Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Acceptance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

The effects of video compression on acceptability of images for monitoring life sciences experiments

Future manned space operations for Space Station Freedom will call for a variety of carefully planned multimedia digital communications, including full-frame-rate color video, to support remote operations of scientific experiments. This paper presents the results of an investigation to determine if video compression is a viable solution to transmission bandwidth constraints. It reports on the impact of different levels of compression and associated calculational parameters on image acceptability to investigators in life-sciences research at ARC. Three nonhuman life-sciences disciplines (plant, rodent, and primate biology) were selected for this study. A total of 33 subjects viewed experimental scenes in their own scientific disciplines. Ten plant scientists viewed still images of wheat stalks at various stages of growth. Each image was compressed to four different compression levels using the Joint Photographic Expert Group (JPEG) standard algorithm, and the images were presented in random order. Twelve and eleven staffmembers viewed 30-sec videotaped segments showing small rodents and a small primate, respectively. Each segment was repeated at four different compression levels in random order using an inverse cosine transform (ICT) algorithm. Each viewer made a series of subjective image-quality ratings. There was a significant difference in image ratings according to the type of scene viewed within disciplines; thus, ratings were scene dependent. Image (still and motion) acceptability does, in fact, vary according to compression level. The JPEG still-image-compression levels, even with the large range of 5:1 to 120:1 in this study, yielded equally high levels of acceptability. In contrast, the ICT algorithm for motion compression yielded a sharp decline in acceptability below 768 kb/sec. Therefore, if video compression is to be used as a solution for overcoming transmission bandwidth constraints, the effective management of the ratio and compression parameters according to scientific discipline and experiment type is critical to the success of remote experiments.

Haines, Richard F.↗

A Human Factors Evaluation of a Methodology for Pressurized Crew Module Acceptability for Zero-Gravity Ingress of Spacecraft

This project aimed to develop a methodology for evaluating performance and acceptability characteristics of the pressurized crew module volume suitability for zero-gravity (g) ingress of a spacecraft and to evaluate the operational acceptability of the NASA crew return vehicle (CRV) for zero-g ingress of astronaut crew, volume for crew tasks, and general crew module and seat layout. No standard or methodology has been established for evaluating volume acceptability in human spaceflight vehicles. Volume affects astronauts'ability to ingress and egress the vehicle, and to maneuver in and perform critical operational tasks inside the vehicle. Much research has been conducted on aircraft ingress, egress, and rescue in order to establish military and civil aircraft standards. However, due to the extremely limited number of human-rated spacecraft, this topic has been un-addressed. The NASA CRV was used for this study. The prototype vehicle can return a 7-member crew from the International Space Station in an emergency. The vehicle's internal arrangement must be designed to facilitate rapid zero-g ingress, zero-g maneuverability, ease of one-g egress and rescue, and ease of operational tasks in multiple acceleration environments. A full-scale crew module mockup was built and outfitted with representative adjustable seats, crew equipment, and a volumetrically equivalent hatch. Human factors testing was conducted in three acceleration environments using ground-based facilities and the KC-135 aircraft. Performance and acceptability measurements were collected. Data analysis was conducted using analysis of variance and nonparametric techniques.

Sanchez, Merri J.↗

Emperical Tests of Acceptance Sampling Plans

Acceptance sampling is a quality control procedure applied as an alternative to 100% inspection. A random sample of items is drawn from a lot to determine the fraction of items which have a required quality characteristic. Both the number of items to be inspected and the criterion for determining conformance of the lot to the requirement are given by an appropriate sampling plan with specified risks of Type I and Type II sampling errors. In this paper, we present the results of empirical tests of the accuracy of selected sampling plans reported in the literature. These plans are for measureable quality characteristics which are known have either binomial, exponential, normal, gamma, Weibull, inverse Gaussian, or Poisson distributions. In the main, results support the accepted wisdom that variables acceptance plans are superior to attributes (binomial) acceptance plans, in the sense that these provide comparable protection against risks at reduced sampling cost. For the Gaussian and Weibull plans, however, there are ranges of the shape parameters for which the required sample sizes are in fact larger than the corresponding attributes plans, dramatically so for instances of large skew. Tests further confirm that the published inverse-Gaussian (IG) plan is flawed, as reported by White and Johnson (2011).

White, K. Preston, Jr.↗

Flight Crew Workload, Acceptability, and Performance When Using Data Comm in a High-Density Terminal Area Simulation

This document describes a collaborative FAA/NASA experiment using 22 commercial airline pilots to determine the effect of using Data Comm to issue messages during busy, terminal area operations. Four conditions were defined that span current day to future flight deck equipage: Voice communication only, Data Comm only, Data Comm with Moving Map Display, and Data Comm with Moving Map displaying taxi route. Each condition was used in an arrival and a departure scenario at Boston Logan Airport. Of particular interest was the flight crew response to D-TAXI, the use of Data Comm by Air Traffic Control (ATC) to send taxi instructions. Quantitative data was collected on subject reaction time, flight technical error, operational errors, and eye tracking information. Questionnaires collected subjective feedback on workload, situation awareness, and acceptability to the flight crew for using Data Comm in a busy terminal area. Results showed that 95% of the Data Comm messages were responded to by the flight crew within one minute and 97% of the messages within two minutes. However, post experiment debrief comments revealed almost unanimous consensus that two minutes was a reasonable expectation for crew response. Flight crews reported that Expected D-TAXI messages were useful, and employment of these messages acceptable at all altitude bands evaluated during arrival scenarios. Results also indicate that the use of Data Comm for all evaluated message types in the terminal area was acceptable during surface operations, and during arrivals at any altitude above the Final Approach Fix, in terms of response time, workload, situation awareness, and flight technical performance. The flight crew reported the use of Data Comm as implemented in this experiment as unacceptable in two instances: in clearances to cross an active runway, and D-TAXI messages between the Final Approach Fix and 80 knots during landing roll. Critical cockpit tasks and the urgency of out-the window scan made the additional head down time to respond to Data Comm messages undesirable during these events. However, most crews also stated that Data Comm messages without an accompanying audio chime and no expectation of an immediate response could be acceptable even during these events.

Norman, R. Michael↗

Acceptability of Flight Deck-Based Interval Management Crew Procedures

The Interval Management for Near-term Operations Validation of Acceptability (IM-NOVA) experiment was conducted at the National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC) in support of the NASA Next Generation Air Transportation System (NextGen) Airspace Systems Program's Air Traffic Management Technology Demonstration - 1 (ATD-1). ATD-1 is intended to showcase an integrated set of technologies that provide an efficient arrival solution for managing aircraft using NextGen surveillance, navigation, procedures, and automation for both airborne and ground-based systems. The goal of the IM-NOVA experiment was to assess if procedures outlined by the ATD-1 Concept of Operations, when used with a minimum set of Flight deck-based Interval Management (FIM) equipment and a prototype crew interface, were acceptable to and feasible for use by flight crews in a voice communications environment. To investigate an integrated arrival solution using ground-based air traffic control tools and aircraft automatic dependent surveillance broadcast (ADS-B) tools, the LaRC FIM system and the Traffic Management Advisor with Terminal Metering and Controller Managed Spacing tools developed at the NASA Ames Research Center (ARC) were integrated in LaRC's Air Traffic Operations Laboratory. Data were collected from 10 crews of current, qualified 757/767 pilots asked to fly a high-fidelity, fixed based simulator during scenarios conducted within an airspace environment modeled on the Dallas-Fort Worth (DFW) Terminal Radar Approach Control area. The aircraft simulator was equipped with the Airborne Spacing for Terminal Area Routes algorithm and a FIM crew interface consisting of electronic flight bags and ADS-B guidance displays. Researchers used "pseudo-pilot" stations to control 24 simulated aircraft that provided multiple air traffic flows into DFW, and recently retired DFW air traffic controllers served as confederate Center, Feeder, Final, and Tower controllers. Pilot participant feedback indicated that the procedures used by flight crews to receive and execute interval management (IM) clearances in a voice communications environment were logical, easy to follow, did not contain any missing or extraneous steps, and required the use of an acceptable level of workload. The majority of the pilot participants found the IM concept, in addition to the proposed FIM crew procedures, to be acceptable and indicated that the ATD-1 procedures can be successfully executed in a near-term NextGen environment.

Murdock, Jennifer L.↗

TASAR Flight Trial 2: Assessment of Air Traffic Controller Acceptability of TASAR Requests

In support of the Flight Trial (FT-2) of NASA's prototype of the Traffic Aware Strategic Aircrew Requests (TASAR) concept, observations were conducted at the air traffic facilities to identify and assess the main factors that affect the acceptability of pilot requests by air traffic controllers. Two observers shadowed air traffic controllers at the Atlanta (ZTL) and Jacksonville (ZJX) air traffic control centers as the test flight pilot made pre-scripted requests to invoke acceptability issues and then they interviewed the observed and other controllers voluntarily. Fifty controllers were interviewed with experience ranging from one to thirty-five years. All interviewed controllers were enthusiastic about the technology and accounting for sector boundaries in pilot requests, particularly if pilots can be made aware of high workload situations. All interviewed controllers accept more than fifty percent of pilot requests; forty percent of them reject less than ten percent of requests. The most common reason for rejecting requests is conflicting with traffic followed by violating letters of agreement (LOAs) and negatively impacting neighboring sector workload, major arrival and departure flows and flow restrictions. Thirty-six requests were made during the test, eight of which were rejected due to: the aircraft already handed off to another sector, violating LOA, opposing traffic, intruding into an active special use airspace (SUA), intruding into another center, weather, and unfamiliarity with the requested waypoint. Nine requests were accepted with delay mostly because the controller needed to locate unfamiliar waypoints or to coordinate with other controllers.

Idris, Husni↗

Meal Replacement Mass Reduction and Integration Acceptability Study

NASA, in planning for long-duration missions, has an imperative to provide a food system with the necessary nutrition, acceptability, and safety to ensure sustainment of crew health and performance. The Orion Multi-Purpose Crew Vehicle (MPCV) and future exploration missions are mass constrained; therefore the team is challenged to reduce the mass of the food system by 10% while maintaining product safety, nutrition, and acceptability. Commercially available products do not meet the nutritional requirements for a full meal replacement in the spaceflight food system, and it is currently unknown if daily meal replacements will impact crew food intake and psychosocial health over time. The purpose of this study was to develop a variety of nutritionally balanced breakfast replacement bars that meet spaceflight nutritional, microbiological, sensorial, and shelf-life requirements, while enabling a 10% savings in food mass. To date, six nutrient-dense meal replacement bars (approximately 700 calories per bar) have been developed, using traditional methods of compression as well as novel ultrasonic compression technologies developed by Creative Resonance Inc. (Phoenix, AZ). The four highest rated bars were evaluated in the Human Exploration Research Analog (HERA) to assess the frequency with which actual meal replacement options may be implemented. Specifically, overall impact of bars on mood, satiety, digestive discomfort, and satisfaction with food. These factors are currently being analyzed to inform successful implementation strategies where crew maintain adequate food intake. In addition, these bars are currently undergoing shelf-life testing to determine long-term sensory acceptability, nutritional stability, qualitative stability of analytical measurements (i.e. water activity and texture), and microbiological compliance over two years of storage at room temperature and potential temperature abuse conditions to predict long-term acceptability. It is expected that this work will enable a successful meal replacement strategy to be implemented that will maintain crew food consumption and health, while informing exploration missions with appropriate mass savings expectations.

Sirmons, T.↗

Using Machine-Learning to Dynamically Generate Operationally Acceptable Strategic Reroute Options

The newly developed Trajectory Option Set (TOS), a preference-weighted set of alternative routes submitted by flight operators, is a capability in the U.S. traffic flow management system that enables automated trajectory negotiation between flight operators and Air Navigation Service Providers. The objective of this paper is to describe and demonstrate an approach for automatically generating pre-departure and airborne TOSs that have a high probability of operational acceptance. The approach uses hierarchical clustering of historical route data to identify route candidates. The probability of operational acceptance is then estimated using predictors trained on historical flight plan amendment data using supervised machine learning algorithms, allowing the routes with highest probability of operational acceptance to be selected for the TOS. Features used describe historical route usage, difference in flight time and downstream demand to capacity imbalance. A random forest was found to be the best performing algorithm for learning operational acceptability, with a model accuracy of 0.96. The approach is demonstrated for an historical pre-departure flight from Dallas/Fort Worth International Airport to Newark Liberty International Airport.

Evans, Antony↗

Using Machine-Learning to Dynamically Generate Operationally Acceptable Strategic Reroute Options

The newly developed Trajectory Option Set (TOS), a preference-weighted set of alternative routes submitted by flight operators, is a capability in the U.S. traffic flow management system that enables automated trajectory negotiation between flight operators and Air Navigation Service Providers. The objective of this paper is to describe and demonstrate an approach for automatically generating pre-departure and airborne TOSs that have a high probability of operational acceptance. The approach uses hierarchical clustering of historical route data to identify route candidates. The probability of operational acceptance is then estimated using predictors trained on historical flight plan amendment data using supervised machine learning algorithms, allowing the routes with highest probability of operational acceptance to be selected for the TOS. Features used describe historical route usage, difference in flight time and downstream demand to capacity imbalance. A random forest was found to be the best performing algorithm for learning operational acceptability, with a model accuracy of 0.96. The approach is demonstrated for an historical pre-departure flight from Dallas/Fort Worth International Airport to Newark Liberty International Airport.

Evans, Antony↗

Calculation of acceptance of high intensity superconducting proton linac for Project X

Project-X is the proposed high intensity proton facility to be built at Fermilab, US. Its Superconducting Linac, to be used at first stage of acceleration, will be operated in continuous wave (CW) mode. The Linac is divided into three sections on the basis of operating frequencies & six sections on the basis of family of RF cavities to be used for the acceleration of beam from 2.5 MeV to 3 GeV. The transition from one section to another can limit the acceptance of the Linac if these are not matched properly. We performed a study to calculate the acceptance of the Linac in both longitudinal and transverse plane. Investigation of most sensitive area which limits longitudinal acceptance and study of influence of failure of beam line elements at critical position, on acceptance are also performed.

43 PARTICLE ACCELERATORS↗

APPLICATION OF THE FAVOR-OCI FRACTURE MECHANICS COMPUTER PROGRAM TO ASME CODE SECTION XI, IWB-3610 FLAW ACCEPTANCE CRITERIA EVALUATIONS

This paper presents an overview of added features in a new version of the FAVOR (Fracture Analysis of Vessels Oak Ridge) computer code called FAVOR-OCI. The original FAVOR code was developed at the US Department of Energy’s Oak Ridge National Laboratory (ORNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC). FAVOR is applied by US and international nuclear power industries to perform deterministic and probabilistic fracture mechanics analyses of commercial nuclear reactor pressure vessels (RPVs). Appli-cations of FAVOR are focused on insuring that the structural integrity of aging, and increasingly embrittled, RPVs is main-tained throughout their licensed service life. Based on the final ORNL release of FAVOR, v16.1, FAVOR-OCI extends existing deterministic features of FAVOR while preserving all prev-iously-existing probabilistic capabilities of FAVOR.The objective of this paper is to describe new deterministic features in FAVOR-OCI that can be applied to analytical evaluations of planar flaws. These evaluations are consistent with the acceptance criteria of ASME Code, Section XI, Article IWB-3610, including Subarticles IWB-3611 (acceptance based on flaw size) and IWB-3612 (acceptance based on applied stress intensity factor). The linear elastic fracture mechanics (LEFM) capabilities of FAVOR-OCI also incorporate the analytical procedures presented in the Nonmandatory Appendix A, Analysis of Flaws, Article A-3000, Method of KI Determination, for both surface and subsurface (embedded) flaws.The paper describes a computational methodology for determining critical values of fracture-related parameters that satisfy ASME Code Section XI acceptance criteria for flaws exposed to multiple thermal-hydraulic transients. These com-pute-intensive analyses can be carried out with a single execution of FAVOR-OCI. The new methodology determines critical values by solving for either the point of tangency or point of intersection between applied KI versus time histories and a user-selected fracture toughness material property (e.g., ASME KIc, FAVOR Weibull KIc, or Master Curve Weibull KJc) for surface or subsurface flaws. Situations where warm prestress conditions apply can also be addressed. The paper highlights a need for this new capability via applications to a recent independent review of safety cases for RPVs in two Belgian nuclear power plants (NPPs). That review required ASME Section XI assessments of several thousand embedded, quasi-laminar flaws in the wall of each RPV. Analysis results provided by the new capability contributed to the technical bases compiled from several sources by the Belgian nuclear regulatory agency (FANC) and eventually used by FANC to justify the restart of these NPPs.

Dickson, Terry L.↗

Acceptance Calculation and Study of Fault Scenarios in the PIP-II Linac

The Proton Improvement Plan (PIP)-II is a proposed high intensity proton facility being developed at the Fermilab. The PIP-II is primarily based on construction of a new superconducting radio frequency (SRF) linear accelerator (linac) that would deliver an average beam current of 2mA with output energy up to 800 MeV. The acceptance of an accelerator outlines its sensitivity against deviations from its nominal design parameters. Consequently, a higher acceptance minimizes possibility of the beam loss. This paper presents longitudinal and transverse acceptance of the PIP-II SRF linac. Furthermore, paper also discusses implications of fault scenarios, such as the cavity failure, on the beam optics and acceptances.

43 PARTICLE ACCELERATORS↗

A Step Towards the Final Frontier: Lessons Learned from Acceptance Testing of the First HPE/Cray EX 3000 System at ORNL

In this paper, we summarize the deployment of the Air Force Weather (AFW) HPC11 system at Oak Ridge National Laboratory (ORNL) including the process followed to successfully complete acceptance testing of the system. HPC11 is the first HPE/Cray EX 3000 system that has been successfully released to its user community in a federal facility. HPC11 consists of two identical 800-node supercomputers, Fawbush and Miller, with access to two independent and identical Lustre parallel file systems. HPC11 is equipped with Slingshot 10 interconnect technology and relies on the HPE Performance Cluster Manager (HPCM) software for system configuration. ORNL has a clearly defined acceptance testing process used to ensure that every new system deployed can provide the necessary capabilities to support user workloads. We worked closely with HPE and AFW to develop a set of tests that used the United Kingdom’s Meteorological Office’s Unified Model (UM) and 4DVAR. We also included benchmarks and applications from the Oak Ridge Leadership Computing Facility (OLCF) portfolio to fully exercise the HPE/Cray programming environment and evaluate the functionality and performance of the system. Acceptance testing of HPC11 required parallel execution of each element on Fawbush and Miller. In addition, careful coordination was needed to ensure successful acceptance of the newly deployed Lustre file systems alongside the compute resources. In this work, we present test results from specific system components and provide an overview of the issues identified, challenges encountered, and the lessons learned along the way.

Melesse Vergara, Veronica↗

Examining the Use of the Technology Acceptance Model for Adoption of Advanced Digital Technologies in Nuclear Power Plants

The United States nuclear industry is being economically challenged and needs wide-scale adoption of enabling technology like advanced automation to remain viable. To enable wide-scale adoption of advanced technology, addressing the human-technology integration challenges and factors that influence technology acceptance (i.e., ‘buy in’) is pertinent. This work examines the Technology Acceptance Model as a framework for characterizing the factors influencing technology adoption in the nuclear industry. An outcome of this work is to support the development of future tools such as a technology acceptance survey that can be used to assess technology acceptance throughout the lifespan of a modernization program to provide a systematic way of ensuring stakeholder and operations ‘buy in.’

99 GENERAL AND MISCELLANEOUS↗

DOE Hanford Tank Side Cesium Removal System (TSCR) Update: Fabrication and Factory Acceptance Testing - 20300

The Tank Side Cesium Removal (TSCR) System is a modular, quickly-deployable, and passively safe system for efficiently removing solids and cesium from alkaline liquid waste raffinate created by fuel processing on the Hanford site. This paper provides an overview of the project with particular emphasis on completion of fabrication and factory acceptance testing (FAT). All TSCR System components are inside three enclosures known as the Process Enclosure, Ancillary Enclosure, and Control Enclosure. The Process Enclosure is seismic design category II (SDC-II) and built to withstand the rigors of transportation and lifting, high winds, volcanic ash fall, and heavy precipitation (snow) over a temperature range of -25 to 115 deg. F. The Process Enclosure and Control Enclosure were fabricated in AVANTech's Columbia, SC facility, while the Ancillary Enclosure was fabricated in AVANTech's Richland, WA facility. The design and preliminary documented safety analysis were completed in December 2019, with all work being performed in accordance with ASME NQA-1 quality assurance requirements. The Process Enclosure, Ion Exchange Columns (IXCs), and several other TSCR components have a nuclear safety function and are designated as safety significant structures, systems, and components (SS-SSCs). The NQA-1 Commercial Grade Dedication (CGD) process was used to identify critical characteristics in order to accept materials and items used for fabrication of several safety significant TSCR components. This paper also addresses unique aspects and challenges of implementing CGD in DOE facilities and systems. After fabrication and preliminary testing, the Process and Control Enclosures were shipped to AVANTech's Richland facility where the complete TSCR System was setup and connected in a represented layout and configuration that will be used on the Hanford site. Test tanks and pumps were put in place and connected to the TSCR Process Enclosure in a manner that mimicked interfacing Double Shell Tanks in the 241-AP Tank Farm. The TSCR System was then tested/operated under conditions equivalent to those planned for onsite operation. Testing was separated into five separate phases as defined below: - Phase 1: Confirmation of TSCR System readiness for the FAT; - Phase 2: Verification of TSCR System operation under standard conditions; - Phase 3: Demonstration of TSCR System operation under non-standard conditions; - Phase 4: Demonstration of ion exchange media removal from an IXC; and - Phase 5: Completion of TSCR System lift plans and site mobilization. The Hanford Tank Operations Contractor, Washington River Protection Solutions (WRPS), participated in all phases of testing. Testing at AVANTech's Richland Facility allowed WRPS personnel to familiarize themselves with TSCR operations in a radiologically clean facility prior to onsite mobilization. Engineering and operations personnel gained valuable experience that allowed them to better refine onsite operational protocols and procedures - including handling and movement of IXCs with a forklift. This paper describes the technologies used by the TSCR System as well as how these technologies are deployed and operated to advance the Hanford mission of safely, efficiently, and effectively treating tank waste. It also provides detailed information on fabrication and FAT, including operational data from simulated tank waste runs. A project schedule for WRPS' planned construction acceptance testing, operational acceptance testing, and actual tank waste treatment is provided. This presentation should be of great interest to parties responsible for the design, testing, and mobilization of modular NQA-1 technologies for the treatment of raffinate and similar liquid wastes containing high concentrations of radioactive cesium. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Understanding and Modeling Pooled Rideshare Acceptance: Influential Factors, Preferred User Experiences, and Implications

Ridesharing allows people to share a vehicle with others traveling in the same direction, which can reduce costs and traffic congestion. Pooled rideshare (PR) services, such as UberX Share and Lyft Shared, offer an economical and environmentally friendly alternative by matching passengers traveling similar routes. However, despite these benefits, PR adoption remains low due to concerns about safety, privacy, and convenience. This research explores the factors influencing PR adoption and provides recommendations to improve user acceptance. A nationwide survey of 5,385 participants across the U.S. was conducted to understand why people choose or avoid PR. The study identified five key factors influencing PR consideration: safety, service experience, privacy, traffic/environment, and time/cost. Additional research examined ways to optimize PR experiences by identifying four critical factors: comfort/ease of use, convenience, vehicle technology/accessibility, and passenger safety. To measure the impact of these factors, a statistical model called the Pooled Rideshare Acceptance Model (PRAM) was developed, providing insights into how each element influences PR adoption. Further analysis using the Pooled Rideshare Acceptance Model Multigroup Analyses (PRAMMA) revealed how demographic characteristics such as age, gender, income, and past rideshare experience shape PR perceptions. Some key findings from the multigroup analyses showed that younger users valued technological features and environmental benefits, while older users prioritized reliability and service transparency. Additionally, privacy concerns were more significant for female users, while convenience was critical for higher-income groups. These results emphasize that a 'onesize-fits-all' approach to PR service design is not effective, highlighting the need for tailored strategies to address different user segments. Further, workshops were conducted with researchers and students to translate the findings into real-world solutions. These workshops and 3 all the statistical analyses led to the development of 95 actionable recommendations. The recommendations focus on key areas such as safety, service reliability, user education, and accessibility, offering tangible improvements to PR services. The insights from this study provide valuable guidance for policymakers, transportation network companies (TNCs), and researchers aiming to make PR services safer, more accessible, and widely accepted. By addressing user concerns, PR can become a more viable transportation option, supporting sustainable urban mobility and reducing reliance on private vehicles. Additionally, these findings emphasize the importance of user-centric service design in encouraging broader PR adoption. Future research should explore evolving trends in PR preferences, technological advancements, and policy changes to ensure continued improvements. By implementing these recommendations, PR services can better align with user expectations, enhance trust in shared mobility, and contribute to a more efficient transportation ecosystem.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Social Acceptance of Wind Power in the United States: Evaluating Stakeholder Perspectives (Poster)

As the wind industry strives to achieve 20% wind energy by 2030, maintaining high levels of social acceptance for wind energy will become increasingly important. Wind Powering America is currently researching stakeholder perspectives in the U.S. market and reviewing findings from wind energy projects around the world to better understand social acceptance barriers. Results from European studies show that acceptance varies widely depending on local community values. A preliminary survey shows similar results in the United States. Further research will be conducted to refine our understanding of key social acceptance barriers and evaluate the best ways to mitigate negative perspectives on wind power.

17 WIND ENERGY↗

Social Acceptance of Wind: A Brief Overview (Presentation)

This presentation discusses concepts and trends in social acceptance of wind energy, profiles recent research findings, and discussions mitigation strategies intended to resolve wind power social acceptance challenges as informed by published research and the experiences of individuals participating in the International Energy Agencies Working Group on Social Acceptance of Wind Energy

17 WIND ENERGY↗