At least 91 records · Page 5

Front-End Engineering and Design: Project Tundra Carbon Capture System (Final Report)

As the next phase of Project Tundra, Minnkota Power Cooperative (MPC) completed a front-end engineering and design (FEED) study to install a post-combustion CO 2 capture system (CCS) at the MPC operated (Square Butte Electric Cooperative-owned) Milton R. Young Station (MRYS) Unit 2 (MRY2), a 477-MW power plant fueled by North Dakota lignite. The project team completed the FEED with Fluor’s Econamine FG Plus℠ (EFG+) technology and is taking the next steps leading up to start of construction. Team members included FEED technical lead Fluor Enterprises (Fluor); owner’s engineer and balance of plant (BOP) engineer Burns & McDonnell (BMcD); leading carbon capture consultants (David Greeson Consulting, Hunt International Energy Services); environmental consultants (AECOM, Agora Environmental), other BOP engineering consultants (Golder Associates, Nels); cost-share funding agency, the North Dakota Industrial Commission (NDIC); and the Energy & Environmental Research Center (EERC). Project Tundra’s goal is to implement carbon capture, utilization, and storage (CCUS) in North Dakota, while preserving the use of lignite. Future options could lead to revitalizing legacy oil fields and creating a new CO 2 enhanced oil recovery (EOR) industry. The topic of this report is the FEED study for the carbon dioxide capture portion of Project Tundra. Building on the findings of a pre-FEED study for MRY2, the key deliverables contained in this FEED study are: a) design, costing, and performance data needed to commence project financing activities; b) engineering and material balances required to file for all project permits; and c) a final project schedule. Based on the results of the previous pre-FEED study, MPC and its team evaluated two options to provide the large amount of steam needed to operate the CCS: 1) installation of new natural gas package boilers and a new pipeline to supply natural gas to the facility and 2) extraction of steam from the existing MRYS steam turbine generator. The FEED study was performed using the package boilers option, as it was deemed to have the lowest technical risk, overall cost, and cost uncertainty. A key feature of the design, however, was the mixing the natural gas boilers’ flue gas with the MRY2 flue gas. This increased the size of the CCS system. This design also enabled the tie-in of Unit 1 flue gas for times when Unit 2 is offline. The CCS was designed to capture a combined 12,978 short tons per day (STPD) of CO 2 from the flue gases produced by the existing MRY Unit 2 along with flue gas produced by the new boiler package within the CCS. The 12,978 STPD CO 2 capture is achieved by normally processing 100% of the total available MRY Unit 2 flue gas (considering full load operation) and 100% of the boiler package flue gas, then removing 90% of the CO 2 available from the processed flue gas streams.

01 COAL, LIGNITE, AND PEAT↗

Development of Telemedicine Capabilities for a Joint US-Russian Space Biomedical Center for Training and Research

From the perspective of scheduling, some medical consultations can have asynchronous and synchronous components. Consultations frequently involve the compilation of patient data, its analysis, a consultant's report, and a real-time conference between the referring physician and the consultant. The bandwidth of the Internet with Moscow and advances in the hardware and software of personal computing now make possible telemedicine events with store-and-forward components and real-time components. These are hybrid telemedicine and this paper describes such a case.

DeBakey, Michael E.↗

The Pine Ridge-Mayo National Aeronautics and Space Administration Telemedicine Project: Program Activities and Participant Reactions

OBJECTIVE: To determine the response of participants to the Pine Ridge-Mayo National Aeronautics and Space Administration telemedicine project. DESIGN: We describe a 3-month demonstration project of medical education and clinical consultations conducted by means of satellite transmission. Postparticipation questionnaires and a postproject survey were used to assess the success of the activity. MATERIAL AND METHODS: Patients and employees at the Pine Ridge Indian Health Service Hospital in southwestern South Dakota and employees at Mayo Clinic Rochester participated in a telemedicine project, after which they completed exit surveys and a postproject questionnaire to ascertain the acceptability of this mode of health care. RESULTS: Almost all Pine Ridge and Mayo Clinic participants viewed the project as beneficial. The educational sessions received favorable evaluations, and almost two-thirds of the patients who completed evaluations thought the consultation had contributed to their medical care. More than 90% of the respondents from Pine Ridge and more than 85% of the respondents from Mayo Clinic Rochester said that they would recommend participation in this project to others. More than 90% of respondents from Pine Ridge and 80% of Mayo respondents agreed with the statement that the project should continue. CONCLUSION: These data suggest that a program of clinical consultation services, professional education, and patient education available by telemedicine might be viewed as beneficial.

United States Indian Health Service↗

Interactions between U.S. biofuels policy and the Endangered Species Act

The Renewable Fuel Standard (RFS) is the primary policy governing the use of biofuels in the United States. Following the 2007 enactment of the RFS, there has been substantial expansion in the use of cropland to produce biofuel feedstocks, including corn and soybeans. Both the conversion of land and the ongoing cultivation of these crops can, depending on management practices, lead to negative environmental outcomes including degraded water quality, increased water use, increased greenhouse gas emissions, and loss or degradation of wildlife habitat. These outcomes have the potential to affect threatened and endangered species protected under the U.S. Endangered Species Act (ESA). The ESA requires federal agencies to consult with the U.S. Fish and Wildlife Service or the National Marine Fisheries Service to ensure that an agency's actions are not likely to jeopardize the existence of imperiled species, nor result in the destruction or adverse modification of their habitat. However, formal consultation has not yet been completed between the U.S. Environmental Protection Agency—the agency charged with implementing the RFS—and the wildlife services, thereby hindering mitigation or remediation of potential impacts. This analysis explores the likely effects of the RFS on land use changes and critical habitat, illustrates example pathways by which threatened and endangered species may be affected, and proposes solutions to help redress this harm. The findings suggest a need for further consultation and assessment of the interactions between the RFS and ESA as well as additional research to support the species-conservation and policymaking processes.

09 BIOMASS FUELS↗

Design options for a bunsen reactor.

This work is being performed for Matt Channon Consulting as part of the Sandia National Laboratories New Mexico Small Business Assistance Program (NMSBA). Matt Channon Consulting has requested Sandia's assistance in the design of a chemical Bunsen reactor for the reaction of SO2, I2 and H2O to produce H2SO4 and HI with a SO2 feed rate to the reactor of 50 kg/hour. Based on this value, an assumed reactor efficiency of 33%, and kinetic data from the literature, a plug flow reactor approximately 1%E2%80%9D diameter and and 12 inches long would be needed to meet the specification of the project. Because the Bunsen reaction is exothermic, heat in the amount of approximately 128,000 kJ/hr would need to be removed using a cooling jacket placed around the tubular reactor. The available literature information on Bunsen reactor design and operation, certain support equipment needed for process operation and a design that meet the specification of Matt Channon Consulting are presented.

Moore, Robert Charles↗

Targeted Technology Transfer to US Independents

The Petroleum Technology Transfer Council (PTTC) is a unique not-for-profit network that focuses on transferring Exploration and Production (E&P) technology to the domestic oil and natural gas producing industry. PTTC connects producers, technology providers and innovators, academia, research and development (R&D) consortiums and governments. Local affordable workshops delivered by Regional Lead Organizations (RLOs), which are typically a university or geological survey, are a primary tool. PTTC also maintains a website network, issues a national newsletter, provides a column in a major trade publication, and exhibits at major industry events. It also encourages industry to ask technology-related questions, striving to find relevant answers that will save questioners significant time. Working since late 1993, the PTTC network has a proven track record of providing industry with technology insights they can apply. Volunteers at the regional and national level provide key guidance regarding where to focus technical effort and help connect PTTC with industry. At historical funding levels, PTTC had been able to hold well more than 100 workshops per year, drawing 6,000+ attendees. As funding decreased in the early 2000s, the level of activity decreased and PTTC sought a merger with the American Association of Petroleum Geologists (AAPG), becoming an AAPG-managed organization at the start of FY08. This relationship with AAPG was terminated by mutual consent in May 2011 and PTTC once again operates independently. Chris Hall, California continued to serve as Chairman of the Board of Directors until December 2013. At the time PTTC reorganized into a RLO led organization with Mary Carr and Jeremy Viscomi as co-Executive Directors. Jerry Anderson became the Chairman of the PTTC Board of Directors and Chris Hall continues to serve on the Board. Workshop activity stabilized at 55-65 workshops per year averaging 3,100 attendees. FY14 represented the fifth year in a multi-year contract with the Department of Energy (DOE) for providing technology transfer services. This report summarizes activity and results during for five years, FY10 through FY14. In FY12 changes occurred in responsibilities of consultants serving HQ, because funding was reduced below the threshold level of $500,000 audits were no longer required and consultant time was reduced on the primary contract. Contracts for Permian Carbon Capture Utilization and Storage (CCUS) training, and providing tech transfer services to the Research Partnership to Secure Energy for America (RPSEA) provided work that enabled HQ to retain services of regular consultants. Both CCUS and RPSEA were five year contracts with PTTC, and providing services for these DOE funded contracts provided synergy for PTTC and the oil and gas industry. With further decreases in DOE funding the regions conducted workshops with no PTTC funding starting in June FY11. Since 2011 the number of workshops has declined from 79 in FY10 and FY11 to 49 in FY12, and risen to 54 in FY13 and 63 in FY14. The attendee's numbers dipped slightly below 3,000 per year in FY 10, FY12, and FY13, but rose to over 3,800 in FY 11 and 3105 in FY14. Quantitative accomplishments: PTTC has maintained its unique structure of a national organization working through Regional Lead Organizations (RLOs) to deliver local, affordable workshops. During the contract period PTTC consolidated from 10 to five regions to increase efficiency, and because no active RLO's would be maintained in the Central and Eastern Gulf Coast regions. RLO's for the regions are located at: Eastern - West Virginia University, (Illinois Geol. Survey., W. Michigan Univ. FY10-12); Midwest created in FY13 - Illinois Geological Survey, W. Michigan University; Midcontinent - University of Kansas, expanded to Houston, TX (2013-14); Rocky Mountain - Colorado School of Mines; Texas/SE New Mexico (FY10-FY11) - Bureau of Economic Geology, Univ. of Texas at Austin; West Coast - Conservation Committee of California O&G Producers.

02 PETROLEUM↗

Visual Impact Assessment of the Energetic Materials Complex Construction Project on Manhattan Project–Era Historic Properties, the TA-06-0037 Concrete Bowl, and the TA-22-0001 Quonset Hut

Concern for potential visual effects to historic Manhattan Project–era properties emerged early in the planning and consultation phase for the upcoming Energetic Materials Complex (EMC) construction project. In initial discussions with project managers and design team members, resource managers became aware of the need to consider potential impacts to the viewsheds of two nearby properties that are eligible for inclusion in the Manhattan Project National Historical Park (MAPR). Resource managers recognized that viewshed characteristics important to the integrity of the Concrete Bowl (Technical Area [TA-]06-0037) and the Quonset Hut (TA-22-0001) conceivably faced the prospect of lasting and irreversible visual impacts. A strategy to gather necessary data soon emerged. The approach presented to the New Mexico State Historic Preservation Officer (SHPO) on April 7, 2021, combined gathering baseline information from field visits with a geographic information system (GIS)-supported viewshed analysis. Accordingly, results from the viewshed analysis would help resource managers determine if a more comprehensive visual impact assessment (VIA) would be needed. If necessitated by the outcome of the GIS viewshed analysis, initial consultation with the SHPO specified the production of a VIA that would explore any potential visual adverse impacts to the Concrete Bowl and the Quonset Hut. Cultural resources and GIS specialists with the Laboratory performed a viewshed analysis shortly after consultation with the SHPO. The analysis indicated a high likelihood that at least one of the two Manhattan Project–era properties would experience at least a minimal level of visual impact and that a VIA would be needed. The resulting analysis provides a description of the undertaking, an account of the properties affected along with an evaluation of historical significance, an examination of potential visual impacts, and a determination of effect to the identified historic properties.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

U.S. Department of Energy-National Lab Equity Summit: Grid Planning and Operations (Workshop Report)

This report summarizes the U.S. DOE and national laboratories equity summit that was held on February 5, 2024, and focused on grid planning and operations. The objectives of the summit were to connect DOE and lab researchers working on grid-related equity issues, share information on current and planned grid-related equity projects and initiatives, and inspire and educate participants by hearing from our panelists about solutions and challenges to integrating equity in grid planning and operations. The summit included two panels of industry leaders. The first was a state and community perspectives panel that included representatives from a state public utility commission (Oregon Public Utility Commission), a state energy office (Washington Department of Commerce), a state utility consumer advocate (Connecticut Consumer Counsel), and industry consultants (Elevated Engagement and ArkSpring Consulting). Panelists shared successes they have seen, critical challenges related to equity and grid planning and operations, and other considerations. The second panel addressed utility perspectives and included representatives from two utilities (Commonwealth Edison and Tacoma Power), the National Rural Electric Cooperative (NRECA), and a former utility employee and legal consultant. Panelists discussed the role of the utility concerning equity, the most significant technical and data modeling needs and opportunities, and the role the labs could help advance equity in grid planning and operations. There was also a session on partner organization presentations. Argonne National Laboratory made a short presentation on the Grid Modernization Laboratory Consortium (GMLC) project they are leading on equity-informed power system planning. NARUC, NASEO, and the Clean Energy States Alliance, as partners of the GMLC project also shared updates on relevant activities and resources. During the summit, there were two rounds of lightning presentations by national labs and DOE highlighting research that addresses equity and grid planning and operations (Tables 5 and 6 and slides in the Appendix). The goal of the lightning rounds was to share information between participants to encourage collaboration and leverage ongoing research at labs and DOE. The summit included two interactive exercises where summit participants shared their perspectives on relevant equity projects and initiatives (Table 2), key challenges regarding equity and grid planning and operations (Table 3), and promising innovations or progress (Table 4). At the end of the session, participants were asked to share essential insights from the event (Table 7) and an action they plan to take as a result of the event. Participants agreed that the event was useful in helping them share and learn from each other. The project team plans to use the information from the summit as a starting point to help inform future research and technical assistance. In 2026, another Equity Summit will be held (virtually or in person) as part of the same project to help raise awareness and disseminate research and resources completed during the project's duration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Determining economic benefits of satellite data in short-range forecasting

The chances of enhanced short term weather predictions and economic benefits from the use of GOES satellite data were examined. Results for a meteorological consulting firm before and after the introduction of GOES data were chosen as the method, and monetary benefits were selected as the measure. Services were provided for use by road and street departments, commodities dealers, and marine clients of the consulting firm. The Man-computer Interactive Data Access Program (McIDAS) was employed to furnish 1/2 hour visual or IR imagery for remote access. The commodities clients reconnected the GOES real-time imagery once the study was completed, while the consulting firm, which was personnel and not equipment intensive, did not. Further development of the flexibility of access to the GOES data and improvements in the projected grids are indicated.

Suchman, D.↗

US Participation in the GOME and SCIAMACHY Projects

This report summarizes research done under NASA Grant NAGW-2541 through September 30, 1997. The research performed under this grant includes development and maintenance of scientific software for the GOME retrieval algorithms, consultation on operational software development for GOME, sensitivity and instrument studies to define GOME and SCIAMACHY instruments, consultation on optical and detector issues for both GOME and SCIAMACHY, consultation and development for SCIAMACHY near-real-time (NRT) and off-line (OL) data products, and development of infrared line-by-line atmospheric modeling and retrieval capability for SCIAMACHY. The European Space Agency selected the SAO to participate in GOME validation and science studies, part of the overall ERS AO. This provided access to all GOME data; The SAO activities that are carried out as a result of selection by ESA were funded by the present grant. The Global Ozone Monitoring Experiment was successfully launched on the ERS- 2 satellite on April 20, 1995, and remains working in normal fashion. SCIAMACHY is currently scheduled for launch in early 2000. The first two European ozone monitoring instruments (OMI), to fly on the q series of operational meteorological satellites being planned by Eumetsat, have been selected to be GOME-type instruments (the first, in fact, will be the refurbished GOME flight spare). K. Chance is the U.S. member of the OMI Users Advisory Group.

Chance, K. V.↗

Aerospace Safety Advisory Panel

This report covers the activities of the Aerospace Safety Advisory Panel (ASAP) for calendar year 1998-a year of sharp contrasts and significant successes at NASA. The year opened with the announcement of large workforce cutbacks. The slip in the schedule for launching the International Space Station (ISS) created a five-month hiatus in Space Shuttle launches. This slack period ended with the successful and highly publicized launch of the STS-95 mission. As the year closed, ISS assembly began with the successful orbiting and joining of the Functional Cargo Block (FGB), Zarya, from Russia and the Unity Node from the United States. Throughout the year, the Panel maintained its scrutiny of NASA's safety processes. Of particular interest were the potential effects on safety of workforce reductions and the continued transition of functions to the Space Flight Operations Contractor. Attention was also given to the risk management plans of the Aero-Space Technology programs, including the X-33, X-34, and X-38. Overall, the Panel concluded that safety is well served for the present. The picture is not as clear for the future. Cutbacks have limited the depth of talent available. In many cases, technical specialties are 'one deep.' The extended hiring freeze has resulted in an older workforce that will inevitably suffer significant departures from retirements in the near future. The resulting 'brain drain' could represent a future safety risk unless appropriate succession planning is started expeditiously. This and other topics are covered in the section addressing workforce. The major NASA programs are also limited in their ability to plan property for the future. This is of particular concern for the Space Shuttle and ISS because these programs are scheduled to operate well into the next century. In the case of the Space Shuttle, beneficial and mandatory safety and operational upgrades are being delayed because of a lack of sufficient present funding. Likewise, the ISS has little flexibility to begin long lead-time items for upgrades or contingency planning. For example, the section on computer hardware and software contains specific findings related to required longer range safety-related actions. NASA can be proud of its accomplishments this past year, but must remain ever vigilant, particularly as ISS assembly begins to accelerate. The Panel will continue to focus on both the short- and long-term aspects of risk management and safety planning. This task continues to be made manageable and productive by the excellent cooperation the Panel receives from both NASA and its contractors. Particular emphasis will continue to be directed to longer term workforce and program planning issues as well as the immediate risks associated with ISS assembly and the initial flights of the X-33 and X-34. Section 2 of this report presents specific findings and recommendations generated by ASAP activities during 1998. Section 3 contains more detailed information in support of these findings and recommendations. Appendix A is a current roster of Panel members, consultants, and staff. Appendix B contains NASA's response to the findings and recommendations from the 1997 ASAP Annual Report. Appendix C details the fact-finding activities of the Panel in 1998. During the year, Mr. Richard D. Blomberg was elected chair of the Panel and Vice Admiral (VADM) Robert F Dunn was elected deputy chair. VADM Bernard M. Kauderer moved from consultant to member. Mr. Charles J. Donlan retired from the Panel after many years of meritorious service. Ms. Shirley C. McCarty and Mr. Robert L. ('Hoot') Gibson joined the Panel as consultants.

Source record↗

The Center Master Plan For NASA Glenn Research Center

The Center Master Plan for NASA Glenn Research Center is a comprehensive survey of NASA Glenn's current facility assets and a vision of how we see the facilities will change over the next 20 years in order to support the changing NASA Mission. This Center Master Plan is a vital management tool used by all organizations for making near term decisions and in future planning. During the summer of 2004, I worked with Joseph Morris, the Chief Architect in the Facilities Division, on beginning this Center Master Planning Process. The previous Master Plan was completed by the Center in 1985 and contained general information on the background of the facility as well as maps detailing environmental and historic records, land use, utilities, etc. The new Master Plan is required for the Center by NASA headquarters and will include similar types of information as used in the past. The new study will provide additional features including showing how individual buildings are linked to the programs and missions that they serve. The Master Plan will show practical future options for the facility s assets with a twenty year look ahead. The Plan will be electronically retrievable so that it becomes a communications tool for Center personnel. A Center Master Plan, although required, is very beneficial to NASA Glenn Research Center in aiding management with the future direction of the campus. Keeping up-to-date information and future plans readily available to all of NASA Glenn will insure that future real property development efficiently and effectively supports the missions camed out and supported by the Center. A Center Master Plan will also facilitate coordination with Center supported programs, stakeholders, and customers. In addition, it will provide a basis for cooperative planning with local and other governmental organizations and ultimately ensure that future budgets include the Center program needs described in the plan. This will ensure that development plans are safe, practical, and cost effective. To properly formulate any future plans, background information and research are required. Before bringing in a consultant to tackle the three year process anticipated to prepare a Center Master Plan, my job was to gather information on different organizations contributions to the NASA mission, their facility needs, consistent trends they observe, etc. I conducted numerous interviews with personnel such as Directorate Representatives, Division Chiefs, Branch Chiefs, System Managers and Building Managers. I documented the information I received from them for future use. I used the information to create various color-coded maps layering the different data. This was done with the ending objective being to collect the information and place it in a database that will be linked with Aperture (a computer program that generates color-coded map layers from database information) and made electronically retrievable to the Planning Consultant, NASA personnel, program stakeholders, and other governmental agencies. My goal this summer was to gather information and ideas appropriate for use in NASA Glenn Research Center s Master Plan and organize them for future application by the Planning Consultant. By the end of the summer, after completion of my goal, I will utilize my knowledge and create an array of preliminary future plans for the facility that can be passed along as a guidance tool.

Bigach, Kristin M.↗

The NASA Engineering and Safety Center (NESC) GN and C Technical Discipline Team (TDT): Its Purpose, Practices and Experiences

This paper will briefly define the vision, mission, and purpose of the NESC organization. The role of the GN&C TDT will then be described in detail along with an overview of how this team operates and engages in its objective engineering and safety assessments of critical NASA projects. This paper will then describe key issues and findings from several of the recent GN&C-related independent assessments and consultations performed and/or supported by the NESC GN&C TDT. Among the examples of the GN&C TDT s work that will be addressed in this paper are the following: the Space Shuttle Orbiter Repair Maneuver (ORM) assessment, the ISS CMG failure root cause assessment, the Demonstration of Autonomous Rendezvous Technologies (DART) spacecraft mishap consultation, the Phoenix Mars lander thruster-based controllability consultation, the NASA in-house Crew Exploration Vehicle (CEV) Smart Buyer assessment and the assessment of key engineering considerations for the Design, Development, Test & Evaluation (DDT&E) of robust and reliable GN&C systems for human-rated spacecraft.

Dennehy, Cornelius J.↗

Real-Time Teleguidance of a Non-Surgeon Crew Medical Officer Performing Orthopedic Surgery at the Amundsen-Scott South Pole Station During Winter-Over

The Amundsen-Scott South Pole Research station located at the geographic South Pole, is the most isolated, permanently inhabited human outpost on Earth. Medical care is provided to station personnel by a non-surgeon crew medical officer (CMO). During the winter-over period from February to October, the station is isolated, with no incoming or outgoing flights due to severe weather conditions. In late June, four months after the station had closed for the austral winter, a 31 year old meteorologist suffered a complete rupture of his patellar tendon while sliding done an embankment. An evacuation was deemed to be too risky to aircrews due to the extreme cold and darkness. A panel of physicians from Massachusetts General Hospital, Johns Hopkins University and the University of Texas Medical Branch were able to assess the patient remotely via telemedicine and agreed that surgery was the only means to restore mobility and prevent long term disability. The lack of a surgical facility and a trained surgical team were overcome by conversion of the clinic treatment area, and intensive preparation of medical laypersons as surgical assistants. The non-surgeon CMO and CMO assistant at South Pole, were guided through the administration of spinal anesthetic, and the two-hour operative repair by medical consultants at Massachusetts General Hospital. Real-time video of the operative field, directions from the remote consultants and audio communication were provided by videoconferencing equipment, operative cameras, and high bandwidth satellite communications. In real-time, opening incision/exposure, tendon relocation, hemostatsis, and operative closure by the CMO was closely monitored and guided and by the remote consultants. The patient s subsequent physical rehabilitation over the ensuing months of isolation was also monitored remotely via telemedicine. This was the first time in South Pole s history that remote teleguidance had been used for surgery and represents a model for real-time guidance of CMO s working at remote duty stations.

Otto, Christian↗

An Assessment of Radiologically Inserted Transoral and Transgastric Gastroduodenal Stents to Treat Malignant Gastric Outlet Obstruction

Introduction: Self-expanding metallic stents (SEMS) are used to palliate malignant gastric outlet obstruction (GOO) and are useful in patients with limited life expectancy or severe medical comorbidity, which would preclude surgery. Stenting can be performed transorally or by a percutaneous transgastric technique. Our goal was to review the outcome of patients who underwent radiological SEMS insertion performed by a single consultant interventional radiologist. Methods: Patients were identified from a prospectively collected database held by one consultant radiologist. Data were retrieved from radiological reports, multidisciplinary team meetings, and the patients’ case notes. Univariate survival analysis was performed. Results: Between December 2000 and January 2011, 100 patients (63 males, 37 females) had 110 gastroduodenal stenting procedures. Median age was 73 (range 39–89) years. SEMS were inserted transorally (n = 66) or transgastrically (n = 44). Site of obstruction was the stomach (n = 37), duodenum (n = 50), gastric pull-up (n = 10), or gastroenterostomy (n = 13). Seven patients required biliary stents. Technical success was 86.4 %: 83.3 % for transoral insertion, 90.9 % for transgastric insertion. Eleven patients developed complications. Median GOO severity score: 1 pre-stenting, 2 post-stenting (p = 0.0001). Median survival was 54 (range 1–624) days. Post-stenting GOO severity score was predictive of survival (p = 0.0001). Conclusions: The technical success rate for insertion of palliative SEMS is high. Insertional technique can be tailored to the individual depending on the location of the tumor and whether it is possible to access the stomach percutaneously. Patients who have successful stenting and return to eating a soft/normal diet have a statistically significant increase in survival.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

SU-F-P-15: Report On AAPM TG 178 Gamma Knife Dosimetry and Quality Assurance

Purpose: AAPM Task Group 178 Gamma Stereotactic Radiosurgery Dosimetry and Quality Assurance was formed in August, 2008. The Task Group has 12 medical physicists, two physicians and two consultants. Methods: A round robin dosimetry intercomparison of proposed ionization chambers, electrometer and dosimetry phantoms was conducted over a 15 month period in 2011 and 2012 (Med Phys 42, 11, Nov, 2015). The data obtained at 9 institutions (with ten different Elekta Gamma Knife units) was analyzed by the lead author using several protocols. Results: The most consistent results were obtained using the Elekta ABS 16cm diameter phantom, with the TG-51 protocol modified as recommended by Alfonso et al (Med Phys 35, 11, Nov 2008). A key white paper (Med Phys, in press) sponsored by Elekta Corporation, was used to obtain correction factors for the ionization chambers and phantoms used in this intercomparison. Consistent results were obtained for both Elekta Gamma Knife Model 4C and Gamma Knife Perfexion units as measured with each of two miniature ionization chambers Conclusion: The full TG 178 report gives clinical history and background of gamma stereotactic radiosurgery, clinical examples and history, quality assurance recommendations and outline of possible dosimetry protocols. The report will be reviewed by the AAPM Working Group on Recommendations for Radiotherapy External Beam Quality Assurance and then by the AAPM Science Council before publication in Medical Physics. Consultant to Elekta, Inc.

60 APPLIED LIFE SCIENCES↗

Development of CCSDS DCT to Support Spacecraft Dynamic Events

This report discusses the development of Consultative Committee for Space Data Systems (CCSDS) Design Control Table (DCT) to support spacecraft dynamic events. The Consultative Committee for Space Data Systems (CCSDS) Design Control Table (DCT) is a versatile link calculation tool to analyze different kinds of radio frequency links. It started out as an Excel-based program, and is now being evolved into a Mathematica-based link analysis tool. The Mathematica platform offers a rich set of advanced analysis capabilities, and can be easily extended to a web-based architecture. Last year the CCSDS DCT's for the uplink, downlink, two-way, and ranging models were developed as well as the corresponding input and output interfaces. Another significant accomplishment is the integration of the NAIF SPICE library into the Mathematica computation platform.

Smart GUI↗

Regulatory Framework for Salt Waste Disposal and Tank Closure at the Savannah River Site - 13663

The end of the Cold War has left a legacy of approximately 37 million gallons of radioactive waste in the aging waste tanks at the Department of Energy's Savannah River Site (SRS). A robust program is in place to remove waste from these tanks, treat the waste to separate into a relatively small volume of high-level waste and a large volume of low-level waste, and to actively dispose of the low-level waste on-site and close the waste tanks and associated ancillary structures. To support performance-based, risk-informed decision making and to ensure compliance with all regulatory requirements, the U.S. Department of Energy (DOE) and its current and past contractors have worked closely with the South Carolina Department of Health and Environmental Control (SCDHEC), the U.S. Environmental Protection Agency (EPA) and the Nuclear Regulatory Commission (NRC) to develop and implement a framework for on-site low-level waste disposal and closure of the SRS waste tanks. The Atomic Energy Act of 1954, as amended, provides DOE the authority to manage defense-related radioactive waste. DOE Order 435.1 and its associated manual and guidance documents detail this radioactive waste management process. The DOE also has a requirement to consult with the NRC in determining that waste that formerly was classified as high-level waste can be safely managed as either low-level waste or transuranic waste. Once DOE makes a determination, NRC then has a responsibility to monitor DOE's actions in coordination with SCDHEC to ensure compliance with the Title 10 Code of Federal Regulations Part 61 (10CFR61), Subpart C performance objectives. The management of hazardous waste substances or components at SRS is regulated by SCDHEC and the EPA. The foundation for the interactions between DOE, SCDHEC and EPA is the SRS Federal Facility Agreement (FFA). Managing this array of requirements and successfully interacting with regulators, consultants and stakeholders is a challenging task but ensures thorough and thoughtful processes for disposing of the SRS low-level waste and the closure of the tank farm facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗