Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Alternating Gradient Synchrotron”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Simulation of 6 to 3 to 1 merge and squeeze of Au77+ bunches in AGS

In order to increase the intensity per Au77+ bunch at AGS extraction, a 6 to 3 to 1 merge scheme was developed and implemented by K. Zeno during the 2016 RHIC run. For this scheme, 12 Booster loads, each consisting of a single bunch, are delivered to AGS per AGS magnetic cycle. The bunch from Booster is itself the result of a 4 to 2 to 1 merge which is carried out on a flat porch during the Booster magnetic cycle. Each Booster bunch is injected into a harmonic 24 bucket on the AGS injection porch. In order to fit into the buckets and allow for the AGS injection kicker rise time, the bunch width must be reduced by exciting quadrupole oscillations just before extraction from Booster. The bunches are injected into two groups of six adjacent harmonic 24 buckets. In each group the 6 bunches are merged into 3 by bringing on RF harmonic 12 while reducing harmonic 24. This is a straightforward 2 to 1 merge (in which two adjacent bunches are merged into one). One ends up with two groups of three adjacent bunches sitting in harmonic 12 buckets. These bunches are accelerated to an intermediate porch for further merging. Doing the merge on a porch that sits above injection energy helps reduce losses that are believed to be due to the space-charge force acting on the bunched particles. (The 6 to 3 merge is done on the injection porch because the harmonic 24 frequency on the intermediate porch would be too high for the AGS RF cavities.) On the intermediate porch each group of 3 bunches is merged into one by bringing on RF harmonics 8 and 4 and then reducing harmonics 12 and 8. One ends up with 2 bunches, each the result of a 6 to 3 to 1 merge and each sitting in a harmonic 4 bucket. This puts 6 Booster loads into each bunch. Each merged bunch needs to be squeezed into a harmonic 12 bucket for subsequent acceleration. This is done by again bringing on harmonic 8 and then harmonic 12. Results of simulations of the 6 to 3 to 1 merge and the subsequent squeeze into harmonic 12 buckets are presented in this note. In particular, they provide a benchmark for what can be achieved with the available RF voltages.

43 PARTICLE ACCELERATORS↗

Double and triple-harmonic RF buckets and their use for bunch squeezing in AGS

For the past several years we have merged bunches in AGS in order to achieve the desired intensity per bunch prior to injection into RHIC. The merging is done on a flat porch at or above AGS injection energy. Because the merges involve the reduction of the RF harmonic number by a factor of 2 (for a 2 to 1 merge) and then a factor of 3 (for a 3 to 1 merge), one requires RF frequencies 6hf s , 3hf s , 2hf s and hf s , where f s is the revolution frequency on the porch and h = 4 is the fundamental harmonic number. The standard AGS RF cavities cannot operate at the lowest frequencies 2hf s and hf s ; these are provided by two modified cavities. Upon completion of the merges, the bunches are sitting in harmonic h buckets. In order to be accelerated they need to be squeezed into harmonic 3h buckets. This is accomplished by producing a double-harmonic bucket in which harmonics h and 2h act in concert, and then a triple-harmonic bucket in which harmonics h, 2h, and 3h act in concert. Simulations have shown that the squeeze presents an acceptance bottleneck which limits the longitudinal emittance that can be put into the harmonic 3h bucket. In this note the areas of the double and triple-harmonic buckets are calculated explicitly, and it is shown that these go through a minimum as the RF voltages are raised to the desired values. Several RF voltage ranges are examined, and the acceptance bottleneck is determined for each of these. Finally, the acceptance bottleneck for Au77+ bunches in AGS is calculated for several RF voltage ranges. The main result is that the RF voltages for the low-frequency harmonic h and 2h cavities both must be at least 22 kV in order to achieve an acceptance of 0:6 eV s per nucleon. If the harmonic h and 2h voltages are 15 and 22 kV, respectively, then the acceptance is reduced to 0:548 eV s per nucleon.

43 PARTICLE ACCELERATORS↗

Comparing the effect on the AGS longitudinal emittance of gold ions from the BtA stripping foil with and without a Booster Bunch Merge

The aim of this note to better understand the effect of merging the Gold bunches in the Booster into one on the resulting AGS longitudinal emittance as compared to not merging them. The reason it matters whether they are merged or not is because they pass through a stripping foil in the BtA line. Data was taken last run (Run 17) for the case where the bunches are not merged, and it will be compared with data from cases where the bunches are merged. Previous data from Tandem operation will also be considered. There are two main pieces to this puzzle. The first is the ε growth associated with the energy spread due to ‘energy straggling’ in the BtA stripping foil and the second is the effective ε growth associated with the energy loss that occurs while passing through the foil. Both of these effects depend on whether or not the Booster bunches have been merged into one.

43 PARTICLE ACCELERATORS↗

Acceleration of polarized protons in the AGS

The high energy (s{sup 1/2} = 500 GeV) polarized proton beam experiments performed in RHIC, require high polarization of the proton beam. With the AGS used as the pre-injector to RHIC, one of the main tasks is to preserve the polarization of the proton beam, during the beam acceleration in the AGS. The polarization preservation is accomplished by the two partial helical magnets [1,2,3,4,5,6,7] which have been installed in AGS, and help overcome the imperfection and the intrinsic spin resonances which occur during the acceleration of protons. This elimination of the intrinsic resonances is accomplished by placing the vertical tune Q{sub y} at a value close to 8.98, within the spin-tune stop-band created by the snake. At this near integer tune the perturbations caused by the partial helical magnets is large resulting in large beta and dispersion waves. To mitigate the adverse effect of the partial helices on the optics of the AGS, we have introduced compensation quads[2] in the AGS. In this paper we present the beam optics of the AGS which ameliorates this effect of the partial helices.

43 PARTICLE ACCELERATORS↗

Booster and AGS transverse emittance during the 2006 and 2009 polarized proton runs

This note is an overview of issues relating to transverse polarized proton emittance in the Booster and AGS. It also compares the transverse emittance during the FY09 polarized proton run with it during the FY06 run as several changes were made for the FY09 run in an attempt to reduce the transverse emittance coming out of the AGS. The FY06 run is used for comparison because it was relatively long, and it's believed that the performance of the injectors for polarized protons, up until FY09, was best during that run. Over the shutdown just before the FY09 run work was done in LEBT and MEBT to reduce the emittance coming out of the Linac. Measurements of the beam coming out of Linac1 indicate that the horizontal normalized emittance was reduced from 11.0 {pi} to 4.5 {pi}mm mrad, and that the vertical normalized emittance was reduced from 12.1 {pi} to 5.5 {pi} mm mrad going from FY06 to FY09. There were 2 new types of stripping foil installed in the Booster, called descriptively the 'strip' (No.6) and 'stamp' (No.2) foil, both nominally 100 {micro}g/cm{sup 2}. Both foils are composed of a diamond like material, and designed to reduce the number of times the beam goes through the foil. Other than those, there are two standard 100 {micro}g/cm carbon foils (No.3 and 5), and one 200 {micro}g/cm{sup 2} carbon foil (No.4). Of the two 100 {micro}g/cm{sup 2} foils, one has shown some deterioration (No.3) in stripping efficiency. During the FY06 run a standard 100 {micro}g/cm{sup 2} foil was generally used, and during the FY09 run the strip foil was generally used, though the stamp foil was also used for the last 3-4 weeks of the run. Both the FY06 and FY09 runs were about 5 months long, starting in late January, FY06 ending in late June, and FY09 ending in early July. A new injection setup was used for about the last 3 months of FY09, from the beginning of April to the end of the run. This setup uses 1/2 integer stopband correctors with the tunes near, but slightly greater than, 4.5 to distort the {beta} functions at the foil in order to reduce the emittance blowup caused by scattering on the foil. New BtA quad settings, largely based on a MAD model of the BtA line and AGS were used for virtually the entire FY09 run (Feb 5 to the end) in an attempt to improve the matching into the AGS. Since, it has been thought for some time that there is emittance blowup in the vertical due to an injection mismatch. The nominal Linac pulse width was decreased from 400 {micro}s to 300 {micro}s in the latter part of february 09, so the vast majority of the FY09 run used a 300 {micro}s pulse width. The standard pulse width for FY06 was 400 {micro}s. This has some implications for comparing the data from FY06 with that from FY09, but they don't seem insurmountable.

43 PARTICLE ACCELERATORS↗

A simple crunching of the AGS 'bare' machine ORM data - February 2007 - to extract some aspects of AGS transverse coupling at injection and extraction

The objective of this note is to (once again) explore the AGS 'ORM' (orbit response matrix) data taken (by Operations) early during the 2007 run with an AGS bare machine and gold beam. Indeed the present motivation is to extract as much information about the AGS inherent transverse coupling as possible - from general arguments and the copious ORM data. And taking this one step further, (though not accomplished yet) the goal really should be to tell the model how to describe this coupling. 'Bare' as used here means the AGS with no quadrupole, sextupole or octupole magnets powered. Only the main (combined-function) magnet string and dipole bumps necessary to optimize beam survival are powered. 'ORM data' means the systematic recording of the equilibrium orbit beam position monitor response to powering individual dipole corrector magnets. The 'matrix' results from looking at the effect of each of the (12 superperiods X 4 dipoles per superperiod) 'kicks' on each of the (12 X 6) pick up electrodes (pues) in each transverse plane. So then we have two (48 X 72) matrices of numbers from the ORM data. (Though 'pue' usually refers to the hardware in the vacuum chamber and 'bpm' to the beam position monitoring system, the two labels will be used casually here.) The exercise is carried out at two magnet rigidities, injection (AGS field {approx}434 Gauss) and extraction to RHIC ({approx}9730 Gauss), - a ratio of rigidities of about 22.4. Since we stick with a bare machine, we are also stuck with the bare tunes which means the tunes are rather close together and near 8.75. Injection: (h,v) {approx} (8.73, 8.76).

43 PARTICLE ACCELERATORS↗

AGS tune jump power supply design and test

A horizontal tune jump system has been installed to overcome the horizontal intrinsic spin resonances, which requires jumping the horizontal tune 0.04 units 82 times, 41 up and 41 down. Two quadruple magnets have been installed in AGS ring to perform this. The pulsed magnet current ranges from about 140A near injection to about 1400A later. The current pulse rise and fall time are around 100uS and flat tops time is around 4mS. These quadruples have separated supplies. This tune jump pulse power supply employees all semiconductor parts as well as the main switches. During dummy load and magnet testing, the test results showed that the power supply could meet the specification. This article will describe some details of power supply simulation, design and testing. Some test waveforms and pictures are presented in this paper.

43 PARTICLE ACCELERATORS↗

AGS tune jump system to cross horizontal depolarization resonances overview

Two partial snakes overcome the vertical depolarizing resonances in the AGS. But a new type of depolarizing intrinsic resonance from horizontal motion appeared. We reduce these using horizontal tune jumps timed to these resonances. We gain a factor of six in crossing rate with a tune jump of 0.05 in 100 {micro}s. Two quadrapoles, we described in 2009, pulse 42 times, the current matching beam energy. The power supplies for these quads are described in detail elsewhere in this conference. The controls for the Jump Quad system is based on a BNL designed Quad Function Generator. Two modules are used; one for timing, and one to supply reference voltages. Synchronization is provided by a proprietary serial bus, the Event Link. The AgsTuneJump application predicts the times of the resonances during the AGS cycle and calculates the power supply trigger times from externally collected tune and energy versus time data and the Low and High PS voltage functions from a voltage to current model of the power supply. The system was commissioned during runs 09 & 10 and is operational. Many beam effects are described elsewhere. The TuneJump system has worked well and has caused little trouble save for the perturbations in the lattice having such a large effect due to our need to run with the vertical tune within a few thousandths of the integer tune. As these problems were mostly sorted out by correcting the 6th harmonic orbit distortions which caused a large 18 theta beta wave. Also running with minimal chromaticity reduces emittance growth. There are still small beta waves which are being addressed. The timing of the pulses is still being investigated, but as each crossing causes minimal polarization loss, this is a lengthy process.

43 PARTICLE ACCELERATORS↗

Modeling, Simulation and Data Fitting of the Charge Injected Diodes (CID) for SLHC Tracking Applications

Modeling and simulations have been performed for the charge injected diodes (CID) for the application in SLHC. MIP-induced current and charges have been calculated for segmented detectors with various radiation fluences, up to the highest SLHC fluence of 1 x 10{sup 16} n{sub eq}/cm{sup 2}. Although the main advantage of CID detectors is their virtual full depletion at any radiation fluence at a modest bias voltage (<600 V), the simulation of CID and fitting to the existing data have shown that the CID operation mode also reduces the free carrier trapping, resulting in a much higher charge collection at the SLHC fluence than that in a standard Si detector. The reduction in free carrier trapping by almost one order of magnitude is due to the fact that the CID mode also pre-fills the traps, making them neutral and not active in trapping. It has been found that, electron traps can be pre-filled by injection of electrons from the n{sup +} contact, and hole traps can be pre-filled by injection of holes from the p{sup +} contact. The CID mode of detector operation can be achieved by a modestly low temperature of around -40 C, achievable by the proposed CO{sub 2} cooling for detector upgrades in SLHC. High charge collection comparable to the 3D electrode Si detectors makes the CID Si detector a valuable alternative for SLHC detectors for its much easier fabrication process.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Near integer tune for polarization preservation in the AGS

The high energy (T = 250 GeV) polarized proton beam experiments performed in RHIC, require high polarization of the beam. In order to preserve the polarization of the proton beam, during the acceleration in the AGS, which is the pre-injector to RHIC, we have installed in AGS two partial helical magnets which minimize the loss of the beam polarization caused by the various intrinsic spin resonances occurring during the proton acceleration. The minimization of the polarization loss during the acceleration cycle, requires that the vertical tune of the AGS is between the values of 8.97 and 8.985 during the acceleration. With the AGS constrained to run at near integer tune {approx}8.980, the perturbations to the beam caused by the partial helical magnets are large and also result in large beta and dispersion waves. To mitigate the adverse effect of the partial helices on the optics of the AGS, we have installed in specified straight sections of the AGS compensation quads and we have also generated a beam bump at the location of the cold partial helix. In this paper we present the beam optics of the AGS which ameliorates the adverse effect of the two partial helices on the beam optics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A model of the AGS based on stepwise ray-tracing through the measured field maps of the main magnets

Two-dimensional mid-plane magnetic field maps of two of the main AGS magnets were produced, from Hall probe measurements, for a series of different current settings. The analysis of these data yielded the excitation functions [1] and the harmonic coefficients [2] of the main magnets which have been used so far in all the models of the AGS. The constant increase of the computation power makes it possible today to directly use a stepwise raytracing through these measured field maps with a reasonable computation time. We describe in detail how these field maps have allowed the generation of models of the 6 different types of AGS main magnets, and how they are being handled with the Zgoubi ray-tracing code [3]. We give and discuss a number of results obtained regarding both beam and spin dynamics in the AGS, and we provide comparisons with other numerical and analytical modelling methods.

43 PARTICLE ACCELERATORS↗

Drift distance survey in DPIS for high current beam production

In a laser ion source, plasma drift distance is one of the most important design parameters. Ion current density and beam pulse width are defined by plasma drift distance between laser target and beam extraction position. In direct plasma injection scheme (DPIS), which uses a laser ion source and Radio Frequency Quadrupole (RFQ) linac, we can apply relatively higher electric field at the beam extraction due to the unique shape of a positively biased electrode. However, when we aim at very high current acceleration like several tens of mA, we observed mismatched beam extraction conditions. We tested three different ion current at ion extraction region by changing plasma drift distance to study better extraction condition. In this experiment, C{sup 6+} beam was accelerated. We confirmed that the matching condition can be improved by controlling plasma drift distance.

43 PARTICLE ACCELERATORS↗

Compact, Achromatic Non-scaling FFAG Accelerator for HEP, Commercial and Medical Applications (CRADA FRA-2008-0005 Final Report)

Proton and light-ion accelerators have many research and medical applications, but the current state of technology in accelerators severely limits their widespread use: (1) synchrotrons have an intrinsic low duty cycle and become quite large for light ions; and (2) cyclotrons do not have energy variability and require complex superconducting magnets for high energy. A new concept in non-scaling Fixed-Field Alternating-Gradient (FFAGs) has been invented that incorporates both the energy variability of the synchrotron and the high duty cycle of the cyclotron. The concept uses normal-conducting, combined-function magnets that apply only constant (dipole) and linear-gradient (quadrupole) fields to stabilize the accelerator. This project will develop an optimized design for a new non-scaling and cost-effective innovation in FFAG accelerators. The accelerator design will have optics that can stably accelerate protons to 250 MeV (or higher) and carbon ions to =200 MeV, an energy considered ideal for radiation therapy. Phase I will optimize, fully simulate, and demonstrate the feasibility of this accelerator. Commercial Applications and other Benefits as described by the awardee: The fixed-field acceleration concept should eliminate some of the most pronounced technical difficulties, expense, maintenance, and required expertise faced in conventional proton and light-ion accelerators. In addition to the application for high energy physics, these accelerators should have application in cancer treatment, radiopharmaceuticals, and medical isotope production, and materials science.

43 PARTICLE ACCELERATORS↗

Acceleration in the linear non-scaling fixed-field alternating-gradient accelerator EMMA

In a fixed-field alternating-gradient (FFAG) accelerator, eliminating pulsed magnet operation permits rapid acceleration to synchrotron energies, but with a much higher beam-pulse repetition rate. Conceived in the 1950s, FFAGs are enjoying renewed interest, fuelled by the need to rapidly accelerate unstable muons for future high-energy physics colliders. Until now a 'scaling' principle has been applied to avoid beam blow-up and loss. Removing this restriction produces a new breed of FFAG, a non-scaling variant, allowing powerful advances in machine characteristics. We report on the first non-scaling FFAG, in which orbits are compacted to within 10?mm in radius over an electron momentum range of 12-18 MeV/c. In this strictly linear-gradient FFAG, unstable beam regions are crossed, but acceleration via a novel serpentine channel is so rapid that no significant beam disruption is observed. This result has significant implications for future particle accelerators, particularly muon and high-intensity proton accelerators.

43 PARTICLE ACCELERATORS↗