T91 Boiler Tube Oxidation Performance and Oxide Spallation in Supercritical Steam Thermal Cycling Conditions
For presentation at the MS&T 23 Technical Meeting and Exhibition, Columbus, OH, October 1-4, 2023.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
For presentation at the MS&T 23 Technical Meeting and Exhibition, Columbus, OH, October 1-4, 2023.
Explore the source record for details and available documents.
The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.
The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.
The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.
The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.
A boiler system having a series of boilers. Each boiler includes a shell having an upstream end, a downstream end, and a hollow interior. The boilers also have an oxidizer inlet entering the hollow interior adjacent the upstream end of the shell and a fuel nozzle positioned adjacent the upstream end of the shell for introducing fuel into the hollow interior of the shell. Each boiler includes a flue duct connected to the shell adjacent the downstream end for transporting flue gas from the hollow interior. Oxygen is delivered to the oxidizer inlet of the first boiler in the series. Flue gas from the immediately preceding boiler in the series is delivered through the oxidizer inlet of each boiler subsequent to the first boiler in the series.
Staged Pressurized Oxy-Combustion (SPOC) is a low-carbon coal combustion power technology being developed by Washington University in St. Louis (WUSTL). Oxy-combustion plants enable straightforward capture of carbon dioxide (CO 2 ) by removing most of the nitrogen in the combustion air prior to use, thereby burning fuel in near-pure oxygen instead of air, producing a flue gas containing primarily CO 2 and water. CO 2 capture at amounts > 90% is possible, often using cryogenic air separation. Oxy-combustion typically relies on flue gas recycle (FGR) to reduce the peak temperature and radiation that would otherwise occur in a fuel/oxygen only flame. SPOC reduces the peak temperatures of combustion by utilizing two or more pressurized boiler modules connected in series to produce fuel staging; hence, only a portion of the fuel is combusted in any given furnace module. This means that the thermal energy released at each stage can be captured and removed from the gases prior to subsequent stages, when more fuel is introduced. This allows the SPOC process to operate with minimal FGR, avoiding the associated efficiency losses and additional costs. Also, the process operates at an elevated gas-side pressure, reducing boiler size, enhancing heat transfer to achieve a compact boiler configuration as compared to an atmospheric-pressure boiler design, and allowing for recovery of the latent heat of the water from the flue gas at a temperature useful to the steam cycle. The resultant net efficiency of the system is over 3 percentage points greater than traditional atmospheric-pressure oxy-combustion, and 7 percentage points greater than the post combustion variant, representing a step-change improvement over first-generation capture technologies. To further develop the concept, WUSTL and the Electric Power Research Institute, Inc., organized a project with American Air Liquide, Inc., Doosan Babcock Limited, and the U.S. Department of Energy to investigate a practicable and workable boiler design. The team has identified the potential for enhanced process flexibility for controlling power generation over a wider load range than is normally available to conventional coal-fired power plants due to the staged nature of the heat release. With increasing intermittent renewable generator contribution, on-demand generators need to be highly flexible to participate in the future energy market, requiring extensive operation at reduced load. Conventional coal-fired steam generators typically face challenges in maintaining temperature control of the reheat steam and main steam at reduced loads. This results in inefficient operation, both in terms of the boiler efficiency and steam turbine heat rate. The results of this project show the SPOC process is capable of exceptional turndown, both on a stage basis and with the ability to bypass entire stages. Oxygen-supply flexibility was also investigated, as this is also a key consideration for the overall flexibility of the SPOC process given the operating constraints of conventional air separation units. A boiler design concept assessment was conducted and was focused on delivering compact and constructible design. The assessment checked appropriate tube operating metal temperatures at full load and at lower operating loads, balanced against the needs of efficient coal combustion, and the resultant slagging and ash environments. Combustion testing in the 100-kWth pressurized combustion test rig at WUSTL was carried out to validate the combustion, heat flux profiles and burnout at multiple loads. Combustion parameters investigated were flame stability, fuel burnout, ash composition, radiative heat flux, and temperature profiles. The results of these tests formed the basis of a full-scale boiler design that will encompass improvements in both efficiency and flexibility over conventional oxy-combustion processes. The air separation unit flexibility was investigated, and associated cost implications were addressed. Detailed economic assessment results for a 550 MWe net power block are also provided, allowing for a comparison against the baseline NETL oxy-combustion and post combustion capture cases.
The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.
The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.
The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.
The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.
The Huslia Tribal Council (HTC) and the Tanana Chiefs Conference (TCC), partnering with the City of Huslia, the Yukon-Koyukuk School District, and Alaska Native Tribal Health Consortium, applied to the U.S. Department of Energy Office of Indian Energy for funding of a community biomass boiler system. The biomass system contributes to heating three community buildings in Huslia, Alaska with locally harvested fuels: the clinic, the water treatment plant/washeteria, and the school. The remaining heating needs are supported by in-building oil-fired boilers, burning imported heating fuel. Some issues, such as control set points on the oil boilers, need to be resolved before the biomass heating system is used at full capacity. The project objectives of the community biomass boiler system were cost reduction, carbon reduction, community resilience, and economic development. Once fully operational, the cost reduction from decreased fuel oil usage due to support from the biomass boiler system is expected to more than offset the cost of purchasing locally harvested biofuel, resulting in overall savings to the community. Locally sourced wood is considered carbon-neutral, so the biomass boiler system decreases the carbon footprint of heating the community buildings. The project increases resilience by decreasing dependence on heating oil brought in from elsewhere. Lastly, it produces economic development by employing locals to gather the wood burned in the biomass boiler. This project satisfies all of the objectives that HTC set out to achieve.
The overall goal of this project was to demonstrate and develop the usage of high-temperature (HT) harsh-environment (HE) wireless surface acoustic wave resonator (SAWR) sensor technology to promote reliable maintenance through condition-based maintenance (CBM) for field applications in harsh service conditions associated with power plant environments. The project aimed to advance the HT HE wireless SAWR sensor technology from TRL 5 to TRL 7. In addition to HT HE wireless temperature sensing, efforts were dedicated during this project to investigate, develop and increase the TRL from 3 to 5 for the following technologies: (a) HT HE strain sensors to address additional CBM monitoring needs, such as boiler tube mechanical / thermal stresses, which can provide early indications for boiler tube cracking and failure; and (b) HT aluminum nitride (AlN) and scandium aluminum nitride (ScAlN) based piezoelectric thin film fabrication and implementation of SAW sensors, with the goal of releasing the need to use single crystal piezoelectric materials for SAWRs and thus broaden possible technology applications to non-planar and harder to modify surfaces. To achieve the goals mentioned above, UMaine and its partner, Environetix Technologies Corporation, established partnerships with the following power plants: Longview Power (Maidsville, WV), a coal-fired power plant; Penobscot Energy Recovery Corp (PERC, Orrington, ME), a waste-to-energy power plant; and the UMaine Steam Plant (Orono, ME), an oil / natural gas power plant. To realize wireless HT HE SAWR sensor systems in these harsh service conditions, the University of Maine research team worked with Environetix and these power plants to define, design, fabricate, test and validate a mature prototype wireless temperature SAWR sensor system for boiler tube applications within the HT HE of the reheater pass damper chamber to directly and wirelessly monitor the temperature at eighteen independent boiler tube locations. The system included three levels, or “tiers”, of wireless communication to enable remote monitoring: Tier 1, the wireless link in the reheater pass damper chamber directly accessing the sensors on the boilers; Tier 2, the wireless local area network link, transmitting processed sensor information within the power plant to the Tier 3, a commercial wireless signal carrier company for secure remote data monitoring outside of the power plant. Regarding the wireless sensor system installed at Longview Power, temperature information from the boilers was continuously transmitted from the Longview boilers at Maidsville, WV, to Environetix headquarters, Orono, ME, over a 34 month period, when the system was finally decommissioned. Strain sensors and piezoelectric ScAlN thin film sensors were successfully installed on the exhaust duct at the UMaine Steam Power plant. The advances in wireless strain sensors and thin film piezoelectric film fabrication and testing were performed mostly in UMaine laboratories and field tested at the UMaine Steam Plant, due to its close proximity to UMaine/Environetix, access to the plant facility, and due to difficulties in accessing the other power plants during the COVID shut-down period. The project accomplished the TRL level increase of the targeted CBM technologies through the successful fabrication, installation, test, and validation of dedicated and commercial wireless sensor systems, utilizing the three different power plants. The outcomes of this project, including the wireless sensor data capability, are expected to yield an advance for CBM in harsh power plant environments. The reduction of maintenance costs, improved safety during plant operation, and increased power plant efficiency will lead to increased revenues (i.e., fewer forced outages) due to better process monitoring enabled by the wireless HT HE SAWR temperature sensor technology.
The Atikokan Generating Station, operated by Ontario Power Generation, has a 200 MW, biomass-fired tower boiler that operates on a dispatch schedule with a five-minute cycle. The boiler is generally operated in the range of 40–100 MW using two of five burner levels. In order to optimize boiler performance, we propose the implementation of a unique digital twin. Our digital twin abstraction couples Bayesian inference from science-based models and from observations (machine learning) with decision theory to predict operating-variable set points that optimize the physical asset (the boiler) in the presence of uncertainty (artificial intelligence). We focus this paper on the continuous Bayesian machine learning part of the Atikokan Digital Twin; we discuss decision theory in a companion paper. We identify and learn about 12 operational, model, and measured-output parameters and their uncertainties from high-fidelity, science-based simulations of the Atikokan boiler and from the observed measurements at the power plant. Since the goal of the Atikokan Digital Twin is to implement it online in real time, we require fast function evaluations for the quantities of interest extracted from the simulations in the Bayesian analysis. We use Gaussian process regression/interpolation to create accurate, robust surrogate models. We define the Bayesian priors and likelihood function and solve for the posterior distributions of the 12 parameters. Here we then propagate these distributions (i.e., parameters with uncertainty) into the predicted distributions of 790 quantities of interest to learn about the relative importance of various sources of error including experimental, model, and operating-parameter errors.
The project delivers a well-integrated and validated simulation platform for cycling operation analysis in coal-fired power plant. Two critical mechanical components of the boiler island were analyzed through mechanical integrity assessment and economic benefit analysis. The current phase of the project focuses on the development of the integrated simulation infrastructure and prove its feasibility and effectiveness using two typical use cases. This integrated platform can help save a lot of engineering efforts for model development and simulation analysis. Through the real simulation scenarios in this document, it was demonstrated that using this platform, an analysis can be completed in approximately 2 days, while it could cost several weeks before using this platform. Going forward, the platform built in this project can be used for more boiler service applications, and it can be further enhanced with more functions/features to maximize its usage and benefits. 1) Extend component-level analysis with more use cases to cover all the major critical components of boiler island under cycling operations. A library of critical components can be developed and validated for typical pulverized coal-fired subcritical boiler units. 2) Develop predictive maintenance features based on the integrated models (Digital Twins) and engineering analysis procedures. Predictive maintenance enables each asset to be serviced based on forecast on life consumption and cost profile for replacing/welding the critical mechanical parts of the boiler. This minimizes the chance of unscheduled shutdowns and emergency services at much higher costs and prevent the fatal accidents in unit operations. 3) Develop and maintain a standard library for critical component analysis under flexible plant operations, which will include libraries of: process models, MI models for typical pressure parts, and economic models with typical plant operating data and ISO power trade data.
The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.
Steam generation in the food sector requires substantial energy and cost expenditures, requiring nearly half of its energy intake. Here, we used life cycle assessment and life cycle cost assessment to investigate the cost and energy impacts of steam generating alternatives: NG, biomass and hydrogen boilers and grid-supplied and self-generated electric steam generation systems (electric boilers, renewable thermal energy storage and industrial heat pumps). The analysis starts with a set of average U.S. conditions, where biomass boilers are the most cost-competitive alternative to NG. In a series of scenarios beyond average conditions, the analysis shows energy procurement costs dominate the total life cycle cost for all technologies and, unfortunately, are highly variable geographically and temporally, significantly affecting the viability of the alternatives. Results show that site-energy consumption ranges from 0.3 MMBtu/klb for industrial heat pumps to 1.6 MMBtu/klb for biomass boilers, with heat pumps achieving up to 78% lower energy use compared to natural gas systems. For the steam costs, the results show a range between $\$$8 and $\$$50/klb for NG, with biomass following closely ($\$$11 – $\$$44/klb) and grey hydrogen and IHP next ($\$$13 – $\$$33/klb and $\$$6 - $\$$78/klb), with cost reductions if IHP's cooling is utilized. Factors like operating hours, the need for cooling, and the ability to negotiate utility rates complicate the decision, making site-specific analyses critical. Therefore, we present a decision-making matrix to help manufacturers identify which steam generating technology is the best business decision for their situation. Overall, these results highlight the importance of steam generation for the facility's organizational goals, as well as the criticality of conducting individual site analyses.