Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BACKUP COMMUNICATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Simulation of PCM Data

Program for communications and control computer simulates pulse-codemodulated data. Software for simulation pulse-code-modulated (PCM) data from Space Shuttle during launch preparations developed for use with checkout, control, and monitor subsystem (CCMS). Facilitates testing of CCMS with data expected from main engines, external fuel tanks, operational instrumentation, general-purpose computer, backup flight system, and payload. Simulator program executes in standard CCMS hardware, requiring no new hardware.

Bernstrom, G. G.↗

SCaN Transportable Communication Platform (STCP)

NASA Glenn Research Center required a satellite communication trailer that served dual purposes; 24/7 Emergency Communication Services (ECS) in the event of a natural or manmade disaster that disrupted conventional communications, and a Ka Band NASA TDRS capability providing a research capability for over the air evaluations/characterizations. The trailer was to be field deployable, environmentally controlled and self-contained providing local area networks (LANs) and Wide Area Networks (WAN's) with user access both wired (Ethernet) and wireless (802.11) supporting VoIP, Internet Web access and Email. The TDRSS terminal included a 200W TWT amplifier mounted on the feed boom, individual up and down converters, and custom integrated waveguide and a supporting feed system. Other features such as a mast, generator, electrical, lighting, surveillance, and storage capabilities were also required. The Trailer was developed and demonstrated these original requested capabilities. New Requirements are defined and the trailer is now being evolved and upgraded to be a backup for the Near- Earth Network (NEN) Stations at KSC that will support the launch phase of EM-1. This paper presents the current and future capabilities of the trailer and additional options that will make it a valuable deployable asset to support remote operations from any launch from location.

Ka Band↗

Investigation of Microphysics and Precipitation for Atlantic Coast-Threatening Snowstorms (IMPACTS) Field Campaign Report

The scientific focus here is interagency collaboration to support a National Aeronautics and Space Administration (NASA)-sponsored 2023 field campaign: Investigation of Microphysics and Precipitation for Atlantic Coast-Threatening Snowstorms (IMPACTS). IMPACTS objectives are to provide observations critical to understanding the mechanisms of snowband formation, organization, and evolution; study how the microphysical characteristics and likely growth mechanisms of snow particles vary across snowbands; and improve snowfall remote-sensing interpretation and modeling to significantly advance predictive capabilities. The relevance to The U.S. Department of Energy Atmospheric Radiation Measurement (ARM) user facility's mission was to support the Interagency Council for Advancing Meteorological Services (ICAMS)’ objectives to enhance communication and coordination, and promote sharing, within and across agencies. NASA therefore requested to borrow ARM’s two-dimensional stereo probe (2DS) for possible use during the 2023 IMPACTS project. Additionally, this use of the 2DS could improve understanding of ARM 2DS measurements collected on previous field campaigns. The plan was to have the 2DS available for possible backup deployment on the NASA Lockheed Orion P-3 aircraft during the 2023 IMPACTS field project. NASA has a 2DS probe and the ARM 2DS is a hot swappable probe in case the project's 2DS fails. The 2DS is a critical probe and we had issues during a 2022 field project that prevented us from obtaining 2DS data on several flights. Hence, we wanted a hot swappable 2DS on stand-by. We have a data acquisition system, along with a backup data acquisition system for the 2DS, so we only needed the 2DS probe. David Delene was responsible for the use of the 2DS on the NASA P-3 aircraft. He has experience deploying the 2DS on several aircraft, including previously on the NASA P-3 in 2022. The team ensured that the aircraft wiring and deployment of the 2DS were completed correctly for the ARM 2DS.

54 ENVIRONMENTAL SCIENCES↗

A soft actuation system for segmented reflector articulation and isolation

Segmented reflectors have been proposed for space based applications such as optical communication and large diameter telescopes. An actuation system for mirrors in a space based segmented mirror array was developed as part of NASA's Precision Segmented Reflector program. The actuation system, called the Articulated Panel Module (APM), provides 3 degrees of freedom mirror articulation, gives isolation from structural motion, and simplifies space assembly of the mirrors to the reflector backup truss. A breadboard of the APM was built and is described.

Agronin, Michael L.↗

An experiment in remote manufacturing using the advanced communications technology satellite

The goal of the completed project was to develop an experiment in remote manufacturing that would use the capabilities of the ACTS satellite. A set of possible experiments that could be performed using the Advanced Communications Technology Satellite (ACTS), and which would perform remote manufacturing using a laser cutter and an integrated circuit testing machine are described in detail. The proposed design is shown to be a feasible solution to the offered problem and it takes into consideration the constraints that were placed on the experiment. In addition, we have developed two more experiments that are included in this report: backup of rural telecommunication networks, and remote use of Synthetic Aperture Radar (SAR) data analysis for on-site collection of glacier scattering data in the Antarctic.

Tsatsoulis, Costas↗

Trajectory Specification for Terminal Air Traffic: Pairwise Conflict Detection and Resolution

Trajectory specification is the explicit bounding and control of aircraft trajectories such that the position at each point in time is constrained to a precisely defined volume of space. The bounding space is defined by cross-track, along-track, and vertical tolerances relative to a reference trajectory that specifies position as a function of time. The tolerances are dynamic and will be based on the aircraft navigation capabilities and the current traffic situation. A standard language will be developed to represent these specifications and to communicate them by datalink. Assuming conformance, trajectory specification can guarantee safe separation for an arbitrary period of time even in the event of an air traffic control (ATC) system or datalink failure, hence it can help to achieve the high level of safety and reliability needed for ATC automation. As a more proactive form of ATC, it can also maximize airspace capacity and reduce the reliance on tactical backup systems during normal operation. It applies to both enroute airspace and the terminal area around airports, but this paper focuses on the terminal area and presents algorithms and software for spacing arrivals and deconflicting both arrivals and departures.

air traffic control↗

Trajectory Specification for Automation of Terminal Air Traffic Control

"Trajectory specification" is the explicit bounding and control of aircraft tra- jectories such that the position at each point in time is constrained to a precisely defined volume of space. The bounding space is defined by cross-track, along-track, and vertical tolerances relative to a reference trajectory that specifies position as a function of time. The tolerances are dynamic and will be based on the aircraft nav- igation capabilities and the current traffic situation. A standard language will be developed to represent these specifications and to communicate them by datalink. Assuming conformance, trajectory specification can guarantee safe separation for an arbitrary period of time even in the event of an air traffic control (ATC) sys- tem or datalink failure, hence it can help to achieve the high level of safety and reliability needed for ATC automation. As a more proactive form of ATC, it can also maximize airspace capacity and reduce the reliance on tactical backup systems during normal operation. It applies to both enroute airspace and the terminal area around airports, but this paper focuses on arrival spacing in the terminal area and presents ATC algorithms and software for achieving a specified delay of runway arrival time.

air traffic control↗

Telecommunications Relay Support of the Mars Phoenix Lander Mission

The Phoenix Lander, first of NASA's Mars Scout missions, arrived at the Red Planet on May 25, 2008. From the moment the lander separated from its interplanetary cruise stage shortly before entry, the spacecraft could no longer communicate directly with Earth, and was instead entirely dependent on UHF relay communications via an international network of orbiting Mars spacecraft, including NASA's 2001 Mars Odyssey (ODY) and Mars Reconnaissance Orbiter (MRO) spacecraft, as well as ESA's Mars Express (MEX) spacecraft. All three orbiters captured critical event telemetry and/or tracking data during Phoenix Entry, Descent and Landing. During the Phoenix surface mission, ODY and MRO provided command and telemetry services, far surpassing the original data return requirements. The availability of MEX as a backup relay asset enhanced the robustness of the surface relay plan. In addition to telecommunications services, Doppler tracking observables acquired on the UHF link yielded an accurate position for the Phoenix landing site.

Edwards, Charles D., Jr.↗

Backup Optical Navigation Attitude for Artemis-1 Backup Attitude Ground Tool

The Backup Optical Navigation Attitude (BONA) software was developed as a response to the Artemis1 Power Distribution Unit (PDU) hardware problems found early in 2021. The hardware problem, a capacitor installed incorrectly, removes the intended redundant path for which the PDU can relay its power and data to attached devices. Specific to the BONA context, the concern is that a failure of the single remaining path in this PDU would lead to an inability to communicate with one of the two-star trackers (STs) on Orion. By flight rule, being reduced to a single star tracker means an immediate turn around end-of-mission. The BONA software is not intended to extend the mission, but instead act as a single star tracker attitude confirmation tool. Insurance, if you will, for the Orion project that a ground tool is available to compare the single remaining ST results with optical navigation images retrieved during the mission. Engineers operating BONA in the Mission Control Center (MCC) Mission Evaluation Room (MER) will analyze the downlinked star field images and based on the stars identified and known time of image, derive vehicle attitude estimates, which can be compared with the ST results. Potentially, in extreme situations, and with expert recommendation, the derivations could lead to navigation state updates being commanded to Orion.

GNC↗

Analysis and testing of a soft actuation system for segmented reflector articulation and isolation

Segmented reflectors have been proposed for space-based applications such as optical communication and large-diameter telescopes. An actuation system for mirrors in a space-based segmented mirror array has been developed as part of the National Aeronautics and Space Administration-sponsored Precision Segmented Reflector program. The actuation system, called the Articulated Panel Module (APM), articulates a mirror panel in 3 degrees of freedom in the submicron regime, isolates the panel from structural motion, and simplifies space assembly of the mirrors to the reflector backup truss. A breadboard of the APM has been built and is described. Three-axis modeling, analysis, and testing of the breadboard is discussed.

Jandura, Louise↗

Deep Space Networking Experiments on the EPOXI Spacecraft

NASA's Space Communications & Navigation Program within the Space Operations Directorate is operating a program to develop and deploy Disruption Tolerant Networking [DTN] technology for a wide variety of mission types by the end of 2011. DTN is an enabling element of the Interplanetary Internet where terrestrial networking protocols are generally unsuitable because they rely on timely and continuous end-to-end delivery of data and acknowledgments. In fall of 2008 and 2009 and 2011 the Jet Propulsion Laboratory installed and tested essential elements of DTN technology on the Deep Impact spacecraft. These experiments, called Deep Impact Network Experiment (DINET 1) were performed in close cooperation with the EPOXI project which has responsibility for the spacecraft. The DINET 1 software was installed on the backup software partition on the backup flight computer for DINET 1. For DINET 1, the spacecraft was at a distance of about 15 million miles (24 million kilometers) from Earth. During DINET 1 300 images were transmitted from the JPL nodes to the spacecraft. Then, they were automatically forwarded from the spacecraft back to the JPL nodes, exercising DTN's bundle origination, transmission, acquisition, dynamic route computation, congestion control, prioritization, custody transfer, and automatic retransmission procedures, both on the spacecraft and on the ground, over a period of 27 days. The first DINET 1 experiment successfully validated many of the essential elements of the DTN protocols. DINET 2 demonstrated: 1) additional DTN functionality, 2) automated certain tasks which were manually implemented in DINET 1 and 3) installed the ION SW on nodes outside of JPL. DINET 3 plans to: 1) upgrade the LTP convergence-layer adapter to conform to the international LTP CL specification, 2) add convergence-layer "stewardship" procedures and 3) add the BSP security elements [PIB & PCB]. This paper describes the planning and execution of the flight experiment and the validation results.

automated data communication↗

A communications model for an ISAS to NASA span link

The authors propose that an initial computer-to-computer communication link use the public packet switched networks (PPSN) Venus-P in Japan and TELENET in the U.S. When the traffic warrants it, this link would then be upgraded to a dedicated leased line that directly connects into the Space Physics Analysis Network (SPAN). The proposed system of hardware and software will easily support migration to such a dedicated link. It therefore provides a cost effective approach to the network problem. Once a dedicated line becomes operation it is suggested that the public networks link and continue to coexist, providing a backup capability.

Green, James L.↗

Scintillation-Hardened GPS Receiver

CommLargo, Inc., has developed a scintillation-hardened Global Positioning System (GPS) receiver that improves reliability for low-orbit missions and complies with NASA's Space Telecommunications Radio System (STRS) architecture standards. A software-defined radio (SDR) implementation allows a single hardware element to function as either a conventional radio or as a GPS receiver, providing backup and redundancy for platforms such as the International Space Station (ISS) and high-value remote sensing platforms. The innovation's flexible SDR implementation reduces cost, weight, and power requirements. Scintillation hardening improves mission reliability and variability. In Phase I, CommLargo refactored an open-source GPS software package with Kalman filter-based tracking loops to improve performance during scintillation and also demonstrated improved navigation during a geomagnetic storm. In Phase II, the company generated a new field-programmable gate array (FPGA)-based GPS waveform to demonstrate on NASA's Space Communication and Navigation (SCaN) test bed.

Stephens, Donald R.↗

Engineering Test Satellite VI (ETS-VI)

The Engineering Test Satellite-VI (ETS-VI) is being developed as the third Japanese three-axis stabilized engineering test satellite to establish the 2-ton geostationary operational satellite bus system and to demonstrate the high performance satellite communication technology for future operational satellites. The satellite is expected to be stationed at 154 deg east latitude. It will be launched from the Tanegashima Space Center in Japan by a type H-II launch vehicle. The Deep Space Network (DSN) will support the prelaunch compatibility test, data interface verification testing, and launch rehersals. The DSN primary support period is from launch through the final AEF plus 1 hour. Contingency support is from final AEF plus 1 hour until launch plus 1 month. The coverage will consist of all the 26-m antennas as prime and the 34-m antennas at Madrid and Canberra as backup. Maximum support will consist of two 8-hour tracks per station for a 7-day period, plus the contingency support, if required. Information is given in tabular form for DSN support, telemetry, command, and tracking support responsibility.

Horii, M.↗

Early Market TRL/MRL Analysis

he focus of this report is TRL/MRL analysis of hydrogen storage; it documents the methodology and results of an effort to identify hydrogen storage technologies’ technical and manufacturing readiness for early market motive and non-motive applications and to provide a path forward toward commercialization. Motive applications include materials handling equipment (MHE) and ground support equipment (GSE), such as forklifts, tow tractors, and specialty vehicles such as golf carts, lawn mowers and wheel chairs. Non-motive applications are portable, stationary or auxiliary power units (APUs) and include portable laptops, backup power, remote sensor power, and auxiliary power for recreational vehicles, hotels, hospitals, etc. Hydrogen storage technologies assessed include metal hydrides, chemical hydrides, sorbents, gaseous storage, and liquid storage. The assessments are based on a combination of Technology Readiness Level (TRL) and Manufacturing Readiness Level (MRL) designations that enable evaluation of hydrogen storage technologies at varying levels of development. The manufacturing status could be established from eight risk elements: Technical Maturity, Design, Materials, Cost & Funding, Process Capability, Personnel, Facilities and Manufacturing Planning. This approach provides a logical methodology and roadmap to enable the identification of hydrogen storage technologies, their advantages/disadvantages, gaps and R&D needs on an unbiased and transparent scale that is easily communicated to interagency partners. This technology readiness assessment (TRA) report documents the process used to conduct the TRA/MRA (technology and manufacturing readiness assessment), reports the TRL and MRL for each assessed technology and provides recommendations based on the findings. To investigate the state of the art and needs to mature the technologies, PNNL prepared a questionnaire to assign TRL and MRL for each hydrogen storage technology. The questionnaire was sent to identified hydrogen storage technology developers and manufacturers who were asked to perform a self-assessment. We included both domestic and international organizations including U.S. national laboratories, U.S. companies, European companies and Japanese companies. PNNL collected the data and performed an analysis to deduce the level of maturity and to provide program recommendations.

early market↗

Space data management at the NSSDC (National Space Sciences Data Center): Applications for data compression

The National Space Science Data Center (NSSDC), established in 1966, is the largest archive for processed data from NASA's space and Earth science missions. The NSSDC manages over 120,000 data tapes with over 4,000 data sets. The size of the digital archive is approximately 6,000 gigabytes with all of this data in its original uncompressed form. By 1995 the NSSDC digital archive is expected to more than quadruple in size reaching over 28,000 gigabytes. The NSSDC digital archive is expected to more than quadruple in size reaching over 28,000 gigabytes. The NSSDC is beginning several thrusts allowing it to better serve the scientific community and keep up with managing the ever increasing volumes of data. These thrusts involve managing larger and larger amounts of information and data online, employing mass storage techniques, and the use of low rate communications networks to move requested data to remote sites in the United States, Europe and Canada. The success of these thrusts, combined with the tremendous volume of data expected to be archived at the NSSDC, clearly indicates that innovative storage and data management solutions must be sought and implemented. Although not presently used, data compression techniques may be a very important tool for managing a large fraction or all of the NSSDC archive in the future. Some future applications would consist of compressing online data in order to have more data readily available, compress requested data that must be moved over low rate ground networks, and compress all the digital data in the NSSDC archive for a cost effective backup that would be used only in the event of a disaster.

Green, James L.↗

Teams and teamwork at NASA Langley Research Center

The recent reorganization and shift to managing total quality at the NASA Langley Research Center (LaRC) has placed an increasing emphasis on teams and teamwork in accomplishing day-to-day work activities and long-term projects. The purpose of this research was to review the nature of teams and teamwork at LaRC. Models of team performance and teamwork guided the gathering of information. Current and former team members served as participants; their collective experience reflected membership in over 200 teams at LaRC. The participants responded to a survey of open-ended questions which assessed various aspects of teams and teamwork. The participants also met in a workshop to clarify and elaborate on their responses. The work accomplished by the teams ranged from high-level managerial decision making (e.g., developing plans for LaRC reorganization) to creating scientific proposals (e.g., describing spaceflight projects to be designed, sold, and built). Teams typically had nine members who remained together for six months. Member turnover was around 20 percent; this turnover was attributed to heavy loads of other work assignments and little formal recognition and reward for team membership. Team members usually shared a common and valued goal, but there was not a clear standard (except delivery of a document) for knowing when the goal was achieved. However, members viewed their teams as successful. A major factor in team success was the setting of explicit a priori rules for communication. Task interdependencies between members were not complex (e.g., sharing of meeting notes and ideas about issues), except between members of scientific teams (i.e., reliance on the expertise of others). Thus, coordination of activities usually involved scheduling and attendance of team meetings. The team leader was designated by the team's sponsor. This leader usually shared power and responsibilities with other members, such that team members established their own operating procedures for decision making. Sponsors followed a hands-off policy during team operations, but they approved and reviewed team products. Most teams, particularly high-level decision-making teams, had little or no authority to carry out their decisions. Team members had few interpersonal conflicts. They monitored each other respectfully about meeting deadlines. Feedback and backup behaviors were seen as desirable aspects of teamwork, wanted by the members, and done appropriately.

Dickinson, Terry L.↗

UAS Modeling of the Communication Links Study Results

There were many links calculated for this and the other scenarios. The rain was analyzed for 99.9% availability with rain rated of none, 20 mm/hr and 90 mm/hr at a height of 5 km out to 25 NM. This was done for each scenario for LOS and for BLOS links for Scenario 5 and 6. Scenario 1 was a LOS-only scenario. Use of two 3 dB Antennas on both ends. The CS2 was unable to maintain a control RF Link during the flight. The largest access gap periods between object top and bottom UA antennae were caused by terrain (ridges and hills). The CS Antenna was changed to High Gain Directional Antenna, all three CS maintained lock on vehicle. There were RF dropouts between the top and bottom UA antennae caused by aircraft obstructions (fuselage, wings, wheel assembles, etc.). Note that for this study antenna locations were placed on top and bottom center of the UA body. Future study should include actual UA antenna locations on the aircraft providing manufactures are willing to provide information. The importance of CS location(s) was demonstrated for primary or backup CS. With a second backup CS placed in a suitable location the UA was able to maintain an overall RF link. The actual location of both backup CSs required the antenna location to be place 150 ft above ground in order to establish a RF link between the UA and CS.

Birr, Richard↗