including affirmation that RPS will be necessary well into the 2030s (at least) and that 238Pu is indeed a precious resource requiring efficient utilization and preservation. Stirling Radioisotope Generators (SRGs) combine a Stirling cycle engine powered by a radioisotope heater unit into a single generator system. Stirling engine technology has been under development at NASA Glenn Research Center (GRC) in partnership with the Department of Energy (DOE) since the 1970's. The most recent design, the 238Pu-fueled Advanced Stirling Radioisotope Generator (ASRG), was offered as part of the NASA Discovery 2010 Announcement of Opportunity (AO). The Step-2 selections for this AO included two ASRG-enabled concepts, the Titan Mare Explorer (TiME) and the Comet Hopper (CHopper), although the only non-nuclear concept, InSight, was ultimately chosen. The DOE's ASRG contract was terminated in 2013. Given that SRGs utilize significantly less 238Pu than traditional Radioisotope Thermoelectric Generators (RTGs) - approximately one quarter of the nuclear fuel, to produce similar electrical power output - they provide a technology worthy of consideration for meeting the aforementioned NASA objectives. NASA's RPS Program Office has recently investigated a new Stirling to Flight (S2F) initiative with the objective of developing a 100-500 We Stirling generator system. Additionally, a different approach is being devised for this initiative to avoid pitfalls of the past, and apply lessons learned from the recent ASRG experience. Two key aspects of this initiative are a Stirling System Technology Maturation Effort, and a Surrogate Mission Team (SMT) intended to provide clear mission pull and requirements context. The S2F project seeks to lead directly into a DOE flight system development of a new SRG. This paper will detail the proposed S2F initiative, and provide specifics on the key efforts designed to pave a forward path for bringing Stirling technology to flight.

Robotics↗

Advanced Manufacturing of Alpha Double Prime Iron Nitride (ADPIN): An Innovative Rare Earth Element (REE) Free Ultra-High Performance Permanent Magnet for Clean Energy Applications

Iron nitride magnets offer the potential for large magnetic remanence magnets absent any rare earth materials [1]. This project was submitted in response to the funding opportunity announcement (FOA) from the Advanced Manufacturing Office (AMO) of the Office of Energy Efficiency & Renewable Energy (EERE) of the Department of Energy (DOE): DE-FOA-0001465: Advanced Manufacturing Projects for Emerging Research Exploration; Topic Area 1: Advanced Materials; Subtopic 1.1: Innovative Advanced Materials Manufacturing for Clean Energy to explore nitriding iron powder using a fluidized bed technique which if successful would accomplish nitriding the iron powder with reduce industrial energy intensity. Of particular concern when using metal powders at high temperatures in a fluidized bed reactor is the defluidization temperature of the bed, also known as the ‘bed collapse’ temperature. Above the defluidization temperature the metal powders can no longer fluidize and instead become an undesirable packed powder bed. Using the published results from the Institute of Process Engineering at the Chinese Academy of Sciences in Beijing, China, FeNix Magnetics was able to develop a spreadsheet calculation that allowed predictive guidelines for the defluidization temperature of iron powder based on the type of carrier gas, flow rate of the carrier gas, and the iron powder diameter. FeNix Magnetics was not able to conclude whether the temperatures to avoid bed defluidization that were achievable in a fluidized bed reactor actually resulted in nitriding the iron powder to the required level. In order to measure the amount of nitrogen in the iron powder, FeNix Magnetics contracted with the DOE sponsored Advanced Photon Source (APS) at Argonne National Laboratory to conduct X-Ray diffraction measurements. Unfortunately, due to COVID-19 restrictions, the DOE sponsored APS was closed and unable to provide X-Ray Diffraction measurements during this program.

36 MATERIALS SCIENCE↗

Hardware Assessment in Support of the Dynamic Power Convertor Development Effort

Stirling Radioisotope Power Systems (RPS) are being developed by NASA's RPS Program in collaboration with the U.S. Department of Energy (DOE). Efforts ranging from 2001 to 2015 enabled development of the Technology Demonstration Convertor (TDC) for use in the 110-watt Stirling Radioisotope Generator (SRG-110) and the Advanced Stirling Convertor (ASC) for use in the Advanced Stirling Radioisotope Generator (ASRG). The DOE selected Lockheed Martin Space Systems Company (LMSSC) as the system integration contractor for both flight development efforts. The SRG-110 housed two TDCs fabricated by Infinia and resulted in the production of 16x demonstration units and 2x engineering units. The project was redirected in 2006 to make use of a more efficient and lower mass ASCs under development by Sunpower Inc. The DOE managed the flight contract with LMSSC and subcontractor Sunpower Inc. from 2007 to 2013 to build the ASRG, with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce ASCs, one with Lockheed Martin to produce ASC-F flight units and one with GRC for the production of ASC-E3 engineering unit pathfinders that were used to refine the flight design and production processes. The DOE initiated termination of the ASRG contract in late 2013. After ASRG had ended, GRC completed characterization testing of the ASRG Engineering Unit #2 (EU2) and the GRC contract with Sunpower was also completed. The NASA RPS Program Office has recently initiated a new Dynamic Power Conversion development effort which includes the potential maturation of Stirling, Brayton, and Rankine power convertors for the next generation of RPS. The effort started with the request for proposal and review of submits. Contracts are anticipated for release in 2017 and will initially focus on a design phase prior to fabrication and testing. This new effort will focus on robustness in addition to high efficiency, specific power, and reliability. Also, some requirements introduced during the ASRG contract have also been included in the new effort, such as constant lateral loading. Due to the focus on robustness and new requirements relative to the older TDC design, the Stirling Cycle Development Project has initiated an assessment of government owned hardware to help inform requirements evolution and evaluation of future designs. While lessons learned from the ASRG flight development project have been taken into consideration, the evaluation of the TDC design had not been completed for some existing environments or relatively new requirements. To further assess the TDC design, a series of tasks were initiated to evaluate degradation for units that have operated unattended for over 105,000 hours, demonstrate robustness to a random vibration environment, characterize and evaluate performance for varying lateral load profiles. The status for each task are described.

Wilson, Scott D.↗

Hardware Assessment in Support of the Dynamic Power Convertor Development Effort

Stirling Radioisotope Power Systems (RPS) are being developed by NASAs RPS Program in collaboration with the U.S. Department of Energy (DOE). Efforts ranging from 2001 to 2015 enabled development of the Technology Demonstration Convertor (TDC) for use in the 110-watt Stirling Radioisotope Generator (SRG-110) and the Advanced Stirling Convertor (ASC) for use in the Advanced Stirling Radioisotope Generator (ASRG). The DOE selected Lockheed Martin Space Systems Company (LMSSC) as the system integration contractor for both flight development efforts. The SRG-110 housed two TDCs fabricated by Infinia and resulted in the production of 16x demonstration units and 2x engineering units. The project was redirected in 2006 to make use of a more efficient and lower mass ASCs under development by Sunpower Inc. The DOE managed the flight contract with LMSSC and subcontractor Sunpower Inc. from 2007 to 2013 to build the ASRG, with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce ASCs, one with Lockheed Martin to produce ASC-F flight units and one with GRC for the production of ASC-E3 engineering unit pathfinders that were used to refine the flight design and production processes. The DOE initiated termination of the ASRG contract in late 2013. After ASRG had ended, GRC completed characterization testing of the ASRG Engineering Unit 2 (EU2) and the GRC contract with Sunpower was also completed. The NASA RPS Program Office has recently initiated a new Dynamic Power Conversion development effort which includes the potential maturation of Stirling, Brayton, and Rankine power convertors for the next generation of RPS. The effort started with the request for proposal and review of submits. Contracts are anticipated for release in 2017 and will initially focus on a design phase prior to fabrication and testing. This new effort will focus on robustness in addition to high efficiency, specific power, and reliability. Also, some requirements introduced during the ASRG contract have also been included in the new effort, such as constant lateral loading. Due to the focus on robustness and new requirements relative to the older TDC design, the Stirling Cycle Development Project has initiated an assessment of government owned hardware to help inform requirements evolution and evaluation of future designs. While lessons learned from the ASRG flight development project have been taken into consideration, the evaluation of the TDC design had not been completed for some existing environments or relatively new requirements. To further assess the TDC design, a series of tasks were initiated to evaluate degradation for units that have operated unattended for over 105,000 hours, demonstrate robustness to a random vibration environment, characterize and evaluate performance for varying lateral load profiles. The status for each task are described.

Wilson, Scott D.↗

Removing the Cloak of Secrecy from Legacy Cleanup at Los Alamos national Laboratory - 20395

With the establishment in 2018 of the Los Alamos Legacy Cleanup Contract, the Department of Energy's (DOE) Environmental Management Los Alamos Field Office (EM-LA) and its contractor Newport News Nuclear BWXT Los Alamos (N3B) embarked on an expansive program to engage a broad range of local and regional stakeholders in the decision-making process for cleanup of legacy wastes (pre-1999) at the Los Alamos National Laboratory (LANL). From the inception of LANL during the Manhattan Project until the issuance of the new cleanup contract, the site was managed by a single management and operations (M and O) contactor whose main focus was national security. Segmenting from laboratory operations a separate cleanup contract managed by DoE's Office of Environmental Management (EM) brought new opportunities for the cleanup of legacy waste. That change likewise has opened new opportunities for engaging the community on legacy cleanup decisions. The new legacy cleanup contract - an unclassified contract - emphasizes public outreach, marking a cultural shift in how stakeholders in Los Alamos and throughout northern New Mexico are engaged. Without the constraints of classified work, EM-LA and N3B have increased the level of transparency with the public regarding cleanup activities. EM-LA and N3B have crafted an approach that best meets the values, priorities and needs of the neighboring communities by adapting the model successfully employed at Rocky Flats. Through enhanced stakeholder involvement, EM-LA will implement decisions that have considered broad input and deliver a safe and efficient cleanup of the site. EM-LA and N3B began the expanded stakeholder outreach program in January 2019, leading up to four Environmental Management Cleanup Forums held in the summer of 2019. EM-LA and N3B are now in the process of initiating a series of meetings with various stakeholder groups to determine their 'values' as they relate to cleanup using a novel approach that elicits and records values. The entire process is documented, ensuring that should questions arise about how, when and why decisions were made, they can be easily addressed. In addition to other public meetings to present cleanup scenarios and solicit active public involvement in cleanup decisions, the EM-LA and N3B approach involves discussions with stakeholders who want to explore specific technical issues and cleanup discussions in depth. EM-LA and N3B are also evaluating and implementing a variety of communications tools to help ensure the engagement plan sets the gold standard for transparency in legacy cleanup and stakeholder involvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mixed precision efficiency improvements for multi-physics flow simulations

This report summarizes research activities at Cascade Technologies during February 2020 - November 2020 to support DOE SBIR phase I contract DE-SC0020548. The primary technical objectives of the work are two-fold: a) to establish a theoretical framework to understand the propagation and impact of finite-precision-related errors and b) to quantify the trade-offs between accelerator throughput and solution accuracy through a series of validation tests involving multi-physics flow phenomena.

97 MATHEMATICS AND COMPUTING↗

Transmission electron microscopy of ion irradiated ODS MA956 samples

Oxide dispersion strengthened (ODS) alloys are promising candidate materials for the next generation advanced nuclear reactors due to their superior irradiation resistance and mechanical properties. To better understand the effect of irradiation on MA956, it is essential to study higher dose (50-100 dpa) samples, so that the general trend of microstructural evolution and the resulting radiation-hardening can be deduced. Currently, ion irradiations are considered the only way to achieve doses beyond ~50 dpa in a practical time frame relevant to alloy and welding development programs. This dataset contains TEM characterization results of ODS MA956 samples that were ion irradiated under different conditions: Sample #5 (1.25 dpa at 190℃); Sample #9 (50 dpa at 190℃); Sample #15 (1.25dpa under 320℃); and Sample 17 (25 dpa at 320℃). TEM characterization focused on the irradiation induced defects (dislocation lines and loops) using the on-zone axis bright field STEM technique. These data were collected using a FEI Tecnai G2 F30 S/TEM at Microscopy and Characterization Suite (MaCS) at Center for Advanced Energy Studies (CAES), Idaho Falls, ID. This project (ion irradiation and TEM studies) was supported by the U.S. Department of Energy, Office of Nuclear Energy under DOE Idaho Operations Office Contract DE-AC07-05ID14517 as part of Nuclear Science User Facilities award #18-14784 (PI: Ramprashad Prabhakaran, PNNL).

Prabhakaran, Ramprashad↗

NASA Glenn Research Center Support of the ASRG Project

A high efficiency radioisotope power system is being developed for long-duration NASA space science missions. The U.S. Department of Energy (DOE) managed a flight contract with Lockheed Martin Space Systems Company (LMSSC) to build Advanced Stirling Radioisotope Generators (ASRGs), with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce Advanced Stirling Convertors (ASCs), one with DOELockheed Martin to produce ASC-F flight units, and one with GRC for the production of ASC-E3 engineering unit pathfinders that are built to the flight design. In support of those contracts, GRC provided testing, materials expertise, government furnished equipment, inspections, and related data products to DOELockheed Martin and Sunpower. The technical support includes material evaluations, component tests, convertor characterization, and technology transfer. Material evaluations and component tests have been performed on various ASC components in order to assess potential life-limiting mechanisms and provide data for reliability models. Convertor level tests have been used to characterize performance under operating conditions that are representative of various mission conditions. Technology transfers enhanced contractor capabilities for specialized production processes and tests. Despite termination of flight ASRG contract, NASA continues to develop the high efficiency ASC conversion technology under the ASC-E3 contract. This paper describes key government furnished services performed for ASRG and future tests used to provide data for ongoing reliability assessments.

Technology Transfer↗

Design and Fabrication of a Temperature-Controlled Fueled Molten Salt Capsule Irradiation Experiment

Idaho National Laboratory (INL) is developing a Molten salt Research Temperature-controlled Irradiation (MRTI) experimental capsule for the Neutron Radiography (NRAD) reactor. The experiment is envisaged to be versatile and able to host a variety of salt-wall material combinations. The first test is designed to contain actinide-bearing chloride salt, which previously has not been subjected to a neutron field. The main objectives of the experiment are to produce irradiated salt samples for Post Irradiation Examination (PIE), to evaluate salt behavior under irradiation, and to test in-situ sensors/instrumentation. The final design for the experiment completed in 2022, and fabrication of the experiment is underway. The salt is double encapsulated providing insulation and redundancy in the case of leakage. A gas-gap between the inner capsule and the outer container enables tuning of thermal conduction to the NRAD coolant by altering its thickness and its gas-mixture. An inert gas mixture ratio in the gas-gap ensures the configurations reached a targeted average salt temperature of 600oC, while avoiding salt freezing or exceeding material limits. A resistive heater placed within a thermowell and controls the temperature of the experiment (both when the reactor is on or off). The selected configurations can contain over 10 cm3 of fuel-bearing chloride salt, which is sufficient for the purposes of the post-irradiation examination (PIE) and provides sufficient volume for two submerged thermocouple probes to monitor salt temperature. The capsule wall material is Inconel 625, and weld qualifications for the assembly have been developed. A glove-box laser weld technique was refined as part of this process to ensure a leak-tight assembly for the salt-bearing assembly and reduce the risks of impurities permeating into the salt. This work was supported through the INL Laboratory Directed Research & Development (LDRD) Program under DOE Idaho Operations Office Contract DE-AC07-05ID14517.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ENYGF 2023 - Design of Temperature-controlled Fuel-salt Irradiation Experiment

Idaho National Laboratory (INL) is developing a Molten salt Research Temperature-controlled Irradiation (MRTI) experimental capsule for the Neutron Radiography (NRAD) reactor. The experiment is envisaged to be versatile and able to host a variety of salt-wall material combinations. The first test is designed to contain actinide-bearing chloride salt, which previously has not been subjected to a neutron field. The main objectives of the experiment are to produce irradiated salt samples for Post Irradiation Examination (PIE), to evaluate salt behavior under irradiation, and to test in-situ sensors/instrumentation. The final design for the experiment completed in 2022, and fabrication of the experiment is underway. The salt is double encapsulated providing insulation and redundancy in the case of leakage. A gas-gap between the inner capsule and the outer container enables tuning of thermal conduction to the NRAD coolant by altering its thickness and its gas-mixture. An inert gas mixture ratio in the gas-gap ensures the configurations reached a targeted average salt temperature of 600oC, while avoiding salt freezing or exceeding material limits. A resistive heater placed within a thermowell and controls the temperature of the experiment (both when the reactor is on or off). The selected configurations can contain over 10 cm3 of fuel-bearing chloride salt, which is sufficient for the purposes of the post-irradiation examination (PIE) and provides sufficient volume for two submerged thermocouple probes to monitor salt temperature. The capsule wall material is Inconel 625, and weld qualifications for the assembly have been developed. A glove-box laser weld technique was refined as part of this process to ensure a leak-tight assembly for the salt-bearing assembly and reduce the risks of impurities permeating into the salt. This work was supported through the INL Laboratory Directed Research & Development (LDRD) Program under DOE Idaho Operations Office Contract DE-AC07-05ID14517.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs)are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report(for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program. For all 205audit reports, sufficient information was available to compare project-level estimated, reported, and guaranteed cost savings. Reported cost savings accounted for ESCO verified savings per each project’s M&V plan. The total reported cost savings for the period addressed were $\$$647.8million,compared with the total guaranteed cost savings of $\$$601.6million. On average across the reported projects: •ESPC contractors guaranteed 92.8% of the estimated cost savings• projects reported achieving 100.0% of the estimated cost savings• projects reported achieving 107.7% of the guaranteed cost savings. The M&V performed for the period indicated adjustments for government operations and maintenance impacts to savings amount to$\$$43.9millionandcould be restored with the original operational parameters for impacted projects. Accounting for this potential cost savings impact, these projects still realized 100.4% of the guaranteed cost savings. The information on estimated and reported energy savings was collected and compared for all 205of the reports examined. Based on site energy, estimated savings totaled 14.88million MMBtu, and reported savings were 15.33million MMBtu; 3.1% greater than the estimated energy savings. All of the reports examined contained sufficient information to calculate source energy savings. Based on site-adjusted source energy, total estimated energy savings were 20.90 million MMBtu, and reported savings were 21.22million MMBtu, 101.5% of the estimated energy savings. For water savings, the estimated savings were 11,539,055 kGal and the reported savings were 13,315,930 kGal. This means 1,776,875 kGal more water was saved than estimated, which is about 15% higher than the estimate. These results indicate that, overall, the reported energy savings slightly exceeded the estimated values, while estimated water savings significantly exceeded estimated values, suggesting that the projects achieved greater cost savings than originally projected. The total annual expense for the ESCOs to perform annual M&V audits and reporting was $\$$10.02million. Through this effort, $\$$647.8 million in annual cost savings was verified. The M&V results indicated that $\$$43.9 million of these verified savings reflected adjustments due to government operations A-6and maintenance impacts, which could be restored under the original operational parameters for the affected projects. These findings show the value of M&V that only costs 1.7%of the guaranteed cost savings to ensure guarantees are met.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs) are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and enhance mission resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report (for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advanced Turbine Technology Applications Project (ATTAP)

This report is the fifth in a series of Annual Technical Summary Reports for the Advanced Turbine Technology Applications Project (ATTAP), sponsored by the U.S. Department of Energy (DOE). The report was prepared by Garrett Auxiliary Power Division (GAPD), a unit of Allied-Signal Aerospace Company, a unit of Allied Signal, Inc. The report includes information provided by Garrett Ceramic Components, and the Norton Advanced Ceramics Company, (formerly Norton/TRW Ceramics), subcontractors to GAPD on the ATTAP. This report covers plans and progress on ceramics development for commercial automotive applications over the period 1 Jan. through 31 Dec. 1992. Project effort conducted under this contract is part of the DOE Gas Turbine Highway Vehicle System program. This program is directed to provide the U.S. automotive industry the high-risk, long-range technology necessary to produce gas turbine engines for automobiles with reduced fuel consumption, reduced environmental impact, and a decreased reliance on scarce materials and resources. The program is oriented toward developing the high-risk technology of ceramic structural component design and fabrication, such that industry can carry this technology forward to production in the 1990's. The ATTAP test bed engine, carried over from the previous AGT101 project, is being used for verification testing of the durability of next generation ceramic components, and their suitability for service at Reference Powertrain Design conditions. This document reports the technical effort conducted by GAPD and the ATTAP subcontractors during the fifth year of the project. Topics covered include ceramic processing definition and refinement, design improvements to the ATTAP test bed engine and test rigs, and the methodology development of ceramic impact and fracture mechanisms. Appendices include reports by ATTAP subcontractors in the development of silicon nitride materials and processes.

Source record↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY2021

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 193 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2021, between October 1, 2020 and September 30, 2021, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2022

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 190 measurement and verification (M&V) reports covering 182 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2021, between October 1, 2021 and September 30, 2022, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

July 2023 Monthly Sewer Monitoring Report

The Sandia National Laboratories, in California (Sandia/CA) is a research and development facility, owned by the U.S. Department of Energy’s National Nuclear Security Administration agency (DOE/NNSA). The laboratory is located in the City of Livermore (the City) and is comprised of approximately 410 acres. The Sandia/CA facility is operated by National Technology and Engineering Solutions of Sandia, LLC (NTESS) under a contract with the DOE/NNSA. The DOE/ NNSA’s Sandia Field Office (SFO) oversees the operations of the site. North of the Sandia/CA facility is the Lawrence Livermore National Laboratory (LLNL), in which Sandia/CA’s sewer system combines with before discharging to the City’s Publicly Owned Treatment Works (POTW) for final treatment and processing. The City’s POTW authorizes the wastewater discharge from Sandia/CA via the assigned Wastewater Discharge Permit #1251 (the Permit), which is issued to the DOE/NNSA’s main office for Sandia National Laboratories, located in New Mexico (Sandia/NM). The Permit requires the submittal of this Monthly Sewer Monitoring Report to the City by the twenty-fifth day of each month.

99 GENERAL AND MISCELLANEOUS↗