Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Attitude thrusters”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Design and operation of the U.S. Space Station Freedom Propulsion System

The propulsion functions for the U.S. Space Station Freedom (SSF) are accomplished by two separate systems, the Primary Propulsion System and the Supplemental Reboost System (SRS). The Primary Propulsion System includes self-contained hydrazine modules for station reboost, attitude control and contingency maneuvers. These Propulsion Modules contain reboost and attitude control thrusters, propellant storage, thermal conditioning and electronic controls. The modules are serviced on the ground and launched on the Space Shuttle as replacements for the on-orbit modules which have expended their propellant. The expended modules are returned to the ground for reservicing and subsequent reuse. The Supplemental Reboost System includes a Waste Gas Assembly and Resistojet Modules which are used for reboost maneuvers only. The Waste Gas Assembly contains waste gas storage, compressors and dryers and the Resistojet Modules contain multipropellant resistojet thrusters, electronic pressure regulators and power conditioning equipment.

Morano, Joseph S.↗

Voyager spacecraft attitude control propulsion system post-launch performance requirements changes

A test program aimed at the re-qualification of the 0.2-lbf attitude control thruster of the Voyager 2 spacecraft was carried out while the spacecraft was in flight on an interplanetary trajectory to Uranus. The objective of the program was to determine if the 0.2-lbf thruster could be successfully and repeatedly fired at pulse widths of less than the standard minimum pulse width of 10 milliseconds with no degradation. It was demonstrated that the thruster was qualified for short pulse operation at pulse widths of 4 ms or greater. Pulse widths of 4.0 ms provide an impulse bit of approximately 45 percent of the impulse provided by a 10-ms pulse, and the pulse-to-pulse and unit-to-unit variation is approximately plus or minus 10 percent.

Groudle, T. A.↗

Design and testing of the U.S. Space Station Freedom primary propulsion system

The primary propulsion system (PPS) for the Space Station Freedom is discussed in terms of salient design characteristics and key testing procedures. The rocket engine modules contain reboost and attitude control thrusters, and their designs are illustrated showing the mounting structures, thruster solenoid valves, and thrust chambers. The propellant tank assembly for storing gaseous N pressurant and hydrazine propellant is described as are the system avionics, thruster solenoid valves, and latching isolation valves. PPS testing conducted on the development systems includes the use of a propulsion-module development unit, a development test article, and system qualification testing. Specific test articles include functional heaters, mass/thermal simulated components, flight-quality structures, and software control operations.

Morano, Joseph S.↗

A study of the impact of the Space Shuttle environment on faint far-UV geophysical and astronomical phenomena

FAUST is a far ultraviolet (1400-1800 A) photon-counting imaging telescope featuring a wide field of view (7.6 deg) and a high sensitivity to extended emission features. During its flight as part of the ATLAS-1 payload aboard the STS-45 mission in March 1992, 19 deep-space nighttime viewing opportunities were utilized by FAUST. Here we report the observed fluxes and their time and space variations, and identify the signatures of postsunset airglow phenomena and Orbiter Vernier attitude control thruster firing events. We find that the Space Shuttle nighttime environment at 296 km altitude is often sufficiently dark to permit geophysical and astronomical UV observations down to levels on the order of 1000 photons/sq cm sr A sec, or 0.01 Rayleighs/A. We also find evidence for occasional geophysical fluxes of some tens or hundreds of Rayleighs in the upward-looking direction.

Lampton, Michael↗

Characterization of in-flight performance of ion propulsion systems

In-flight measurements of ion propulsion performance, ground test calibrations, and diagnostic performance measurements were reviewed. It was found that accelerometers provided the most accurate in-flight thrust measurements compared with four other methods that were surveyed. An experiment has also demonstrated that pre-flight alignment of the thrust vector was sufficiently accurate so that gimbal adjustments and use of attitude control thrusters were not required to counter disturbance torques caused by thrust vector misalignment. The effects of facility background pressure, facility enhanced charge-exchange reactions, and contamination on ground-based performance measurements are also discussed. Vacuum facility pressures for inert-gas ion thruster life tests and flight qualification tests will have to be less than 2 mPa to ensure accurate performance measurements.

Sovey, James S.↗

Characterization of in-flight performance of ion propulsion systems

In-flight measurements of ion propulsion performance, ground test calibrations, and diagnostic performance measurements were reviewed. It was found that accelerometers provided the most accurate in-flight thrust measurements compared with four other methods that were surveyed. An experiment has also demonstrated that pre-flight alignment of the thrust vector was sufficiently accurate so that gimbal adjustments and use of attitude control thrusters were not required to counter disturbance torques caused by thrust vector misalignment. The effects of facility background pressure, facility enhanced charge-exchange reactions, and contamination on ground-based performance measurements are also discussed. Vacuum facility pressures for inert-gas ion thruster life tests and flight qualification tests will have to be less than 2 mPa to ensure accurate performance measurements.

Sovey, James S.↗

Real-time RMS active damping augmentation: Heavy and very light payload evaluations

Controls-Structures Integration Technology has been applied to the Space Shuttle Remote Manipulator System (RMS) to improve on-orbit performance. The objective was to actively damp undesired oscillatory motions of the RMS following routine payload maneuvering and Shuttle attitude control thruster firings. Simulation of active damping was conducted in the real-time, man-in-the-loop Systems Engineering Simulator at NASA's Johnson Space Center. The simulator was used to obtain qualitative and quantitative data on active damping performance from astronaut operators. Using a simulated three-axis accelerometer mounted on the RMS, 'sensed' vibration motions were used to generate joint motor commands that reduced the unwanted oscillations. Active damping of the RMS with heavy and light attached payloads was demonstrated in this study. Five astronaut operators examined the performance of active damping following operator commanded RMS maneuvers and Shuttle thruster firings. Noticeable improvements in the damping response of the RMS with the heavy, Hubble Space Telescope payload and the very light, astronaut in Manipulator Foot Restraint payload were observed. The potential of active damping to aid in precisely maneuvering payloads was deemed significant.

Demeo, Martha E.↗

SAMS Acceleration Measurements on MIR

During NASA Increment 3 (September 1996 to January 1997), about 5 gigabytes of acceleration data were collected by the Space Acceleration Measurement System (SAMS) onboard the Russian Space Station, Mir. The data were recorded on 11 optical disks and were returned to Earth on STS-81. During this time, SAMS data were collected in the Priroda module to support the following experiments: the Mir Structural Dynamics Experiment (MiSDE) and Binary Colloidal Alloy Tests (BCAT). This report points out some of the salient features of the microgravity environment to which these experiments were exposed. Also documented are mission events of interest such as the docked phase of STS-81 operations, a Progress engine burn, attitude control thruster operation, and crew exercise. Also included are a description of the Mir module orientations, and the panel notations within the modules. This report presents an overview of the SAMS acceleration measurements recorded by 10 Hz and 100 Hz sensor heads. Variations in the acceleration environment caused by unique activities such as crew exercise and life-support fans are presented. The analyses included herein complement those presented in previous mission summary reports published by the Principal Investigator Microgravity Services (PIMS) group.

Moskowitz, Milton E.↗

Stardust Navigation Covariance Analysis

The Stardust spacecraft was launched on February 7, 1999 aboard a Boeing Delta-II rocket. Mission participants include the National Aeronautics and Space Administration (NASA), the Jet Propulsion Laboratory (JPL), Lockheed Martin Astronautics (LMA) and the University of Washington. The primary objective of the mission is to collect in-situ samples of the coma of comet Wild-2 and return those samples to the Earth for analysis. Mission design and operational navigation for Stardust is performed by the Jet Propulsion Laboratory (JPL). This paper will describe the extensive JPL effort in support of the Stardust pre-launch analysis of the orbit determination component of the mission covariance study. A description of the mission and it's trajectory will be provided first, followed by a discussion of the covariance procedure and models. Predicted accuracy's will be examined as they relate to navigation delivery requirements for specific critical events during the mission. Stardust was launched into a heliocentric trajectory in early 1999. It will perform an Earth Gravity Assist (EGA) on January 15, 2001 to acquire an orbit for the eventual rendezvous with comet Wild-2. The spacecraft will fly through the coma (atmosphere) on the dayside of Wild-2 on January 2, 2004. At that time samples will be obtained using an aerogel collector. After the comet encounter Stardust will return to Earth when the Sample Return Capsule (SRC) will separate and land at the Utah Test Site (UTTR) on January 15, 2006. The spacecraft will however be deflected off into a heliocentric orbit. The mission is divided into three phases for the covariance analysis. They are 1) Launch to EGA, 2) EGA to Wild-2 encounter and 3) Wild-2 encounter to Earth reentry. Orbit determination assumptions for each phase are provided. These include estimated and consider parameters and their associated a-priori uncertainties. Major perturbations to the trajectory include 19 deterministic and statistical maneuvers planned for the mission. The spacecraft is three axis stabilized and has unbalanced thrusters for attitude control. Accelerations due to the attitude control system are treated stochastically. The tracking scenario for the study is patterned after the actual schedule employed during the different phases of the mission. Conventional X-band two-way Doppler and SRA range data was simulated and the standard accuracy for these data types was assumed throughout most of the mission. However, a deweighting scheme was used for the Doppler data during times of low Sun-Earth-Probe angles, especially in the case of the DSM. Optical data is assumed to be available starting at 50 days prior to the comet encounter. The optical data will be used to improve the ephemeris of Wild-2, which is considered crucial to properly target the comet flyby. Results of the covariance analysis are presented for all mission phases. Navigation capability will be discussed in terms of the uncertainty in the encounter B-Plane (B.R and B.T) and linearized time of flight. Delivery errors based on the final maneuver prior to the comet encounter will be presented. The most stringent navigation requirement is for the Earth reentry. The uncertainty in the flight path angle must be less than 0.02 degree (orbit determination and maneuver performance) to assure successful recovery of the SRC. Results presented show that this requirement can be met.

Menon, Premkumar R.↗

Evolution of International Space Station GN&C System Across ISS Assembly Stages

The Guidance Navigation and Control (GN&C) system for the International Space Station is initially implemented by the Functional Cargo Block (FGB) which was built by the Khrunichev Space Center under direct contract to Boeing. This element (Stage 1A/R) was launched on 20 November 1998 and is currently operating on-orbit. The components and capabilities of the FGB Motion Control System (MCS) are described. The next ISS element, which has GN&C functionality will be the Service Module (SM) built by Rocket Space Corporation-Energia. This module is scheduled for launch (Stage 1R) in early 2000. Following activation of the SM GN&C system, the FGB MCS is deactivated and no longer used. The components and capabilities of the SM GN&C system are described. When a Progress vehicle is attached to the ISS it can be used for reboost operations, based on commands provided by the Mission Control Center-Moscow. When a data connection is implemented between the SM and the Progress, the SM can command the Progress thrusters for attitude control and reboosts. On Stage 5A, the U.S. GN&C system will become activated when the U.S. Laboratory is de loyed and installed (launch schedule is currently TBD). The U.S. GN&C system provides non-propulsive control capabilities to support micro-gravity operations and minimize the use of propellant for attitude control, and an independent capability for determining the ISS state vector, attitude, attitude rate. and time.. The components and capabilities of the U.S. GN&C system are described and the interactions between the U.S. and Russian Segment GN&C systems are also described.

Lee, Roscoe↗

Liquid Motion Experiment Flown on STS-84

During some part or all of each mission, about half of all scientific and commercial spacecraft will spin. For example, commercial spacecraft are made to spin during the transfer maneuver from low Earth orbit to the mission orbit to obtain gyroscopic stiffness. Many spacecraft spin continuously in orbit for the same reason. Other reasons for spinning include controlling the location of liquid propellants within their tanks and distributing solar heat loads. Although spinning has many benefits, it also creates problems because of the unavoidable wobble motion that accompanies spinning. Wobbling makes the spacecraft's flexible components oscillate. The energy dissipated by the internal friction of these components causes the wobbling amplitude to increase continually until, at some point, the attitude control thrusters must be fired to bring the spacecraft's amplitude back to an acceptable level.

Dalton, Penni J.↗

Demonstration of an Aerocapture GN and C System Through Hardware-in-the-Loop Simulations

Aerocapture is an orbit insertion maneuver in which a spacecraft flies through a planetary atmosphere one time using drag force to decelerate and effect a hyperbolic to elliptical orbit change. Aerocapture employs a feedback Guidance, Navigation, and Control (GN&C) system to deliver the spacecraft into a precise postatmospheric orbit despite the uncertainties inherent in planetary atmosphere knowledge, entry targeting and aerodynamic predictions. Only small amounts of propellant are required for attitude control and orbit adjustments, thereby providing mass savings of hundreds to thousands of kilograms over conventional all-propulsive techniques. The Analytic Predictor Corrector (APC) guidance algorithm has been developed to steer the vehicle through the aerocapture maneuver using bank angle control. Through funding provided by NASA's In-Space Propulsion Technology Program, the operation of an aerocapture GN&C system has been demonstrated in high-fidelity simulations that include real-time hardware in the loop, thus increasing the Technology Readiness Level (TRL) of aerocapture GN&C. First, a non-real-time (NRT), 6-DOF trajectory simulation was developed for the aerocapture trajectory. The simulation included vehicle dynamics, gravity model, atmosphere model, aerodynamics model, inertial measurement unit (IMU) model, attitude control thruster torque models, and GN&C algorithms (including the APC aerocapture guidance). The simulation used the vehicle and mission parameters from the ST-9 mission. A 2000 case Monte Carlo simulation was performed and results show an aerocapture success rate of greater than 99.7%, greater than 95% of total delta-V required for orbit insertion is provided by aerodynamic drag, and post-aerocapture orbit plane wedge angle error is less than 0.5 deg (3-sigma). Then a real-time (RT), 6-DOF simulation for the aerocapture trajectory was developed which demonstrated the guidance software executing on a flight-like computer, interfacing with a simulated IMU and simulated thrusters, with vehicle dynamics provided by an external simulator. Five cases from the NRT simulations were run in the RT simulation environment. The results compare well to those of the NRT simulation thus verifying the RT simulation configuration. The results of the above described simulations show the aerocapture maneuver using the APC algorithm can be accomplished reliably and the algorithm is now at TRL-6. Flight validation is the next step for aerocapture technology development.

Masciarelli, James↗

Flight Performance Feasibility Studies for the Max Launch Abort System

In 2007, the NASA Engineering and Safety Center (NESC) initiated the Max Launch Abort System Project to explore crew escape system concepts designed to be fully encapsulated within an aerodynamic fairing and smoothly integrated onto a launch vehicle. One objective of this design was to develop a more compact launch escape vehicle that eliminated the need for an escape tower, as was used in the Mercury and Apollo escape systems and what is planned for the Orion Multi-Purpose Crew Vehicle (MPCV). The benefits for the launch vehicle of eliminating a tower from the escape vehicle design include lower structural weights, reduced bending moments during atmospheric flight, and a decrease in induced aero-acoustic loads. This paper discusses the development of encapsulated, towerless launch escape vehicle concepts, especially as it pertains to the flight performance and systems analysis trade studies conducted to establish mission feasibility and assess system-level performance. Two different towerless escape vehicle designs are discussed in depth: one with allpropulsive control using liquid attitude control thrusters, and a second employing deployable aft swept grid fins to provide passive stability during coast. Simulation results are presented for a range of nominal and off-nominal escape conditions.

Tarabini, Paul V.↗

Green Propellant Infusion Mission Program Development and Technology Maturation

The NASA Space Technology Mission Directorate's (STMD) Green Propellant Infusion Mission (GPIM) Technology Demonstration Mission (TDM) is comprised of a cross-cutting team of domestic spacecraft propulsion and storable green propellant technology experts. This TDM is led by Ball Aerospace & Technologies Corp. (BATC), who will use their BCP- 100 spacecraft to carry a propulsion system payload consisting of one 22 N thruster for primary divert (DeltaV) maneuvers and four 1 N thrusters for attitude control, in a flight demonstration of the AF-M315E technology. The GPIM project has technology infusion team members from all three major market sectors: Industry, NASA, and the Department of Defense (DoD). The GPIM project team includes BATC, includes Aerojet Rocketdyne (AR), Air Force Research Laboratory, Aerospace Systems Directorate, Edwards AFB (AFRL), NASA Glenn Research Center (GRC), NASA Kennedy Space Center (KSC), and NASA Goddard Space Flight Center (GSFC). STMD programmatic and technology oversight is provided by NASA Marshall Space Flight Center. The GPIM project shall fly an operational AF-M315E green propulsion subsystem on a Ball-built BCP-100 spacecraft.

AF-M315E↗

Implementation of Motion Simulation Software and Visual-Auditory Electronics for Use in a Low Gravity Robotic Testbed

The Jet Propulsion Laboratory (JPL) is developing the All-Terrain Hex-Limbed Extra-Terrestrial Explorer (ATHLETE) to assist in manned space missions. One of the proposed targets for this robotic vehicle is a near-Earth asteroid (NEA), which typically exhibit a surface gravity of only a few micro-g. In order to properly test ATHLETE in such an environment, the development team has constructed an inverted Stewart platform testbed that acts as a robotic motion simulator. This project focused on creating physical simulation software that is able to predict how ATHLETE will function on and around a NEA. The corresponding platform configurations are calculated and then passed to the testbed to control ATHLETE's motion. In addition, imitation attitude, imitation attitude control thrusters were designed and fabricated for use on ATHLETE. These utilize a combination of high power LEDs and audio amplifiers to provide visual and auditory cues that correspond to the physics simulation.

gravity↗

Navigation Challenges of the Mars Phoenix Lander Mission

The Mars Phoenix Lander mission was launched on August 4th, 2007. To land safely at the desired landing location on the Mars surface, the spacecraft trajectory had to be controlled to a set of stringent atmospheric entry and landing conditions. The landing location needed to be controlled to an elliptical area with dimensions of 100km by 20km. The two corresponding critical components of the atmospheric entry conditions are the entry flight path angle (target: -13.0 deg +/-0.21 deg) and the entry time (within +/-30 seconds). The purpose of this paper is to describe the navigation strategies used to overcome the challenges posed during spacecraft operations, which included an attitude control thruster calibration campaign, a trajectory control strategy, and a trajectory reconstruction strategy. Overcoming the navigation challenges resulted in final Mars atmospheric entry conditions just 0.007 deg off in entry flight path angle and 14.9 sec early in entry time. These entry dispersions in addition to the entry, descent, and landing trajectory dispersion through the atmosphere, lead to a final landing location just 7 km away from the desired landing target.

Portock, Brian M.↗

A Proposed Ascent Abort Flight Test for the Max Launch Abort System

The NASA Engineering and Safety Center initiated the Max Launch Abort System (MLAS) Project to investigate alternate crew escape system concepts that eliminate the conventional launch escape tower by integrating the escape system into an aerodynamic fairing that fully encapsulates the crew capsule and smoothly integrates with the launch vehicle. This paper proposes an ascent abort flight test for an all-propulsive towerless escape system concept that is actively controlled and sized to accommodate the Orion Crew Module. The goal of the flight test is to demonstrate a high dynamic pressure escape and to characterize jet interaction effects during operation of the attitude control thrusters at transonic and supersonic conditions. The flight-test vehicle is delivered to the required test conditions by a booster configuration selected to meet cost, manufacturability, and operability objectives. Data return is augmented through judicious design of the boost trajectory, which is optimized to obtain data at a range of relevant points, rather than just a single flight condition. Secondary flight objectives are included after the escape to obtain aerodynamic damping data for the crew module and to perform a high-altitude contingency deployment of the drogue parachutes. Both 3- and 6-degree-of-freedom trajectory simulation results are presented that establish concept feasibility, and a Monte Carlo uncertainty assessment is performed to provide confidence that test objectives can be met.

Tartabini, Paul V.↗

Voyager Interstellar Mission: Challenges of Flying a Very Old Spacecraft on a Very Long Mission

Two Voyager spacecraft were launched in 1977. After the successful flybys of Jupiter and Saturn by both Voyagers and Uranus and Neptune by Voyager 2, the mission has been extended for another 30 years in search of the transition region between the dominance of the solar energy and interstellar energy. The Voyager Interstellar Mission (VIM) started on January 1, 1990. It can be characterized by several factors including extremely long communication distances, aging hardware, reduced staffing levels and difficulty in obtaining Deep Space Network (DSN) resources necessitated by the increasing distance between the spacecraft and Earth. The mission was redesigned to compensate for such factors while maximizing the science return. After 25 years of VIM and several significant science discoveries, both Voyager spacecraft are still functioning well and the Voyager flight team is preparing for an even longer mission - until the year 2025 and beyond. In order to work around the challenges and to continue the mission even further, the team has been implementing numerous changes, mainly through flight software modifications and hardware reconfiguration. The major drivers for the changes are two-fold: resource constraints (such as decreasing power output and difficulty in obtaining the necessary DSN coverage) and anomalies due to the aging hardware. The majority of changes occur through flight software modifications so the state of the on-board responses is appropriate for the changing space environment and mission phase, and the flight software is compatible in allowing the maximum data gathering. The on-board flight software routines such as baseline sequence, fault protection routines, the High Gain Antenna POINTing to Earth (HPOINT) table, and long-term events table need to be maintained through flight software updates. The changes also occur through hardware reconfiguration such as selecting the backup Hybrid Buffer Interface Circuits (HYBIC) or attitude propulsion thrusters. This paper will describe the challenges of VIM and what has been done to overcome or mitigate those challenges. The primary focus will be the major flight software changes made during VIM and the changes that are in store for the near future in preparation for continuing the extended mission, from the originally projected year of 2020 out to the year 2025 and possibly beyond.

Matsumoto, Sun Kang↗