Performance Evaluation of Peer-to-Peer Distributed Microgrids Coordination for Voltage Regulation: Preprint

This paper presents the performance evaluation of a peer-to-peer microgrids coordination algorithm for sub-transmission systems. As distributed energy resources (DERs) in distribution system start to show negative impact to the bulk power system, a paradigm shift is needed for transmission planning and operation. Because distribution substations are located far from the sub-transmission system, and it is hard to use traditional centralized control for real-time control and coordination. Thus, distributed control is a natural choice because it requires less communication and central computation. In this paper, each distribution substation is treated as a microgrid, and the peer-to-peer distributed microgrids control is formulated as a real-time optimal power flow problem to reduce the negative impact in sub-transmission systems. A distributed primal-dual optimization algorithm is adopted to solve the problem. Validation of the peer-to-peer algorithm is performed through the simulation of a real-world sub-transmission system composing of many distribution systems with high renewable penetration. Simulation results show that the peer-to-peer algorithm can achieve satisfactory performance (e.g., voltage regulation) in sub-transmission system by coordinating and controlling DERs in distribution systems.

distributed control↗

Advanced Communication and Control for Distributed Energy Resource Integration: Phase 2 Scientific Report

The objective of this research project is to demonstrate sensing, communication, information and control technologies to achieve a seamless integration of multivendor distributed energy resource (DER) units at aggregation levels that meet individual user requirements for facility operations (residential, commercial, industrial, manufacturing, etc.) and further serve as resource options for electric and natural gas utilities. The fully demonstrated DER aggregation system with embodiment of communication and control technologies will lead to real-time, interactive, customer-managed service networks to achieve greater customer value. Work on this Advanced Communication and Control Project (ACCP) consists of a two-phase approach for an integrated demonstration of communication and control technologies to achieve a seamless integration of DER units to reach progressive levels of aggregated power output. Phase I involved design and proof-of-design, and Phase II involves real-world demonstration of the Phase I design architecture. The scope of work for Phase II of this ACCP involves demonstrating the Phase I design architecture in large scale real-world settings while integrating with the operations of one or more electricity supplier feeder lines. The communication and control architectures for integrated demonstration shall encompass combinations of software and hardware components, including: sensors, data acquisition and communication systems, remote monitoring systems, metering (interval revenue, real-time), local and wide area networks, Web-based systems, smart controls, energy management/information systems with control and automation of building energy loads, and demand-response management with integration of real-time market pricing. For Phase II, BPL Global shall demonstrate the Phase I design for integrating and controlling the operation of more than 10 DER units, dispersed at various locations in one or more Independent System Operator (ISO) Control Areas, at an aggregated scale of more than 1 MW, to provide grid support. Actual performance data with respect to each specified function above is to be collected during the Phase II field demonstration. At a minimum, the Phase II demonstration shall span one year of field operations. The demonstration performance will need to be validated by the target customer(s) for acceptance and subsequent implementation. An ISO must be involved in demonstration planning and execution. As part of the Phase II work, BPL Global shall develop a roadmap to commercialization that identifies and quantifies the potential markets for the integrated, aggregated DER systems and for the communication and control technologies demonstrated in Phase I. In addition, the roadmap must identify strategies and actions, as well as the regional and national markets where the aggregated DER systems with communication and control solutions will be introduced, along with a timeline projected for introduction into each identified market. In Phase I of this project, we developed a proof-of-concept ACCP system and architecture and began to test its functionality at real-world sites. These sites had just over 10 MW of DERs and allowed us to identify what needed to be done to commercialize this concept. As a result, we started Phase II by looking at our existing platform and identified its strengths and weaknesses as well as how it would need to evolve for commercialization. During this process, we worked with different stakeholders in the market including: Independent System Operators, DER owners and operators, and electric utility companies to fully understand the issues from all of the different perspectives. Once we had an understanding of the commercialized ACCP system, we began to document and prepare detailed designs of the different system components. The components of the system with the most significant design improvements were: the on-site remote terminal unit, the communication technology between the remote site and the data center, and the scalability and reliability of the data center application. As we began to implement the Phase II ACCP system, we upgraded the real-world demonstration sites from Phase I of the project as well as added additional sites to broaden the types of DER the platform was tested with. We worked with the owners and operators of these sites to understand how the system was meeting their needs and made modifications throughout the project as needed. This also included an effort to continue to understand the barriers to commercial adoption of the ACCP architecture and standardized communication protocols. The final aspect of this phase of the project was to prepare resources to aid in the commercial adoption of the ACCP architecture and standardized communication protocols. This entailed: presentations at conferences, published articles and papers, and web-based technical resources to provide tools to aid in the design and implementation of ACCP systems.

03 NATURAL GAS↗

Robust PCA-Deep Belief Network Surrogate Model for Distribution System Topology Identification with DERs

With the expansion of distribution networks and increased penetration of distributed energy resources (DERs), it is becoming increasingly important to obtain accurate distribution network topology in real-time. In this paper, a robust principal component analysis coupled deep belief network (PCA-DBN) surrogate model is proposed for distribution system topology identification. It integrates the benefits of robust feature extraction from PCA to deal with data quality issues and filter out noise, and the strength of DBN in capturing the nonlinear relationship between voltage amplitudes and the binary states of switchable connections. This also significantly reduces the DBN training complexity without loss of accuracy. It is shown that the widely used standard deviation of voltage drop and the voltage covariance matrix features yield less accuracy as compared to that of the voltage amplitudes in presence of high penetration of DERs and ZIP loads. Comparison results with other alternatives, such as the random forest (RF), multi-output regression (MOR) and the traditional DBN methods demonstrate that the proposed method can achieve a much higher topology identification accuracy while maintaining robustness to missing data and measurement noise under various penetration levels of DERs.

deep belief network↗

Cybersecurity Standards, Certification, and Best Practices for DERs

Distributed energy resources (DERs) are becoming increasingly important to the electric grid, including solar energy systems. However, DERs also introduce new cybersecurity risks, including those posed by cloud computing. Standards harmonization is essential for ensuring that DERs are secure and can be safely integrated into the grid. This panel will discuss cyber standards harmonization for solar security. The panel will feature experts from the S2G Program, National Labs and Industry who will discuss the following topics: the cybersecurity risks and future benefits posed by ubiquitous solar energy systems, the development and implementation of cloud-based security solutions for DERs, including solar energy systems, the challenges and opportunities for harmonizing DER cybersecurity standards, and Cyber Informed Engineering and the solar security implementations The panel will also discuss the following specific initiatives: the S2G Program's DER Cybersecurity Framework, UL's DER Cybersecurity Certification Program, and IEEE 1547 Updates. The panel will conclude with a discussion of the future of standards harmonization for DER cybersecurity.

14 SOLAR ENERGY↗

Black-Starting Microgrids Using Inverter-Based Distributed Energy Resources

Recent trends in power systems show increasing deployment of inverter-based distributed energy resources (DERs) at the distribution level. Efforts have also been made to use inverter-based DERs for system restoration of critical sections of distribution feeders. In the past few years, there has been active consideration of using local grid-forming (GFM) DERs, which can form their own voltage and frequency, to black-start microgrids instead of waiting for the bulk system for supply restoration. However, using current-limited inverter-based DERs for black-start operations with high inrush currents can pose some technical challenges. This paper presents detailed electromagnetic transient studies on a digital real-time simulator to assess the operational feasibility of using local inverter-based GFM DERs for microgrid black-start operations as a bottom-up approach instead of a top-down approach where the substation is used to restore critical sections of the feeder. The paper presents key modeling details for distribution system components for studying GFM DER-based microgrid black-start operations. The paper presents simulation results comparing different black-start approaches using GFM DERs for two test systems: i) a simple test microgrid and ii) a real-world utility microgrid currently being designed and deployed by Holy Cross Energy in Colorado.

black start↗

Enabling Realistic Communications Evaluations for ADMS

Increasing penetration levels of inverter-based distributed energy resources (DERs) in distribution systems are creating challenges in system operation. Currently, wired or proprietary wireless communications are used by advanced distribution management systems (ADMS) to detect the state of the system and control the DERs for optimal operation. Wireless communications are an alternative solution that can enable connectivity between the dispersed assets used in distribution system applications. As demand for the seamless integration of distributed energy resources (DERs) continues to increase, proper networking and communications systems are becoming important to support the DER infrastructure. This report summarizes validation of a private wireless LTE network in a laboratory environment. The purpose of this work is to 1) demonstrate the effectiveness of private wireless LTE communication for grid applications and 2) provide a means of evaluating latency and overall performance of wireless communication in grid applications. First, private wireless LTE communication was validated in a direct transfer trip relaying scenario as an example of one-way communications using grid equipment. This study provided a baseline understanding of the variation in latency for seven different kinds of wireless scenarios shown in Figure A below. As expected, weak (attenuated) wireless signal-based communication yielded the widest ranges in latency. When higher priority was set for the trip signal communication, this resulted in lower latency in communication timing. In the final phase of this project, the private wireless LTE network was validated using two-way communications in an advanced distribution management system (ADMS) testbed which was developed in the ESIF at NREL. The purpose of this was to study the impact of wireless communication on grid performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Scheduler Modeling of Distributed Energy Resources for Providing Ancillary Services

Distribution energy resources (DERs) have been integral components of modern power systems, and their capability to provide grid services has been widely studied. To promote the deployment of these resources in providing grid services in real-world utility operations, this paper proposes a day-ahead scheduler model for a distribution system connected DER plant. A certain amount of generation capacity of this DER plant is reserved for frequency services, and some ancillary services for the distribution system-including peak load reduction, voltage regulation, and power factor control-are integrated into the model. The model is tested on a real-world distribution system. From the simulation results, the energy and reserve schedule of the solar photovoltaic (PV) unit and battery energy storage system (BESS) can be determined, and voltage and power factor are well maintained. Additionally, in order to demonstrate the specific characteristics of the co-located and hybrid operation modes for the PV and BESS, these two modes are analyzed both theoretically and through real-time simulation. Simulation results show that most of PV's variability is transferred to the net power in the co-located mode, whereas it is transferred to the BESS in the hybrid mode. This proposed scheduler model and the comparison of co-located and hybrid modes can provide practical guidance for the applications of DER plant in the real-world utility.

14 SOLAR ENERGY↗

Network Constraints Consideration for Grid-Edge Energy Management System

Increased deployment of distributed energy resources (DER) in distribution system is bringing need for enhanced grid intelligence, control, and flexibility. This is significant at the edge of the grid where DERs, loads or microgrids are located. Integrated DERs in a distribution system need to follow grid codes to avoid violations that results in DER disconnection. To comply with grid code requirements (e.g. IEEE 1547-2018) at the grid edge level, network constrained grid edge energy management system (GEEMS) is proposed in this paper. The objective of GEEMS is to provide economic solution for active and reactive power dispatch set-points at each interval and ensure voltage regulation to support secure interconnection of the grid edge segment to the distribution system. To evaluate the proposed GEEMS framework, four DERs are included into IEEE 13 bus system. GEEMS outperforms the existing economic dispatch-based energy management system by reducing the voltage violation.

Electric vehicle depot charging station↗

Peer-to-peer Communication Control Architecture for Engaging Ubiquitous DERs to Support Distribution System Resiliency

In this project, we developed a leader-follower consensus (LFC) control architecture to coordinate between GFM and GFL inverters with the former being leaders and the latter being followers. The objective is to simultaneously achieve a fast frequency and voltage regulation along with accurate real power and var sharing among all inverters under various disturbances. The distinction of our work is that we consider both GFM and GFL inveters for frequency and voltage regulations. In addition, rather than a standard consensus algorithm, our work utilized a leader-follower consensus algorithm which exploits the physical characteristics of GFM-GFL inverters: (i) the GFM inverters directly control frequency and voltage, and hence, serve as leaders, (ii) the GFL inverters measure frequency/voltage to modulate their outputs, and hence, they should serve as followers. The effectiveness of the proposed LFC coordination was tested on a networked microgrid test system under different disturbances and communication degradation events. We demonstrated that the proposed fully coordinated control is robust to disturbances, while outperforming uncoordinated and GFM-only coordinated approaches. Overall, this work emphasized the necessity and benefits of the GFMGFL coordination in the secondary control of microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Intelligent Sensor Development and Demonstration for Future Distribution Systems with High Penetration DERs

The nation’s electric grid is evolving to supply the electricity needed for economic growth, health, and quality of life. As the DOE has pointed out “Old Tools Won’t Solve New Problems” This project conceived, designed, built, and demonstrated a new tool that promises to make the emerging grid dependable at a lower cost. The tool is a smart sensor with the sensitivity and the bandwidth to measure actionable information about grid health that was unmeasurable.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hierarchical Management of Distributed Energy Resources Using Chance-Constrained OPF and Extremum Seeking Control: Preprint

Distributed energy resources (DERs) are becoming an important part of distribution systems because of their economic and environmental benefits. Although their inherent intermittency and volatility introduce uncertainties into the system, they have potential to provide controllability to the system under proper coordination. In this paper, we propose a hierarchical control algorithm for distribution systems with DERs so that they have controllability similar to that of a generator bus. The upper level scheduler solves a chance-constrained optimal power flow (OPF) problem to plan the operation of the DERs based on forecasts, and the lower level distributed DER controllers leverage the extremum seeking approach to deliver the planned power at the feeder head. The proposed algorithm is tested on a modified IEEE 13-node feeder, demonstrating its effectiveness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hierarchical Management of Distributed Energy Resources Using Chance-Constrained OPF and Extremum Seeking Control

Distributed energy resources (DERs) are becoming an important part of distribution systems, because of their economic and environmental benefits. Although their inherent intermittency and volatility introduce uncertainties into the electric power system, they have the potential to provide controllability to the system under proper coordination. In this paper, we propose a hierarchical control algorithm for distribution systems with DERs so that they have controllability similar to a generator bus. The upper level scheduler solves a chance-constrained optimal power flow (OPF) problem to plan the operation of the DERs based on forecasts, and the lower level distributed DER controllers leverage the extremum seeking approach to deliver the planned power at the feeder head. The proposed algorithm is tested on a modified IEEE 13-node feeder, demonstrating its effectiveness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Stochastic responses of Van der Pol vibro-impact system with fractional derivative damping excited by Gaussian white noise

This paper focuses on the study of the stochastic Van der Pol vibro-impact system with fractional derivative damping under Gaussian white noise excitation. The equations of the original system are simplified by non-smooth transformation. For the simplified equation, the stochastic averaging approach is applied to solve it. Then, the fractional derivative damping term is facilitated by a numerical scheme, therewith the fourth-order Runge-Kutta method is used to obtain the numerical results. And the numerical simulation results fit the analytical solutions. Therefore, the proposed analytical means to study this system are proved to be feasible. In this context, the effects on the response stationary probability density functions (PDFs) caused by noise excitation, restitution condition, and fractional derivative damping are considered, in addition the stochastic P-bifurcation is also explored in this paper through varying the value of the coefficient of fractional derivative damping and the restitution coefficient. These system parameters not only influence the response PDFs of this system but also can cause the stochastic P-bifurcation.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Experimental Test Bed to Enable Realistic Evaluations for Direct Transfer Trip Relaying via Private Wireless LTE Communications

Increasing penetration levels of inverter-based distributed energy resources (DERs) in distribution systems are creating challenges in system operation. Currently, wired or proprietary wireless communications are used by advanced distribution management systems (ADMS) to detect the state of the system and control the DERs for optimal operation. Wireless communications are an alternative solution that can enable connectivity between the dispersed assets used in distribution system applications. This paper demonstrates an experimental test bed to enable the realistic evaluation of communications system characteristics for direct transfer trip (DTT) relaying of a photovoltaic inverter system using a private 900-MHz spectrum wireless LTE network. Private LTE network communications can be deployed to many remote DERs and other grid-edge devices to prevent costly infrastructure upgrades across distribution systems. In addition, this paper provides a framework for evaluating the impact of signal strength and network traffic in communications systems. The results shown develop a better understanding of the best practices for using LTE communications systems across multiple utility applications, such as protective relaying, voltage regulation, and supervisory control and data acquisition system messages.

900-MHz LTE network↗

Experimental Test Bed to Enable Realistic Evaluations for Direct Transfer Trip Relaying via Private Wireless LTE Communications: Preprint

Increasing penetration levels of inverter-based distributed energy resources (DERs) in distribution systems are creating challenges in system operation. Currently, wired or proprietary wireless communications are used by advanced distribution management systems (ADMS) to detect the state of the system and control the DERs for optimal operation. Wireless communications are an alternative solution that can enable connectivity between the dispersed assets used in distribution system applications. This paper demonstrates an experimental test bed to enable the realistic evaluation of communications system characteristics for direct transfer trip (DTT) relaying of a photovoltaic inverter system using a private 900-MHz spectrum wireless LTE network. Private LTE network communications can be deployed to many remote DERs and other grid-edge devices to prevent costly infrastructure upgrades across distribution systems. In addition, this paper provides a framework for evaluating the impact of signal strength and network traffic in communications systems. The results shown develop a better understanding of the best practices for using LTE communications systems across multiple utility applications, such as protective relaying, voltage regulation, and supervisory control and data acquisition system messages.