Commissioning of a GeoMelt Vitrification Plant at the Central Laboratory on the Sellafield Site - 17561

The National Nuclear Laboratory (NNL) and Kurion Veolia (Kurion) have installed a GeoMelt{sup R} In-Container Vitrification (ICV){sup R} radioactive waste treatment system in the Central Laboratory Active Rig Hall at Sellafield. This installation was completed in 2016. GeoMelt incorporates a range of patented and proprietary vitrification processing technologies that are configured in a variety of ways depending on the project and the waste. GeoMelt transforms hazardous chemical and radioactive wastes into an inert vitreous monolith. Hazardous organics are destroyed by pyrolysis and heavy metals and radionuclides are immobilized within the glass matrix where they are not preferentially leached into the environment. GeoMelt IVC produces a durable wasteform for a large variety of input wastes. The batch nature of the process which involves single-use refractory offers a wide range of process benefits over traditional vitrification technologies including: - a wide range of waste chemistries allowing high waste loadings; - compatibility with heterogeneous wastes including wastes with high metal content; - a technological simple solution without stirrers, bubblers, etc.; - No refractory corrosion concerns or melter drain failure scenarios; - Flexibility in glass chemistry and melter/disposal container configuration allows the wasteform to be specifically tailored to the storage or disposal site requirements. As part of the 2016 system commissioning at NNL's Central Laboratory, three demonstration melts were performed, one funded by Sellafield Ltd. and two by the Nuclear Decommissioning Authority (NDA). The first melt processed inactive soil with an inactive caesium tracer. The second melt processed inactive soil with a Cs-137 tracer. The third melt processed active waste soil from a variety of NDA nuclear licensed sites. The work conducted during commissioning was multi-purpose; it successfully demonstrated the benefits that the GeoMelt technology could bring to the UK NDA estate while performing equipment testing/troubleshooting and operator training. A significant benefit of the GeoMelt ICV technology is volume reduction for wastes which would otherwise experience a volume increase if encapsulated. Another benefit is the ability to treat difficult radioactive waste streams not amenable to encapsulation (e.g., reactive and/or organic wastes) with a very low energy consumption. The purpose of the first commissioning melt, Plant Performance Demonstration (PPD)-1, was to operate the GeoMelt system under typical conditions and to perform a post-melt mass balance of the caesium as a surrogate for Cs-137 in order to access retention of caesium in the final glass product. The melt processed a mixture of inactive soil obtained near the Sellafield site (as analogue for contaminated Sellafield soil), additives, and glass frit. An inactive caesium tracer was added to this melt as Cs{sub 2}CO{sub 3}. The purpose of the second commissioning melt, PPD-2, was to operate the GeoMelt system under typical conditions and to perform a post-melt activity balance using a Cs-137 tracer in order to assess retention of Cs-137 in the final glass product. Materials processed were inactive soil, glass frit, additives, and a radioactive caesium tracer (CsCl). The purpose of the third melt, Experiment-1 (EX-1) was to treat active waste and inactive waste simulant, as a demonstration of simultaneous processing of multiple waste streams. EX-1 consisted of processing active soil, Magnox sludge simulant, inactive soil, additives, and frit. The active soil used for this melt was obtained from the Hunterston A, Bradwell, Capenhurst, and Sellafield nuclear licensed sites. Since most soils are high in silica, the concept for this experiment was to use the active soils to provide glass formers while co-processing Magnox sludge simulant which does not contain glass formers. Beyond demonstration of capability areas of focus of this series of demonstrations included processing efficiency (kWh/kg treated) and caesium retention (%). This paper summarizes operations and results of the three melts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Commissioning the LCLS Injector

The Linac Coherent Light Source (LCLS) is a SASE x-ray Free-Electron Laser (FEL) project presently under construction at SLAC. The injector section, from drive laser and RF photocathode gun through first bunch compressor chicane, was installed in fall 2006. Initial system commissioning with an electron beam was completed in August 2007, with the goal of a 1.2-micron emittance in a 1-nC bunch clearly demonstrated. The second phase of commissioning, including second bunch compressor and full linac, is planned for 2008, with FEL commissioning in 2009. We report experimental results and experience gained in the first phase of commissioning, including the photo-cathode drive laser, RF gun, photocathode, S-band and X-band RF systems, first bunch compressor, and the various beam diagnostics.

43 PARTICLE ACCELERATORS↗

Commissioning of the LCLS Linac and Bunch Compressors

The Linac Coherent Light Source (LCLS) is a SASE x-ray Free-Electron Laser (FEL) project under construction at SLAC [1]. The injector section, from drive-laser and RF photocathode gun through the first bunch compressor, was commissioned in the spring and summer of 2007. The second phase of commissioning, including the second bunch compressor and various main linac modifications, was completed in January through August of 2008. We report here on experience gained during this second phase of machine commissioning, including the injector, the first and second bunch compressor stages, the linac up to 14 GeV, and beam stability measurements. The final commissioning phase, including the undulator and the long transport line from the linac, is set to begin in December 2008, with first light expected in July 2009.

43 PARTICLE ACCELERATORS↗

Improving mine safety technology and training in the U.S. recommendations of the Mine Safety Technology and Training Commission

The key issues studied focused on underground coal mining and included (1) prevention of explosions in sealed areas, (2) better emergency preparedness and response, (3) improvement of miners' ability to escape, (4) better protection of miners before and after a fire or explosion, (5) improved provision of oxygen, and (6) development and implementation of more robust post-incident communication. The U.S. Congress passed the Mine Improvement and New Emergency Response Act of 2006, which mandated new laws to address the issues. Concurrent with investigations and congressional deliberations, the National Mining Association formed the independent Mine Safety Technology and Training Commission to study the state-of-the-art relative to technology and training that could address the vulnerabilities exposed by the mine disasters. As discussed, the report outlined persistent vulnerabilities linked with significant hazards in underground coal mines, and made recommendations to provide a path for addressing them. Overall the commission report made 75 recommendations in the areas of risk-based design and management, communications technology, emergency response and mine rescue procedures, training for preparedness, and escape and protection strategies. In its deliberations, the commission importantly noted that mine safety in the U.S. needs to follow a new paradigm for ensuring mine safety and developing a culture of prevention that supports safe production at the business core. In the commission's viewpoint, the bottom line in protecting coal miners is not only adopting a culture of prevention but also systematically pursuing mitigation of significant risks. 4 refs., 2 figs.

01 COAL, LIGNITE, AND PEAT↗

Commissioning of a 20 K helium refrigeration system for NASA-JSC Chamber-A

A new 20 K helium refrigerator installed at NASA Johnson Space Center's Space Environment Simulation Laboratory (SESL) was successfully commissioned and tested in 2012. The refrigerator is used to create a deep space environment within SESL's Chamber A to perform ground testing of the James Webb Space Telescope (JWST). The chamber previously and currently still has helium cryo-pumping panels (CPP) and liquid nitrogen shrouds used to create low earth orbit environments. Now with the new refrigerator and new helium shrouds the chamber can create a deep space environment. The process design, system analysis, specification development, and commissioning oversight were performed by the cryogenics department at Jefferson Lab, while the contracts and system installation was performed by the ESC group at JSC. Commissioning data indicate an inverse coefficient of performance better than 70 W/W for a 18 kW load at 20 K (accounting for liquid nitrogen pre-cooling power) that remains essentially constant down to one third of this load. Even at 10 percent of the maximum capacity, the performance is better than 150 W/W at 20 K. The refrigerator exceeded all design goals and demonstrated the ability to support a wide load range from 10 kW at 15 K to 100 kW at 100 K. The refrigerator is capable of operating at any load temperature from 15 K to ambient with tight temperature stability. The new shroud (23 metric tons of aluminum) can be cooled from room temperature to 20 K in 24 hours. This paper will outline the design, project execution and commissioning results.

Homan, J.↗

Design, development and commissioning of a multi-alkali semiconductor photocathode deposition system for the IUAC Delhi light source photoinjector

A fourth-generation light source, called Delhi Light Source (DLS) based on photocathode-based RF gun has been commissioned at Inter-University Accelerator Centre, New Delhi. Presently, the electron beam is being generated from copper photocathode and the beam is being used for scheduled experiments. Soon, the semiconductor photocathode will be used to produce higher beam current. Here, to develop the semiconductor photocathode, a dedicated photocathode deposition facility was developed in collaboration with Brookhaven national Laboratory (BNL) and has been successfully commissioned and becomes operational at IUAC. This deposition facility is an integrated system with the electron gun and is a unique system as it is capable of producing, preserving (without residual gas poisoning) and in-vacuum transfer of the deposited photocathodes from the deposition chamber up to the RF electron gun. The system is designed to operate under ultra-high vacuum (UHV) and is equipped with load-lock chambers, substrate heating assembly, thickness monitoring via a quartz crystal microbalance (QCM), and an in-situ setup for quantum efficiency (QE) measurements. After testing of all the subsystems and a detailed calibration, the first deposition of a cesium telluride (Cs 2 Te) photocathode was successfully performed on a copper (Cu) substrate. This successful commissioning and initial deposition mark a significant step toward the indigenous photocathode development and lays the groundwork for further research into advanced photo emissive materials at IUAC. This paper will discuss the salient features, installation, commissioning, first semiconductor photocathode deposition and its results.

47 OTHER INSTRUMENTATION↗

Commissioning and operational results of helium refrigeration system at JLab for the 12GeV upgrade

The new 4.5 K refrigerator system at the Jefferson Lab (JLab) Central Helium Liquefier (CHL-2) for the 12 GeV upgrade was commissioned in late spring of 2013, following the commissioning of the new compressor system, and has been supporting 12 GeV LINAC commissioning since that time. Six design modes were tested during commissioning, consisting of a maximum capacity, nominal capacity, maximum liquefaction, maximum refrigeration, maximum fill and a stand-by/reduced load condition. The maximum capacity was designed to support a 238 g/s, 30 K and 1.16 bar cold compressor return flow, a 15 g/s, 4.5 K liquefaction load and a 12.6 kW, 35-55 K shield load. The other modes were selected to ensure proper component sizing and selection to allow the cold box to operate over a wide range of conditions and capacities. The cold box system is comprised of two physically independent cold boxes with interconnecting transfer-lines. The outside (upper) 300-60 K vertical cold box has no turbines and incorporates a liquid nitrogen pre-cooler and 80-K beds. The inside (lower) 60-4.5 K horizontal cold box houses seven turbines that are configured in four expansion stages including one Joule-Thompson expander and a 20-K bed. The helium compression system has five compressors to support three pressure levels in the cold box. This paper will summarize the analysis of the test data obtained over the wide range of operating conditions and capacities which were tested.

Knudsen, Peter N.↗

Commissioning plan for LCLS II 2 K cold box

Commissioning of the LCLS II cryogenic plant has been planned with respect to electrical and mechanical systems checkout, equipment cleanup, cool-down, and individual performance evaluation. This plant consists of warm and cold storage, helium compressors, 4.5 K and 2 K cold boxes, and all auxiliaries typical for helium refrigeration processes. The 2 K cold box, consisting of five cold compressors in series to produce the flow and pressures necessary for 2K operation, will be the last equipment installed and, along with an additional 10,000 L helium dewar, will allow the entire plant to be commissioned as a single entity. The pre-commissioning stages, commissioning plan for 2 K cold box without connecting to the LCLS II LINAC, additional test equipment needed to simulate the loads, all process studies and associated results are described herein.

36 MATERIALS SCIENCE↗

SU-F-P-34: Commission of Enhanced Dynamic Wedge of Varian Truebeam Linac System with Feature Study

Purpose: To evaluate an Enhanced Dynamic Wedge (EDW) as part of machine commission process with feature study. Methods: The EDW system in this study was from a Truebeam, which is the Linear accelerator manufactured by Varian Medical Systems. The EDW feature vectors includes selected elements. These elements were dosimetric output spots check, field size, wedge angles, dose rate, collimator orientation, and different energy settings. Point dose measurement was done by a PTW farmer chamber, and profiles were measured by Gafchromic EBT2 films positing at different depths of the Solidwater based on the study elements. The output spot measurements were done with PTW farmer chamber with Solidwater setting for all orientation and wedge angles in the EDW system. The profiles comparisons were done by IMRT measurement function in RIT software at version 6.3. And the films were scanned by Vidar scanner. Dosimetry calculation were done by using the same Solidwater scanned by GE LightSpeed CT in Eclipse Treatment Planning System (TPS). Then measurements were compared to simulation results in TPS. Results: The energy average percentage difference between chamber measurement and TPS was 0.16% with standard deviation (SD) at 0.93%. For selected features, the average percentage difference between film measurement and computation was 0.93% with SD at 1.55% in horizontal profiles, and 1.18% with SD at 0.98% at vertical profiles. The average gamma difference for film measurement and TPS computing results was at 0.924 with SD at 0.314. Conclusion: A feature vector was developed to describe the commission of EDW, and developing a complete set of features for sufficiency of commission of a LINAC function could provide optimal commission instance with acceptable confident level of clinical application of the machine. Given the institution specific vector pattern and big data process, it could provide wide range clinical outcome comparison information in application of EDW.

60 APPLIED LIFE SCIENCES↗

Retro-Commissioning Sensor Suitcase

This software package is the Graphic User Interface (GUI) software component for the Sensor Suitcase Retro-Commissioning project, which is a sensor and analysis system to support monitoring-based retro-commissioning of small commercial buildings, performed by non-experts. Small commercial buildings typically do not have the budgets or business economics to allow investing in energy efficiency enhancements the building retro-commissioning provides. In addition, they do not have in-house staff with expertise in building systems who can perform building retro-commissioning or identify energy efficiency improvement opportunities. The solution to this problem is to develop a turn-key hardware/software solution (the RCx Sensor Suitcase) that can be used by non-experts to automatically generate low and no-cost energy efficiency rec commendations that will improve building operating costs, occupant comfort and building energy performance. This is a joint project between Lawrence Berkeley National Laboratory, leading the development of the software and analysis elements, and Pacific Northwest National Laboratory (PNNL), leading the development of the hardware and sensor elements with an associated table-based configuration support tool. The project is funded by the U.S. Department of Energy. This software package was developed as a proof-of-concept prototype for the sensor suitcase software component. The software component was developed with a Microsoft Excel spreadsheet which reads the sensor data and calls a MATLAB DLL to analyze the sensor data.

Lin, Guanjing↗

Beam Commissioning and Integrated Test of the PIP-II Injector Test Facility

The PIP-II Injector Test (PIP2IT) facility is a near-complete low energy portion of the Superconducting PIP-II linac driver. PIP2IT comprises the warm front end and the first two PIP-II superconducting cryomodules. PIP2IT is designed to accelerate a 2 mA H⁻ beam to an energy of 20 MeV. The facility serves as a testbed for a number of advanced technologies required to operate PIP-II and provides an opportunity to gain experience with commissioning of the superconducting linac, significantly reducing project technical risks. Some PIP2IT components are contributions from international partners, who also lend their expertise to the accelerator project. The project has been successfully commissioned with the beam in 2021, demonstrating the performance required for the LBNF/DUNE. In this paper, we describe the facility and its critical systems. We discuss our experience with the integrated testing and beam commissioning of PIP2IT, and present commissioning results. This important milestone ushers in a new era at Fermilab of proton beam delivery using superconducting radio-frequency accelerators.

43 PARTICLE ACCELERATORS↗

NSLS-II 500 MHz Upstream Superconducting Cavity Commissioning

The NSLS-II Storage Ring RF system was designed to be equipped with up to four CESR-B type 500MHz niobium superconducting cavities. The first one has been installed and commissioned with beam at the upstream location of Cell 24 RF straight. Prior to tunnel installation, cryogenic and RF tests had been performed in the blockhouse to ensure that the cavity could provide enough energy gain for electron beam current of 25 mA for commissioning, and up to ~300 mA for early operation depending upon the total energy loss per turn at that time. After the blockhouse test, the cavity was installed in the storage ring tunnel, where it was then cooled down, conditioned, and finally commissioned with up to 50 mA of beam current. The NSLS-II LHe Cryogenic Plant was used to maintain the cavity temperature at 4.5K. The blockhouse interfaces with the cryogenic manifold box via a vacuum jacketed line, while in the tunnel the cryomodule is fed by a valvebox which is supplied by the same manifold box. The helium gas is recovered by the close-loop LHe system, and the nitrogen gas is vented outside of the RF building through a vent line. This report contains three parts describes cryogenic and RF tests in the blockhouse and cavity commissioning in the tunnel. Within the sections, the cryogenic operation is introduced first then the RF test is described. Section 5 describes further studies proposed for the next operation period.

36 MATERIALS SCIENCE↗

Status of the Slow Extraction Commissioning for the Mu2e Experiment at Fermilab

We present the current status of slow-extraction commissioning for the Mu2e experiment at Fermilab. The system employs third-integer resonant extraction of 8 GeV protons from the Delivery Ring to deliver a uniform, slow-spilled beam to the production target. During recent commissioning periods, we achieved stable optics, reproducible injection and energy matching, and consistent multi-spill operation. The sextupole circuits and fast-ramping quadrupoles were exercised near nominal resonance conditions, yielding promising extraction performance. A prototype spill-regulation system based on the ARIA-10 SoC was commissioned with integrated diagnostics, demonstrating closed-loop operation and establishing the framework for PID- and RFKO-based control. These commissioning results lay the foundation for achieving precision-regulated, high-quality slow extraction in upcoming Mu2e operations.

Narayanan, A. [Fermilab]↗

Energy and Cost Savings of Retro-Commissioning and Retrofit Measures for Large Office Buildings

This paper evaluates the energy and cost savings of seven retro-commissioning measures and 29 retrofit measures applicable to most large office buildings. The baseline model is for a hypothetical building with characteristics of large office buildings constructed before 1980. Each retro-commissioning measure is evaluated against the original baseline in terms of its potential of energy and cost savings while each retrofit measure is evaluated against the commissioned building. All measures are evaluated in five locations (Miami, Las Vegas, Seattle, Chicago and Duluth) to understand the impact of weather conditions on energy and cost savings. The results show that implementation of the seven operation and maintenance measures as part of a retro-commissioning process can yield an average of about 22% of energy use reduction and 14% of energy cost reduction. Widening zone temperature deadband, lowering VAV terminal minimum air flow set points and lighting upgrades are effective retrofit measures to be considered.

Wang, Weimin↗

Commissioning of NSLS-II

NSLS-II, the new 3rd generation light source at BNL was designed for a brightness of 10 22 photons s -1 mm -2 mrad -2 (0.1%BW) -1 . It was constructed between 2009 and 2014. The storage ring was commissioned in April 2014 which was followed by insertion device and beamline commissioning in the fall of 2014. All ambitious design parameters of the facility have already been achieved except for commissioning the full beam intensity of 500mA which requires more RF installation. This paper reports on the results of commissioning.

43 PARTICLE ACCELERATORS↗

NSLS-II injector commissioning and initial operation

The injector for the National Synchrotron Light Source II (NSLS-II) storage ring consists of a 3 GeV booster synchrotron and a 200 MeV S-band linac. The linac was designed to produce either a single bunch with a charge of 0.5 nC of electrons or a train of bunches up to 300 ns long containing a total charge of 15 nC. The booster was designed to accelerate up to 15 nC each cycle in a train of bunches up to 300 ns long. Linac commissioning was completed in April 2012. Booster commissioning was started in November 2013 and completed in March 2014. All of the significant design goals were satisfied including beam emittance, energy spread, and transport efficiency. While the maximum booster charge accelerated was only 10 nC, this has proven to be more than sufficient for storage ring commissioning and operation. The injector has operated reliably during storage ring operation since then. Results will be presented showing measurements of linac and booster operating parameters achieved during commissioning and initial operation. Operating experience and reliability during the first year of NSLS-II operation will be discussed.

43 PARTICLE ACCELERATORS↗

Scaling Retro-Commissioning to Small Commercial Buildings: A Turnkey Automated Hardware-Software Solution

In the United States, small commercial buildings represent 51% of total floor space of all commercial buildings and consume nearly 3 quadrillion Btu (3.2 quintillion joule) of site energy annually, presenting an enormous opportunity for energy savings. Retro-commissioning (RCx), the process through which professional energy service providers identify and correct operational problems, has proven to be a cost-effective means to achieve median energy savings of 16%. However, retro-commissioning is not typically conducted at scale throughout the commercial stock. Very few small commercial buildings are retro-commissioned because utility expenses are relatively modest, margins are tighter, and capital for improvements is limited. In addition, small buildings do not have in-house staff with the expertise to identify improvement opportunities. In response, a turnkey hardware-software solution was developed to enable cost-effective, monitoring-based RCx of small commercial buildings. This highly tailored solution enables non-commissioning providers to identify energy and comfort problems, as well as associated cost impacts and remedies. It also facilitates scale by offering energy service providers the means to streamline their existing processes and reduce costs by more than half. The turnkey RCx sensor suitcase consists of two primary components: a suitcase of sensors for short-term building data collection that guides users through the process of deploying and retrieving their data and a software application that automates analysis of sensor data, identifies problems and generates recommendations. This paper presents the design and testing of prototype models, including descriptions of the hardware design, analysis algorithms, performance testing, and plans for dissemination.

Lin, Guanjing↗

LLRF Commissioning of the new CEBAF 100 MeV Cryomodule

Commissioning of the 100 MeV cryomodule (CEBAF acronym C100) is part of the CEBAF energy upgrade to 12 GeV at Jefferson Lab. LLRF commissioning includes field control, cavity interlocks, resonance controls (Stepper Motor and Piezo tuner) and operational software. All the above mentioned systems and software are calibrated and tested on the bench and in test platforms prior to installation. Once installed and connected to the cryomodule, the system supports cavity commissioning (Emax, Qo etc.). In addition the LLRF system is calibrated (gradient and RF power), optimized (system gains and set points) and functionality is tested for operability. This poster describes the detailed description of various stages of commissioning of first 100 MeV cryomodule.

Bachimanchi, Ramakrishna↗