Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Capacity Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Analysis of dynamic capacity of low-contact-ratio spur gears using Lundberg-Palmgren theory

A concise mathematical model is developed for surface fatigue life of low-contact-ratio spur gears. The expected fatigue life of the pinion, gear, or gear sets may be calculated from the model. An equation for the dynamic capacity of the gear set was also derived in terms of the transmitted tangential tooth load which will give a 10-percent fatigue life of one million pinion revolutions. The theoretical life was compared with experimental data for a set of VAR AISI 9310 gears operating at a Hertz stress of 1.71X10 to the 9th power newtons per square meter (248,000 psi) and 10 000 revolutions per minute. Good agreement was obtained between the experimental and theoretical surface fatigue life of the gears.

Coy, J. J.↗

High Capacity Communications From Martian Distances: Spacecraft Link Design Analysis - Part 1

High capacity space communications has been a desire for Human Exploration and Science missions. Current Mars missions operate at data rates of 120 kbps for telemetry downlink and it is desirable to study high rate communication links in the range of 100 Mbps to 1 Gbps data rates from Martian distances. This paper will present some assumed scenarios along with link design assumptions and link analysis for high capacity communications from Mars. The paper will focus on RF subsystems namely antenna and power for the downlink communication from a relay orbiter at Mars. The relay orbiter will communicate with the low orbit spacecrafts at Mars or any Martian surface elements such as robots, and relay the data back to the ground networks on Earth. The study will dive into the spacecraft downlink system design and communication link analysis between the relay orbiter and ground network on Earth for data rates ranging from 100 Mbps to 1 Gbps based on the assumed scenarios and link assumptions. With high rate links at larger distances, there will be a significant impact on the antenna and power requirements and the link design will make an attempt to minimize the mass of the RF subsystem on the spacecraft. The results of this study will be presented for three data rates 1 Gbps, 500 Mbps and 100 Mbps at maximum Mars to Earth distance of 2.67AU. The design will use a Ka-band downlink with 90% link availability, along with various ground network G/T assumptions and possible bandwidth efficient modulations. The paper will conclude with what types of high rate communication links are feasible from Martian distances and also identify a range of requirements for antenna and power technologies for these high capacity communications from Mars.

Ka-Band communications↗

Nuclear's Role in the U.S. Electricity System: A Multi-Model Inter-Comparison Analysis

Multiple capacity expansion models (CEMs) for the U.S. power system represent the balance of options among generation, transmission, and storage assets that can satisfy electric loads, operating and planning reserves, and policy requirements. These models are typically set up to find the least-cost portfolio of assets that meet specified requirements, and model decisions can include both investments in new, and retirement of existing, resources. The scenarios explored by CEMs can help inform strategies for meeting future electricity and energy needs under a range of future conditions. However, projections can differ between models, sometimes dramatically, for a seemingly similar scenario. Differences in model coverage, structure, and input assumptions contribute to the range of model outcomes. Understanding what drives the biggest differences in model outputs improves model insights and provides context for interpreting results. This summary presents analysis that was performed through a forum of analysts who own, update, and apply CEMs, as well as nuclear experts from national laboratories, industry, and the research community. The following sections describe methods, results, and findings from an original, innovative inter-model comparison that provides insights into what drives the greatest differences in nuclear retirement and deployment projections across models and a range of technology, market, and policy conditions.

capacity expansion model↗

Capacity Assessment and Cost Analysis of Geologic Storage of Hydrogen: A Case Study in Intermountain-West Region USA

Hydrogen is an integral component of the current energy transition roadmap to decarbonize the economy and create an environmentally-sustainable future. However, surface storage options (e.g., tanks) do not provide the required capacity or durability to deploy a regional or nationwide hydrogen economy. In this study, we have analyzed the techno-economic feasibility of the geologic storage of hydrogen in depleted gas reservoirs, salt caverns, and saline aquifers in the Intermountain-West (I-WEST) region. We have identified the most favorable candidate sites for hydrogen storage and estimated the volumetric storage capacity. Our results show that the geologic storage of hydrogen can provide at least 72% of total energy consumption of the I-WEST region in 2020. We also calculated the capital and levelized costs of each storage option. We found that a depleted gas reservoir is the most cost-effective candidate among the three geologic storage options. Interestingly, the cushion gas type plays a significant role in the storage cost when we consider hydrogen storage in saline aquifers. The levelized costs of hydrogen storage in depleted gas reservoirs, salt caverns, and saline aquifers with large-scale storage capacity are approximately $\$$1.15, $\$$2.50, and $\$$3.27 per kg of H 2 , respectively. Here, this work provides essential guidance for the geologic hydrogen storage in the I-WEST region.

08 HYDROGEN↗

Analysis of Electrical Grid Capacity by Interconnection for Urban Air Mobility

A wide range of challenges must be overcome to conduct Urban Air Mobility (UAM)operations at scale with electric vertical take-off and landing aircraft as envisioned. This paper documents an analysis of one potential infrastructure challenge for UAM: available electrical grid power capacity. The success of UAM depends on the availability of electricity, which will be increasingly impacted by the proliferation of ground electric vehicles(EVs) over time. Under the best-case assumption that electricity can be transmitted and distributed as needed within each interconnection (i.e., electrical grid), it is estimated that the maximum number of UAM aircraft that can charge simultaneously in the continental United States will decrease by 20% from about 595 thousand in the year 2021 to about 475 thousand in the year 2050due to the projected increase in ground EVs.

electrical grid↗

Analysis of Electrical Grid Capacity by Interconnection for Urban Air Mobility

A wide range of challenges must be overcome to conduct Urban Air Mobility (UAM)operations at scale with electric vertical take-off and landing aircraft as envisioned. This paper documents an analysis of one potential infrastructure challenge for UAM: available electrical grid power capacity. The success of UAM depends on the availability of electricity, which will be increasingly impacted by the proliferation of ground electric vehicles(EVs) over time. Under the best-case assumption that electricity can be transmitted and distributed as needed within each interconnection (i.e., electrical grid), it is estimated that the maximum number of UAM aircraft that can charge simultaneously in the continental United States will decrease by 20% from about 595 thousand in the year 2021 to about 475 thousand in the year 2050due to the projected increase in ground EVs.

electrical grid↗

Analysis of Electrical Grid Capacity in Major U.S. Metropolitan Areas for Urban Air Mobility

A wide range of challenges must be overcome to conduct Urban Air Mobility (UAM) operations at scale with electric vertical takeoff and landing aircraft as envisioned. This paper documents an analysis of one potential infrastructure challenge for UAM: available electrical grid power capacity. The success of UAM depends on the availability of electricity, which will be increasingly impacted by the proliferation of ground electric vehicles (EVs) over time. Under the worst-case assumption that each U.S. Metropolitan Statistical Area (MSA) can only access and utilize the electricity generated by power plants within its boundaries, it is estimated that the maximum number of UAM aircraft that can charge simultaneously in the 25 most populous MSAs will decrease by about 61% from about 129,000 in the year 2021 to about 51,000 in the year 2050, due to the projected increase in ground EVs. Also, it is estimated that the number of these MSAs that may lack any available electrical grid power capacity for UAM operations will increase from zero MSAs in 2021 to eleven MSAs in 2050—including three MSAs that prospective UAM operators have announced as target markets (Los Angeles, Miami, and Orlando)—unless electricity demand for other purposes is reduced.

electrical grid↗

Analysis of Electrical Grid Capacity in Major U.S. Metropolitan Areas for Urban Air Mobility

A wide range of challenges must be overcome to conduct Urban Air Mobility (UAM) operations at scale with electric vertical takeoff and landing aircraft as envisioned. This paper documents an analysis of one potential infrastructure challenge for UAM: available electrical grid power capacity. The success of UAM depends on the availability of electricity, which will be increasingly impacted by the proliferation of ground electric vehicles (EVs) over time. Under the worst-case assumption that each U.S. Metropolitan Statistical Area (MSA) can only access and utilize the electricity generated by power plants within its boundaries, it is estimated that the maximum number of UAM aircraft that can charge simultaneously in the 25 most populous MSAs will decrease by about 61% from about 129,000 in the year 2021 to about 51,000 in the year 2050, due to the projected increase in ground EVs. Also, it is estimated that the number of these MSAs that may lack any available electrical grid power capacity for UAM operations will increase from zero MSAs in 2021 to eleven MSAs in 2050—including three MSAs that prospective UAM operators have announced as target markets (Los Angeles, Miami, and Orlando)—unless electricity demand for other purposes is reduced.

electrical grid↗

Summary Analysis of Different Offshore Wind Capacity Density Drivers in Proposed U.S. Projects and Impacts on Progress Towards State and Federal Deployment Targets

Understanding the density of offshore wind development - or the "capacity density" - is important for state and federal offshore wind planning efforts and to track progress towards policy goals. NREL has traditionally assumed a capacity density of 3 megawatts per square kilometer (MW/km2) when estimating the U.S. project pipeline (Musial et al. 2022), but capacity densities for existing European offshore wind farms ranged from 2-19 MW/km2 (Borrmann et al. 2018). We track the expected capacity densities of the proposed U.S. projects in the East Coast and make an analysis by state and by developer to identify what are the capacity density norms in the industry and whether the state in which the development efforts are taking place has some impact on capacity density. We also analyze the effects of the area occupied by station keeping systems on capacity density for lease areas dedicated to floating projects and provide a list of main capacity density drivers. This summary analysis sets a baseline to study how different capacity density drivers could impact the progress towards state and federal deployment targets. Given the currently delineated Renewable Energy Areas in the Outer Continental Shelf (OCS) and the basis from the summary analysis, we estimate the expected offshore wind deployment over time federally and by state and compare it to the state and federal deployment targets. The proposed analysis helps identify gaps and needs to meet state and federal targets, which provides sufficient information to propose strategic supply chain and policy planning with the objective of meeting deployment goals.

capacity density↗

Probabilistic Assessment and Uncertainty Analysis of CO2 Storage Capacity of the Morrow B Sandstone—Farnsworth Field Unit

This paper presents probabilistic methods to estimate the quantity of carbon dioxide (CO2) that can be stored in a mature oil reservoir and analyzes the uncertainties associated with the estimation. This work uses data from the Farnsworth Field Unit (FWU), Ochiltree County, Texas, which is currently undergoing a tertiary recovery process. The input parameters are determined from seismic, core, and fluid analyses. The results of the estimation of the CO2 storage capacity of the reservoir are presented with both expectation curve and log probability plot. The expectation curve provides a range of possible outcomes such as the P90, P50, and P10. The deterministic value is calculated as the statistical mean of the storage capacity. The coefficient of variation and the uncertainty index, P10/P90, is used to analyze the overall uncertainty of the estimations. A relative impact plot is developed to analyze the sensitivity of the input parameters towards the total uncertainty and compared with Monte Carlo. In comparison to the Monte Carlo method, the results are practically the same. The probabilistic technique presented in this paper can be applied in different geological settings as well as other engineering applications.

03 NATURAL GAS↗

A simulation model of temperature transitory on rocks having different thermal inertia. Analysis of the theoretical capacity of rock discrimination by remote sensing data

The possibility of identifying ground surface material by measuring the surface temperature at two different and significant times of the day was investigated for the case of hypothetical island whose rocky surface contained no vegetation and consisted of dolomite, clay, and granite. The thermal dynamics of the soil surface during a day in which atmospheric conditions were average for a latitude of about 40 deg to 50 deg were numerically simulated. The line of separation between zones of different materials was delineated by the range of temperature variation. Results show that the difference between maximum and minimum value of the temperature of ground surface during the day is linked to the thermal inertia value of the material of which the rock is formed.

Cassinis, R.↗

Historical Pattern Analysis of Global Geothermal Power Capacity Development: Preprint

Between 1913 and 1958, Italy was the only country with an operational geothermal power plant until New Zealand installed its first plant in 1958. At present, 24 countries are involved in the geothermal power market, and they have a combined installed capacity of 16,127 GW. This study analyzes the historical patterns of geothermal power capacity in the world and in individual countries to investigate the ideal global geothermal development pattern by examining the annual cumulative capacity (ACC) and the annual capacity addition (ACA) graphs of the historical development of geothermal power capacity in 24 countries. First, the global patterns are analyzed using these graphs in five periods (1945-1957, 1958-1976, 1977-1991, 1992-2002, and 2003-2020) that are marked by a series of characteristics of ACA peaks separated by two major troughs. Then, five characteristic patterns are developed in five periods globally. These patterns correspond to the early-stage linear, the first acceleration, the first steady-state linear, the second acceleration, and the second steady-state linear developments. A positive relationship exists between global patterns and the 5-year shifted oil-price curve: two major factors influenced global development: 1) increasing oil prices and increasing awareness of global climate change, and 2) global development of geothermal power. Last, we investigate these patterns in each country. The top ten countries, which comprise 93.3% of the world's total installed capacity are separated into five groups based on the availability and characteristics of patterns globally developed in five periods. Group-1 (the United States) has an installed capacity of 3,794 MW, Group-2 (Mexico and Philippines) 963-1935 MW, Group-3 (New Zealand, Italy, Iceland, and Japan) 601-1,037 MW, and Group-4 (Indonesia, Kenya, and Turkiye) 944-2,356 MW. The remaining 14 countries (6.7%), which are called Group 5, are still in an immature stage and have installed capacities of 7-262 MW and are not involved in pattern analysis. Overall, geothermal power in the world is in its third stage of development, which had its peak development after 1977. A fourth development peak may be expected to occur after this through business-as-usual cases. The biggest barrier to the development of the global geothermal power market is the risk associated with exploration and drilling. If risk mitigation systems and funds are employed, the growth of geothermal power production projects could accelerate.

GEOTHERMAL ENERGY↗

Historical Pattern Analysis of Global Geothermal Power Capacity Development

Between 1913 and 1958, Italy was the only country with an operational geothermal power plant until New Zealand installed its first plant in 1958. At present, 24 countries are involved in the geothermal power market, and they have a combined installed capacity of 16,127 GW. This study analyzes the historical patterns of geothermal power capacity in the world and in individual countries to investigate the ideal global geothermal development pattern by examining the annual cumulative capacity (ACC) and the annual capacity addition (ACA) graphs of the historical development of geothermal power capacity in 24 countries. First, the global patterns are analyzed using these graphs in five periods (1945-1957, 1958-1976, 1977-1991, 1992-2002, and 2003-2020) that are marked by a series of characteristics of ACA peaks separated by two major troughs. Then, five characteristic patterns are developed in five periods globally. These patterns correspond to the early-stage linear, the first acceleration, the first steady-state linear, the second acceleration, and the second steady-state linear developments. A positive relationship exists between global patterns and the 5-year shifted oil-price curve: two major factors influenced global development: 1) increasing oil prices and increasing awareness of global climate change, and 2) global development of geothermal power. Last, we investigate these patterns in each country. The top ten countries, which comprise 93.3% of the world's total installed capacity are separated into five groups based on the availability and characteristics of patterns globally developed in five periods. Group-1 (the United States) has an installed capacity of 3,794 MW, Group-2 (Mexico and Philippines) 963-1935 MW, Group-3 (New Zealand, Italy, Iceland, and Japan) 601-1,037 MW, and Group-4 (Indonesia, Kenya, and Turkiye) 944-2,356 MW. The remaining 14 countries (6.7%), which are called Group 5, are still in an immature stage and have installed capacities of 7-262 MW and are not involved in pattern analysis. Overall, geothermal power in the world is in its third stage of development, which had its peak development after 1977. A fourth development peak may be expected to occur after this through business-as-usual cases. The biggest barrier to the development of the global geothermal power market is the risk associated with exploration and drilling. If risk mitigation systems and funds are employed, the growth of geothermal power production projects could accelerate.

GEOTHERMAL ENERGY↗

Direct evidence from STXM analysis of enhanced oxygen storage capacity in ceria through the addition of Cu and Mg: Correlation of HT-WGS reaction performance

Here, scanning transmission X-ray microscopy (STXM) analysis was utilized to directly present visual evidence of changes in oxygen storage capacity (OSC) when small amounts of an additive were incorporated into CeO2. Specifically, the chemical map measured by STXM analysis differentiated between Cu-rich and Ce-rich areas to derive the proportion of Ce3+. Additionally, we found that the dispersion of Cu significantly influenced the formation of OSC. The findings were applied to the high-temperature water–gas shift reaction for producing high-purity hydrogen from waste-derived syngas, establishing a correlation with catalyst performance. Consequently, the CCM75 (Ce/Mg = 75/25) catalyst demonstrated the highest Cu dispersion and OSC values (6.9 %, 800.3 μmolO/gcat), and it also showed the highest CO conversion (79 % at 450 °C) and stability (−7.7 % at 450 °C after 50 h), attributed to the significant presence of active Cu. This study confirms previously reported interactions between Cu and CeO2 and uncovers the significant roles of Cu and Mg in this catalysis system, providing new understanding of the mechanisms that facilitate OSC improvement.

Lee, Ru-Ri↗