Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “AEP”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

13kW Advanced Electric Propulsion Flight System Development and Qualification

The next phase of robotic and human deep space exploration missions is enhanced by high performance, high power solar electric propulsion systems for large-scale science missions and cargo transportation. Aerojet Rocketdynes Advanced Electric Propulsion System (AEPS) program is completing development, qualification and delivery of five flight 13.3kW EP systems to NASA. The flight AEPS includes a magnetically-shielded, long-life Hall thruster, power processing unit (PPU), xenon flow controller (XFC), and intrasystem harnesses. The Hall thruster, originally developed and demonstrated by NASAs Glenn Research Center and the Jet Propulsion Laboratory, operates at input powers up to 12.5kW while providing a specific impulse over 2600s at an input voltage of 600V. The power processor is designed to accommodate an input voltage range of 95 to 140V, consistent with operation beyond the orbit of Mars. The integrated system is continuously throttleable between 3 and 13.3kW. The program has completed the system requirement review; the system, thruster, PPU and XFC preliminary design reviews; development of engineering models, and initial system integration testing. This paper will present the high power AEPS capabilities, overall program and design status and the latest test results for the 13.3kW flight system development and qualification program.

Jackson, Jerry↗

Development of High Power Hall Thruster Systems to Enable the NASA Exploration Vision

The next phase of space exploration missions requires high power Solar Electric Propulsion (SEP) systems for large-scale science missions and cargo transportation. Development is underway at Aerojet Rocketdyne on Hall thruster systems that are intended to bracket the needs of future NASA SEP missions in support of space exploration. The Advanced Electric Propulsion System (AEPS) program is developing and qualifying a 13.3kW Hall thruster system to be demonstrated on the Power and Propulsion Element (PPE), which is intended to be the first element of a Lunar Outpost Platform - Gateway (LOP-G). The NextSTEP program is integrating a nested Hall thruster into a 100kW system and testing it for 100 hours. These two programs will provide a path to efficient in-space propulsion that will allow NASA to transfer the large amounts of cargo that is needed to support human missions - first to the moon and then on to Mars. The Advanced Electric Propulsion System (AEPS) program is completing development, qualification and delivery of five flight 13.3kW EP systems to NASA. The flight AEPS system includes a magnetically shielded long-life Hall thruster, Power Processing Unit (PPU) and a Xenon Flow Controller (XFC). The Hall thruster, developed and demonstrated by NASA, operates at input powers up to 12.5kW while providing a specific impulse over an estimated 2800s at an input voltage of 600V. The power processor is designed to accommodate an input voltage range of 95-140V, consistent with operation beyond the orbit of Mars. The integrated system input power is continuously throttleable between 3 and 13.3kW. Component level testing of the EP String has begun with prototype hardware. The NextSTEP program is developing a 100kW Electric Propulsion (EP) system using a nested Hall thruster designed for powers up to 250kW, a modular power processor and a modular mass flow controller. While the program objective is to operate the integrated EP system continuously at 100kW for 100hrs to demonstrate thermal stability and support the development of system life time models, it builds on decades of experience with long-life Hall thrusters and the design is evolvable to a capability of 250kW. Design upgrades that demonstrate the 100kW EP system have been completed and tested. Aerojet Rocketdyne (AR) is excited to support NASA as it extends human reach into deep space and believes that these programs will provide the propulsion to make such missions affordable and sustainable. These systems provide NASA with a range of options to power its deep space transport vehicles. This paper presents the mission requirements for supporting the NASA exploration vision, as well as the status for the high power Hall thruster systems in development.

Jackson, Jerry↗

Development of High Power Hall Thruster Systems to Enable the NASA Exploration Vision

The next phase of space exploration missions requires high power Solar Electric Propulsion (SEP) systems for large-scale science missions and cargo transportation. Development is underway at Aerojet Rocketdyne on Hall thruster systems that are intended to bracket the needs of future NASA SEP missions in support of space exploration. The Advanced Electric Propulsion System (AEPS) program is developing and qualifying a 13.3kW Hall thruster system to be demonstrated on the Power and Propulsion Element (PPE), which is intended to be the first element of a Lunar Outpost Platform - Gateway (LOP-G). The NextSTEP program is integrating a nested Hall thruster into a 100 kW system and testing it for 100 hours. These two programs will provide a path to efficient in-space propulsion that will allow NASA to transfer the large amounts of cargo that is needed to support human missions - first to the moon and then on to Mars. The Advanced Electric Propulsion System (AEPS) program is completing development, qualification and delivery of five flight 13.3kW EP systems to NASA. The flight AEPS system includes a magnetically shielded long-life Hall thruster, Power Processing Unit (PPU) and a Xenon Flow Controller (XFC). The Hall thruster, developed and demonstrated by NASA, operates at input powers up to 12.5 kW while providing a specific impulse over an estimated 2800s at an input voltage of 600V. The power processor is designed to accommodate an input voltage range of 95-140V, consistent with operation beyond the orbit of Mars. The integrated system input power is continuously throttleable between 3 and 13.3kW. Component level testing of the EP String has begun with prototype hardware. The NextSTEP program is developing a 100kW Electric Propulsion (EP) system using a nested Hall thruster designed for powers up to 250kW, a modular power processor and a modular mass flow controller. While the program objective is to operate the integrated EP system continuously at 100kW for 100 hours to demonstrate thermal stability and support the development of system life time models, it builds on decades of experience with long-life Hall thrusters and the design is evolvable to a capability of 250kW. Design upgrades that demonstrate the 100kW EP system have been completed and tested. Aerojet Rocketdyne is excited to support NASA as it extends human reach into deep space and believes that these programs will provide the propulsion to make such missions affordable and sustainable. These systems provide NASA with a range of options to power its deep space transport vehicles. This paper presents the mission requirements for supporting the NASA exploration vision, as well as the status for the high power Hall thruster systems in development.

Jackson, Jerry↗

Completing the development of the 12.5 kW Hall Effect Rocket with Magnetic Shielding (HERMeS)

The Hall Effect Rocket with Magnetic Shielding (HERMeS) is a 12.5 kW Hall thruster co-developed by NASA Glenn Research Center and the Jet Propulsion Laboratory. HERMeS incorporates magnetic shielding to eliminate discharge channel erosion in order to reach its design lifetime of 50 kh at specific impulses up to 3000 s. The capabilities of the HERMeS thruster technology transferred to Aerojet Rocketdyne under the Advanced Electric Propulsion System (AEPS) program are described. HERMeS hardware testing is now focused at reducing risk and supporting the qualification of the AEPS thruster. These includes a series of progressively longer wear tests, plasma characterization and modeling supporting life qualification, magnetic field optimization, and environmental testing. Initial results from AEPS thruster testing show operation consistent with the HERMeS thrusters and steady-state operation has been achieved at 600 V, 12.5 kW.

Herman, Daniel↗

Extended Wear Testing of the 12-kW Advanced Electric Propulsion System Engineering Test Unit Hall Thruster

This work presents a summary of the first wear test of the 12 kW Advanced Electric Propulsion System (AEPS) intended to isolate the impact of discharge current on component wear rates. Testing was led by Aerojet Rocketdyne and performed with the AEPS Engineering Test Unit 2 (ETU-2) thruster. In total, approximately 860 hours of operation were accumulated split between operating conditions of 600 V/9 kW, 600 V/11 kW, and 600 V/12 kW. Thruster performance and stability were invariant throughout the wear test for all thruster throttle conditions and shown to be equal to the values previously measured with ETU-2. Inner front pole cover erosion rates were found to be invariant to discharge current as the measurements at all three operating conditions were equal to within the empirical uncertainty. Outer front pole cover erosion rates were found to be equal for the 600 V/9 kW and 600 V/12 kW conditions with operation at 600 V/11 kW yielding elevated erosion rates. Overall, the data shows that the AEPS thruster design has a high probability of meeting lifetime and performance requirements as the design proceeds to flight production and qualification.

Jason D Frieman↗

Mountaineer Commercial Scale Carbon Capture and Storage Project Topical Report: Preliminary Public Design Report

This Preliminary Public Design Report consolidates for public use nonproprietary design information on the Mountaineer Commercial Scale Carbon Capture & Storage project. The report is based on the preliminary design information developed during the Phase I - Project Definition Phase, spanning the time period of February 1, 2010 through September 30, 2011. The report includes descriptions and/or discussions for: (1) DOE's Clean Coal Power Initiative, overall project & Phase I objectives, and the historical evolution of DOE and American Electric Power (AEP) sponsored projects leading to the current project; (2) Alstom's Chilled Ammonia Process (CAP) carbon capture retrofit technology and the carbon storage and monitoring system; (3) AEP's retrofit approach in terms of plant operational and integration philosophy; (4) The process island equipment and balance of plant systems for the CAP technology; (5) The carbon storage system, addressing injection wells, monitoring wells, system monitoring and controls logic philosophy; (6) Overall project estimate that includes the overnight cost estimate, cost escalation for future year expenditures, and major project risks that factored into the development of the risk based contingency; and (7) AEP's decision to suspend further work on the project at the end of Phase I, notwithstanding its assessment that the Alstom CAP technology is ready for commercial demonstration at the intended scale.

01 COAL, LIGNITE, AND PEAT↗

Intracycle RPM control for vertical axis wind turbines

The wind energy market is currently dominated by horizontal axis wind turbines (HAWTs); however, vertical axis wind turbines (VAWTs) are emerging as a design alternative, especially for deep-water offshore siting due to their low center of gravity, ease of access to drivetrain components, and overall simplicity. Due to the absence of a pitch mechanism in large-scale Darrieus VAWTs, stall control has often been used to manage power and loads. Introducing a pitching mechanism in H-type VAWTs has been studied, but this diminishes the mechanical simplicity advantage, and the use of a pitching mechanism in a large-scale Darrieus-type VAWT is not practical. This work examines an innovative, alternative method to control the rotor dynamics of a large-scale 5 MW VAWT to maximize power while constraining loads without introducing any new or complex mechanical elements. This control strategy is termed intracycle revolution per minute (RPM) control, where the rotational speed of the turbine is allowed to vary in an optimal fashion with the azimuthal location of blades as opposed to typical constant RPM operation. An optimization framework is formulated for an open-loop optimal control problem and solved to maximize power subject to constraints on aerodynamic design loads. Results are presented to demonstrate the benefits and the performance limits of intracycle RPM control for large-scale 5 MW Darrieus VAWTs, namely, (1) power production (quantified in terms of AEP) that can be increased subject to baseline load limits and (2) opportunities to significantly increase AEP or decrease loads via intracycle RPM control that are examined for both two-bladed and three-bladed VAWTs.

17 WIND ENERGY↗

An Evaluation of Advanced Tools for Distributed Wind Turbine Performance Estimation

We evaluate various classes of distributed wind turbine performance tools across two sites in the United States. The class of tools ranges from the simple mass conservation model to the coupled Reynolds-averaged Navier-Stokes model, all initiated by the WIND Toolkit data set. The resource estimation at the site is evaluated against measured data at the mast location. Taking a sample 100-kW wind turbine and constant losses, we evaluate Openwind, Continuum, and WindNinja tools and document annual energy production (AEP) and time-series statistics associated with the performance estimation of the wind turbine. Using a methodology that is consistent and unbiased across the three options currently available in the industry, we elaborate results at the two sample locations and discuss the probable sources of discrepancy in the AEP estimates. Two main sources of the discrepancy come from the input WIND Toolkit data and the spatial modeling techniques of the tools to capture atmospheric physics. The discussion includes additional values that these tools may bring into the energy assessment process to enhance the owners' confidence over the distributed wind power systems.

17 WIND ENERGY↗

Preparation for Hollow Cathode Testing for the Advanced Electric Propulsion System at NASA Glenn Research Center

NASA Glenn Research Center is performing activities to support the unique needs of hollow cathode development and testing for the Advanced Electric Propulsion System (AEPS). Three existing vacuum facilities have been outfitted as cathode test facilities, and each will serve a different role in upcoming testing. Vacuum Facility 67 is being developed to serve as a long-duration test facility for the Engineering Development Unit cathode, which is to be delivered by the AEPS contractor. It will feature a thruster-like magnetic field simulator and cold-cycle capability via a liquid nitrogen-cooled cold plate. Vacuum Facility 17 is being developed as a test facility for short- to medium-duration experiments in order to provide auxiliary support for the long-duration testing. It will feature a magnetic field simulator but not cold-cycling. Finally, Vacuum Facility 1 will be a high-pumping speed cathode development environment, and will feature an array of plasma and temperature diagnostics. In addition to the facility preparation work, a new cathode, referred to as the Mark II, has been designed. The Mark II is an evolution of the Technology Demonstration Unit cathodes that better evokes the geometry, fabrication, and construction of the forthcoming Engineering Development Unit. This cathode serves as a transition between the Technology Demonstration Unit cathodes used during early thruster development and the forthcoming Engineering Development Unit cathodes. It will be used as a means of verifying the new test facilities prior to arrival of Engineering Development Unit hardware. Details of the Mark II design and key features are presented, as well as details of future work to be performed.

Advanced Electric Propulsion System (AEPS)↗

Characterization Test of the 12.5-kW Advanced Electric Propulsion System Engineering Test Unit Hall Thruster

This work presents a summary of the detailed characterization testof the 12.5 kW Advanced Electric Propulsion System Engineering Test Unit 2 (AEPS ETU-2) thruster produced by Aerojet Rocketdyne. This test campaign had two major goals: to assessthe risk of design compliance with thruster requirements and providea comparison to the previously-tested NASA Hall Effect Rocket with Magnet Shielding Technology Demonstration Units (HERMeS TDUs) from which the AEPS ETU design was derived.

AEPS↗

NASA Progress on the Development and Qualification of a 12-kW Hall-Effect, Solar Electric Propulsion Thruster

The National Aeronautics and Space Administration (NASA) continues to evolve the human exploration approach for beyond low-Earth orbit and in a manner involving international, academic, and industry partners. The center of this approach is NASA’s Gateway program that will establish a permanent human presence in lunar orbit for human cislunar science, operations, and lunar surface access to eventually land the next American astronauts on the south pole of the Moon. In support of the effort, NASA’s Space Technology Mission Directorate (STMD) began a project to increase the state of the art for the Hall-Effect Solar Electric Propulsion (SEP) technology. The resulting Advanced Electric Propulsion System (AEPS) project has developed a 12 kW Hall-effect thruster in support of the Gateway program. The project is managed by the NASA Glenn Research Center (GRC), supported by the NASA Jet Propulsion Laboratory (JPL) with development, qualification & flight hardware all supplied by L3 Harris Aerojet Rocketdyne (AR). Development of the 12-kW Hall thruster electric propulsion system began with maturation of the Hall Effect Rocket with Magnetic Shielding (HERMeS) Technology Demonstration Units (TDUs). The technology development was then transitioned to AR via the AEPS contract, which built and tested two Engineering Test Unit (ETU) thrusters and multiple critical components. The project transitioned to the production of the three flight thrusters and entered qualification testing at the component and thruster levels.

Electric Propulsion↗

NASA Progress on the Development and Qualification of a 12-kW Hall-Effect, Solar Electric Propulsion Thruster

The National Aeronautics and Space Administration (NASA) continues to evolve the human exploration approach for beyond low-Earth orbit and in a manner involving international, academic, and industry partners. The center of this approach is NASA’s Gateway program that will establish a permanent human presence in lunar orbit for human cislunar science, operations, and lunar surface access to eventually land the next American astronauts on the south pole of the Moon. In support of the effort, NASA’s Space Technology Mission Directorate (STMD) began a project to increase the state of the art for the Hall-Effect Solar Electric Propulsion (SEP) technology. The resulting Advanced Electric Propulsion System (AEPS) project has developed a 12 kW Hall-effect thruster in support of the Gateway program. The project is managed by the NASA Glenn Research Center (GRC), supported by the NASA Jet Propulsion Laboratory (JPL) with development, qualification & flight hardware all supplied by L3 Harris Aerojet Rocketdyne (AR). Development of the 12-kW Hall thruster electric propulsion system began with maturation of the Hall Effect Rocket with Magnetic Shielding (HERMeS) Technology Demonstration Units (TDUs). The technology development was then transitioned to AR via the AEPS contract, which built and tested two Engineering Test Unit (ETU) thrusters and multiple critical components. The project transitioned to the production of the three flight thrusters and entered qualification testing at the component and thruster levels.

Electric Propulsion↗

An Evaluation of Advanced Tools for Distributed Wind Turbine Performance Estimation: Preprint

We evaluate various classes of distributed wind turbine performance tools across two sites in the USA. The tools class ranges from the simple mass conservation model to coupled Reynolds Averaged Navier-Stokes (RANS) model, all initiated by the WIND Toolkit dataset. The resource estimation at the site is evaluated against measured data at the mast location. Taking a sample 100 kW wind turbine and constant losses, we evaluate Openwind, Continuum, and WindNinja tools and document Annual Energy Production (AEP) and time series statistics associated with the performance estimation of the wind turbine. Using a methodology that is consistent and unbiased across the three advance options currently available in the industry, we elaborate results at the two sample locations and discuss the probable sources of discrepancy in the AEP estimates. The discussion includes additional values these tools may bring into the energy assessment process to enhance the owners' confidence over the distributed wind power systems.

17 WIND ENERGY↗

Machine learning enables national assessment of wind plant controls with implications for land use

Summary As deployment of wind energy continues to expand, computationally efficient tools for predicting wind plant performance over a wide range of layout designs, technology innovations, and spatial locations are increasingly important for policy and investment decisions. We demonstrate two approaches to training a surrogate model to predict annual energy production (AEP) of parameterized wind plant layouts: one using a Gaussian process (GP) and the other using a fully convolutional neural network (FCNN). We leverage the powerful FCNN architecture by encoding wind plant design parameters and output response surface as an image. The FCNN produces more accurate results than the GP with mean absolute errors equivalent to 1% and 1.9% of plant rated power, respectively, although the GP performs well under limited training data and provides useful uncertainty information. We also evaluate a surrogate model for wake steering, enabling a nationwide assessment of the impact of plant control strategies and plant layout decisions. Across two million locations, we find that wake steering strategies boost AEP with relative gains upwards of 3%. Gains are most pronounced at sites without a dominant wind direction and where layout optimization is less fruitful. Additionally, we perform a nationwide sensitivity analysis showing that wake steering can mitigate wake losses from higher density plant layouts. Our results suggest that regions which have not been previously viable for wind deployment due to moderate wind resources are especially well enhanced by wake steering strategies that could help overcome land constraints and inflexible layout options, potentially identifying new deployment opportunities.

17 WIND ENERGY↗

National-scale impacts on wind energy production under curtailment scenarios to reduce bat fatalities

Wind energy often plays a major role in meeting renewable energy policy objectives; however, increased deployment can raise concerns regarding the impacts of wind plants on certain wildlife. Particularly, estimates suggest hundreds of thousands of bat fatalities occur annually at wind plants across North America, with potential implications for the viability of several bat species. One approach to reducing bat fatalities is shutting down (or curtailing) turbines when bats are most at risk, such as at night during relatively low wind speed periods throughout summer and early autumn. While curtailment has consistently been shown to reduce bat fatalities, the lost power production reduces revenues for wind plants. This study conducted simulations with a range of curtailment scenarios across the contiguous United States to examine sensitivities of annual energy production (AEP) loss and potential impacts on economic metrics for future wind energy deployment. We found that AEP reduction can vary across the country from less than 1% to more than 10% for different curtailment scenarios. From an estimated 2891 gigawatts (GW) of simulated economically viable wind capacity (measured by a positive net present value), we found the mid curtailment scenario (6.0 m/s wind speed cut-in from July 1 through October 31) reduced the quantity of economic wind capacity by 274 GW or 9.5%. Our results indicate that high levels of curtailment could substantially reduce the future footprint of financially viable wind energy. In this context, future work that illuminates cost-effective strategies to minimize curtailment while reducing bat fatalities would be of value.

17 WIND ENERGY↗

Acidity of arylsulfonamides as function of quantum chemical parameters of sulfonamide nitrogen

The structures of aromatic sulfonamide molecules XPhSO{sub 2}NH{sub 2} (X = H, 4-Me, 4-F, 4-Cl, 4-Br, 4-MeO, 4-OH, 4-NH{sub 2}, 4-CN, 3-NO{sub 2}, 4-NO{sub 2}, 3,5-(NO{sub 2}){sub 2}, 3,4-Cl{sub 2}, 3-Cl-4-Me, 3,4-Me{sub 2}, 3-Me-4-F, 2-Me) were calculated at the M06/6-311++G** (SMD) level of theory. The atomic electrostatic potentials (AEP) and the Hirshfeld charges of the sulfonamide nitrogen atoms were determined. Correlation equations relating the AEP to Bronsted acidities (pK{sub a}) of these compounds were obtained using published data and the previously unknown pK{sub a} values for a number of arylsulfonamides were calculated. These pK{sub a} values are consistent with independently determined free energies of acid dissociation of sulfonamides.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

The predominance of nucleotidyl activation in bacterial phosphonate biosynthesis

Phosphonates are rare and unusually bioactive natural products. However, most bacterial phosphonate biosynthetic capacity is dedicated to tailoring cell surfaces with molecules like 2-aminoethylphosphonate (AEP). Although phosphoenolpyruvate mutase (Ppm)-catalyzed installation of C-P bonds is known, subsequent phosphonyl tailoring (Pnt) pathway steps remain enigmatic. Here we identify nucleotidyltransferases in over two-thirds of phosphonate biosynthetic gene clusters, including direct fusions to ~60% of Ppm enzymes. We characterize two putative phosphonyl tailoring cytidylyltransferases (PntCs) that prefer AEP over phosphocholine (P-Cho) – a similar substrate used by the related enzyme LicC, which is a virulence factor in Streptococcus pneumoniae. PntC structural analyses reveal steric discrimination against phosphocholine. These findings highlight nucleotidyl activation as a predominant chemical logic in phosphonate biosynthesis and set the stage for probing diverse phosphonyl tailoring pathways.

59 BASIC BIOLOGICAL SCIENCES↗

Evaluation of the potential for wake steering for U.S. land-based wind power plants

The wind power plant-wide control strategy known as wake steering involves the misalignment of upstream turbines with the wind direction to deflect wakes away from downstream turbines, increasing net wind plant power production. In this paper, we evaluate the potential of wake steering for U.S. land-based wind power plants. First, we outline a method for simulating and optimizing wake steering control for existing wind plants by combining the flow redirection and induction in steady state wake steering engineering model with the U.S. Wind Turbine Database and Wind Integration National Dataset Toolkit wind resource dataset. Next, to better understand the potential benefits of wake steering beyond those for existing wind plants, we evaluate the relative impacts of turbine specific power, turbine spacing, and mean wind speed on energy gain and levelized cost of energy (LCOE) using a model land-based wind power plant. For a subset of 60 existing wind plants, assuming a constant turbulence intensity of 8%, wake steering was found to yield an average annual energy production (AEP) gain of 0.80%, equivalent to recovering 13.85% of baseline wake losses. Further, we present a linear approximation between baseline wake losses and AEP gains that can be used to estimate wake steering gains for other wind power plants. Highlighting additional benefits of wake steering, for the model wind power plant we found that energy gains from wake steering enabled an approximate 30% reduction in turbine spacing while keeping LCOE constant.

17 WIND ENERGY↗