Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “AD COUNCIL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

84 records · Page 5

EERE Showcase Event (Solar Decathlon 2015)

The goal of the Orange County Great Park Corporation (Great Park) is to successfully host the U.S. Department of Energy Solar Decathlon 2015. In furtherance of that goal, tasks to be performed within the current reporting period include the following: Task 1.0 Arrange Site Team Visits for January 2015 The Great Park arranged appropriate meeting space for the site team visits over a three-day period, January 8, 2015 through January 10, 2015. Instead of a meeting in Hanger 244, the DOE requested a different meeting space. The working team met in the Operations offices on January 8th. The student teams were welcomed at the City of Irvine’s Lakeview Senior Center on January 9th, and came back on January 10th for breakout sessions. Task 2.0 Outreach Activities The following outreach activities related to the U.S. Department of Energy Solar Decathlon 2015 occurred during and prior to the event: • Promoted the return of the Solar Decathlon 2015 on the City’s website. (cityofirvine.org) • Promoted the return of the Solar Decathlon 2015 through the City’s and Great Park’s social media channels, including Facebook and Twitter. (facebook.com/cityofirvine, facebook.com/orangecountygreatpark, twitter.com/City_of_Irvine, twitter.com/ocgreatpark) • Promoted the return of the Solar Decathlon 2015 and student visit through a City Council Announcement. • Worked to set-up meetings between the U.S. Department of Energy team and potential donors/key stakeholders in Irvine. • Began ICTV filming and coverage of the Solar Decathlon 2015 teams. This includes student team interviews, interview with Richard King and b-roll footage. • Facilitated an interview with Sarah Farrar and the Orange County Register during the recent student visit in January • Information in May was provided to Irvine Unified School District and Tustin Unified School District promoting the three Education Days that the DOE will host during the event. More DOE information is due in August, which will be forwarded to the school districts that will provide important information for school tours. • A promotional ICTV video has been sent through the Irvine Chamber of Commerce and to dozens of businesses in Irvine promoting the Solar Decathlon 2015 and inviting attendance. • Cover story of Fall Inside Irvine magazine detailed teams competing in Solar Decathlon. Magazine goes to more than 100,000 Irvine residences. • Produced public service announcement with KPCC radio to air 9/28-10/16. Outreach also included a web banner on the station’s website. • Full-page advertisements in special sections of the Orange County Register, including UCI 50th Anniversary magazine that went to over 1 million readers of the Register, the Riverside Press Enterprise and the L.A. Times; Best of Orange County magazine; and Solar Decathlon special section. • Full-page ad in Urban Land magazine Sept./Oct. issue. • Produced ad for Irvine Global Village Festival brochure (tens of thousands in attendance at event.) • Ten posters displayed at Irvine Company properties throughout the City, including the Irvine Spectrum Center. • Rack cards promoting Solar Decathlon displayed at Irvine Spectrum Center, Discovery Science Center, Orange County Farm Bureau (at farmers markets) and at City facilities. • Tote bags promoting Solar Decathlon filled with magnets and rack cards on the event distributed at Irvine Global Village Festival, Great Park farmers market and UCI Festival of Discovery; some 8,000 bags handed out. • E-blast from City of Irvine Community Services Department included information on Solar Decathlon. (List contains 51,000 recipients.) • E-blast to Irvine Co. mailing list sent out 9/30. Web banner posted at shopirvinespectrumcenter.com. • E-blast sent to Orange County Register mailing list on 10/6. • Web banner posted on Orange County Register’s homepage. • E-blast sent by Irvine Chamber of Commerce on 10/9. • E-blast using City’s GovDelivery to 2,100 on 10/12. • Produced additional ads for the Orange County Register to fulfill the in-kind agreement between the DOE and the Register: Friday, Oct. 9, Local front page strip ad; Saturday, Oct. 10, half-page Home & Garden section ad; Sunday, Oct. 11, full page Local section ad; Wednesday, Oct. 14, ½ page Main or Local ad; Friday, Oct. 16, full Local or Main section ad; Saturday, Oct. 17, half-page Home & Garden section ad; Sunday Oct. 18, full page Local or Main ad. • Produced two additional Register ads promoting final days of the event: Full page Main or Local ad for Thursday, Oct. 15 and full page ad in Irvine World News weekly publication. • Produced separate press releases on Solar Decathlon, Volunteer Effort, Children’s Activities Area and Final Days. • Produced and distributed Children’s Activities Days rack cards. • Continued to promote the event on the City’s webpage, Great Park webpage and social media channels. • ICTV produced the “Solar Decathlon Minute” videos, which were posted on the City’s YouTube channel and the solardecathlon.gov website. • Four-minute video promoting Solar Decathlon shown on iShuttles in the City in weeks leading up to event. • Promoted a “Business Day” to local businesses in which businesses could sign up for tour led by Solar Decathlon docents. • Access Irvine Special Event Button running 9/28-10/18/15. • Access Irvine Push Notification on 10/15/15. • Facebook ad boost 10/13-10/18.

14 SOLAR ENERGY↗

SU-E-T-550: Range Effects in Proton Therapy Caused by Systematic Errors in the Stoichiometric Calibration

Purpose: The procedure for proton treatment planning involves the conversion of the patient's X-ray CT from Hounsfield units into relative stopping powers (RSP), using a stoichiometric calibration curve (Schneider 1996). In clinical practice a 3.5% margin is added to account for the range uncertainty introduced by this process and other errors. RSPs for real tissues are calculated using composition data and the Bethe-Bloch formula (ICRU 1993). The purpose of this work is to investigate the impact that systematic errors in the stoichiometric calibration have on the proton range. Methods: Seven tissue inserts of the Gammex 467 phantom were imaged using our CT scanner. Their known chemical compositions (Watanabe 1999) were then used to calculate the theoretical RSPs, using the same formula as would be used for human tissues in the stoichiometric procedure. The actual RSPs of these inserts were measured using a Bragg peak shift measurement in the proton beam at our institution. Results: The theoretical calculation of the RSP was lower than the measured RSP values, by a mean/max error of - 1.5/-3.6%. For all seven inserts the theoretical approach underestimated the RSP, with errors variable across the range of Hounsfield units. Systematic errors for lung (average of two inserts), adipose and cortical bone were - 3.0/-2.1/-0.5%, respectively. Conclusion: There is a systematic underestimation caused by the theoretical calculation of RSP; a crucial step in the stoichiometric calibration procedure. As such, we propose that proton calibration curves should be based on measured RSPs. Investigations will be made to see if the same systematic errors exist for biological tissues. The impact of these differences on the range of proton beams, for phantoms and patient scenarios, will be investigated. This project was funded equally by the Engineering and Physical Sciences Research Council (UK) and Ion Beam Applications (Louvain-La-Neuve, Belgium)

60 APPLIED LIFE SCIENCES↗

Vitamin E Acetate Causes Softening of Pulmonary Surfactant Membrane Models

The popularity of electronic cigarettes and vaping products has launched the outbreak of a condition affecting the respiratory system of users, known as electronic-cigarette/vaping-associated lung injury (EVALI). The build-up of vitamin E acetate (VEA), a diluent of some illicit vaping oils, in the bronchoalveolar lavage of patients with EVALI provided circumstantial evidence as a target for investigation. In this work, we provide a fundamental characterization of the interaction of VEA with lung cells and pulmonary surfactant (PS) models to explore the mechanisms by which vaping-related lung injuries may be present. We first confirm the localization and uptake of VEA in pulmonary epithelial cells. Further, as PS is vitally responsible for the biophysical functions of the lungs, we explore the effect of added VEA on three increasingly complex models of PS: dipalmitoylphosphatidylcholine (DPPC), a lipid-only synthetic PS, and the biologically derived extract Curosurf. Using high-resolution techniques of small-angle X-ray scattering, small-angle neutron scattering, neutron spin–echo spectroscopy, and neutron reflectometry, we compare the molecular-scale behaviors of these membranes to the bulk viscoelastic properties of surfactant monolayer films as studied by Langmuir monolayer techniques. While VEA does not obviously alter the structure or organization of PS membranes, a consistent softening of membrane systems—regardless of compositional complexity—provides a biophysical explanation for the respiratory distress associated with EVALI and yields a new perspective on the behavior of the PS system.

59 BASIC BIOLOGICAL SCIENCES↗

SU-E-T-521: Investigation of the Uncertainties Involved in Secondary Neutron/gamma Production in Geant4/MCNP6 Monte Carlo Codes for Proton Therapy Application

Purpose: A major concern in proton therapy is the production of secondary neutrons causing secondary cancers, especially in young adults and children. Most utilized Monte Carlo codes in proton therapy are Geant4 and MCNP. However, the default versions of Geant4 and MCNP6 do not have suitable cross sections or physical models to properly handle secondary particle production in proton energy ranges used for therapy. In this study, default versions of Geant4 and MCNP6 were modified to better handle production of secondaries by adding the TENDL-2012 cross-section library. Methods: In-water proton depth-dose was measured at the “The Svedberg Laboratory” in Uppsala (Sweden). The proton beam was mono-energetic with mean energy of 178.25±0.2 MeV. The measurement set-up was simulated by Geant4 version 10.00 (default and modified version) and MCNP6. Proton depth-dose, primary and secondary particle fluence and neutron equivalent dose were calculated. In case of Geant4, the secondary particle fluence was filtered by all the physics processes to identify the main process responsible for the difference between the default and modified version. Results: The proton depth-dose curves and primary proton fluence show a good agreement between both Geant4 versions and MCNP6. With respect to the modified version, default Geant4 underestimates the production of secondary neutrons while overestimates that of gammas. The “ProtonInElastic” process was identified as the main responsible process for the difference between the two versions. MCNP6 shows higher neutron production and lower gamma production than both Geant4 versions. Conclusion: Despite the good agreement on the proton depth dose curve and primary proton fluence, there is a significant discrepancy on secondary neutron production between MCNP6 and both versions of Geant4. Further studies are thus in order to find the possible cause of this discrepancy or more accurate cross-sections/models to handle the nuclear interactions of protons with energy ranges used for therapy. NSERC-CRSNG’ CREATE Medical Physics Research Training Network compute calcul CANADA; McGill University health center research institute the fast foundation; LM acknowledges partial support by the CREATE Medical Physics Research Training Network grant of the Natural Sciences and Engineering; Research Council Grant number 432290.

60 APPLIED LIFE SCIENCES↗

Limiting Future Collision Risk to Spacecraft: An Assessment of NASA's Meteoroid and Orbital Debris Programs

Over the past 50 years, various NASA communities have contributed significantly to maturing NASA s meteoroid and orbital debris (MMOD)1 programs to their current state. As a result of these community efforts, and to NASA s credit, NASA s MMOD programs and models are now widely used and respected by the providers and users of both government and commercial satellites, nationally as well as internationally. Satellites have been redesigned to protect critical components from MMOD damage by moving critical components from exterior surfaces to deep inside a satellite s structure. Orbits are monitored and altered to minimize the risk of collision with tracked orbital debris. MMOD shielding added to the International Space Station (ISS) protects critical components and astronauts from potentially catastrophic damage that might result from smaller, untracked debris and meteoroid impacts. The space shuttle, as it orbited Earth, and whether docked to the ISS or not, was optimally oriented to protect its fragile thermal protection and thermal radiation systems from MMOD damage. In addition, astronauts inspected its thermal protection system for MMOD damage before the shuttle reentered Earth s atmosphere; Orion, NASA s capsule to carry astronauts to low Earth orbit, includes designs to mitigate the threat of MMOD damage and provide increased safety to the crew. When a handful of reasonable assumptions are used in NASA s MMOD models, scenarios are uncovered that conclude that the current orbital debris environment has already reached a "tipping point." That is, the amount of debris - in terms of the population of large debris objects, as well as overall mass of debris in orbit - currently in orbit has reached a threshold where it will continually collide with itself, further increasing the population of orbital debris. This increase will lead to corresponding increases in spacecraft failures, which will only create more feedback into the system, increasing the debris population growth rate. The increase thus far has been most rapid in low Earth orbit (LEO), with geosynchronous Earth orbits (GEOs) potentially suffering the same fate, but over a much longer time period. The exact timing and pace of this exponential growth are uncertain, but the serious implications of such a scenario require careful attention because of the strategic importance of U.S. space operations. The Office of Science and Technology Policy and the Office of Management and Budget contracted with the National Research Council for a study to perform three tasks: review NASA s MMOD programs and efforts, recommend in which of those NASA should increase or decrease its effort or change focus, and determine whether NASA should pursue work in any new MMOD areas. The official letter requesting the study and the full statement of task for the Committee for the Assessment of NASA s Orbital Debris Programs are in Appendixes A and B, respectively.

Source record↗

HarDWR - Harmonized Water Rights Records

A dataset within the Harmonized Database of Western U.S. Water Rights (HarDWR). For a detailed description of the database, please see the meta-record v2.0. Changelog v2.0 - Recalculated based on data sourced from WestDAAT - Changed using a Site ID column to identify unique records to using aa combination of Site ID and Allocation ID - Removed the Water Management Area (WMA) column from the harmonized records. The replacement is a separate file which stores the relationship between allocations and WMAs. This allows for allocations to contribute to water right amounts to multiple WMAs during the subsequent cumulative process. - Added a column describing a water rights legal status - Added "Unspecified" was a water source category - Added an acre-foot (AF) column - Added a column for the classification of the right's owner v1.02 - Added a .RData file to the dataset as a convenience for anyone exploring our code. This is an internal file, and the one referenced in analysis scripts as the data objects are already in R data objects. v1.01 - Updated the names of each file with an ID number less than 3 digits to include leading 0s v1.0 - Initial public release Description Here we present an updated database of Western U.S. water right records. This database provides consistent unique identifiers for each water right record, and a consistent categorization scheme that puts each water right record into one of seven broad use categories. These data were instrumental in conducting a study of the multi-sector dynamics of inter-sectoral water allocation changes though water markets (Grogan et al., *in review*). Specifically, the data were formatted for use as input to a process-based hydrologic model, Water Balance Model (WBM), with a water rights module (Grogan et al., *in review*). While this specific study motivated the development of the database presented here, water management in the U.S. West is a rich area of study (e.g., Anderson and Woosly, 2005; Tidwell, 2014; Null and Prudencio, 2016; Carney et al., 2021) so releasing this database publicly with documentation and usage notes will enable other researchers to do further work on water management in the U.S. West. We produced the water rights database presented here in four main steps: (1) data collection, (2) data quality control, (3) data harmonization, and (4) generation of cumulative water rights curves. Each of steps (1)-(3) had to be completed in order to produce (4), the final product that was used in the modeling exercise in Grogan et al. (*in review*). All data in each step is associated with a spatial unit called a Water Management Area (WMA), which is the unit of water right administration utilized by the state in which the right came from. Steps (2) and (3) required use to make assumptions and interpretation, and to remove records from the raw data collection. We describe each of these assumptions and interpretations below so that other researchers can choose to implement alternative assumptions an interpretation as fits their research aims. Motivation for Changing Data Sources The most significant change has been a switch from collecting the raw water rights directly from each state to using the water rights records presented in WestDAAT, a product of the Water Data Exchange (WaDE) Program under the Western States Water Council (WSWC). One of the main reasons for this is that each state of interest is a member of the WSWC, meaning that WaDE is partially funded by these states, as well as many universities. As WestDAAT is also a database with consistent categorization, it has allowed us to spend less time on data collection and quality control and more time on answering research questions. This has included records from water right sources we had previously not known about when creating v1.0 of this database. The only major downside to utilizing the WestDAAT records as our raw data is that further updates are tied to when WestDAAT is updated, as some states update their public water right records daily. However, as our focus is on cumulative water amounts at the regional scale, it is unlikely most records updates would have a significant effect on our results. The structure of WestDAAT led to several important changes to how HarWR is formatted. The most significant change is that WaDE has calculated a field known as `SiteUUID`, which is a unique identifier for the Point of Diversion (POD), or where the water is drawn from. This separate from `AllocationNativeID`, which is the identifier for the allocation of water, or the amount of water associated with the water right. It should be noted that it is possible for a single site to have multiple allocations associated with it and for an allocation to be able to be extracted from multiple sites. The site-allocation structure has allowed us to adapt a more consistent, and hopefully more realistic, approach in organizing the water right records than we had with HarDWR v1.0. This was incredibly helpful as the raw data from many states had multiple water uses within a single field within a single row of their raw data, and it was not always clear if the first water use was the most important, or simply first alphabetically. WestDAAT has already addressed this data quality issue. Furthermore, with v1.0, when there were multiple records with the same water right ID, we selected the largest volume or flow amount and disregarded the rest. As WestDAAT was already a common structure for disparate data formats, we were better able to identify sites with multiple allocations and, perhaps more importantly, allocations with multiple sites. This is particularly helpful when an allocation has sites which cross WMA boundaries, instead of just assigning the full water amount to a single WMA we are now able to divide the amount of water between the number of relevant WMAs. As it is now possible to identify allocations with water used in multiple WMAs, it is no longer practical to store this information within a single column. Instead the stAllocationToWMATab.csv file was created, which is an allocation by WMA matrix containing the percent Place of Use area overlap with each WMA. We then use this percentage to divide the allocation's flow amount between the given WMAs during the cumulation process to hopefully provide more realistic totals of water use in each area. However, not every state provides areas of water use, so like HarDWR v1.0, a hierarchical decision tree was used to assign each allocation to a WMA. First, if a WMA could be identified based on the allocation ID, then that WMA was used; typically, when available, this applied to the entire state and no further steps were needed. Second was the spatial analysis of Place of Use to WMAs. Third was a spatial analysis of the POD locations to WMAs, with the assumption that allocation's POD is within the WMA it should belong to; if an allocation still had multiple WMAs based on its POD locations, then the allocation's flow amount would be divided equally between all WMAs. The fourth, and final, process was to include water allocations which spatially fell outside of the state WMA boundaries. This could be due to several reasons, such as coordinate errors / imprecision in the POD location, imprecision in the WMA boundaries, or rights attached with features, such as a reservoir, which crosses state boundaries. To include these records, we decided for any POD which was within one kilometer of the state's edge would be assigned to the nearest WMA. Other Changes WestDAAT has Allowed In addition to a more nuanced and consistent method of assigning water right's data to WMAs, there are other benefits gained from using the WestDAAT dataset. Among those is a consistent categorization of a water right's legal status. In HarDWR v1.0, legal status was effectively ignored, which led to many valid concerns about the quality of the database related to the amounts of water the rights allowed to be claimed. The main issue was that rights with legal status' such as "application withdrawn", "non-active", or "cancelled" were included within HarDWR v1.0. These, and other water rights status' which were deemed to not be in use have been removed from this version of the database. Another major change has been the addition of the "unspecified water source category. This is water that can come from either surface water or groundwater, or the source of which is unknown. The addition of this source category brings the total number of categories to three. Due to reviewer feedback, we decided to add the acre-foot (AF) column so that the data may be more applicable to a wider audience. We added the ownerClassification column so that the data may be more applicable to a wider audience. File Descriptions The dataset is a series of various files organized by state sub-directories. In addition, each file begins with the state's name, in case the file is separate from its sub-directory for some reason. After the state name is the text which describes the contents of the file. Here is each file described in detail. Note that st is a placeholder for the state's name. stFullRecords_HarmonizedRights.csv: A file of the complete water records for each state. The column headers for each of this type of file are: state - The name of the state to which the allocations belong to. FIPS - The two digit numeric state ID code. siteID - The site location ID for POD locations. A site may have multiple allocations, which are the actual amount of water which can be drawn. In a simplified hypothetical, a farm stead may have an allocation for "irrigation" and an allocation for "domestic" water use, but the water is drawn from the same pumping equipment. It should be noted that many of the site ID appear to have been added by WaDE, and therefore may not be recognized by a given state's water rights database. allocationID - The allocation ID for the water right. For most states this is the water right ID, and what is recommended to use should a right be looked up on a given state's water rights database. The water amounts associated with these IDs tend to be finer scaled than those associated with siteID. It should be noted that some allocations may be extracted from multiple sites, particularly for larger Places of Use. ownerClassification - A classification of the types of owners for water rights. The most common is `Private` which incorporates a wide range of entities. Several classifications would be grouped into a government category, most of which are for the U.S. Federal Government. These allocations could be listed as "Federal", "United States of America", or as the names of any number of federal agencies. The last major grouping of entities is for "Native American"s. priorityDate - The date we use as the water right priority date for our modeling analysis. This is the legal priority date when it is available. However, for some rights, specifically from California and New Mexico, we used a pseudo priority date (e.g. well completion date or start of well drilling date) when a legal priority date was not available. The most questionable dates come from New Mexico, where the only date associated with certain water right records was the date the allocation was recorded in the database. As the allocation record creation tended to be within a few months of the filing of the application of the water right, from manually double checking the water rights, and our analysis focuses on aggregating water rights on the timescale of years, we determined it was acceptable to use such dates to include as many records as possible. primaryBeneficialUse - From the numerous state water use categories, WaDE categorized them into 21 categories WestDAAT. This column is the original WaDE category for the primary water use at the PoD site. allocationBeneficialUse - From the numerous state water use categories, WaDE categorized them into 21 categories for WestDAAT. This column is the original WaDE category

Economics↗

Low cost modular plasma system for reforming of natural gas

The initial aim of this project was to develop a low-cost compact, modularly scalable, point of use, on demand production system for the reforming of natural gas (NG) into products such as acetylene, hydrogen and other related hydrocarbons. Based on a pulsed dielectric barrier discharge (DBD), the fast rising voltage pulses produced by the system causes the dielectric breakdown of the gas to lag behind the rapid voltage increase so that a voltage greater than the static breakdown voltage of the gas, called an overvoltage, is briefly attained. The century long commercial use of the DBD discharge to push the highly endothermic oxygen to ozone reaction served as an additional motivation. The project meets the recommendations of the National Research Council 2007 report on plasma science for a greater investment in low temperature plasma science and engineering. An important finding is that the method investigated has a high specific energy requirement (SER) of the order of 1,000 to 5,000 kWh per kg of hydrogen, and a corresponding low efficiency of only ~0.1 to 0.5% of converting electrical into chemical (ΔH, ΔG) energy. This compares unfavorably with 52 kWh/kgH 2 required for NG thermal plasma reforming, or a pulsed spark discharge, Lotfalipour et. al, and Gao et. al. (For comparison electrolysis of water into hydrogen and oxygen gas requires only 45 to 80kWh/kgH 2 ). This project garnered data with different reactor configurations, materials, gases and mixtures including NG, methane, hydrogen, propane, argon, nitrogen and air, gap sizes ranging from 0.5 to 4.1 mm, electrode areas from 5 to 460 cm, voltages to 27 kV, pulse frequencies to 20 kHz and peak currents into the hundreds of amperes, temperatures to 625 °C and pressures from 15 mbar to 2 bar. An SRS 300 residual gas analyzer (RGA) yielded quadrupole mass spectrometry (QMS) data on the reformate. To analyze the data we extended the public domain software OpenChrom®, Wenig, to QMS data, yielding accurate identification and quantitative data on reformate products. This extension of OpenChrom® is applicable beyond this project and is a significant contribution to the general community of researchers. The documentation is available on the internet, see Whitlock, and a copy has been appended to this report. The main product of methane and natural gas plasma reforming is hydrogen, constituting ~90% of the products, followed by 1% to 10% ethane, propane, ethylene, acetylene and isobutene. Neopentane, propene, butane and pentane constitute less than 1 % of product. Adding a nickel catalyst increases the selectivity for hydrogen. Carbon nanosheets (graphene), a product of commercial interest, were synthesized by plasma reforming of acetylene at low pressure. The reformate analysis shows hat saturated and branched hydrocarbons are favored compared with unsaturated and linear hydrocarbons. For example, ethane, propane, iso-butane, 2-methyl butane, and 2-methyl pentane are produced in higher amounts compared with unsaturated and linear components. At low pressure acetylene and ethylene production rate is higher and propane production lower. We developed a recirculating system in which hydrogen is removed through a permeable membrane as fast as it is being produced by the reactor and the remaining products are recirculated at a high flow rate of several liters per minute. This keeps the concentration of H 2 in the reactor low, while achieving a total output concentration of 79%, high enough for pressure swing adsorption to be used for further purification. The recirculating system could be used with other gas reforming technologies. We report on four different reactors,1) a spark discharge reactor, 2) a standard DBD cylindrical reactor, 3) a small DBD reactor where catalyst powder can be quickly loaded onto a carrier to investigate the effect of the plasma on the catalyst and the effectiveness of the of the catalyst in promoting gas reformation and 4) a configurable DBD reactor to study the performance effects of dielectric selection, electrode gap distance, and electrode/dielectric interface on plasma reactor operation. This project achieved a commercializable 1kW plasma system including reactors a plasma pulse generator and a gas supply module.

03 NATURAL GAS↗

Observation and integrated Earth-system science: A roadmap for 2016–2025

This report is the response to a request by the Committee on Space Research of the International Council for Science to prepare a roadmap on observation and integrated Earth-system science for the coming ten years. Its focus is on the combined use of observations and modelling to address the functioning, predictability and projected evolution of interacting components of the Earth system on timescales out to a century or so. It discusses how observations support integrated Earth-system science and its applications, and identifies planned enhancements to the contributing observing systems and other requirements for observations and their processing. All types of observation are considered, but emphasis is placed on those made from space. The origins and development of the integrated view of the Earth system are outlined, noting the interactions between the main components that lead to requirements for integrated science and modelling, and for the observations that guide and support them. What constitutes an Earth-system model is discussed. Summaries are given of key cycles within the Earth system. The nature of Earth observation and the arrangements for international coordination essential for effective operation of global observing systems are introduced. Instances are given of present types of observation, what is already on the roadmap for 2016–2025 and some of the issues to be faced. Observations that are organized on a systematic basis and observations that are made for process understanding and model development, or other research or demonstration purposes, are covered. Specific accounts are given for many of the variables of the Earth system. The current status and prospects for Earth-system modelling are summarized. The evolution towards applying Earth-system models for environmental monitoring and prediction as well as for climate simulation and projection is outlined. General aspects of the improvement of models, whether through refining the representations of processes that are already incorporated or through adding new processes or components, are discussed. Some important elements of Earth-system models are considered more fully. Data assimilation is discussed not only because it uses observations and models to generate datasets for monitoring the Earth system and for initiating and evaluating predictions, in particular through reanalysis, but also because of the feedback it provides on the quality of both the observations and the models employed. Inverse methods for surface-flux or model-parameter estimation are also covered. Reviews are given of the way observations and the processed datasets based on them are used for evaluating models, and of the combined use of observations and models for monitoring and interpreting the behaviour of the Earth system and for predicting and projecting its future. A set of concluding discussions covers general developmental needs, requirements for continuity of space-based observing systems, further long-term requirements for observations and other data, technological advances and data challenges, and the importance of enhanced international co-operation.

Earth system science↗

Treatability Study for Edible Oil Deployment for Enhanced cVOC Attenuation for T-Area, Savannah River Site

Groundwater beneath T-Area, a former laboratory and semiworks operation at the Department of Energy (DOE) Savannah River Site (SRS), is contaminated by chlorinated solvents (cVOCs). Since the contamination was detected in the 1980s, the cVOCs at T-Area have been treated by a combination of soil vapor extraction and groundwater pump and treat. The site received approval to temporarily discontinue the active groundwater treatment and implement a treatability study of enhanced attenuation - an engineering and regulatory strategy that has recently been developed by DOE and the Interstate Technology and Regulatory Council (ITRC 2007). Enhanced attenuation uses active engineering solutions to alter the target site in such a way that the contaminant plume will passively stabilize and shrink and to document that the action will be effective, timely, and sustainable. The paradigm recognizes that attenuation remedies are fundamentally based on a mass balance. Thus, long-term plume dynamics can be altered either by reducing the contaminant loading from the source or by increasing the rate of natural attenuation processes within all, or part of, the plume volume. The combination of technologies that emerged for T-Area included: (1) neat (pure) vegetable oil deployment in the deep vadose zone in the former source area, (2) emulsified vegetable oil deployment within the footprint of the groundwater plume, and (3) identification of attenuation mechanisms and rates for the distal portion of the plume. In the first part, neat oil spreads laterally forming a thin layer on the water table to intercept and reduce future cVOC loading (via partitioning) and reduce oxygen inputs (via biostimulation). In the second and third parts, emulsified oil forms active bioremediation reactor zones within the plume footprint to degrade existing groundwater contamination (via reductive dechlorination and/or cometabolism) and stimulates long-term attenuation capacity in the distal plume (via cometabolism). For TArea, the enhanced attenuation development process proved to be a powerful tool in developing a strategy that provides a high degree of performance while minimizing adverse collateral impacts of the remediation (e.g., energy use and wetland damage) and minimizing life-cycle costs. As depicted in Figure 1, Edible oil deployment results in the development of structured geochemical zones and serves to decrease chlorinated compound concentrations in two ways: (1) physical sequestration, which reduces effective aqueous concentration and mobility; and (2) stimulation of anaerobic, abiotic and cometabolic degradation processes. In the central deployment area, contaminant initially partitions into the added oil phase. Biodegradation of the added organic substrate depletes the aquifer of oxygen and other terminal electron acceptors and creates conditions conducive to anaerobic degradation processes. The organic substrate is fermented to produce hydrogen, which is used as an electron donor for anaerobic dechlorination by organisms such as Dehalococcoides. Daughter products leaving the central treatment zone are amenable to aerobic oxidation. Further, the organic compounds leaving the central deployment zone (e.g., methane and propane) stimulate and enhance down gradient aerobic cometabolism which degrades both daughter compounds and several parent cVOCs. Figure 1 depicts TCE concentration reduction processes (labeled in green) along with their corresponding breakdown products in a structured geochemical zone scenario. A consortium of bacteria with the same net effect of Dehalococcoides may be present in the structured geochemical zones leading to the degradation of TCE and daughter products. Figure 2 shows a schematic of the documented cVOC degradation processes in both the anaerobic and aerobic structured geochemical zones. Specific aerobic and anaerobic bacteria and their degradation pathways are also listed in the diagram and have either been confirmed in the field or the laboratory. See references in the bibliography in Section 11.

54 ENVIRONMENTAL SCIENCES↗

Princeton Plasma Physics Laboratory Annual Site Environmental Report for Calendar Year 2024

This report provides the US Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2024 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2024. PPPL has engaged in fusion energy research since 1951 and at its current locations since 1958. The Laboratory’s mission is to develop the scientific knowledge and advanced engineering to enable fusion to power the US and the world, and to develop the understanding of plasmas from the nano- to the astrophysical scale. PPPL’s primary experiment, the National Spherical Torus Experiment-Upgrade (NSTX-U) is a collaboration among national laboratories, universities, and national and international research institutions and is a major element in the US Fusion Energy Sciences Program. Its design tests the physics principles of spherical torus (ST) plasmas, playing an important role in the development of smaller, more economical fusion reactors. Due to previous operational issues, NSTX-U did not operate in 2024. PPPL is engaged in a project to replace key NSTX-U components and systems to enable the operation of this international magnetic fusion user facility. In 2024, PPPL’s radiological environmental monitoring program measured tritium in the air at onsite sampling stations. Using highly sensitive air monitors, PPPL is capable of detecting small changes in the ambient levels of tritium. The operation of monitors located on D-site is used to demonstrate compliance with the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations. Also included in PPPL’s radiological environmental monitoring program, are water monitoring – ground, surface, and waste waters. PPPL’s radiological monitoring program characterized the background levels of tritium in the environment and those data are presented in this report. Ground water monitoring continued under New Jersey Department of Environmental Protection’s (NJDEP) Site Remediation Program regulations. PPPL monitored for nonradiological contaminants, mainly volatile organic compounds (components of common degreasing solvents). In 2024, PPPL complied with permit limits for surface water and sanitary wastewater discharges. PPPL was honored with an award for EPEAT-certified electronics purchasing from the Global Electronics Council on July 25, 2024.

54 ENVIRONMENTAL SCIENCES↗

2022 Annual Site Environment Report, Princeton Plasma Physics Laboratory

This report provides the U.S. Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2022 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2022. PPPL’s on-site operations started to be restored in 2022, following curtailments in 2020 and 2021 for the global coronavirus (COVID-19) pandemic. PPPL has engaged in fusion energy research since 1951 and at its current locations since 1958. The Laboratory’s mission is to develop the scientific knowledge and advanced engineering to enable fusion to power the U.S. and the world, and to develop the understanding of plasmas from the nano- to the astrophysical scale. PPPL’s primary experiment, the National Spherical Torus Experiment-Upgrade (NSTX-U) is a collaboration among national laboratories, universities, and national and international research institutions and is a major element in the US Fusion Energy Sciences Program. Its design tests the physics principles of spherical torus (ST) plasmas, playing an important role in the development of smaller, more economical fusion reactors. Due to previous operational issues, NSTX-U did not operate in 2022. PPPL is engaged in a project to replace key NSTX-U components and systems to enable the operation of this international magnetic fusion user facility. In 2022, PPPL’s radiological environmental monitoring program measured tritium in the air at onsite sampling stations. Using highly sensitive air monitors, PPPL is capable of detecting small changes in the ambient levels of tritium. The operation of monitors located on D-site is used to demonstrate compliance with the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations. Also included in PPPL’s radiological environmental monitoring program, are water monitoring – ground, surface, and waste waters. PPPL’s radiological monitoring program characterized the background levels of tritium in the environment and those data are presented in this report. Ground water monitoring continued under New Jersey Department of Environmental Protection’s (NJDEP) Site Remediation Program regulations. PPPL monitored for non-radiological contaminants, mainly volatile organic compounds (components of common degreasing solvents). In 2022, PPPL complied with permit limits for surface water and sanitary wastewater discharges. PPPL was honored with an award for EPEAT-certified electronics purchasing from the Global Electronics Council.

54 ENVIRONMENTAL SCIENCES↗

Brigham City Hydro Generation Project

Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and the U.S. Fish and Wildlife Services (USFWS) concurring with the National Environmental Policy Act of 1969 (NEPA) It was determined that Brigham City’s Upper Hydroelectric Power Plant upgrade would have no effect to federally listed or candidate species. However Brigham City has contributed a onetime lump sum towards Bonneville cutthroat trout conservation in the Northern Bonneville Geographic Management Unit with the intention to offset any impacts from the Upper Hydro Project needed to move forward with design and construction and is sufficient for NEPA compliance. No work was done in the river or river bank. During construction, the penstock was disconnected and water was diverted through and existing system around the powerhouse and back into the water system. The penstock, which is currently a 30-inch steel pipe, would be removed and replaced with a new section of 30-inch pipe. Brigham City worked with the DOE and was awarded a new modification and the permission to proceed with Phase III of our Hydro Project in Dec. 2013; with the exception to the modification of the award for the construction phase. Brigham City developed and issued a Request for Proposal for Engineer and Design vendor. Sunrise Engineering was selected for the Design and throughout the Construction Phase of the Upper Hydroelectric Power Plant. Brigham City conducted a Kickoff Meeting with Sunrise June 28, 2013 and received a Scope of Work Brigham City along with engineering firm sent out a RFP for Turbine, Generator and Equipment for Upper Hydro. We select Turbine/Generator Equipment from Canyon Industries located in Deming, WA. DOE awarded Brigham City a new modification and the permission to proceed with Phase III Construction of our Hydro Project. Brigham City Crews removed existing turbine/generator and old equipment alone with feeder wires coming into the building basically giving Caribou Construction an empty shell to begin demolition. Brigham City contracted with Caribou Construction from Jerome, Idaho for the Upper Power Plant construction. A kickoff meeting was June 24, 2014 and demolition was immediately started on building. Because of a delivery delay of Turbine, Generator and Equipment from Canyon Brigham City had to request another extension for the final date of completion. DOE awarded modification (.007) to Brigham City with a new completion date of August 1, 2015. The Turbine has had a few adjustments to help with efficiency; but the Generator had a slight vibration when generator got hot so Canyon Industries had U S Motor’s that manufactured the generator come to check out the issue. The other Equipment seems to be running normal. Brigham City, Sunrise Engineering and Canyon Industries met to determine what the vibration in the generator was and how to solve the issue Us Motor’s found some welds that failed: they have been repaired. U S Motor’s delivered the repaired generator Feb. 17, 2015. Canyon Industries arranged for a crane to installed generator in Power Plant. U S Motor’s balanced and wired generator. Plant Operators put the generator back on line. Canyon Industries returned and gave their approval to keep Hydro online. After Hydro was put back into operations it kept going off line because of overheating issues. Canyon Industries returned and replaced sensors and adjusted them to the proper settings for normal operations. Brigham City added additional steel screens to windows to increase air flow in Power Plant Building. After construction phase of the Upper Hydro Plant some landscaping has been restored around the building additional gravel brought in and leveled out and the road that was cut through for conduits to run wires. A retaining wall was installed to protect penstock. The Upper Hydro Plant is complete and in full operations. The final reimbursement was submitted.

13 HYDRO ENERGY↗