Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DEMONSTRATION PROGRAMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

High Energy Batteries for Hybrid Buses

EnerDel batteries have already been employed successfully for electric vehicle (EV) applications. Compared to EV applications, hybrid electric vehicle (HEV) bus applications may be less stressful, but are still quite demanding, especially compared to battery applications for consumer products. This program evaluated EnerDel cell and pack system technologies with three different chemistries using real world HEV-Bus drive cycles recorded in three markets covering cold, hot, and mild climates. Cells were designed, developed, and fabricated using each of the following three chemistries: (1) Lithium nickel manganese cobalt oxide (NMC) - hard carbon (HC); (2) Lithium manganese oxide (LMO) - HC; and (3) LMO - lithium titanium oxide (LTO) cells. For each cell chemistry, battery pack systems integrated with an EnerDel battery management system (BMS) were successfully constructed with the following features: real time current monitoring, cell and pack voltage monitoring, cell and pack temperature monitoring, pack state of charge (SOC) reporting, cell balancing, and over voltage protection. These features are all necessary functions for real-world HEV-Bus applications. Drive cycle test data was collected for each of the three cell chemistries using real world drive profiles under hot, mild, and cold climate conditions representing cities like Houston, Seattle, and Minneapolis, respectively. We successfully tested the battery packs using real-world HEV-Bus drive profiles under these various climate conditions. The NMC-HC and LMO-HC based packs successfully completed the drive cycles, while the LMO-LTO based pack did not finish the preliminary testing for the drive cycles. It was concluded that the LMO-HC chemistry is optimal for the hot or mild climates, while the NMC-HC chemistry is optimal for the cold climate. In summary, the objectives were successfully accomplished at the conclusion of the project. This program provided technical data to DOE and the public for assessing EnerDel technology, and helps DOE to evaluate the merits of underlying technology. The successful completion of this program demonstrated the capability of EnerDel battery packs to satisfactorily supply all power and energy requirements of a real-world HEV-Bus drive profile. This program supports green solutions to metropolitan public transportation problems by demonstrating the effectiveness of EnerDel lithium ion batteries for HEV-Bus applications.

25 ENERGY STORAGE↗

Benchmark Specification for FFTF LOFWOS Test #13

The Fast Flux Test Facility (FFTF) at the Hanford site in Washington was designed by the Westinghouse Electric Corporation for the U.S. Department of Energy. FFTF was a 400 MW thermal, oxide-fueled, liquid sodium cooled test reactor, built to assist development and testing of advanced fuels and materials for fast breeder reactors. After reaching criticality in 1980, FFTF operated until 1992, providing the U.S. Department of Energy (DOE) with the means to test fuels, materials, and other components in a fast neutron flux environment. In July 1986, a series of unprotected transients (with the plant protection system intentionally disabled) were performed in FFTF as part of the passive safety demonstration program. Among these were thirteen loss of flow without scram (LOFWOS) tests. The goals of this program included confirming the liquid metal reactor safety margins, providing data for computer code validation, and demonstrating the inherent and passive safety benefits of specific design features. The test defined in this benchmark is LOFWOS Test #13, which was initiated at 50% power and 100% flow with the pump pony motors turned off. This benchmark specification is intended to support collaborative efforts within international partnerships on the validation of simulation tools and models in the area of Sodium-cooled Fast Reactor (SFR) safety. Validated tools and models are needed to evaluate SFR inherent safety characteristics and assess the impact of passive design features in response to accident initiators. Comparisons with experimental data and the results of safety analyses from other groups create unique opportunities to improve predictive capabilities of computational codes and methods for SFR modeling and simulation. The conditions of the LOFWOS test along with the feedback from FFTF’s limited free bow core restraint system and the novel passive reactivity control Gas-Expansion Modules (GEMs) pose a very challenging and uniquely valuable benchmark exercise.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Modeling and Simulation of Xe-100-type Pebble Bed Gas-Cooled Reactor with SCALE

The US Department of Energy (DOE) announced the Advanced Reactor Demonstration Program (ARDP) to accelerate the deployment of advanced reactor concepts. Awardees of ARDP funds are expected to demonstrate the operation of an advanced reactor within 7 years of receiving the award. X-Energy’s advanced reactor concept, the Xe-100, was selected as one of two advanced reactor concepts to receive funding to demonstrate the operation of its high-temperature gas-cooled pebble-bed reactor before the end of this decade. As a result of this push to bring advanced reactors to maturation and commercialization, transition and deployment scenario studies are being performed under the Systems Analysis and Integration (SA&I) campaign within the DOE Office of Nuclear Energy (DOE-NE) to evaluate the transition of the current US commercial fleet of light-water reactors (LWRs) to a future fleet of advanced reactors consisting of a mix of ARDP type reactor concepts and advanced LWRs. To accurately evaluate the front- and back-end resource requirements, it is important to perform reactor physics calculations to determine the discharge burnup and isotopic content, fuel residence time, as well as other parameters. For this purpose, a summer project funded by the SA&I campaign allowed for the setup of SCALE models for full-core Xe-100 type high-temperature gas-cooled pebble-bed reactor and a Xe-100 type slice using publicly available information. The core-averaged equilibrium compositions and zone-wise equilibrium compositions for the slice and 3D models, respectively, were obtained following an iterative depletion method developed by Bostelmann et al. using SCALE’s reactor physics sequence TRITON. The slice model was used with TRITON to generate burnup-dependent cross section libraries at different temperatures which can be used with SCALE’s ORIGAMI code to rapidly determine fuel inventory and therefore to perform quick sensitivity studies on parameters such as the pebble location in the core. The SCALE/TRITON transport and depletion calculation for the Xe-100 type slice model indicates that the isotopic concentrations are in good agreement at 1,300 effective full power days (EFPD) for 235 U. An analysis of 236 U results match 239 Pu results would seem to indicate a typographical error in Mulder and Boyes wherein the reported results of 236 U and 239 Pu are reversed. In addition to SCALE/TRITON calculations, a new capability within SCALE/ORIGAMI for the simulation of pebble-bed reactors was used to study the burnup sensitivity with respect to the pebble pathway through the core. The SCALE/ORIGAMI results show that pebbles that travel closer to the reflector for the entire depletion history have a higher burnup than pebbles that travel through the middle of the core because of the higher thermal to fast flux ratio near the reflector. Consequently, a pebble’s burnup is strongly affected by the pebble’s pathway for each pass. Additional phenomena such as temperature distributions in the core and different travel times of the pebbles in the individual radial zones further affect the burnup distribution. The sensitivity of the discharge vector to the pebble pathways taken during each pass can be evaluated in the future using SCALE/ORIGAMI now that the SCALE inputs have been established.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Bright Solar Futures

The Bright Solar Futures (BSF) program addresses national climate and energy concerns by fulfilling the need for more solar technicians. About to enter its 5th year, the program demonstrates how the need for alternative energy can be addressed through a sustainable education and employment strategy. Career and Technical Education (CTE) Solar programs in the U.S. that train young adults for employment in the solar industry are in demand. Bright Solar Futures is designed to fill this local and national need as a replicable high school solar curriculum for CTE students.

14 SOLAR ENERGY↗

Sequential self-assembly of DNA functionalized droplets

Complex structures and devices, both natural and manmade, are often constructed sequentially. From crystallization to embryogenesis, a nucleus or seed is formed and built upon. Sequential assembly allows for initiation, signaling, and logical programming, which are necessary for making enclosed, hierarchical structures. Though biology relies on such schemes, they have not been available in materials science. We demonstrate programmed sequential self-assembly of DNA functionalized emulsions. The droplets are initially inert because the grafted DNA strands are pre-hybridized in pairs. Active strands on initiator droplets then displace one of the paired strands and thus release its complement, which in turn activates the next droplet in the sequence, akin to living polymerization. This strategy provides time and logic control during the self-assembly process, and offers a new perspective on the synthesis of materials.

36 MATERIALS SCIENCE↗

DOE Challenge Home Multifamily Development - Mixed Climate

The U.S. Department of Energys Zero Energy Ready Home (ZERH) recognition program builds upon the building science requirements of ENERGY STAR Certified Homes, Version 3 and best practices tested by the Building America research and demonstration program. Multifamily units (units in buildings with five or more apartments) comprise an increasingly important segment in the U.S. new housing market. Over the past 30 years, this segment has averaged 24% of residential building permits and since the recession in 2008 averages 34% of new residential building permits. This study analyses two multifamily homes, one townhouse and one apartment. The study looks to improve the efficiency of these homes to meet ENERGY STAR standards. Apartment - 2 bedroom apartment unit Townhome - 3 bedroom townhome unit

Array↗

Strengthening Retrofit Markets for Comprehensive Savings in Multifamily Buildings (Interim Final Report)

Energy efficiency is vitally important in Maine. Nearly 70% of Maine households rely on fuel oil as their primary energy source for home heating, a higher share than in any other state. Coupled with the state's long, cold winters, Maine's dependence on oil renders homeowners particularly vulnerable to fluctuating fuel costs. With $\$$4.5 million in seed funding from the Energy Department's Better Buildings Neighborhood Program, the Governor's Energy Office (GEO), through Efficiency Maine Trust (the Trust), is spurring Maine landlords to lower their monthly energy bills and improve comfort for their tenants during the state's cold winter months and increasingly warmer summers. Maine's aging multifamily housing stock can be expensive to heat and costly to maintain. It is not unusual to find buildings with little or no insulation, drafty windows, and significant air leaks, making them ideal candidates for energy efficiency upgrades. Maine modeled its Multifamily Efficiency Program (MEP) after the state's highly successful Home Energy Savings Program (HESP) for single-family homes. HESP provided cash incentives and financing opportunities to owners of one-to four-unit structures, which resulted in thousands of energy assessments and whole-house energy upgrades in 225 communities. Maine's new MEP multifamily energy efficiency upgrade and weatherization initiative focuses on small to medium-sized (i.e., five to 20 units) apartment buildings. The program's energy efficiency upgrades will provide at least 20% energy savings for each upgraded multifamily unit. The Trust’s MEP relies on a network of approved program partners who help move projects through the pipeline from assessment to upgrade. MEP has two components: benchmarking and development of an Energy Reduction Plan (ERP). Using the ENERGY STAR® Portfolio Manager benchmarking tool, MEP provides an assessment of current energy usage in the building, establishes a baseline for future energy efficiency improvements, and enables tracking and monitoring of future energy usage at the building— all at no cost to the building owner. The ERP is developed by a program partner using either the Trust’s approved modeling or prescriptive tools; it provides detailed information about the current energy related conditions in the building and recommends energy efficiency, health, and safety improvements. The Trust's delivery contractor provides quality assurance and controls throughout the process. Through this effort, MEP's goal is to establish a self-sustaining, market-driven program, demonstrating the value of energy efficiency to other building owners. The increasing value of properties across the state will help incentivize these owners to continue upgrades after the grant period has ended. Targeting urban areas in Maine with dense clusters of multifamily units—such as Portland, Lewiston- Auburn, Bangor, and Augusta—MEP engaged a variety of stakeholder groups early on to design its multifamily program. Through direct emails and its website, program officials invited lending institutions, building professionals, engineering firms, equipment distributors, and local property owners associations to attend open meetings around the state to learn about the goals of the multifamily program and to help define its parameters. These meetings helped program administrators understand the diversity of the customer base: some owners are individuals with a single building, while other owners are groups of people or management companies with an entire portfolio of multifamily buildings. The diversity of the customer base notwithstanding, owners see MEP as an opportunity to make gains in their respective properties. Consistently high turnouts at stakeholder meetings fueled greater customer interest as awareness of the program spread through word of mouth. The program also gained traction by utilizing the program partner networks and building on the legacy of the Trust’s successful HESP for single-family residences. MEP offers significant incentives for building owners to participate in the upgrade program. Wholebuilding benchmarking services are available to most multifamily housing buildings free of charge. The service provides the building owner with an assessment of the building's current energy efficiency as compared to other multifamily buildings on a national scale, establishes a baseline to measure future improvements, and enables owners to track monthly energy consumption using the ENERGY STAR Portfolio Manager. Once the benchmarking process is complete, the program links building owners with approved program partners (e.g., energy professionals, home performance contractors) to identify and implement specific energy-saving opportunities in the building. Program partners can also provide project quotes with estimated financing incentives and payback period calculations that enable building owners to make informed decisions. What's more, the Trust provides two financial incentives for successful completion of program milestones. The first is a per-unit incentive for completion of an approved ERP (i.e., $\$$100 per unit if a prescriptive path is followed, and $\$$200 per unit for a modeled ERP). Upon final inspection of the installed project scope of work, an incentive of $\$$1,400 per unit or 50% of installed cost—whichever is less—is paid. The Trust originally established a $\$$1 million loan-loss reserve fund (LLRF) to further enhance financing opportunities for qualified multifamily building owners. This funding mechanism was designed to connect building owners with lenders that retain the mortgages for their properties and encourages the lenders to offer financing for energy efficiency improvements. However, there has been no interest in the LLRF and therefore the LLRF has been reduced. Ultimately, MEP plans to build an online tool for building owners to assess opportunities to make upgrades in their multifamily units. The tool will include a performance rating system to provide a way for building owners to more easily understand energy use in their building, and how it could be improved with energy efficiency upgrades. Prospective tenants will also be able to use the rating system to make informed decisions about where to rent. Furthermore, the rating can be incorporated into real estate listings as a way for prospective home buyers and the real estate financial community to evaluate a home's operating costs. The Trust’s MEP has identified the state's most experienced energy professionals, vendors, suppliers, and contractors that install energy efficiency equipment in the multifamily sector to be qualified program partners. To be eligible for partnership, energy assessment professionals and contractors are required to have demonstrated experience in the multifamily sector and hold associated professional certifications, such as Building Operator Certification (BOC), Certified Energy Manager (CEM), Professional Engineer (PE), or Building Performance Institute (BPI) Multifamily Building Analyst. Widespread program interest has enabled the Trust to redirect funds that might otherwise be needed for program promotion to building capacity through contractor training. In addition to boosting professional training and certification opportunities, MEP teaches its partners how to market the multifamily program to prospective multifamily homeowners.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Technology Proving Ground Program Plan

New methods of energy production and distribution are required to meet clean energy goals and demands across all U.S. energy sectors. Idaho National Laboratory’s (INL) Integrated Energy Systems (IES) initiative is enabling clean energy research, development, and demonstration (RD&D) activities. To date, IES demonstration programs have been limited by distributed infrastructure and a lack of large-scale facilities to accommodate industry-scale research of Technical Readiness Level (TRL) 6-8 technologies. The IES initiative plans to eliminate these constraints by establishing a new research complex at INL known as the Energy Technology Proving Ground (Proving Ground) to be led by the Energy and Environment Science and Technology Directorate. The Energy and Environment Science and Technology (EES&T) directorate, one of five Idaho National Laboratory (INL) RD&D organizations, focuses on clean energy technologies that anchor the industry-enabling research of the Proving Ground. The Proving Ground will combine diverse clean energy systems into lean integrated test bed of independent multiscale capabilities available to the government and commercial industries to perform research; and will enable INL’s goal of becoming a Net-Zero entity by 2031. This program encompasses existing and new research space at both the in-town Research and Education Campus (REC) and the Arco desert site (the Site). The Proving Ground will support the maturation of IES technologies from TRL 1 through 8 by providing the infrastructure and capabilities needed to sustain a continuum of RD&D from basic science to industry-scale. To establish The Proving Ground and meet INL’s net-zero goals by 2031, nine research program areas have been identified within the IES initiative that require expanded and new capital infrastructure. This program plan provides guidance for establishing the Proving Ground at the Site for plug-and-play pilot testing and proofing of integrated energy system functionality including fission and renewable energy sources for industry driven application platforms.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Technology Proving Ground FY-2026 Program Plan (Rev.1)

New methods of energy production and distribution are required to meet clean energy goals and demands across all U.S. energy sectors. Idaho National Laboratory’s (INL) Integrated Energy Systems (IES) initiative is enabling clean energy research, development, and demonstration (RD&D) activities. To date, IES demonstration programs have been limited by distributed infrastructure and a lack of large-scale facilities to accommodate industry-scale research of Technical Readiness Level (TRL) 6-8 technologies. The IES initiative plans to eliminate these constraints by establishing a new research complex at INL known as the Energy Technology Proving Ground (Proving Ground) to be led by the Energy and Environment Science and Technology Directorate. The Energy and Environment Science and Technology (EES&T) directorate, one of five Idaho National Laboratory (INL) RD&D organizations, focuses on clean energy technologies that anchor the industry-enabling research of the Proving Ground. The Proving Ground will combine diverse clean energy systems into lean integrated test bed of independent multiscale capabilities available to the government and commercial industries to perform research; and will enable INL’s goal of becoming a Net-Zero entity by 2031. This program encompasses existing and new research space at both the in-town Research and Education Campus (REC) and the Arco desert site (the Site). The Proving Ground will support the maturation of IES technologies from TRL 1 through 8 by providing the infrastructure and capabilities needed to sustain a continuum of RD&D from basic science to industry-scale. To establish The Proving Ground and meet INL’s net-zero goals by 2031, nine research program areas have been identified within the IES initiative that require expanded and new capital infrastructure. This program plan provides guidance for establishing the Proving Ground at the Site for plug-and-play pilot testing and proofing of integrated energy system functionality including fission and renewable energy sources for industry driven application platforms.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Preliminary Process and Instrumentation Design of Advanced Reactor Integration with Refineries and Hydrogen Production Facilities

With the ongoing push to decarbonize energy use and especially greenhouse gas emissions across all sectors, there are incentives to investigate how nuclear reactors may be used to generate clean energy and be used in various energy economies beyond just the electrical grid. Two initial integrations, high temperature steam electrolysis (HTSE) and oil refineries, are investigated in this first DOE Integrated Energy Systems (IES) program detailed industrial integration design report. Increasingly detailed reports are anticipated both for the industries discussed in this report and for additional industries in the future of the program. This report is a robust starting point showing how integration thermodynamic analysis establishes the requirements on the reactor and methods by which those requirements can be evaluated for specific reactor designs. Two Advanced Reactor Demonstration Program awardees are selected as representative designs for their respective technologies: NuScale for light-water reactors (LWRs) and X-Energy for high temperature gas reactors (HTGRs). Other reactor technologies or specific reactor configurations would require specific analysis similar to what is done in this report, thus this report can be a reference point by which to extend this work to other nuclear plant designs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Mentoring Human Performance - 12480

Although the positive effects of implementing a human performance approach to operations can be hard to quantify, many organizations and industry areas are finding tangible benefits to such a program. Recently, a unique mentoring program was established and implemented focusing on improving the performance of managers, supervisors, and work crews, using the principles of Human Performance Improvement (HPI). The goal of this mentoring was to affect behaviors and habits that reliably implement the principles of HPI to ensure continuous improvement in implementation of an Integrated Safety Management System (ISMS) within a Conduct of Operations framework. Mentors engaged with personnel in a one-on-one, or one-on-many dialogue, which focused on what behaviors were observed, what factors underlie the behaviors, and what changes in behavior could prevent errors or events, and improve performance. A senior management sponsor was essential to gain broad management support. A clear charter and management plan describing the goals, objectives, methodology, and expected outcomes was established. Mentors were carefully selected with senior management endorsement. Mentors were assigned to projects and work teams based on the following three criteria: 1) knowledge of the work scope; 2) experience in similar project areas; and 3) perceived level of trust they would have with project management, supervision, and work teams. This program was restructured significantly when the American Reinvestment and Recovery Act (ARRA) and the associated funding came to an end. The program was restructured based on an understanding of the observations, attributed successes and identified shortfalls, and the consolidation of those lessons. Mentoring the application of proven methods for improving human performance was shown effective at increasing success in day-to-day activities and increasing confidence and level of skill of supervisors. While mentoring program effectiveness is difficult to measure, and return on investment is difficult to quantify, especially in complex and large organizations where the ability to directly correlate causal factors can be challenging, the evidence presented by Sydney Dekker, James Reason, and others who study the field of human factors does assert managing and reducing error is possible. Employment of key behaviors-HPI techniques and skills-can be shown to have a significant impact on error rates. Our mentoring program demonstrated reduced error rates and corresponding improvements in safety and production. Improved behaviors are the result, of providing a culture with consistent, clear expectations from leadership, and processes and methods applied consistently to error prevention. Mentoring, as envisioned and executed in this program, was effective in helping shift organizational culture and effectively improving safety and production. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Fast Modular Reactor (FMR) Pre-Application Regulatory Engagement Plan

The Fast Modular Reactor (FMR) is a 50 MWe Gascooled Fast Reactor (GFR) being developed by General Atomics Electromagnetic Systems (GA-EMS) under U.S. Department of Energy’s (DOE’s) Advanced Reactor Demonstration Program (ARDP), specifically Advanced Reactor Concepts 2020 (ARC-20). The 3-year conceptual design of the FMR is being conducted with verifications of key metrics in fuel, safety, and operational performance. GAEMS is pursuing design, licensing, and commercialization of the proposed reactor, with demonstration by 2030 and deployment by the mid-2030s. The U.S. Nuclear Regulatory Commission (NRC) recommends the pre-application regulatory engagement to provide for early identification of regulatory requirements for advanced reactors and to provide all interested parties with a timely, independent assessment of the safety and security characteristics of advanced reactor designs. As such, GAEMS is developing a pre-application regulatory engagement plan (REP) of the FMR.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Dynamic Line Rating Oncor Electric Delivery Smart Grid Program

Electric transmission lines are the lifeline of the electric utility industry, delivering its product from source to consumer. This critical infrastructure is often constrained such that there is inadequate capacity on existing transmission lines to efficiently deliver the power to meet demand in certain areas or to transport energy from high-generation areas to high-consumption regions. When this happens, the cost of the energy rises; more costly sources of power are used to meet the demand or the system operates less reliably. These economic impacts are known as congestion, and they can amount to substantial dollars for any time frame of reference: hour, day or year. There are several solutions to the transmission constraint problem, including: construction of new generation, construction of new transmission facilities, rebuilding and reconductoring of existing transmission assets, and Dynamic Line Rating (DLR). All of these options except DLR are capital intensive, have long lead times and often experience strong public and regulatory opposition. The Smart Grid Demonstration Program (SGDP) project co-funded by the Department of Energy (DOE) and Oncor Electric Delivery Company developed and deployed the most extensive and advanced DLR installation to demonstrate that DLR technology is capable of resolving many transmission capacity constraint problems with a system that is reliable, safe and very cost competitive. The SGDP DLR deployment is the first application of DLR technology to feed transmission line real-time dynamic ratings directly into the system operation’s State Estimator and load dispatch program, which optimizes the matching of generation with load demand on a security, reliability and economic basis. The integrated Dynamic Line Rating (iDLR)1 collects transmission line parameters at remote locations on the lines, calculates the real-time line rating based on the equivalent conductor temperature, ambient temperature and influence of wind and solar radiation on the stringing section, transmits the data to the Transmission Energy Management System, validates its integrity and passes it on to Oncor and ERCOT (Electric Reliability Council of Texas) respective system operations. The iDLR system is automatic and transparent to ERCOT System Operations, i.e., it operates in parallel with all other system status telemetry collected through Supervisory Control and Data Acquisition (SCADA) employed across the company.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ARDP Natrium Neutronic Methodology: Argonne Neutronic Assessment of ABR-1000

The Natrium Sodium-cooled Fast Reactor (SFR) concept developed by TerraPower, LLC was selected as one of the advanced reactor designs for demonstration under the Advanced Reactor Demonstration Program Natrium Demo project. In collaboration with TerraPower, the Argonne National Laboratory (ANL) team provide independent reviews of the neutronic methodology being used for the Natrium design. As part of this activity, both the TerraPower and ANL teams agreed to perform independent neutronics analyses of the ABR-1000 reactor problem as a demonstration on the usage of the neutronics methodologies. Comparison of the results from TerraPower and ANL would expose any methodological differences in the modeling approaches. This report describes and presents the Argonne analysis work on the ABR-1000, and will be provided to TerraPower, along with data files, to complete the comparison study. The comparison will cover the methodology to evaluate the reactivity coefficients for a safety analysis, the shutdown margin, and the reconstructed pin power distribution. The methods and models used to calculate the kinetic parameters and the reactivity coefficients (density, Doppler, axial/radial expansion, etc.) are described in detail with recommendations of specific method options and modelling techniques. The control system reactivity worth and the excess reactivity due to temperature defect are calculated for the shutdown margin analysis. The method to evaluate the excess reactivity is discussed in detail. The pin power reconstruction methodology used in SE2ANL, SE2RCT, and DASSH are discussed in this report. The pin power distribution evaluated by different methods are compared and discussed in the report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Demand response event simulator and risk-aware bidding tool for industrial customers

Incentive Based Demand Response (IBDR) program participation delivers financial benefits to the consumers and resiliency benefits to the electricity grid. Effectively participating in these programs as an industrial consumer requires bidding strategies that balance financial risk with operational constraints. Existing bidding tools tend not to fully incorporate stochastic IBDR event modeling, program specific baseline and payment/penalty calculations, or demand reduction process control schemes that account for the cascading impacts of shutdown in complex facilities. Here, this work presents an IBDR event simulator and risk-aware bidding framework tool integrating three key components: a flexible, parameterized demand response event generator that rigorously accounts for program structures and stochasticity, a demand response operational simulation model that generates explicit control strategies for load reduction, and a Monte Carlo simulator to evaluate financial risk for varied capacity bids. A case study at a wastewater treatment plant participating in PG&E's Capacity Bidding Program demonstrates the framework's utility. In the peak capacity price month of August, optimal bidding by the wastewater treatment plant nets a mean IBDR benefit of $101,000 (67% of the August electricity bill) with 0.4% probability of a financial loss. This framework enables industrial operators to make informed bidding decisions, negotiate better program terms with demand response load aggregators, and analyze energy flexibility investments at their facilities. Ultimately, this work reduces participation barriers in IBDR programs and supports the broader goal of enhancing grid reliability and renewable energy integration.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Exploration of Artificial Frustrated Magnets

This program encompasses experimental and theoretical studies of arrays of nanometer-scale magnets known as “artificial frustrated magnets”. These magnets are small and closely spaced, so that their behavior as a collective group is complex and reveals insights into how such collections of interacting objects behave as a group. In particular, the placement of the magnets is such that the interactions between them are “frustrated”, in that they compete with each other. These systems are analogs to a class of magnetic materials in which the lattice geometry frustrates interactions between individual atomic moments, and in which a wide range of novel physical phenomena have been recently observed. The advantage to studying the arrays is that they are both designable and resolvable: i.e., the experiments can control all aspects of the array geometry, and can also observe how individual elements of the arrays behave. This research program demonstrated a number of phenomena including the role of multiple collective interactions, the feasibility of using systems with their magnetism aligned perpendicular to the plane of the array, the importance of disorder in the arrays, and the possibility of using high temperatures to adjust the magnet orientations. All of these phenomena, and others explored in this program, add to the body of knowledge around collective magnetic behavior and magnetism in general. Aside from building scientific knowledge in an important technological area, with relevance to computing and memory, the program also gave critical support to the education of students working on the experiments.

97 MATHEMATICS AND COMPUTING↗

Pre-conceptual Evaluation of DOD Pele Microreactor Sites at Idaho National Laboratory

Members of the INL Land Use Committee met to discuss potential options and make recommendations for siting the Pele microreactor demonstration and testing projects at INL. The Pele microreactor prototype will be a DOE authorized reactor. The evaluation team of subject matter experts (SME) was asked to consider both indoor sites and outdoor sites. A preliminary evaluation was performed by the SME team and based on those discussions the following recommendations were made: (1) Present EBR-II as the most suitable indoor site, and (2) Utilize CITRC Pads A-D as a system of outdoor demonstration and testing sites. Each pad has its own set of attributes that have been established to enable equipment testing and can provide options for various configurations when the group of pads are used as a system of testing sites. Utilizing CITRC Pads A-D as a system of sites offers flexibility in scheduling activities at CITRC to meet existing program schedules and future Pele program demonstration and testing needs with the least programmatic impact.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Long-Term Stewardship Optimization for a Decommissioned Nuclear Reactor - 19579

The decommissioned Hallam Nuclear Power Facility (Hallam), located in Lancaster County, Nebraska, approximately 19 miles south of Lincoln, was developed as a prototype to investigate the technical and economic feasibility of a sodium-cooled, graphite-moderated nuclear reactor. As part of its Power Demonstration Program, the US Atomic Energy Commission (US AEC), a predecessor agency of the US Department of Energy (US DOE), operated the Hallam reactor from 1962 to 1964. The radiological surveillance of the Hallam site was established when the operating agreement between AEC and the Nebraska Public Power District was terminated. The US DOE Chicago Operations Office and the Nebraska Department of Health (NDH) agreed to install a shallow groundwater monitoring system as part of the environmental surveillance program. Surveillance at the site was scheduled to end in fiscal year 2005, with no further activities planned after that. At that time, the plan was to transition the site to the Nebraska Public Power District with future use of the facility to remain restricted. US DOE has title to and responsibility for the entombed radioactive materials. A surveillance and monitoring program was initiated in 1970 by NDH and was funded by US AEC. It included the analysis of samples from deep production wells (groundwater from the regional aquifer at depths greater than 55 meters [180 feet]) at the Sheldon Station. NDH was concerned in 1990 about the possibility of shallow groundwater coming in contact with the buried radiological materials along the buried walls of the reactor. Subsequently, DOE and NDH agreed to further characterize hydrologic conditions and establish a monitoring program in the shallow, perched groundwater zones. The current monitoring program focuses on the shallow, perched groundwater. Today, decades since facility decommissioning, site inspections and groundwater monitoring continue at this Cold War-era legacy site. The US DOE Office of Legacy Management (LM) monitors groundwater as a best management practice in response to a request from the Nebraska Department of Health and Human Services (DHHS). In 2006, LM recommended discontinuing groundwater monitoring because analytical results since 1970 demonstrated there had been no impact to shallow, perched groundwater and no current or anticipated unacceptable risk to human health and the environment. The State of Nebraska did not concur with the recommendation to stop monitoring but did agree to a reduction in sampling and analysis from once a year to once every 2 years--a schedule that began in 2008. An updated assessment of the groundwater monitoring effort was issued in 2016. The entire body of water-quality data continues to demonstrate that there have been no negative impacts to the shallow, perched groundwater from radioactive materials entombed at the site 46 years ago. LM, with concurrence from Nebraska DHHS, changed the sampling frequency, effective in 2018, as follows: once every 5 years from 2021 to 2041 and once every 10 years from 2041 to 2071. In summary, LM remains committed to its primary mission to protect human health and the environment at each of its 92 legacy sites. With results from groundwater sampling events demonstrating compliance for 48 years, the Hallam site was able to set an LM benchmark to optimize long-term stewardship and define an end-state strategy for other decommissioned reactor facilities across the DOE complex. Continued collaboration with local communities, stakeholder, and regulators often leads to outcomes of sound protectiveness without compromise to safety or compliance, as demonstrated by the optimization of the long-term stewardship at the Hallam site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗