Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Crew Performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Plasma-jet printing of colloidal thermoelectric Bi 2 Te 3 nanoflakes for flexible energy harvesting

Thermoelectric generators (TEGs) convert temperature differences into electrical power and are attractive among energy harvesting devices due to their autonomous and silent operation. While thermoelectric materials have undergone substantial improvements in material properties, a reliable and cost-effective fabrication method suitable for microgravity and space applications remains a challenge, particularly as commercial space flight and extended crewed space missions increase in frequency. This paper demonstrates the use of plasma-jet printing (PJP), a gravity-independent, electromagnetic field-assisted printing technology, to deposit colloidal thermoelectric nanoflakes with engineered nanopores onto flexible substrates at room temperature. We observe substantial improvements in material adhesion and flexibility with less than 2% and 11% variation in performance after 10 000 bending cycles over 25 mm and 8 mm radii of curvature, respectively, as compared to previously reported TE films. Our printed films demonstrate electrical conductivity of 2.5 × 10 3 S m -1 and a power factor of 70 μW m -1 K -2 at room temperature. To our knowledge, these are the first reported values of plasma-jet printed thermoelectric nanomaterial films. This advancement in plasma jet printing significantly promotes the development of nanoengineered 2D and layered materials not only for energy harvesting but also for the development of large-scale flexible electronics and sensors for both space and commercial applications.

99 GENERAL AND MISCELLANEOUS↗

Camera Inspection Arm for Boiling Water Reactors - 13330

Boiling Water Reactor (BWR) outage maintenance tasks can be time-consuming and hazardous. Reactor facilities are continuously looking for quicker, safer, and more effective methods of performing routine inspection during these outages. In 2011, S.A. Technology (SAT) was approached by Energy Northwest to provide a remote system capable of increasing efficiencies related to Reactor Pressure Vessel (RPV) internal inspection activities. The specific intent of the system discussed was to inspect recirculation jet pumps in a manner that did not require manual tooling, and could be performed independently of other ongoing inspection activities. In 2012, SAT developed a compact, remote, camera inspection arm to create a safer, more efficient outage environment. This arm incorporates a compact and lightweight design along with the innovative use of bi-stable composite tubes to provide a six-degree of freedom inspection tool capable of reducing dose uptake, reducing crew size, and reducing the overall critical path for jet pump inspections. The prototype camera inspection arm unit is scheduled for final testing in early 2013 in preparation for the Columbia Generating Station refueling outage in the spring of 2013. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Design and implementation of HuREX analysis supporting interface - 171

Human error is recognized as one of the main causes to affect to the socio-technical system including nuclear power plant. Therefore, reducing human error through human reliability analysis (HRA) is a critical issue. Moreover, sufficient and reliable human performance data collection is a prerequisite for ensuring the safety of nuclear power plants. Korea Atomic Energy Research Institute developed the HuREX (Human Reliability data Extraction) framework to collect and analyze the responses of human operators from simulator training records of nuclear power plant. Thus, the development and computer software interfaces of the database are essential to efficiently support human reliability analysis. In this study, OPERA database was developed in accordance with the following process. First, the essential data required for the HRA analysis (e.g., plant data, procedures, system and equipment info, operating crews, results of simulator experiments, and so forth) was stored in the database. In addition, standardized procedures and related items were stored in the database to support HRA quantification. A data structure was developed to store crew responses conducted by operators to cope with an emergency situation during simulator experiments. In addition, various interfaces that escalate efficiency of the HuREX applications were developed. The HuREX analysis support interface was developed with HuREX Video Analyzer for observation of simulator collection data (e.g., audio-visual records, plant parameters, operator's action logs) and HuREX Data Analyzer for analysis of operator's conducted task. By using the OPERA database and HuREX analysis support interface developed through this research, maximizing the efficiency of human reliability analysis based on simulator training data. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SPARCLE: Electrostatic Tool for Lunar Dust Control

Successful exploration of most planetary surfaces, with their impact-generated dusty regoliths, will depend on the capabilities to keep surfaces free of the dust which could compromise performance and to collect dust for characterization. Solving the dust problem is essential before we return to the Moon. During the Apollo missions, the discovery was made that regolith fines, or dust, behaved like abrasive velcro, coating surfaces, clogging mechanisms, and making movement progressively more difficult as it was mechanically stirred up during surface operations, and abrading surfaces, including spacesuits, when attempts were made to remove it manually. In addition, some of the astronauts experienced breathing difficulties when exposed to dust that got into the crew compartment. The successful strategy will deal with dust dynamics resulting from interaction between mechanical and electrostatic forces. Here we will describe the surface properties of dust particles, the basis for their behavior, and an electrostatically-based approach and methodology for addressing this issue confirmed by our preliminary results. Our device concept utilizes a focused electron beam to control the electrostatic potential of the surface. A plate of the opposite potential is then used to induce dust migration in the presence of an electrical field. Our goal is a compact device of <5 kg mass and using <5 watts of power to be operational in <5 years with heritage from ionic sweepers for active spacecraft potential control (e.g., on POLAR). Rovers could be fitted with devices that could harness the removal of dust for sampling as part of the extended exploration process on Mercury, Mars, asteroids or outer solar system satellites, as well as the Moon.

79 ASTRONOMY AND ASTROPHYSICS↗

Adapting ORAP to wind plants : industry value and functional requirements.

Strategic Power Systems (SPS) was contracted by Sandia National Laboratories to assess the feasibility of adapting their ORAP (Operational Reliability Analysis Program) tool for deployment to the wind industry. ORAP for Wind is proposed for use as the primary data source for the CREW (Continuous Reliability Enhancement for Wind) database which will be maintained by Sandia to enable reliability analysis of US wind fleet operations. The report primarily addresses the functional requirements of the wind-based system. The SPS ORAP reliability monitoring system has been used successfully for over twenty years to collect RAM (Reliability, Availability, Maintainability) and operations data for benchmarking and analysis of gas and steam turbine performance. This report documents the requirements to adapt the ORAP system for the wind industry. It specifies which existing ORAP design features should be retained, as well as key new requirements for wind. The latter includes alignment with existing and emerging wind industry standards (IEEE 762, ISO 3977 and IEC 61400). There is also a comprehensive list of thirty critical-to-quality (CTQ) functional requirements which must be considered and addressed to establish the optimum design for wind.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Computerized procedure systems: procedure edition and maintenance challenges - 232

Very few nuclear power plants are using computerized procedures to guide the control room operation. A CPS implementation consists of two processes: digitalization and computerization. The former deals with the transformation of paper-based procedure into a digital data; the latter is referred to as the addition to that data of extra information that is meaningful for decision-making. This information may include real-time data (plant parameter values and binary process values to indicate equipment states), provide access to trends and historical data, etc. In order to be efficient and to optimize the digitalization and computerization processes, these set of aids should be implemented at the same time as operating procedures are digitalized There are references of plants having successfully implemented Computerized Procedures Systems (CPS) for emergency procedures, but when questioned about normal or abnormal operating procedures, operators and plant management seem reluctant to take that step. Given that a CPS is meant, by design concept, to increase operation crew efficiency by facilitating the procedures execution and reducing human error, why are we reluctant to enjoy CPS benefits in the most common plant status (i.e. normal operation)? Although there are many answers to this question, one is shared by most of the users: CPSs are not designed for editing and maintaining procedures easily and reliably. Normal operating procedures, in opposition to the emergency procedures, are often reviewed. Nowadays, these edition activities are performed easily with a word processor software and using paper, but what is required when dealing with a CPS? (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Upgrades to Alabama Power Company Hydroelectric Developments

From 2010 to 2014, Alabama Power Company (“Alabama Power”) performed upgrades on four units at three of the hydropower developments it operates in east-central Alabama under licenses issued by the Federal Energy Regulatory Commission (“FERC”). These three hydropower developments are located on the Coosa River in Coosa, Chilton, and Elmore counties in east-central Alabama.

13 HYDRO ENERGY↗

A Toolbox Necessity: Finding Best Practices in High-Performance Homes with the Building America Solution Center

The U.S. Department of Energy’s Building America Solution Center is a free, easy-to-access web tool containing the latest building science research from the Building America program. This paper describes how the Solution Center is bringing best practices for high-performance homes to members of the building industry to help their businesses to gain an edge to help expand their markets. It includes a tour of the Solution Center’s newest features and updates. The Building America Solution Center provides full and simple access to a wealth of best practices based on building science and energy efficiency research generated by the Building America program, along with other resources to help builders specify features, train crews, complete quality installations, and sell houses. This paper supports the visual presentation with the same title. The paper will be submitted for inclusion in the ACEEE Summer Study 2018 proceedings. The poster will be presented at the ACEEE 2018 Summer Study conference.

.S. Department of Energy Building Technologies Pro↗

Umatilla Basin Fish Facilities Operation & Maintenance : Annual Report Fiscal Year 2008.

Westland Irrigation District, as contractor to Bonneville Power Administration, and West Extension Irrigation District, as subcontractor to Westland, provide labor, equipment, and material necessary for the operation, care, and maintenance of fish facilities on the Umatilla River. Westland Irrigation District is the contractor of record. Job sites that are covered: Three Mile Right, Three Mile Left, Three Mile Adult Spawning, WEID Sampling Facility, Maxwell Screen Site, Westland Screen Site/Ladder/Juvenile Sampling Facility, Feed Canal Ladder/Screen Site, Stanfield Ladder/Screen Site, Minthorn Holding Facility, Thornhollow Acclimation Site, Imeques Acclimation Site, Pendleton Acclimation Site, and South Fork Walla Walla Spawning Facility. O & M personnel coordinate with the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) personnel in performing tasks under this contract including scheduling of trap and haul, sampling, acclimation site maintenance, and other related activities as needed. The input from ODFW biologists Bill Duke and Ken Loffink, and CTUIR biologist Preston Bronson is indispensable to the success of the project, and is gratefully acknowledged. All tasks associated with the project were successfully completed during the fiscal year 2008 work period of October, 2007 through September, 2008. The project provides operations and maintenance throughout the year on five fish screen sites with a total of thirty-four rotating drum-screens, and four fish ladders in the Umatilla River Basin; additionally, periodic operations and maintenance is performed at holding, acclimation, and spawning sites in the Basin. Three people are employed full-time to perform these tasks. The FY08 budget for this project was $492,405 and actual expenditures were $490,267.01. Selected work activities and concerns: (1) Feed Dam Passage Improvement Project - A project to improve fish passage over the short term at the Feed Canal Diversion Dam site (Umatilla River mile 28.7) was implemented with local U.S. Bureau of Reclamation field office personnel coordinating project activities. Operation and Maintenance Project personnel assisted with labor, materials, and equipment to ensure the project was completed as planned. Discussions are under way to determine feasible alternatives for longer term solutions to passage issues at the site. (2) Three Mile Right (east bank) Facilities - The pump for supplying water to the fish handling facility holding pond was reconstructed successfully to achieve the desired increase in flow output necessary when increased quantities of fish are present. (3) Fish Screen Rehab at Stanfield Canal Diversion - Working with the Washington Department of Fish and Wildlife screen shop personnel, three rotating drum screens at the Stanfield Canal diversion site (Umatilla River mile 33.3) were serviced and overhauled with new bearings, seals, paint, and reinforcing bars. Work was completed, and screens reinstalled prior to water diversions beginning in the spring. (4) O & M personnel performed daily, weekly, and monthly operations and maintenance duties at the screen and ladder sites including, but not limited to, desilting of mud and debris, lubrication of mechanical parts, replacement of screen seals and screen motor components, adjustment of ladder gates, removal of large trees and woody debris deposited during high river flow conditions, servicing of pumps and screens for fish handling operations and sampling studies, in addition to general site clean-up, vegetative control, and security. Crew members responded as needed during evenings and after-hours according to weather conditions, river flows, and fish passage facility needs.

13 HYDRO ENERGY↗

Integration of energy storage with diesel generation in remote communities

Highlights Battery energy storage may improve energy efficiency and reliability of hybrid energy systems composed by diesel and solar photovoltaic power generators serving isolated communities. In projects aiming update of power plants serving electrically isolated communities with redundant diesel generation, battery energy storage can improve overall economic performance of power supply system by reducing fuel usage, decreasing capital costs by replacing redundant diesel generation units, and increasing generator system life by shortening yearly runtime. Fast-acting battery energy storage systems with grid-forming inverters might have potential for improving drastically the reliability indices of isolated communities currently supplied by diesel generation. Abstract This paper will highlight unique challenges and opportunities with regard to energy storage utilization in remote, self-sustaining communities. The energy management of such areas has unique concerns. Diesel generation is often the go-to power source in these scenarios, but these systems are not devoid of issues. Without dedicated maintenance crews as in large, interconnected network areas, minor interruptions can be frequent and invasive not only for those who lose power, but also for those in the community that must then correct any faults. Although the immediate financial benefits are perhaps not readily apparent, energy storage could be used to address concerns related to reliability, automation, fuel supply concerns, generator degradation, solar utilization, and, yes, fuel costs to name a few. These ideas are shown through a case study of the Levelock Village of Alaska. Currently, the community is faced with high diesel prices and a difficult supply chain, which makes temporary loss of power very common and reductions in fuel consumption very impactful. This study will investigate the benefits that an energy storage system could bring to the overall system life, fuel costs, and reliability of the power supply. The variable efficiency of the generators, impact of startup/shutdown process, and low-load operation concerns are considered. The technological benefits of the combined system will be explored for various scenarios of future diesel prices and technology maintenance/replacement costs as well as for the avoidance of power interruptions that are so common in the community currently. Graphic abstract Discussion In several cases, energy storage can provide a means to promote energy equity by improving remote communities’ power supply reliability to levels closer to what the average urban consumer experiences at a reduced cost compared to transmission buildout. Furthermore, energy equity represents a hard-to-quantify benefit achieved by the integration of energy storage to isolated power systems of under-served communities, which suggests that the financial aspects of such projects should be questioned as the main performance criterion. To improve battery energy storage system valuation for diesel-based power systems, integration analysis must be holistic and go beyond fuel savings to capture every value stream possible.

25 ENERGY STORAGE↗

Lower Three Runs Remediation Safety Preparation Strategy - 13318

The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina that contains six primary stream/river systems. The Lower Three Runs Stream (LTR) is one of the primary streams within the site that is located in the southeast portion of the Savannah River Site. It is a large blackwater stream system that originates in the northeast portion of SRS and follows a southerly direction before it enters the Savannah River. During reactor operations, secondary reactor cooling water, storm sewer discharges, and miscellaneous wastewater was discharged and contaminated a 20 mile stretch of Lower Three Runs Stream that narrows and provides a limited buffer of US DOE property along the stream and flood-plain. Based on data collected during the years 2009 and 2010 under American Recovery and Re-investment Act funding, the stream was determined to be contaminated with cesium-137 at levels that exceeded acceptable risk based limits. In agreement with the Environmental Protection Agency and the South Carolina Department of Health and Environmental Control, three areas were identified for remediation [1] (SRNS April 2012). A comprehensive safety preparation strategy was developed for safe execution of the LTR remediation project. Contract incentives for safety encouraged the contractor to perform a complete evaluation of the work and develop an implementation plan to perform the work. The safety coverage was controlled to ensure all work was observed and assessed by one person per work area within the project. This was necessary due to the distances between the fence work and three transects being worked, approximately 20 miles. Contractor Management field observations were performed along with DOE assessments to ensure contractor focus on safe performance of the work. Dedicated ambulance coverage for remote worker work activities was provided. This effort was augmented with access to medical evacuation services. The areas where the work was performed were remote and difficult to get emergency vehicles to in a timely manner in case of an accident. Satellite phones were utilized due to intermittent phone coverage. High visibility vests were utilized to enable any hunters in the area to see the workers; due to the limited buffer areas along the stream route. An innovative approach to providing the necessary protection for workers during periods of extreme heat and humidity was also employed, which included the use of 'heat islands' with fans and crew trailers and ice vests for workers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydra: Computer Vision for Data Quality Monitoring

Hydra: Computer Vision for Data Quality Monitoring Mar 13, 2024, 4:15 PM 30m Charles B. Wang Center, Stony Brook University Poster Track 1: Computing Technology for Physics Research Poster session with coffee break Speaker Ayan Roy Description Hydra is an extensible framework for training, managing, and deploying machine learning models for near real-time data quality monitoring. It is designed to take some of the burden off of shift crews by providing ‘round-the-clock’ monitoring of plots representing the data being collected. The Hydra system is backed by a database which is leveraged for near push button training and is primarily controlled and viewed through a set of web interfaces. This web interface contains a simple-to-use web based GUI for labeling of the datasets used in training; making it possible to label thousands of images quickly and efficiently. To aid in the analysis of Hydra inferences gradCAM, a method of interpretability, is performed and overlaid on the target image, highlighting regions of interest, making diagnosis of problems much faster. Development began in 2019 for the GlueX Experiment in Hall-D, the Hydra system has grown to encompass all of the experimental halls at Jefferson Laboratory. This talk will focus on the features of Hydra as well as provide details of the challenges present with deploying to disparate experimental halls. With a roadmap of development established, Hydra aims to continue to grow in richness of feature set and expand to encompass other monitoring tasks in differing communities.

Roy, Ayan↗

A Vibrating Wire System For Quadrupole Fiducialization

A vibrating wire system is being developed to fiducialize the quadrupoles between undulator segments in the LCLS. This note provides a detailed analysis of the system. The LCLS will have quadrupoles between the undulator segments to keep the electron beam focused. If the quadrupoles are not centered on the beam axis, the beam will receive transverse kicks, causing it to deviate from the undulator axis. Beam based alignment will be used to move the quadrupoles onto a straight line, but an initial, conventional alignment must place the quadrupole centers on a straight line to 100 {micro}m. In the fiducialization step of the initial alignment, the position of the center of the quadrupole is measured relative to tooling balls on the outside of the quadrupole. The alignment crews then use the tooling balls to place the magnet in the tunnel. The required error on the location of the quadrupole center relative to the tooling balls must be less than 25 {micro}m. In this note, we analyze a system under construction for the quadrupole fiducialization. The system uses the vibrating wire technique to position a wire onto the quadrupole magnetic axis. The wire position is then related to tooling balls using wire position detectors. The tooling balls on the wire position detectors are finally related to tooling balls on the quadrupole to perform the fiducialization. The total 25 {micro}m fiducialization error must be divided between these three steps. The wire must be positioned onto the quadrupole magnetic axis to within 10 {micro}m, the wire position must be measured relative to tooling balls on the wire position detectors to within 15 {micro}m, and tooling balls on the wire position detectors must be related to tooling balls on the quadrupole to within 10 {micro}m. The techniques used in these three steps will be discussed. The note begins by discussing various quadrupole fiducialization techniques used in the past and discusses why the vibrating wire technique is our method of choice. We then give an overview of the measurement system showing how the vibrating wire is positioned onto the quadrupole axis, how the wire position detectors locate the wire relative to tooling balls without touching the wire, and how the tooling ball positions are all measured. The novel feature of this system is the vibrating wire which we discuss in depth. We analyze the wire dynamics and calculate the expected sensitivity of the system. The note should be an aid in debugging the system by providing calculations to compare measurements to.

43 PARTICLE ACCELERATORS↗

Identifying human failure events (HFEs) for external hazard probabilistic risk assessment

In recent years, several advancements in nuclear power plant (NPP) probabilistic risk assessment (PRA) have been driven by increased understanding of external hazards, plant response, and uncertainties. However, major sources of uncertainty associated with external hazard PRA remain. One important source is how risk-significant human actions that are carried out to enable plant response and recovery from natural hazards cause the close coupling of physical impacts on plants and overall plant risk during these hazard events. This makes human reliability and human-plant interactions important elements to consider in resolving PRA gaps in external hazards. One of the challenges in considering human response in external hazard probabilistic risk assessment (XHPRA) is that most existing human reliability analysis (HRA) models were not developed for assessing actions outside the control room (termed ex-control room actions) and hazard response. To support this new scope, HRA models will need to be developed or modified to support identification of human activities, causal factors, and uncertainties inherent in external hazard response, thereby providing insights regarding event timing and physical event conditions as they relate to human performance. In this study, there are two main objectives: (1) evaluate the applicability of an existing cognitive-based HRA method, Phoenix, to ex-control room actions, and (2) identify sources of uncertainty to be characterized or reduced in order to make this method suitable for XHPRA. The first step of such work is performed by assessing the suitability of existing HRA methods to support identifying human failure events (HFEs) for human response to flooding hazards. These HFEs are human actions or inactions that are involved in human responses to flooding hazards and could contribute to the loss of a critical function for the plant in the scenario being examined. Here, in this work, decomposition analyses using the cognitive-based Phoenix HRA model are used to identify HFEs. The Phoenix method was found to be suitable for analyzing ex-control room actions as well as identifying specific HFEs and underlying crew failure modes (CFMs). However, the method's suitability for use in ex-control room actions would benefit from expanding the available CFMs to accommodate a larger variety of physical and communication tasks.

42 ENGINEERING↗

Cle Elum Supplementation and Research Facility : Monthly Progress Report November 2008.

FISH PRODUCTION: Final shocking of eggs was finished in the incubation. Egg enumeration for the 2008 brood was completed and the eggs are being incubated in 38 degree Fahrenheit chilled water. Don Larsen of NOAA made a request of eggs for research purposes and was able to acquire supplemental line eggs 10,555. Estimated density at the time of ponding in Mid-March of 2009 is approximately 43,869 fry per raceway after calculating an average fry loss of 2%. The end of the month totals for the 2007 brood reports 773,807 juveniles on hand with an overall average of 31.4 fish per pound. Tagging continues on the 2007 brood and is on pace to wrap up in early December. FISH CULTURE: Ponds are cleaned as needed and due to the colder water temperatures, the feeding frequency has been changed to three days a week. All ponds are sampled at the end of the month. Growth for production fish are adjusted accordingly as temperature dictates feeding levels. Torrential rain on the 12th turned the Yakima River extremely turbid. Fish tagging operations were halted and the ensuing conditions at the facility intake screens became a concern. Water flow to the wet well became restricted so the decision was made to shut the surface water (river) pumps down and turn on well pumps No.1, No.4 and No.6 to run water to the facility head box. This operation continued for twenty-four hours at which point normal operations were optimal and fish tagging resumed, although the river didn't clear up enough to feed the fish until the 17th. WATER PRODUCTION: The current combined well and river water supply to the complex is 14,822 gallons/minute. Well No.2 is pumping water at a rate of 530 gallons per minute. All four river pumps are in operation and pumping 14,292 gallons/minute. ACCLIMATION SITES: Cle Elum staff has been working to prep the acclimation sites for the upcoming fish transfer before the snow falls. Thermographs at each site are changed weekly. AMB Tools performed routine maintenance on the compressor and Brown and Jackson pumped out the septic tank at the Jack Creek acclimation site. VEHICLE MAINTENANCE: Snow tires are now on all vehicles and snow blowers were installed on the John Deere tractor and lawn tractor. The snowplow was also installed on the Ford one ton. The four Snowmobiles were serviced by Yamaha Jacks of Ellensburg. MAINTENANCE BUILDING MAINTENANCE: Clean up occurs on Fridays of each week. HATCHERY BUILDING MAINTENANCE: Water has been turned on to vertical incubator islands one and two. After eggs were transferred to vertical stacks cleaning of troughs began. WDFW crew inventoried eggs from isolettes and then transferred them to the vertical incubators. RIVER PUMP STATION MAINTENANCE: All four pumps are in operation and supplying the facility with 14,292 gallons/minute of water to rearing ponds. WELL FIELD MAINTENANCE: Well pumps No.1, No.4 and No.6 were turned on to supplement water flow to the facility as mentioned previously. Well No.5 was powered up but a winterizing valve malfunction wouldn't allow operation, we are currently working on it at this time. Well No.2 is pumping 530 gallons per minute and supplies well water to incubation and chiller. The pumps meter is recorded weekly. Test holes are monitored weekly and results are faxed to CH2MHILL afterward. SAFETY AND TRAINING: Ice melt and sand bags are popular items at the facility this month as freezing temperatures cause ground to become slippery and hazardous. GROUNDS: Van Alden's Plumbing installed a new commode in resident house No.411 and also inspected a plumbing problem at resident No.1131. Cle Elum staff along with WDFW staff worked to locate the spawning channel building back to the position it was at to have Greg Wallace of Wallace Electric hook electricity back up to the spawning shed. MEETINGS AND TOURS: Charlie attended a policy meeting at Cle Elum on the 18th. The Internal projects annual review took place at Cle Elum on the 19th and 20th. Bill Bosch continues to visit monthly to incorporate data into the YKFP data base. PERSONNEL: IHS employees traveled to Cle Elum to administer flu shots to YN staffers and families as well as WDFW staffers.

13 HYDRO ENERGY↗

A sequential Attacker-Defender game for distribution systems resilience enhancement against extreme weather events

Improving distribution system resilience against frequent extreme weather events is important for reliable power system operations. Especially when dealing with events such as hurricanes that have short-term predictions, proactive pre-event preparedness plays a vital role in system resilience performance. In this paper, we propose a novel approach to construct pre-event resource allocation plans for system operators to cope with upcoming threats through a sequential attacker-defender game framework. The sequential attacker-defender game is designed to model the interaction between the extreme weather and the system operator. In each round of the game, the attacker and the defender sequentially update their current strategies by accounting for the opponent’s action set. The attacker model is formulated as a bi-level problem to identify the severe outage scenarios, and the defender model is formulated as a two-stage optimization problem to determine the allocation of restoration resources including mobile responsive resources and repair crews. Two scale-reduction strategies are proposed to ensure the scalability of the game scheme. Finally, case studies on the IEEE 33-bus and a 7149-node practical utility system validate the effectiveness of the proposed sequential game and the efficiency of the scale-reduction strategies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A method to assess social sustainability of capture fisheries: An application to a Norwegian trawler

Social sustainability assessment of capture fisheries is, both in terms of method development and measurement, not well developed. The objective of this study, therefore, was to develop a method consisting of indicators and rubrics (i.e. categories that articulate levels of performance) to assess social sustainability of capture fisheries. This method was applied to a Norwegian trawler that targets cod and haddock in the northeast Atlantic. Based on previous research, 13 social sustainability issues were selected. To measure the state of these issues, 17 process and outcome indicators were determined. To interpret indicator values, rubrics were developed for each indicator, using standards set by international conventions or data retrieved from national statistics, industry agreements or scientific publications that explore rubric scales. The indicators and rubrics were subsequently used in a social sustainability assessment of a Norwegian trawler. This assessment indicated that overall, social sustainability of this trawler is relatively high, with high rubric scores, for example, for worker safety, provisions aboard for the crew and companies' salary levels. The assessment also indicated that the trawler could improve on healthy working environment, product freshness and fish welfare during capture. This application demonstrated that our method provides insight into social sustainability at the level of the vessel and can be used to identify potential room for improvement. This method is also promising for social sustainability assessment of other capture fisheries. - Highlights: • A method was developed for social sustainability assessment of capture fisheries. • This method entailed determining outcome and process indicators for important issues. • To interpret indicator values, a rubric was developed for each indicator. • Use of this method gives insight into social sustainability and improvement options. • This method is promising for social sustainability assessment of capture fisheries.

54 ENVIRONMENTAL SCIENCES↗

Resource Characterization and Quantification of Natural Gas-Hydrate and Associated Free-Gas Accumulations in the Prudhoe Bay - Kuparuk River Area on the North Slope of Alaska

Natural gas hydrates have long been considered a nuisance by the petroleum industry. Hydrates have been hazards to drilling crews, with blowouts a common occurrence if not properly accounted for in drilling plans. In gas pipelines, hydrates have formed plugs if gas was not properly dehydrated. Removing these plugs has been an expensive and time-consuming process. Recently, however, due to the geologic evidence indicating that in situ hydrates could potentially be a vast energy resource of the future, research efforts have been undertaken to explore how natural gas from hydrates might be produced. This study investigates the relative permeability of methane and brine in hydrate-bearing Alaska North Slope core samples. In February 2007, core samples were taken from the Mt. Elbert site situated between the Prudhoe Bay and Kuparuk oil fields on the Alaska North Slope. Core plugs from those core samples have been used as a platform to form hydrates and perform unsteady-steady-state displacement relative permeability experiments. The absolute permeability of Mt. Elbert core samples determined by Omni Labs was also validated as part of this study. Data taken with experimental apparatuses at the University of Alaska Fairbanks, ConocoPhillips laboratories at the Bartlesville Technology Center, and at the Arctic Slope Regional Corporation's facilities in Anchorage, Alaska, provided the basis for this study. This study finds that many difficulties inhibit the ability to obtain relative permeability data in porous media-containing hydrates. Difficulties include handling unconsolidated cores during initial core preparation work, forming hydrates in the core in such a way that promotes flow of both brine and methane, and obtaining simultaneous two-phase flow of brine and methane necessary to quantify relative permeability using unsteady-steady-state displacement methods.

02 PETROLEUM↗