A bibliography of russian scientific and technological literature in manual control and associated areas
Manual control systems, human engineering, and man in space - bibliography of Russian literature on manned space flight technology
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Manual control systems, human engineering, and man in space - bibliography of Russian literature on manned space flight technology
Purpose: This study summarizes the results of an initial radiation survey of the Willis-Knighton Cancer Center in Shreveport, Louisiana. The facility houses an IBA ProteusOne compact single room proton therapy unit coupled with a C230 cyclotron that operates at a maximum energy of 230 MeV. Methods: A calibrated survey meter was used for the photon measurements to obtain reliable results. A neutron detector was used as the measuring instrument for neutrons. The locations of the survey and measurements were planned carefully in order to get a proper evaluation of the facility shielding configuration. The walls, ceiling, vault entrance, and the adjacent environment were each surveyed with suitable measurement instruments. A total of 22 locations were chosen for radiation survey. Dose equivalent values were calculated for both the photon and the neutron radiation using measured data. Results: All measured dose values are presented in millisievert per year. The highest dose measured at the vault entrance is 0.34 mSv/year. A dedicated shielding door was not present at the time of the measurement. The vault entrance area is considered as a controlled area. The shielding design goals are not to exceed 5 mSv/year for the controlled area and 1 mSv/year the uncontrolled area. The total combined neutron and photon dose equivalent values were found to be compliant with the Louisiana Department of Environmental Quality radiation protection regulatory codes. Conclusion: In our efforts to evaluate the radiation levels at the Willis-Knighton Cancer Center proton treatment facility, we have found that all the measured values of the radiation shielding are below the critical radiation limits per year. Since the total dose measured at the vault entrance is below the shielding design goal, a shielding door is not required at this proton treatment vault.
To demonstrate and validate the performance of the wide-area damping control system, the project plans to conduct closed-loop tests on the PDCI in spring/summer 2017. A test plan details the open and closed loop tests to be conducted on the PDCI using the wide-area damping control system. To ensure the appropriate level of preparedness, simulations were performed in order to predict and evaluate any possible unsafe operations before hardware experiments are attempted. This report contains the results from these simulations using the power system dynamics software PSLF (Power System Load Flow, trademark of GE). The simulations use the WECC (Western Electricity Coordinating Council) 2016 light summer and heavy summer base cases and the 2014 dual export base case. Because of the large volume of plots, the results were divided into three reports corresponding to the three base cases. This report contains results from the 2016 light summer base case.
To demonstrate and validate the performance of the wide-area damping control system, the project plans to conduct closed-loop tests on the PDCI in spring/summer 2017. A test plan details the open and closed loop tests to be conducted on the PDCI using the wide-area damping control system. To ensure the appropriate level of preparedness, simulations were performed in order to predict and evaluate any possible unsafe operations before hardware experiments are attempted. This report contains the results from these simulations using the power system dynamics software PSLF (Power System Load Flow, trademark of GE). The simulations use the WECC (Western Electricity Coordinating Council) 2016 light summer and heavy summer base cases and the 2014 dual export base case. Because of the large volume of plots, the results were divided into three reports corresponding to the three base cases. This report contains results from the 2016 heavy summer base case.
To demonstrate and validate the performance of the wide-area damping control system, the project plans to conduct closed-loop tests on the PDCI in spring/summer 2017. A test plan details the open and closed loop tests to be conducted on the PDCI using the wide-area damping control system. To ensure the appropriate level of preparedness, simulations were performed in order to predict and evaluate any possible unsafe operations before hardware experiments are attempted. This report contains the results from these simulations using the power system dynamics software PSLF (Power System Load Flow, trademark of GE). The simulations use the WECC (Western Electricity Coordinating Council) 2016 light summer and heavy summer base cases and the 2014 dual export base case. Because of the large volume of plots, the results were divided into three reports corresponding to the three base cases. This report contains results from the 2014 dual export base case.
With photovoltaic generation increasing, the wide-area oscillation has a vital influence on the long-distance power transmission of photovoltaic power. For an efficient integration of photovoltaic generation, a gain scheduling wide-area damping controller (WADC) is designed to guarantee system damping performance under a wide-area signal delay and a changing operating condition, which could be aggravated by the fluctuant and uncertain photovoltaic generation. A linear parameter-varying (LPV) model is proposed to represent all possible operating conditions within varying ranges of the photovoltaic generation and the load. Then, a tensor product (TP) model transformation is applied to transform the LPV model into a TP model. Based on the TP model, a parallel distributed compensation controller (PDC) framework is adopted to design the gain scheduling WADC, which is solved by linear matrix inequalities (LMIs) considering the accommodation to the random interval delay. In addition, a staircase basis function method is proposed to reduce the conservatism of LMIs within the PDC framework. The gain of the proposed WADC will be adjusted according to the operating condition acknowledged through the real-time scheduling and control center, once a wide-area oscillation is detected. Lastly, the performance of the proposed WADC is verified by a 2-area 4-machine system and a 68-bus 16-machine system.
Systems and methods are disclosed that provide for managing transient assets used in connection with an access-controlled area of a distribution site of an electric power delivery system. In some embodiments, one or more users entering and access-controlled area may be identified via physical access control credentials provided to an associated access control system. Transient assets brought within an access-controlled area may be detected via one or more wired and/or wireless communication channels and may be associated with the one or more identified users located within the access-controlled area.
Systems and methods are disclosed that provide for managing transient assets used in connection with an access-controlled area of a distribution site of an electric power delivery system. In some embodiments, one or more users entering and access-controlled area may be identified via physical access control credentials provided to an associated access control system. Transient assets brought within an access-controlled area may be detected via one or more wired and/or wireless communication channels and may be associated with the one or more identified users located within the access-controlled area.
The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tank inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.
Post treatment brood development was normal and teratological effects were not detected at exposures of 3 to 50 mw sq cm for 30 minutes. Post treatment survival, longevity, orientation, navigation, and memory of adult bees were also normal after exposures of 3 to 50 mw sq cm for 30 minutes. Post treatment longevity of confined bees in the laboratory was normal after exposures of 3 to 50 mw sq cm for 24 hours. Thermoregulation of brood nest, foraging activity, brood rearing, and social interaction were not affected by chronic exposure to 1 mw sq cm during 28 days. In dynamic behavioral bioassays the frequency of entry and duration of activity of unrestrained, foraging adult bees was identical in microwave exposed areas versus control areas.
The James Webb Space Telescope (JWST), successor to the Hubble Space Telescope, will be the largest astronomical telescope ever sent into space. To observe the very first light of the early universe, JWST requires a large deployed 6.5-meter primary mirror cryogenically cooled to less than 50 Kelvin. Three scientific instruments are further cooled via a large radiator system to less than 40 Kelvin. A fourth scientific instrument is cooled to less than 7 Kelvin using a combination pulse-tube Joule-Thomson mechanical cooler. Passive cryogenic cooling enables the large scale of the telescope which must be highly folded for launch on an Ariane 5 launch vehicle and deployed once on orbit during its journey to the second Earth-Sun Lagrange point. Passive cooling of the observatory is enabled by the deployment of a large tennis court sized five layer Sunshield combined with the use of a network of high efficiency radiators. A high purity aluminum heat strap system connects the three instrument's detector systems to the radiator systems to dissipate less than a single watt of parasitic and instrument dissipated heat. JWST's large scale features, while enabling passive cooling, also prevent the typical flight configuration fully-deployed thermal balance test that is the keystone of most space missions' thermal verification plans. This paper describes the JWST Core 2 Test, which is a cryogenic thermal balance test of a full size, high fidelity engineering model of the Observatory's 'Core' area thermal control hardware. The 'Core' area is the key mechanical and cryogenic interface area between all Observatory elements. The 'Core' area thermal control hardware allows for temperature transition of 300K to approximately 50 K by attenuating heat from the room temperature IEC (instrument electronics) and the Spacecraft Bus. Since the flight hardware is not available for test, the Core 2 test uses high fidelity and flight-like reproductions.
In our previous work, an adaptive measurement-driven wide-area damping controller (WADC) for suppressing inter-area oscillations has been proposed and a hardware prototype was developed and validated through hardware-in-the-loop tests. As a continuation of the work, this paper introduces a WADC software prototype to handle the realistic challenges for field implementation in the control room of the power grid. The WADC software is developed and operated as an openPDC adapter with a graphical user interface (GUI) to monitor the WADC inputs and output, the communication delays and other variables. The software prototype has been fully tested through an enhanced hardware-in-the-loop (HIL) test setup. Its performance is verified under various realistic communication uncertainties, such as random time delays and data losses, with different communication protocols. The experiment results have proven the WADC software can deliver sufficient damping to suppress the targeted oscillation mode in handling various communication uncertainties for future field deployment.
With the increasing deployment of Flexible AC Transmission System (FACTS) devices in wide-area voltage control systems (WAVCS) for achieving improved voltage stability of bulk power systems, the possibility for cyber attacks on these systems is also increasing. Successful stealthy cyber attacks that are difficult to detect by traditional informational technology (IT)-based cybersecurity solutions or threshold-based bad data detectors can lead to a voltage collapse in power grid. This paper presents the testbed-based attacks implementation and real-time evaluation of machine learning (ML) algorithm for detecting and mitigating stealthy cyber attacks on FACTS-based WAVCS on a hardware-in-the-loop (HIL) testbed. Initially, we discuss the implementation of a fuzzy logic controller (FLC) that controls a Static VAR Compensator (SVC) device deployed in a two-area four-machine Kundur power system for improving transient voltage stability. Later, the ML-based Anomaly Detection and Mitigation (ADM) system is implemented on the cyber-physical HIL testbed to detect and mitigate various stealthy cyber attacks, which are injected in real-time over the wide-area network (WAN). The experimental results show accurate and effective performance of ADM system in detecting and mitigating anomalies while keeping the grid stable and within the system operating limits, as defined by the North America Electric Reliability Corporation (NERC).
Systems and methods are disclosed that provide for management of resources of one or more systems included in an access-controlled area of a distributed site of an electric power delivery system. In certain embodiments, one or more users entering and access-controlled area may be identified via physical access control credentials provided to an associated access control system. A determination may be made as to whether the users have access rights to one or more hardware and/or software resources of systems included in the access-controlled area. Based on the determination, control signals may be generated by the access control system to enable and/or disable associated resources.
Solar power forecasting improvements are mainly evaluated by statistical and economic metrics, and the practical reliability benefits of these forecasting enhancements have not yet been well quantified. This paper aims to quantify reliability benefits from solar power forecasting improvements. To systematically analyze the relationship between solar power forecasting improvements and reliability performance in power system operations, an expected synthetic reliability (ESR) metric is proposed to integrate state-of-the-art independent reliability metrics. The absolute value and standard deviation of area control errors (ACE), and the North American Electric Reliability Corporation Control Performance Standard 2 (CPS2) score are calculated through the multi-timescale scheduling simulation, including the day-ahead unit commitment (DU), real-time unit commitment (RU), real-time economic dispatch (RE), automatic generation control (AGC) sub-models. The absolute area control error in energy (AACEE), CPS2 violations, CPS2 score, and standard deviation of the raw ACE are all calculated and combined as the ESR metric. Numerical simulations show that the reliability benefits of multi-timescale power system operations are significantly increased due to the improved solar power forecasts.
Building 06-CP-65 has been determined to be a contributing element to the Area 6 Control Point Historic District (O’Neill et al. 2021; Reed 2022). It contributes to the significance of the historic district under Criterion A as one of the principal buildings that supported timing and firing operations for nuclear testing on the NNSS from 1966 to 1992. As such, the building served as a major warehouse with office space within the district. It was used by both REECo, a long-time general contractor at the NNSS, as well as EG&G, which provided technical support to the national laboratories and the DOD. The building served as an important staging area and electrical power supply point for the NNSS diagnostic trailer fleet and its unique location immediately along Mercury Highway allowed easy accessibility to the forward areas of the NNSS. The building also contributes to the historic district under Criterion C as it is one of the large, unadorned, precast concrete buildings at the Control Point. These types of buildings were the prominent elements of the compound that convey the district’s overall utilitarian, military-industrial character. Building 06-CP-65 retains all aspects of integrity to a high degree and easily conveys its significance as a warehouse that supported Control Point operations. Building 06-CP-65 is not recommended eligible for listing in the NRHP as an individual resource. While it served an important support function as part of the Control Point Historic District, an archival and literature review did not reveal information linking it to any specific test, series of tests, programs, or for any specific role on the NNSS other than as a warehouse (Criterion A). It has no direct association with any important individual (Criterion B). It also is not architecturally significant in its own right beyond reflecting the overall aesthetic of the Control Point Historic District (Criterion C), and it does not have potential to yield information important to the history of nuclear testing beyond what can be learned from historic texts, drawings, and other documents (Criterion D).
Systems and methods are disclosed that provide for physical access management of an access-controlled area of a distributed site of an electric power delivery system using one or more one or more articulated access control policies. In some embodiments, to authenticate rights to access an access-controlled area, a first user may provide an associated access control system with credentials satisfying first authentication requirements based on an applicable policy. In connection with subsequent access authentication requests, the access control system may accept credentials satisfying second authentication requirements that may be different than the first authentication requirements. In this manner, access control requirements to the access-controlled area may be managed based on an associated articulated policy.
Due to the rapid development of economies, large urban cities consume an increasing amount of energy and have a higher requirement for power quality. Voltage source converter based high voltage direct current (VSC-HVDC) is a promising device to transmit clean power from remote regions to urban power systems, while also providing wide area damping control (WADC) for frequency stabilization. However, the time-delay naturally existing in the VSC-HVDC system may degrade the performance of WADC and even result in instability. To address this issue, this paper develops a time-delay correction control strategy for VSC-HVDC damping control in urban power grids. First, a small signal model of WADC is built to analyze the negative impacts of time delay. Then, a data-driven approach is proposed to compensate for the inherent time delay in VSC-HVDC damping control. The extensive training data will be generated under various disturbances. After offline training, the long short-term memory network (LSTM) can be implemented online to predict the actual frequency deviation based on real-time measurements. Finally, the proposed method is validated through MATLAB-Simulink in a two-area four-machine system. The results indicate that the data-driven compensation has a strong generalization ability for random delay time constants and can improve the performance of WADC significantly.