Risk Management for Human Support Technology Development

NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.

jones, Harry↗

The role of flight planning in aircrew decision performance

The role of flight planning in increasing the safety and decision-making performance of the air transport crews was investigated in a study that involved 48 rated airline crewmembers on a B720 simulator with a model-board-based visual scene and motion cues with three degrees of freedom. The safety performance of the crews was evaluated using videotaped replays of the flight. Based on these evaluations, the crews could be divided into high- and low-safety groups. It was found that, while collecting information before flights, the high-safety crews were more concerned with information about alternative airports, especially the fuel required to get there, and were characterized by making rapid and appropriate decisions during the emergency part of the flight scenario, allowing these crews to make an early diversion to other airports. These results suggest that contingency planning that takes into account alternative courses of action enhances rapid and accurate decision-making under time pressure.

Pepitone, Dave↗

STS-93: Columbia / Chandra Mission Overview (from JSC)

A press briefing held on July 7, 1999 reviews the progress of the Chandra X ray Observatory project. The tape begins with an animated view of the launch of the Chandra X ray Observatory from the shuttle, as it was planned. Next is a press briefing. Bryan Austin, the Lead Flight Director, discusses the five day mission, and the reason for the shortened length, due to the added weight from the Chandra Observatory. He also reviews the other payloads, and activities that will take place during the mission. Kenneth Ledbetter, Science Director Mission Development, discusses the 4 great observatories and the role of each. They are the Hubble, which observed visible light; Compton Gamma Ray Observatory, the Chandra, and the Space Infrared Telescope Facility. A time line of the expected operational lifetime of each of the 4 great observatories is shown. Specific information about the Chandra Telescope is reviewed. The last press briefing presenter is Fred Wojtalik, who is the Chandra Program Manager. He reviews the Chandra's components, and acknowledges a few of the many companies that contributed to its building. He also reviews the orbital activation and checkout sequences. Question that follows, center around contingency plans if some part of the planned sequence is not successful. The costs are reviewed, and concerns about the Initial Upper Stage, the propulsion unit required to take the Chandra to its high orbit are addressed. The Chandra is planned to take an eliptical orbit, which is higher than the other space telescopes, thus far launched due to the requirement to avoid Earth generated X rays.

Source record↗

The ISS 2B PVTCS Ammonia Leak: An Operational History

In 2006, the Photovoltaic Thermal Control System (PVTCS) for the International Space Station's 2B power channel began leaking ammonia at a rate of approximately 1.5lbm/year (out of a starting approximately 53lbm system ammonia mass). Initially, the operations strategy was "feed the leak," a strategy successfully put into action via Extra Vehicular Activity during the STS‐134 mission. During this mission the system was topped off with ammonia piped over from a separate thermal control system. This recharge was to have allowed for continued power channel operation into 2014 or 2015, at which point another EVA would have been required. Without these periodic EVAs to refill the 2B coolant system, the channel would eventually leak enough fluid as to risk pump cavitation and system failure, resulting in the loss of the 2B power channel - the most critical of the Space Station's 8 power channels. In mid‐2012, the leak rate increased to approximately 5lbm/year. Once discovered, an EVA was planned and executed within a 5 week timeframe to drastically alter the architecture of the PVTCS via connection to a dormant thermal control system not intended to be utilized as anything other than spare components. The purpose of this rerouting of the TCS was to increase system volume and to isolate the photovoltaic radiator, thought to be the likely leak source. This EVA was successfully executed on November 1st, 2012 and left the 2B PVTCS in a configuration where the system was now being adequately cooled via a totally different radiator than what the system was designed to utilize. Unfortunately, data monitoring over the next several months showed that the isolated radiator was not leaking, and the system itself continued to leak steadily until May 9th, 2013. It was on this day that the ISS crew noticed the visible presence of ammonia crystals escaping from the 2B channel's truss segment, signifying a rapid acceleration of the leak from 5lbm/year to 5lbm/day. Within 48 hours of the crew noticing the leak, an EVA was in progress to replace the coolant pump - the only other replaceable leak source. This paper will explore the management of the 2B PVTCS leak from the operations perspective. It will discuss the methodology of performing the STS‐134 refill, the considerations and contingency plans which went into the architectural overhaul of the system in 2012, and the unprecedented effort which went into the EVA response to the visible leak of May 2013. In particular the paper will focus on the techniques utilized by flight controllers to monitor the system health and to respond to such instances as the rapid May 2013 leak by putting the electrical system in a safe configuration for loss of cooling, and will use recorded telemetry of these events to describe system response to EVA crew and ground actions. It will discuss the innovative design for redundancy of the integrated truss structure's cooling systems which allowed for this leak to be managed with minimal impact to other ISS operations and electrical services, contrasted against the real unintended operations consequences of utilizing the flexibility of the spacecraft's design in this manner. The paper will discuss how the training of the crew and flight controller personnel has adapted to the changing architecture of the power system and the unpredictable nature of the 2B leak.

Vareha, Anthony↗

Persistent meanders and eddies lead to quasi-steady Lagrangian transport patterns in a weak western boundary current

The Brazil Current (BC) is a weak western boundary current flowing along the Southwestern Atlantic Ocean. It is frequently described as a flow with intense mesoscale activity and relatively low volume transport between 5.0 and 10.0 Sv. We use a 13-year eddy-resolving primitive-equation simulation to show that the presence of persistent meanders and eddies leads to characteristic quasi-steady Lagrangian transport patterns, aptly extracted through climatological Lagrangian Coherent Structures (cLCS). The cLCS position the surface expression of the BC core along the 2000-m isobath, in excellent visual agreement with high resolution satellite sea-surface temperature and the model Eulerian mean velocity. The cLCS deformation pattern also responds to zonally persistent cross-shelf SSH transition from positive (high) values near coastline to low (negative) values between 200- and 2000-m and back to positive (high) offshore from the 2000-m isobath. Zonally-paired cyclonic and anticyclonic structures are embedded in this transition, also causing the cLCS to deform into chevrons. An efficient transport barrier is identified close to the 200-m isobath confirmed by limited inshore movement of drogued drifters and accurately indicated by an along slope maxima of climatological strength of attraction. We also show that the persistent cyclonic and anticyclonic structures may induce localized cross-shelf transport. Regions of low climatological strength of attraction coincide with large shelves and with stagnant synthetic trajectories. We also show that cLCS accurately depict trajectories initiated at the location of Chevron’s spill (November 2011) as compared to synthetic and satellite-tracked trajectories, and the outline of the oil from that accident. There is also an agreement between the large-scale oil slicks reaching the Brazilian beaches (from August 2019 to February 2020) and the strength of climatological attraction at the coast. Our work also clarifies the influence of persistent mesoscale structures on the regional circulation. The identification and quantitative description of climatological Lagrangian coherent structures is expected to improve the effectiveness of future emergency response to oil spills, contingency planning, rescue operations, larval and fish connectivity assessment, drifter launch strategies, waste pollutant and marine debris dispersion and destination.

54 ENVIRONMENTAL SCIENCES↗

Open-Source Steady-State Models for Integration of Wave Energy Converter into Microgrids

This paper proposes a software framework, WEC-Grid, for integrating wave energy converters (WECs) into power flow software, such as Siemens PSS®E, to aid the integration of alternative energy sources into Microgrids. While integrating alternative sources such as WECs presents specific challenges such as cost, power quality, and power variability, wave energy is a promising renewable energy resource. Evaluating the integration of WECs into the power grid is a complex and nuanced problem that requires seamless communication between a WEC model and power flow software. The presented WEC-Grid software framework bridges and extends the functionality of WEC-Sim, an open-source WEC modeling package for MATLAB, through a wave-to-wire (W2W) electro-mechanical power conversion and processing model. WEC-Grid acts as a software wrapper, handler, and communication layer between the W2W modeler and power flow software. The software is designed to represent each grid system as a class object, allowing power system operators to perform power system duties such as contingency planning and dispatch operations. The integration of WECs with PSS®E’s power flow calculations workflow is demonstrated with an IEEE RTS case study.

16 TIDAL AND WAVE POWER↗

Transactive Emergency Power Allocation

The devastating impacts of extreme weather events, many of which are climate-change related, are increasingly evident through the frequency and duration of outages on power grids, especially the distribution systems. One of the major modern-day concerns of utilities is dealing with such extreme supply outages where operators have used rolling blackouts as a contingency plan balance supply and demand while serving critical loads. Such events have significant repercussions social and economic costs. Such blackouts practices are a blunt instrument, depriving customers with low-capacity high-priority loads (i.e. refrigeration, water, telecommunication, etc.) that provide high marginal amenity. Our contribution presented in this work is a transactive emergency allocation mechanism that would provide some minimum level of service to all of the customers while enabling preference-based trading of this initial allocation. This is in contrast to the state-of-art TE mechanisms that allocate resources to customers solely based on their willingness-to-pay. The effectiveness of the proposed mechanism is demonstrated through simulation-based evaluation on a prototypical distribution system experiencing 12-hour scarcity-based emergency event due to extreme operating conditions. Simulation results clearly demonstrate the capability of the proposed transactive emergency allocation mechanism in effectively utilizing the available energy and providing some level of service to all customers to operate their high-priority loads throughout the extreme scarcity event while being economically efficient in allowing trading of allocation based on customer preferences.

transactive energy, power system economics, emerge↗

Established Regulatory Limits for Surface Water and Groundwater

The regulatory limits for surface water and groundwater contained in this database comprise chemical-specific preliminary remediation goals (PRGs) based on potential Applicable or Relevant and Appropriate Requirements (ARARs). These values should be used in conjunction with PRGs based on risk assessment to ensure that the PRGs for a site meet the residual risk requirements for protection of human health and the environment in the National Oil and Hazardous Substance Pollution Contingency Plan (NCP). In some cases, the values presented in this database may be To-Be-Considered (TBC) Guidance because these values are superseded by site-specific state requirements. ARARs are available for the Federal government, California, Georgia, Illinois, Kentucky, New Jersey, New Mexico, Nevada, New York, Ohio, South Carolina, Tennessee, Washington, and Wisconsin. The dataset provides maximum contaminant levels for drinking water and water quality criteria for fresh and marine environments based on acute and chronic exposures. Users can select ARAR sources, drinking water standards and water quality standards, individual chemicals, and retrieve results in tabular or spreadsheet formats for analysis. ARARs are derived from authoritative sources, including federal and state government agencies. The dataset supports environmental risk assessments, regulatory decision-making, and environmental planning, with tools for benchmarking against promulgated standards. This structured approach ensures a robust evaluation of environmental risks tailored to regulatory needs.

Stewart, Debra [Oak Ridge National Laboratory (ORN↗

A Comprehensive Assessment Tool for Low-TRL Current Energy Converters

Along with a market-competitive levelized cost of energy, a current energy converter technology strongly benefits from an extensive consideration of socioeconomic, environmental, and regulatory factors early in the design process. As part of a technology performance level assessment, a series of assessment questions and guidance are developed and presented to evaluate an early-stage current energy technology on holistic criteria considering the entire device lifecycle. The assessment represents an accumulation of industry and research experience to date and relies on regular updates to ensure alignment with industry best-practices, regulatory requirements, and up-to-date technical understanding. A cradle-to-grave (materials, manufacturing, installation and deployment, operations and maintenance, and end-of-life) assessment of capabilities and functional requirements (i.e., high, medium, and low) performance criteria for current energy converters deployed in tidal, ocean current, and/or river applications. Key considerations related to manufacturing and installation include supply chain robustness, manufacturability and related job creation in the end-user and/or adjacent communities, and the time-to-repayment of the embodied energy debt. During deployment and maintenance operations, the safety of the device and subsystems during disconnect or grid failure, the difficulty and frequency of offshore heavy-lift activities, the avoidance or mitigation of area-use conflicts, the sea-states and weather conditions that permit maintenance access, and the availability of contingency plans (should conditions change unexpectedly) are a portion of the considered assessment criteria. Results include the potential impact of early-stage design decisions on the socioeconomic, environmental, and regulatory performance of a technology that allows developers to increase the product value and probability of success, and minimize costly late-stage design iterations through early and broad consideration of factors affecting overall performance and acceptability.

life cycle analysis↗

Skylab experimental performance evaluation manual. Appendix O: Experiment T002 manual navigation sightings (MSFC)

A series of analyses for Experiment T002, Navigation Sightings (MSFC), to be used for evaluating the performance of the Skylab corollary experiments under preflight, inflight, and post-flight conditions are presented. Experiment contingency plan workaround procedure and malfunction analyses are presented in order to assist in making the experiment operationally successful.

Purushotham, K. S.↗

Skylab experiment performance evaluation manual. Appendix R: Experiment T020 foot controlled maneuvering unit (MSFC)

A series of analyses for experiment T020, foot controlled maneuvering unit (MSFC), to be used for evaluating the performance of the Skylab corollary experiments under preflight, inflight and post-flight conditions is reported. Experiment contingency plan procedure and malfunction analyses are presented in order to assist in making the experiment operationally successful.

Tonetti, B. B.↗

Skylab experiment performance evaluation manual. Appendix P: Experiment T003 inflight aerosol analysis (DOT/MSFC)

A series of analyses is presented for experiment T003, inflight aerosol analysis, to be used for evaluating the performance of the Skylab corollary experiments under preflight, inflight, and post-flight conditions. Experiment contingency plan workaround procedure and malfunction analyses are presented in order to assist in making the experiment operationally successful.

Purushotham, K. S.↗

Skylab experiment performance evaluation manual. Appendix N: Experiment S183 ultraviolet panorama (MSFC), revision 1

A series is presented of analyses for Experiment S183, Ultraviolet Panorama (MSFC), to be used for evaluating the performance of the Skylab corollary experiments under preflight, inflight, and post-flight conditions. Experiment contingency plan workaround procedure and malfunction analyses are presented in order to assist in making the experiment operationally successful.

Purushotham, K. S.↗

Skylab experimental performance evaluation manual. Appendix D: Experiment M487 habitability/crew quarters (MSFC)

This appendix contains a series of analyses for Experiment M487, Habitability/ Crew Quarters (MSFC), to be used for evaluating the performance of the Skylab corollary experiments under preflight, inflight, and post flight conditions. Experiment contingency plan workaround procedure and malfunction analyses are presented in order to assist in making the experiment operationally successful.

Purushotham, K. S.↗