Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Systems design study of the Pioneer Venus spacecraft. Volume 2. Preliminary program development plan

The preliminary development plan for the Pioneer Venus program is presented. This preliminary plan treats only developmental aspects that would have a significant effect on program cost. These significant development areas were: master program schedule planning; test planning - both unit and system testing for probes/orbiter/ probe bus; ground support equipment; performance assurance; and science integration Various test planning options and test method techniques were evaluated in terms of achieving a low-cost program without degrading mission performance or system reliability. The approaches studied and the methodology of the selected approach are defined.

Source record↗

Silica RSI for Application to the Shuttle Orbiter

Silica reusable surface insulation is analyzed for its cold soak properties, bond properties at low temperature, gap and step heating effects, and aerodynamic surface roughness effects to determine space shuttle weight and cost sensitivity to structure subsystem weights. Computerized simulation studies show that total program cost savings of silica (vs. mullite) exceed thermal protection system design and development costs and that an early introduction of silica increases total program cost savings.

Forsberg, K. J.↗

Shuttle user analysis (study 2.2): Volume 3. Business Risk And Value of Operations in space (BRAVO). Part 4: Computer programs and data look-up

Computer program listings as well as graphical and tabulated data needed by the analyst to perform a BRAVO analysis were examined. Graphical aid which can be used to determine the earth coverage of satellites in synchronous equatorial orbits was described. A listing for satellite synthesis computer program as well as a sample printout for the DSCS-11 satellite program and a listing of the symbols used in the program were included. The APL language listing for the payload program cost estimating computer program was given. This language is compatible with many of the time sharing remote terminals computers used in the United States. Data on the intelsat communications network was studied. Costs for telecommunications systems leasing, line of sight microwave relay communications systems, submarine telephone cables, and terrestrial power generation systems were also described.

Source record↗

Thermal Protection Systems Technology Transfer from Apollo and Space Shuttle to the Orion Program

This paper describes how the Orion program is utilizing the Thermal Protection System (TPS) experience from the Apollo and Space Shuttle programs to reduce program risk and improve affordability to meet NASA's future manned exploration missions. The Orion program successfully completed the Exploration Flight Test (EFT-1) mission in 2014 and is currently assembling, integrating, and testing the next spacecraft for the Exploration Mission (EM-1) to meet the flight test objectives of an unmanned orbital mission to the moon and return to earth in 2019. The Orion spacecraft production operations are located in the Neil Armstrong Operations and Checkout (O&C) facility at the Kennedy Space Center (KSC) providing an affordable and seamless delivery approach of vehicles directly to the launch site eliminating spacecraft transportation and additional checkout testing. Innovative vehicle design, manufacturing and test operations approaches are maturing and evolving with each Orion vehicle build to support the challenging NASA exploration mission requirements beyond Low Earth Orbit (LEO) while reducing program cost and schedule impacts. An example of Orion's evolution is the incorporation of an improved heat shield design, assembly and testing approach to meet the higher re-entry velocities for a lunar return for the EM-1 mission. The EFT- 1 heat shield was based on the Apollo heat shield manufacturing processes and was assembled at a supplier location and then transported to KSC for final integration. The EM-1 heat shield is now manufactured, assembled, tested, and installed into the spacecraft at the O&C facility reducing program cost and production schedules. The transition of the Space Shuttle TPS capabilities has enabled Orion to provide a human rated capsule design using proven materials and processes established over years of orbiter re-entry missions. The Orion Crew Module (CM) TPS configuration is derived from the Apollo CM approach utilizing improved materials and processes developed from the Space Shuttle program. The Orion EFT-1 heat shield utilized the Avcoat ablative material from Apollo which was injected into a honeycomb substrate and has been updated for EM-1 incorporating a block configuration bonded to a composite shell structure. This approach utilizes the proven Avcoat material for the heat shield ablator and is utilizing derived bonding and inspection methods and techniques from the Space Shuttle tile experience. The Orion back shell TPS configuration is based on Space Shuttle tile designs using proven tile materials and coatings. The Orion forward bay cover utilizes the high temperature tiles similar to the back shell tiles and low temperature blankets derived from the Space Shuttle program reducing weight impacts. Space Shuttle Multi-Layer Insulation (MLI) is installed in the Orion capsule to control the interior temperature environment providing a light weight design. These TPS design approaches have performed successfully on the Orion first flight test on EFT-1 and are incorporated in the configuration for the next flight test for EM-1. Completion of these two flight tests will certify the TPS for the Orion program for human rated exploration missions and has reduced the development cost to the Orion program. In addition to transitioning the Space Shuttle TPS design configurations to Orion, the supporting manufacturing infrastructure, manufacturing processes, and inspection methods are also incorporated into the Orion assembly operations at KSC. This has avoided significant startup schedule and costs impacts of new capabilities and development of support operations necessary to fabricate, install, inspect, and validate the TPS installations for the Orion spacecraft. The Thermal Protection System Facility (TPSF) which supported the Space Shuttle program provides the heat shield Avcoat blocks and the back shell AETB-8 tiles for Orion program. Extending the existing Space Shuttle TPS operations at KSC provides onsite support to the Orion spacecraft assembly operations. A significant benefit to the Orion program is the transition of the Space Shuttle technician work force at KSC. This highly skilled workforce was able to transition to the Orion program and immediately support the TPS installation operations. They brought with them the human rated manufacturing and assembly operations culture that was critical to the Space Shuttle success avoiding the retraining cost and schedule impacts of a new workforce to Orion. The technician skills certification program from the Space Shuttle was found to be compatible with the Lockheed Martin technician certification programs enabling a seamless training process utilizing process similarity avoiding the cost of retraining the work force to Orion standards. The existing workforce is certificated for multiple processes enabling reassignment of technicians to other tasks in the Orion AI&P operations reducing the overall touch labor manpower requirements. Additional benefits of using the Space Shuttle workforce is the incorporation of the lessons learned from Space Shuttle processes to improve the Orion TPS processes. This has resulted in a continuous evolution of TPS processes to improve the producibility and reduce the program cost for the TPS for the Orion program. Transitioning the Apollo and Space Shuttle TPS designs, processes, and technician workforce has been instrumental in enabling Orion to successfully meet the program challenges for NASA's exploration missions of the future.

Stewart, Michael↗

Life sciences payload definition and integration study. Volume 1: Executive summary

The definition and integration tasks involved in the development of design concepts for a carry-on laboratory (COL), to be compatible with Spacelab operations, were divided into the following study areas: (1) identification of research and equipment requirements of the COL; (2) development of a number of conceptual layouts for COL based on the defined research of final conceptual designs; and (4) development of COL planning information for definition of COL/Spacelab interface data, cost data, and program cost schedules, including design drawings of a selected COL to permit fabrication of a functional breadboard.

Source record↗

Standard spacecraft procurement analysis: A case study in NASA-DoD coordination in space programs

The Space Test Program Standard Satellite (STPSS), a design proposed by the Air Force, and two NASA candidates, the Applications Explorer Mission spacecraft (AEM) and the Multimission Modular Spacecraft (MMS), were considered during the first phase. During the second phase, a fourth candidate was introduced, a larger, more capable AEM (L-AEM), configured by the Boeing Company under NASA sponsorship to meet the specifications jointly agreed upon by NASA and the Air Force. Total program costs for a variety of procurement options, each of which is capable of performing all of the Air Force Space Test Program missions during the 1980-1990 time period, were used as the principal measure for distinguishing among procurement options. Program cost does not provide a basis for choosing among the AEM, STPSS, and MMS spacecraft, given their present designs. The availability of the L-AEM spacecraft, or some very similar design, would provide a basis for minimizing the cost of the Air Force Space Test Program.

Harris, E. D.↗

Propulsion for the lunar mission

The paper describes the selection process utilized by NASA during the conduct of the 90-day study of the mission set that is known as the Space Exploration Initiative (SEI). It is directed specifically toward propulsion system definition and selection, with emphasis on the proposed Lunar Transfer Vehicle and the Lunar Exploration Vehicle. Results of trade studies show that selection cannot be readily made on the basis of engine performance alone, because the cost of launching hardware elements and the required propellant are very high. A decision must be made to use either life-cycle costs or annual program costs as the economic figure of merit, because they drive the selection in opposite directions.

Jones, Lee W.↗

Cost-estimating relationships for space programs

Cost-estimating relationships (CERs) are defined and discussed as they relate to the estimation of theoretical costs for space programs. The paper primarily addresses CERs based on analogous relationships between physical and performance parameters to estimate future costs. Analytical estimation principles are reviewed examining the sources of errors in cost models, and the use of CERs is shown to be affected by organizational culture. Two paradigms for cost estimation are set forth: (1) the Rand paradigm for single-culture single-system methods; and (2) the Price paradigms that incorporate a set of cultural variables. For space programs that are potentially subject to even small cultural changes, the Price paradigms are argued to be more effective. The derivation and use of accurate CERs is important for developing effective cost models to analyze the potential of a given space program.

Mandell, Humboldt C., Jr.↗

Strategic Energy Management Program Persistence and Cost Effectiveness An Analysis of the SEM Program Landscape

This study examines the relationship between strategic energy management (SEM) programs and their persistence and cost effectiveness, with analysis based on interview data from 24 SEM program administrators, SEM program evaluations, and other reports. The 80 interview questions focused on the topics of program design, energy savings, energy savings persistence, cost effectiveness, and customer SEM persistence. The generosity of interview respondents provided a wealth of data, resulting in a report of sufficient length to warrant inclusion of this brief guide of the report structure. The major sections are listed below with brief descriptions. Individual sections of this report are mainly stand-alone and do not require reading of other sections. As a result, there is some duplication between sections, but with differing levels of detail. Executive Summary: Presents three key conclusions of this work with a short description of potential actions to advance the understanding of each key finding. Brief Observations: Lists a large number of bulleted observations resulting from this research, arranged by the five major topic areas included in the interviews. Analysis details are provided in the Analysis of Interview Results section. Foundations for this Research: Provides an overview of SEM, SEM frameworks, SEM programs, the topics of persistence and cost effectiveness, and the focus of this research. Methodology: Details the approach and strategy of this research, providing background information relevant to the formulation of interview questions and the identification of which SEM programs to interview. Observations from Compiled Evaluations and Other Reports: Reports observations from the collection and analysis of program evaluations, annual reports, utility planning documents, and SEM-related white papers. This section, presented in bullet form, highlights challenges in data collection and ultimately a comparison of program practices as they pertain to persistence and cost effectiveness. Analysis of Interview Results: Presents detailed analysis of responses from SEM program administrators, arranged by the five major categories examined: program design, energy savings, energy savings persistence, cost effectiveness, and customer SEM persistence. Interview questions are generally grouped together into subsections when it makes sense to examine them together. SEM Programs Challenge Traditional Cost-Effectiveness Metrics: Details an analysis based on five key factors showing that applying traditional cost-effectiveness metrics to SEM programs is not straightforward. This invites the opportunity to consider whether traditional cost-effectiveness metrics are applicable to SEM programs, either individually or at large. Resolution of Research Hypotheses: Tabulates a set of hypotheses that were developed to address the fundamental nature of the research at hand. Analysis of responses to multiple questions informs an understanding of each hypothesis and can be used to better understand the SEM program environment at large.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Gas Storage Technology Consortium

The EMS Energy Institute at The Pennsylvania State University (Penn State) has managed the Gas Storage Technology Consortium (GSTC) since its inception in 2003. The GSTC infrastructure provided a means to accomplish industry-driven research and development designed to enhance the operational flexibility and deliverability of the nation's gas storage system, and provide a cost-effective, safe, and reliable supply of natural gas to meet domestic demand. The GSTC received base funding from the U.S. Department of Energy's (DOE) National Energy Technology Laboratory (NETL) Oil & Natural Gas Supply Program. The GSTC base funds were highly leveraged with industry funding for individual projects. Since its inception, the GSTC has engaged 67 members. The GSTC membership base was diverse, coming from 19 states, the District of Columbia, and Canada. The membership was comprised of natural gas storage field operators, service companies, industry consultants, industry trade organizations, and academia. The GSTC organized and hosted a total of 18 meetings since 2003. Of these, 8 meetings were held to review, discuss, and select proposals submitted for funding consideration. The GSTC reviewed a total of 75 proposals and committed co-funding to support 31 industry-driven projects. The GSTC committed co-funding to 41.3% of the proposals that it received and reviewed. The 31 projects had a total project value of $6,203,071 of which the GSTC committed $3,205,978 in co-funding. The committed GSTC project funding represented an average program cost share of 51.7%. Project applicants provided an average program cost share of 48.3%. In addition to the GSTC co-funding, the consortium provided the domestic natural gas storage industry with a technology transfer and outreach infrastructure. The technology transfer and outreach were conducted by having project mentoring teams and a GSTC website, and by working closely with the Pipeline Research Council International (PRCI) to jointly host technology transfer meetings and occasional field excursions. A total of 15 technology transfer/strategic planning workshops were held.

03 NATURAL GAS↗

Advanced transportation system studies technical area 3: Alternate propulsion subsystem concepts, volume 3

The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F-1A Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results, and the program cost estimates are described in more detail in Volume 1 - Executive Summary and in individual Final Task Reports.

Levak, Daniel↗

US Global Change Research Program Distributed Cost Budget Interagency Funds Transfer from DOE to NSF

These funds were transferred from DOE to NSF as DOE's contribution to the U.S. Global Change Research Program in support of 4 internationalnactivities/programs as approved by the U.S. Global Change Research Program on 14 March 2014. The programs are the International Geosphere-Biosphere Programme, the DIVERSITAS programme, and the World Climate Research Program. All program awards ended as of 09-23-2015.

99 GENERAL AND MISCELLANEOUS↗

Design guide for space shuttle low-cost payloads

A handbook is presented which delineates the principles of the new low-cost design methodology for designers of unmanned payloads to be carried by the space shuttle. The basic relationships between payload designs and program cost effects are discussed, and some concepts for designing low-cost payloads and implementing low-cost programs are given. The data are summarized from a payloads effects study of three unmanned earth satellites (OAO, a syneq orbiter, and a small research satellite), and the earth satellite design is emphasized. Brief summaries of space shuttle and space tug performance, environmental, and interface data pertinent to low-cost payload concepts are included.

Source record↗

Life cycle cost based program decisions

The following subject areas are covered: background (space propulsion facility assessment team final report); changes (Advanced Launch System, National Aerospace Plane, and space exploration initiative); life cycle cost analysis rationale; and recommendation to panel.

Dick, James S.↗

Nuclear electric propulsion mission engineering study development program and costs estimates, Phase 2 review

The results are presented of the second six-month performance period of the Nuclear Electric Propulsion Mission Engineering Study. A brief overview of the program, identifying the study objectives and approach, and a discussion of the program status and schedule are presented. The program results are reviewed and key conclusions to date are summarized. Planned effort for the remainder of the program is reviewed.

Source record↗