Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Stochastic ordering properties and optimal routing control for a class of finite capacity queueing systems

The problem of routing jobs to parallel queues with identical exponential servers and unequal finite buffer capacities is considered. Stochastic ordering and weak majorization properties on critical performance measures are established by means of event-driven inductions. In particular, it is shown that the intuitive 'join the shortest non-full queue' (SNQ) policy is optimal with respect to an overall function that accounts for holding and blocking costs. Moreover, the buffer allocation problem is solved by proving the intuitive result that, for a fixed total buffer capacity, the optimal allocation scheme is the one in which the difference between the maximum and minimum queue capacities is minimized, i.e., becomes either 0 or 1.

Towsley, Don↗

Integrated propulsion technology demonstrator. Program plan

NASA and Rockwell have embarked on a cooperative agreement to define, develop, fabricate, and operate an integrated propulsion technology demonstrator (IPTD) for the purpose of validating design, process, and technology improvements of launch vehicle propulsion systems. This program, a result of NRA8-11, Task Area 1 A, is jointly funded by both NASA and Rockwell and is sponsored by the Reusable Launch Vehicle office at NASA Marshall Space flight Center. This program plan provides to the joint NASA/Rockwell integrated propulsion technology demonstrator (IPTD) team a description of the activities within tasks / sub tasks and associated schedules required to successfully achieve program objectives. This document also defines the cost elements and manpower allocations for each sub task for purpose of program control. This plan is updated periodically by developing greater depth of direction for outyear tasks as the program matures. Updating is accomplished by adding revisions to existing pages or attaching page revisions to this plan. In either case, revisions will be identified by appropriate highlighting of the change, or specifying a revision page through the use of footnotes on the bottom right of each change page. Authorization for the change is provided by the principal investigators to maintain control of this program plan document and IPTD program activities.

Source record↗

Frequency-Modulated, Continuous-Wave Laser Ranging Using Photon-Counting Detectors

Optical ranging is a problem of estimating the round-trip flight time of a phase- or amplitude-modulated optical beam that reflects off of a target. Frequency- modulated, continuous-wave (FMCW) ranging systems obtain this estimate by performing an interferometric measurement between a local frequency- modulated laser beam and a delayed copy returning from the target. The range estimate is formed by mixing the target-return field with the local reference field on a beamsplitter and detecting the resultant beat modulation. In conventional FMCW ranging, the source modulation is linear in instantaneous frequency, the reference-arm field has many more photons than the target-return field, and the time-of-flight estimate is generated by balanced difference- detection of the beamsplitter output, followed by a frequency-domain peak search. This work focused on determining the maximum-likelihood (ML) estimation algorithm when continuous-time photoncounting detectors are used. It is founded on a rigorous statistical characterization of the (random) photoelectron emission times as a function of the incident optical field, including the deleterious effects caused by dark current and dead time. These statistics enable derivation of the Cramér-Rao lower bound (CRB) on the accuracy of FMCW ranging, and derivation of the ML estimator, whose performance approaches this bound at high photon flux. The estimation algorithm was developed, and its optimality properties were shown in simulation. Experimental data show that it performs better than the conventional estimation algorithms used. The demonstrated improvement is a factor of 1.414 over frequency-domainbased estimation. If the target interrogating photons and the local reference field photons are costed equally, the optimal allocation of photons between these two arms is to have them equally distributed. This is different than the state of the art, in which the local field is stronger than the target return. The optimal processing of the photocurrent processes at the outputs of the two detectors is to perform log-matched filtering followed by a summation and peak detection. This implies that neither difference detection, nor Fourier-domain peak detection, which are the staples of the state-of-the-art systems, is optimal when a weak local oscillator is employed.

Erkmen, Baris I.↗

Exploring New Frontiers in Space Communications: Enhancing Delay Tolerant Networking through Cloud and Containerization

The High-rate Delay Tolerant Networking (HDTN) project at NASA Glenn Research Center has developed software that enables more flexible, reliable, and efficient space internetworking by using modern computing techniques such as cloud services, microservices, network function virtualization, software defined networking, and a distributed architecture. HDTN is built upon the Bundle Protocol and related convergence layers which have been developed to mitigate the challenges of the space networking environment including long delays, asymmetric data rates, and intermittent connectivity. The HDTN implementation employs asynchronous message processing tasks which allow for non-blocking operations as well as deployment in both centralized and distributed architectures. This paper investigates deploying HDTN in a containerized approach on the NASA Goddard’s Mission Cloud Platform using Amazon Web Services Elastic Compute Cloud (EC2). Commercial cloud computing will lower operating costs, provide flexible resource allocation, and allow for interconnectivity between multiple NASA centers as well as external partners. Containerization using Docker will enable greater portability and scalability for HDTN to be deployed into a variety of environments. We discuss possible NASA missions and use-cases such as the Laser Communications Relay Demonstration (LCRD) where the services provided by HDTN (reliable transport, high-rate message processing, and store-and-forward capabilities) will be enhanced through cloud computing and containerization. In addition, we describe the HDTN architecture and possible microservice-based networking approaches that can be obtained via HDTN’s configuration capabilities. Finally, we detail the EC2 specifications needed to achieve data rates greater than 1 Gbps to support optical communication missions such as LCRD.

Blake LaFuente↗

Cost analysis of water recovery systems

A methodology was developed to predict the relevant contributions of the more intangible cost elements encountered in the development of flight-qualified hardware based on an extrapolation of past hardware development experience. Major items of costs within water recovery systems were identified and related to physical and/or performance criteria. Cost and performance data from Gemini, Skylab, and other aerospace and biotechnology programs were analyzed to identify major cost elements required to establish cost estimating relationships for advanced water recovery systems. The results of the study are expected to assist NASA in long-range planning and allocation of resources in a cost effective manner in support of earth orbital programs. This report deals with the cost analysis of the five leading water reclamation systems, namely: (1) RITE waste management-water system, (2) reverse osmosis system, (3) multifiltration system, (4) vapor compression system, and (5) closed air evaporation system with electrolytic pretreatment.

Yakut, M. M.↗

Concepts for Life Cycle Cost Control Required to Achieve Space Transportation Affordability and Sustainability

Cost control must be implemented through the establishment of requirements and controlled continually by managing to these requirements. Cost control of the non-recurring side of life cycle cost has traditionally been implemented in both commercial and government programs. The government uses the budget process to implement this control. The commercial approach is to use a similar process of allocating the non-recurring cost to major elements of the program. This type of control generally manages through a work breakdown structure (WBS) by defining the major elements of the program. If the cost control is to be applied across the entire program life cycle cost (LCC), the approach must be addressed very differently. A functional breakdown structure (FBS) is defined and recommended. Use of a FBS provides the visibifity to allow the choice of an integrated solution reducing the cost of providing many different elements of like function. The different functional solutions that drive the hardware logistics, quantity of documentation, operational labor, reliability and maintainability balance, and total integration of the entire system from DDT&E through the life of the program must be fully defined, compared, and final decisions made among these competing solutions. The major drivers of recurring cost have been identified and are presented and discussed. The LCC requirements must be established and flowed down to provide control of LCC. This LCC control will require a structured rigid process similar to the one traditionally used to control weight/performance for space transportation systems throughout the entire program. It has been demonstrated over the last 30 years that without a firm requirement and methodically structured cost control, it is unlikely that affordable and sustainable space transportation system LCC will be achieved.

Rhodes, Russel E.↗

Optimized allocation method of the VSC-MTDC system for frequency regulation reserves considering the cost

In recent years, the interconnection of asynchronous power grids through the VSC-MTDC system has been proposed and extensively studied in light of the potential benefits of economical bulk power exchanges and frequency regulation reserves sharing. This paper proposed an optimized allocation method for sharing frequency regulation reserves among the interconnected power systems and the corresponding frequency regulation control of the VSC-MTDC system under emergency frequency deviation events. Firstly, the frequency regulation reserve classification is proposed. In the classification, the available frequency response capacity reserves of each interconnection are divided into commercial reserves and regular reserves. While the commercial reserves are procured through long-term contracts, the regular reserves are purchased based on market prices of frequency regulation services. Secondly, based on the proposed frequency regulation reserve classification, a novel frequency regulation control is then introduced for the VSC-MTDC system. This control method could minimize the costs of the disturbed power grid for the needed frequency response supports from the other power grids. Simulation verifications are performed on a modified IEEE 39 bus system and a highly reduced power system model representing the North American grids. The simulation verification indicates that the developed frequency regulation control significantly reduced ancillary service costs of the disturbed power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of a Reference Design for a Cyber-Physical System

The purpose of this thesis is to develop a reference design to assist in the selection of security practices in power electronics design. A prototype will be developed from this reference design for evaluation. This evaluation will include a brief cost/benefit analysis to gauge the efficacy of implementing each layer of security throughout the power electronics design process. This thesis will also describe the obstacles and effectiveness of integrating a Trusted Platform Module (TPM) into a cyber-hardened grid-connected device. The TPM device is a secured crypto processor that assists in generating, storing, and restricting the use of cryptographic keys. The emphasis of this research is to establish integrity, authenticity, and confidentiality within a system by providing a baseline of security concerns for segments of the system. This research considers communication, control, and hardware level securities. The scope of this thesis will review the necessary security methods as well as consider the effects these methods have on the embedded system, to assess the desired security to responsiveness trade off. Applying this approach to a design process will alleviate various unknowns of appending security to a power electronics design. This thesis describes the specific vulnerabilities introduced within this grid-edge environment, and how the liabilities within the system can be mitigated. Initially, common security techniques will be considered to establish a guideline to benchmark performance and resource costs of the system. The foundation will be a non-hardened power electronic system platform with industry standard communication protocols. Several security techniques and attack vectors will then be evaluated to contribute to the base level platform. Other fail-safe features take place to gauge progress of the selected approach, non-inclusive to the TPM. Collectively, this investigation will determine a valid experiment by appraising and categorizing resource allocation, performance overhead, and monetary cost analysis results into a reference design. The prototype will then demonstrate methods to relieve common threats that are purposefully implemented into the design.

Blair, Nicholas Paul↗

Optimum allocation of redundancy among subsystems connected in series

This analysis considers the optimum allocation of redundancy in a system of serially connected subsystems in which each subsystem is of the k-out-of-n type. Redundancy is optimally allocated when: (1) reliability is maximized for given costs; or (2) costs are minimized for given reliability. Several techniques are presented for achieving optimum allocation and their relative merits are discussed. Approximate solutions in closed form were attainable only for the special case of series-parallel systems and the efficacy of these approximations is discussed.

Bien, D. D.↗

Hybrid Energy Systems: Opportunities for Coordinated Research

This chapter presents a baseline assessment of DOE’s current portfolio related to hybrid systems that produce electricity as their only output (Track 1), within the context of the key challenges facing these systems. Of particular importance is that this chapter is focused on understanding what makes a hybrid different from two standalone technologies, both in terms of the research being performed and the challenges that ongoing and planned research will seek to overcome. The purpose of summarizing and describing current research areas is to identify opportunities DOE could consider supporting in the near term. DOE encompasses several offices, each of which has unique objectives and is financially constrained. Additionally, the emergence of low-cost hybrid resources presents an array of new opportunities for the electricity sector, including better managing and allocating risk, improving operating performance, reducing system costs, and enhancing reliability and resilience. Realizing these opportunities will require overcoming barriers to the deployment of hybrids through targeted R&D which multiple DOE offices can invest in and benefit from.

42 ENGINEERING↗

Overview of a new slicing method: Fixed Abrasive Slicing Technique (FAST)

The fixed abrasive slicing technique (FAST) was developed to slice silicon ingots more effectively. It was demonstrated that 25 wafers/cm can be sliced from 10 cm diameter and 19 wafers/cm from 15 cm diameter ingots. This was achieved with a combination of machine development and wire-blade development programs. Correlation was established between cutting effectiveness and high surface speeds. A high speed slicer was designed and fabricated for FAST slicing. Wirepack life of slicing three 10 cm diameter ingots was established. Electroforming techniques were developed to control widths and prolong life of wire-blades. Economic analysis indicates that the projected add-on price of FAST slicing is compatible with the DOE price allocation to meet the 1986 cost goals.

Schmid, F.↗

Economical Production of Pu-238: NIAC Phase I Final Report

All space exploration missions traveling beyond Jupiter must use radioisotopic power sources for electrical power. The best isotope to power these sources is plutonium-238 (Pu-238). The US supply of Pu-238 is almost exhausted and will be gone within the next decade. The Department of Energy has initiated a production program with a $10M allocation from NASA but the cost is estimated at over $100M to get to production levels. The Center for Space Nuclear Research (CSNR) has conceived of a potentially better process to produce Pu-238 earlier and for significantly less cost. Potentially, the front end capital costs could be provided by private industry such that the government only had to pay for the product produced. In the Phase I NIAC (NASA Innovative Advanced Concepts) grant, the CSNR has evaluated the feasibility of using a low power, commercially available nuclear reactor to produce 1.5 kg of Pu-238 per year. The impact on the neutronics of the reactor have been assessed, the amount of Neptunium target material estimated, and the production rates calculated. In addition, the size of the post-irradiation processing facility has been established. Finally, as the study progressed, a new method for fabricating the Pu-238 product into the form used for power sources has been identified to reduce the cost of the final product. In short, the concept appears to be viable, can produce the amount of Pu-238 needed to support the NASA missions, can be available within a few years, and will cost significantly less than the current DOE program.

Plutonium↗

10 meter Sub-Orbital Large Balloon Reflector (LBR)

The realization of a large, space-based 10 meter class telescope for far-infrared/THz studies has long been a goal of NASA. Such a telescope could study the origins of stars, planets, molecular clouds, and galaxies; providing a much needed means of following-up on tantalizing results from recent successful missions such as Spitzer, Herschel, and SOFIA. Indeed, Herschel began its life in the US space program as the Large Deployable Reflector (LDR) to be assembled in low Earth orbit by shuttle astronauts. Escalating costs and smaller federal budget allocations resulted in a downsizing of the mission. However, by combining successful suborbital balloon and ground-based telescope technologies, the dream of a 10 meter class telescope free of ~99% of the Earth's atmospheric absorption in the far-infrared can be realized. The same telescope can also be used to perform sensitive, high spectral and spatial resolution limb sounding studies of the Earth's atmosphere in greenhouse gases such as CO, ClO, O3, and water, as well as serve as a high flying hub for any number of telecommunications and surveillance activities. Flight times of 100+ days will be possible, with instruments having mass and power requirements in excess of ~500 kg and ~1 kW.Here we present the results of our NIAC Step 1, Phase B design study where each key aspect of the LBR concept is discussed and recommendations made for further study in Phase II.These aspects include realization of a large spherical reflecting surface, spherical corrector, pointing system, instrument module, and service module/gondola. Once each hardware component is introduced, a typical LBR Mission profile is described that enables the realization of a stratospheric 10 meter THz observatory and limb sounder. Verification of the design approach was achieved by using a combination of analytical modelling, lab testing of materials and techniques, and building a 3 meter rooftop LBR prototype.

Telescope↗

National Cost-effectiveness of ANSI/ASHRAE/IES Standard 90.1-2016

The purpose of this analysis is to examine the cost-effectiveness of the 2016 edition of ANSI/ASHRAE/IES Standard 90.1 (ASHRAE 2016). Standard 90.1 is developed by the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) Standard Standing Project Committee (SSPC) 90.1. It is the model energy standard for commercial and multi-family residential buildings over three floors (42 USC 6833). PNNL analyzed the cost-effectiveness of changes in Standard 90.1 from 90.1-2013 to 90.1-2016, as applied in commercial buildings across the United States. During the development of new editions of Standard 90.1, the cost-effectiveness of individual changes (addenda) is often calculated to support the deliberations of ASHRAE Standard Standing Project Committee (SSPC) 90.1. The ASHRAE process, however, does not include analysis of the cost-effectiveness of the entire package of addenda from one edition of the standard to the next, which is of particular interest to adopting State and local governments. Providing States with an analysis of cost-effectiveness may encourage more rapid adoption of newer editions of energy codes based on Standard 90.1. This information may also inform the development of future editions of Standard 90.1. To establish the cost-effectiveness of Standard 90.1-2016, three main tasks were addressed: (1) Identification of building elements impacted by the updated standard; (2) Allocation of associated installation, maintenance, and replacement costs; and (3) Cost-effectiveness analysis of required changes In addition to installation, maintenance, and replacement costs, energy cost differences were needed to determine cost-effectiveness. The energy costs for each edition of Standard 90.1 were determined previously under the development of Standard 90.1-2016, as described below. The current analysis builds on the previous PNNL analysis (as outlined in Section 5.2) of the energy use and energy cost saving impacts of Standard 90.1-2016 compared to previous editions. The overall energy savings analysis of Standard 90.1 utilized a suite of 16 prototype EnergyPlus building models in 15 climate locations representing all eight U.S. climate zones. Detailed methodology and overall energy saving results from Standard 90.1-2016 are documented in the DOE technical report titled Energy Savings Analysis: ANSI/ASHRAE/IES Standard 90.1-2016 (DOE. 2018b).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Investigation of test methods, material properties and processes for solar cell encapsulants

The goal of the program is to identify, test, evaluate and recommend encapsulation materials and processes for the fabrication of cost-effective and long life solar modules. Of the $18 (1948 $) per square meter allocated for the encapsulation components approximately 50% of the cost ($9/sq m) may be taken by the load bearing component. Due to the proportionally high cost of this element, lower costing materials were investigated. Wood based products were found to be the lowest costing structural materials for module construction, however, they require protection from rainwater and humidity in order to acquire dimensional stability. The cost of a wood product based substrate must, therefore, include raw material costs plus the cost of additional processing to impart hygroscopic inertness. This protection is provided by a two step, or split process in which a flexible laminate containing the cell string is prepared, first in a vacuum process and then adhesively attached with a back cover film to the hardboard in a subsequent step.

Willis, P. B.↗

System-Availability And Resource-Allocation Program

ACARA analyzes availability, life-cycle cost, and scheduling of resources. Uses statistical Monte Carlo method to simulate capacity states of system as well as failure and repair of components. Failures of components modeled mathematically by use of combination of exponential and Weibull probability distributions. Schedules replacement of components to optimize performance of system. Made to comply with any constraints on production of components, capacities of resupply vehicles, spares kept on site, crews, and/or equipment. Written in APL2.

Viterna, L. A.↗