Gunnar uranium mine environmental remediation - Northern Saskatchewan

The Gunnar Mine and mill site was the largest of some 38 now-abandoned uranium mines that were developed and operated in Northern Saskatchewan, Canada, during the Cold War years. During their operating lifetimes these mines produced large quantities of ore and tailings. The Gunnar mine (open pit and underground) produced over 5 million tonnes of uranium ore and nearly 4.4 million tonnes of mine tailings during its operations from 1955 through 1963. An estimated 2.2 to 2.7 million m{sup 3} of waste rock that was generated during the processing of the ore abuts the shores of Lake Athabasca, the 22. largest lake in the world. After closure in the 1960's, the Gunnar site was abandoned with little to no decommissioning being done. The Saskatchewan Research Council has been contracted to manage the clean-up of these abandoned northern uranium mine and mill sites. The Gunnar Mine, because of the magnitude of tailings and waste rock, is subject to an environmental site assessment process regulated by both provincial and federal governments. This process requires a detailed study of the environmental impacts that have resulted from the mining activities and an analysis of projected impacts from remediation efforts. The environmental assessment process, specific site studies, and public involvement initiatives are all now well underway. Due to the many uncertainties associated with an abandoned site, an adaptive remediation approach, utilizing a decision tree, presented within the environmental assessment documents will be used as part of the site regulatory licensing. A critical early task was dealing with major public safety hazards on the site. The site originally included many buildings that were remnants of a community of approximately 800 people who once occupied the site. These buildings, many of which contained high levels of asbestos, had to be appropriately abated and demolished. Similarly, the original mine head frame and mill site buildings, many of which still contained the original machinery and equipment, also had to be dismantled. Remediation options for the accumulated demolition debris have been assessed, as have remediation options for the waste rock and tailings, all of which form part of the environmental assessment. The regulatory requirements include the environmental assessment processes, a complex public involvement strategy, and licensing from the Canadian Nuclear Safety Commission (CNSC) with the long-term goal of releasing the property in a remediated and stable state to the Province of Saskatchewan. Prescribed environmental and land use endpoints will be determined based on the environmental assessment studies and remediation options analyzed and implemented. Ultimately, the site will be released into an institutional controls program that will allow long-term government management and monitoring. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Observations on the Optimality Tolerance in the CAISO 33% RPS Model

In 2008 Governor Schwarzenegger of California issued an executive order requiring that 33 percent of all electricity in the state in the year 2020 should come from renewable resources such as wind, solar, geothermal, biomass, and small hydroelectric facilities. This 33% renewable portfolio standard (RPS) was further codified and signed into law by Governor Brown in 2011. To assess the market impacts of such a requirement, the California Public Utilities Commission (CPUC) initiated a study to quantify the cost, risk, and timing of achieving a 33% RPS by 2020. The California Independent System Operator (CAISO) was contracted to manage this study. The production simulation model used in this study was developed using the PLEXOS software package, which allows energy planners to optimize long-term system planning decisions under a wide variety of system constraints. In this note we describe our observations on varying the optimality tolerance in the CAISO 33% RPS model. In particular, we observe that changing the optimality tolerance from .05% to .5% leads to solutions over 5 times faster, on average, producing very similar solutions with a negligible difference in overall distance from optimality.

09 BIOMASS FUELS↗

Steam Turbine Materials for Ultrasupercritical Coal Power Plants

The Ultrasupercritical (USC) Steam Turbine Materials Development Program is sponsored and funded by the U.S. Department of Energy and the Ohio Coal Development Office, through grants to Energy Industries of Ohio (EIO), a non-profit organization contracted to manage and direct the project. The program is co-funded by the General Electric Company, Alstom Power, Siemens Power Generation (formerly Siemens Westinghouse), and the Electric Power Research Institute, each organization having subcontracted with EIO and contributing teams of personnel to perform the requisite research. The program is focused on identifying, evaluating, and qualifying advanced alloys for utilization in coal-fired power plants that need to withstand steam turbine operating conditions up to 760°C (1400°F) and 35 MPa (5000 psi). For these conditions, components exposed to the highest temperatures and stresses will need to be constructed from nickel-based alloys with higher elevated temperature strength than the high-chromium ferritic steels currently used in today's high-temperature steam turbines. In addition to the strength requirements, these alloys must also be weldable and resistant to environmental effects such as steam oxidation and solid particle erosion. In the present project, candidate materials with the required creep strength at desired temperatures have been identified. Coatings that can resist oxidation and solid particle erosion have also been identified. The ability to perform dissimilar welds between nickel base alloys and ferritic steels have been demonstrated, and the properties of the welds have been evaluated. Results of this three-year study that was completed in 2009 are described in this final report. Additional work is being planned and will commence in 2009. The specific objectives of the future studies will include conducting more detailed evaluations of the weld-ability, mechanical properties and repair-ability of the selected candidate alloys for rotors, casings and valves, and to perform scale-up studies to establish a design basis for commercial scale components. A supplemental program funded by the Ohio Coal Development Office will undertake supporting tasks such as testing and trials using existing atmospheric, vacuum and developmental pressure furnaces to define specific metal casting techniques needed for producing commercial scale components.

20 FOSSIL-FUELED POWER PLANTS↗

LLNS Request for Variance from 10 CFR 851 for Construction of LLNL Digital Infrastructure Capabilities Expansion Project

Lawrence Livermore National Security, LLC (LLNS) requests variance to 10 CFR 851 (the Rule) for the construction of the Digital Infrastructure Capabilities Expansion (DICE) project. The request isin continued support of the National Nuclear Security Administration (NNSA) “pilot” to streamline the delivery of commercial-like line-item construction projects under $50 million. This pilot is aligned with the approved NA-50 safety approach. Experience gained in the construction of the new Lawrence Livermore National Laboratory (LLNL) Emergency Operations Facility (EOC) under the variance granted in June 2020 is very encouraging. While detailed analysis will be forthcoming after that project is completed, there are strong indicators that a benefit has been realized by the subcontractors executing the work. The variance has permitted local/regional construction businesses contracted to Management & Operation contractor operated facilities and lower tier subcontractors to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the Department of Energy (DOE) Complex. While compliance to standards that are as safe and healthful as those in 10 CFR 851: confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum has been avoided. Safety and health performance on the EOC construction project including the number of inspection and surveillance issues is comparable to other subcontractors and projects at LLNL executed under 10 CFR 851.

99 GENERAL AND MISCELLANEOUS↗

LLNS Request for Variance From 10 CFR 851 for Construction of LLNL Emergency Operations Center

Lawrence Livermore National Security, LLC (LLNS) is submitting the following variance application requesting the use of the State of California’s Occupational Safety and Health Administration (Cal/OSHA) Regulations in lieu of Title 10 Code of Federal Regulations Part 851 (10 CFR 851, the Rule), Worker Safety and Health Program, Subpart B (Program Requirements), Subpart C (Specific Program Requirements), and Appendix A (Worker Safety and Health Functional Areas), solely with respect to the construction of the new Lawrence Livermore National Laboratory (LLNL) Emergency Operations Center (EOC) facility. The request is in support of the National Nuclear Security Administration (NNSA) “pilot” to streamline the delivery of commercial-like line item construction projects under $50 million. This pilot is aligned with the approved NA-50 safety approach for the projects in the pilot. This pilot is to test and demonstrate innovation leading to a reduced cost of construction for building commercial type structures at Department of Energy (DOE)/NNSA facilities. The variance proposes to permit local/regional construction businesses contracted to Management & Operation contractor operated facilities to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the DOE Complex. This will permit compliance to standards that are as safe and healthful as those in 10 CFR 851 without confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum.

99 GENERAL AND MISCELLANEOUS↗

LLNS Request for Permanent Variance from 10 CFR 851 for Construction

Lawrence Livermore National Security, LLC (LLNS) requests variance from 10 CFR 851 (the Rule) for construction work at Lawrence Livermore National Laboratory (LLNL). The request is based upon successful application of similar variances granted to LLNS in continued support of the National Nuclear Security Administration (NNSA) initiative to streamline the delivery of line-item construction projects under $50 million. This request is aligned with the approved NA 50 safety approach. Experience gained in the construction of the new LLNL Emergency Operations Center (EOC) under the variance granted in June 2020 and construction preparations to date on the Digital Infrastructure Capabilities Expansion (DICE) under the variance granted April 2022 is very encouraging. There are strong indicators that a benefit has been realized by both the subcontractors executing the work and the Laboratory. The variance has permitted local/regional construction businesses contracted to Management & Operation Contractor operated facilities and lower tier subcontractors to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the Department of Energy (DOE) Complex. While compliance to standards that are as safe and healthful as those in 10 CFR 851: confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum has been avoided. Safety and health performance on the construction project including the number of inspection and surveillance issues is comparable to other subcontractors and projects at LLNL executed under 10 CFR 851. This variance application was prepared according to the requirements in 10 CFR 851, Subpart D – Variances, § 851.31 Variance Process. This request is limited to subcontractor executed construction at LLNL.

42 ENGINEERING↗

Securing Digital Energy Infrastructure: Procurement, Contracting, and Supply Chain Risk Management Guidance

Recognizing the scale of this industry challenge, the United States (U.S.) Department of Energy (DOE) Grid Deployment Office (GDO) and Cybersecurity Energy Security & Emergency Response office have launched a multi-year BESS supply chain security initiative to identify consequence-driven approaches to addressing BESS supply chain security and provide resources to support prioritization of supply chain security efforts associated with the procurement of BESS equipment and services. This guide is one element of the supporting resources to be provided and sets forth a framework and guidance for procurement bidding, selection, risk analysis, and agreements stakeholders can implement to mitigate cybersecurity risks across the entirety of battery system component ecosystem, including the interconnected software and hardware required for control and monitoring BESSs.

25 ENERGY STORAGE↗

Special Report on The Department of Energy's Acquisition Workforce and its Impact on Implementation of the American Recovery and Reinvestment Act of 2009

Signed by the President on February 17, 2009, the American Recovery and Reinvestment Act of 2009 (Recovery Act) seeks to strengthen the U.S. economy through the creation of new jobs, aiding State and local governments with budget shortfalls, and investing in the long-term health of the Nation's economic prosperity. Under the Recovery Act, the Department of Energy will receive approximately $40 billion for various energy, environmental, and science programs and initiatives. To have an immediate stimulative impact on the U.S. economy, the Department's stated goal is to ensure that these funds are spent as expeditiously as possible, without risking transparency and accountability. Given the Department's almost total reliance on the acquisition process (contracts, grants, cooperative agreements, etc.) to carry out its mission, enhanced focus on contract administration and, specifically, the work performed by Federal acquisition officials is of vital importance as the unprecedented flow of funds begins under the Recovery Act.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A vectorized molecule code

The vectorization of the computational chemistry code, MOLECULE, is discussed. Computational simplifications of molecular integrals, memory management, and contraction schemes are addressed and a brief guide for users is included.

Almloef, J.↗

Miniature Optical Wide-Angle-Lens Startracker (Mini-OWLS)

This paper provides a brief overview of the design considerations and the current status of the Miniature Optical Wide-Angle Lens Startracker Program. Mini-OWLS offers a revolutionary alternative to the conventional startracker. It is a small, lightweight, low cost, high performance startracker that can be used in a variety of applications including calibration and alignment of Inertial Measurement Units (IMU's) Mini-OWLS makes use of a strap down design incorporating Holographic Optical Elements (HOES) in place of conventional optics. HOES can be multiplexed so that the same aperture can be used for multiple separate optical paths looking in several directions simultaneously without startracker rotation. Additionally, separate Schmidt corrector plates are not required to compensate for spherical aberration. The optical assembly, or what would normally be considered as the telescope, is less than 20 cc in volume, weighs less than 55 grams, and contains the equivalent of three individual telescopes. Each one has a 4 deg Field of View (FOV) with a field of regard of 48 square degrees. Mini-OWLS has a bandwidth of approximately 300 nm in or near the visible wavelength. The projected resolution of the startracker is 5 to 10 arcseconds, depending on the centroiding algorithm used. The Mini-OWLS program was initiated last year and represents a miniaturized version of a similar design for aeronautical applications. The contract is managed by Wright Laboratory, Air Force Systems Command, Wright-Patterson AFB, Ohio, with funding from the Strategic Defense Initiative Organization through Eglin AFB. The initial phase of the program is to build and test a development unit. The second phase is to integrate the startracker with the Charles Stark Draper Laboratory Micromechanical Inertial Guidance System (MIGS) and the Signal Processing Packaging Design (SPPD) being developed by Texas Instruments. The preliminary design review was conducted in November 1991. Three-axes prototype telescope assemblies have been built and design evaluation tests initiated.

Miller, Rick↗

Wetlands Survey

Ducks Unlimited, Inc. is dedicated to preservation of the world's waterfowl. Current inventories of wetland resources are crucial to effective waterfowl management. They contracted with NASA to use data from the LANDSAT satellites Thematic Mapper (TM), an advanced Earth scanning instrument that collects data in seven bands of the spectrum utilizing the Earth Resources Laboratory Applications Software (ELAS). The TM measures and records six values of light energy reflected from Earth and one value of heat energy as it scans the Earth below. On each orbital sweep, sensors produce a series of digital scenes representing features of Earth segments measuring about 100 by 110 miles, each scene covering about eight million acres, and each containing some 40 million bits of information called picture elements or pixels. They are computer processed and the resulting mosaic is projected on a digital display device.

Source record↗

NSTAR Ion Propulsion System Power Electronics

The NASA Solar Electric Propulsion Technology Application Readiness (NSTAR) program, managed by the Jet Propulsion Laboratory (JPL), is currently developing a high performance, simplified ion propulsion system. This propulsion system, which is throttleable from 0.5- to 2.3-kW output power to the thruster, targets primary propulsion applications for planetary and Earth-space missions and has been baselined as the primary propulsion system for the first New Millennium spacecraft. The NASA Lewis Research Center is responsible for the design and delivery of a breadboard power processing unit (PPU) and an engineering model thruster (EMT) for this system and will manage the contract for the delivery of the flight hardware to JPL. The PPU requirements, which dictate a mass of less than 12 kg with an efficiency of 0.9 or greater at a 2.3-kW output, forced a departure from the state-of-the-art ion thruster PPU design. Several innovations--including dual-use topologies, simplified thruster control, and the use of ferrite magnetic materials--were necessary to meet these requirements.

Source record↗

An Overview of the Applied Meteorology Unit (AMU)

The Applied Meteorology Unit (AMU) acts as a bridge between research and operations by transitioning technology to improve weather support to the Shuttle and American space program. It is a NASA entity operated under a tri-agency agreement by NASA, the US Air Force, and the National Weather Service (NWS). The AMU contract is managed by NASA, operated by ENSCO, Inc. personnel, and is collocated with Range Weather Operations at Cape Canaveral Air Force Station. The AMU is tasked by its customers in the 45th Weather Squadron, Spaceflight Meteorology Group, and the NWS in Melbourne, FL with projects whose results help improve the weather forecast for launch, landing, and ground operations. This presentation describes the history behind the formation of the AMU, its working relationships and goals, how it is tasked by its customers, and examples of completed tasks.

Merceret, Francis↗

Advanced Electric Propulsion System (AEPS) Enabling a Sustainable Return to the Lunar Surface through NASA Gateway

NASA continues to evolve a human exploration approach for beyond low-Earth orbit. The center of this approach is NASA’s Gateway that is envisioned to provide a maneuverable outpost in lunar orbit to extend human presence in deep space and expand on NASA exploration goals. The Gateway represents the initial step in NASA’s architecture for human cislunar operations, lunar surface access and missions to Mars. NASA announced at the May 2020 NASA Advisory Council’s Human Explorations and Operations Committee a new plan that calls for launching the first two elements of Gateway as a co-manifested mission in the late 2023 timeframe [2]. Launching the Power and Propulsion Element (PPE) and the Habitation and Logistics Outpost (HALO) together reduces mission risk, utilizes the PPE high-powered Electric Propulsion (EP) system to transport both elements to the lunar orbit, and reduces overall cost. NASA and Maxar Technologies have a commercial partnership to develop and demonstration a high-powered Solar Electric Propulsion (SEP) spacecraft [3, 4]. The PPE is baselined to include three 12.5-kW Advanced Electric Propulsion Systems (AEPS) and four 6-kW Hall thrusters, currently under development by Maxar, for a total beginning of life propulsion power of over 48-kW [5]. High-power solar electric propulsion is one of the key technologies that has been prioritized because of its significant exploration benefits, specifically, for missions beyond low Earth orbit. Spacecraft size and mass are currently dominated by onboard chemical propulsion systems and propellants that may constitute more than 50 percent of spacecraft mass. This impact can be substantially reduced through the utilization of SEP, due to its higher specific impulse and lower propellant load required to meet the equivalent mission delta-V. Studies performed for NASA’s HEOMD and Science Mission Directorate (SMD) have demonstrated that 40-kW-class SEP provides the necessary capabilities that would enable near term and future architectures, and science missions [6]. Accordingly, NASA has been developing a 12 kW Hall thruster electric propulsion thruster that can serve as the building block for a 40-kW-class SEP capability. The AEPS development, led by the NASA Glenn Research Center (GRC) and the Jet Propulsion Laboratory (JPL), began with the maturation of the high-power Hall thruster. The technology development work has transitioned to AR via a competitive procurement selection for the AEPS contract in May 2016. Management of the AEPS contract is being led by NASA GRC with funding from NASA’s Science Technology Mission Directorate (STMD) under the Technology Demonstration Missions (TDM) program. NASA continues to support the AEPS development leveraging in-house expertise, plasma modeling capability, and world-class test facilities.

AEPS↗